Page 1: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate

Advisor: Jörg Fenske, Dipl.-Ing.

1

Technologies and Solutions for modern railways

www.porr.ro PORR Construct SRL - Gigi Gavrilla

Page 2: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

Technologies and Solutions for modern railways

2

• Introduction of PORR Group

• Slab track system

• Anchored High Performance Netting

Overview

Page 3: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

PORR - Group

• Leading Austrian construction company

• 140 years of tradition

• 11,880 staff and skilled workers in 16 countries

• 2,9 Billion Euro gross revenue per year

• All-in-one: Investor, Planner, Constructor, Operator

Technologies and Solutions for modern railways

Page 4: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

4

PORR in Europe

Technologies and Solutions for modern railways

Page 5: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

5

Structure of PORR Group

*) Industrial leadership

Technologies and Solutions for modern railways

Page 6: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

6

PORR – Tunnel Construction

Technologies and Solutions for modern railways

Page 7: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

7

PORR – Bridge Construction

Technologies and Solutions for modern railways

Page 8: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

8

PORR – Rail Construction

Technologies and Solutions for modern railways

Page 9: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

9

PORR Construct SRL - Romania

Technologies and Solutions for modern railways

current projects in progress

• JV Arad Bypass – highway construction• Campina-Predeal Section – railway construction• JV Petrobrazi – railway construction

• Alpha Windpark Casimcea - civil construction

• Bioremediation Plants - environmental construction• Landfills - environmental construction• Gura Humorolui Ski Slope - earth / civil construction• Vatra Dornei Ski Slope - earth / civil construction• Rachitele turistic access - road construction• …etc.

Page 10: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

10

PORR – Slab Track Systems

Technologies and Solutions for modern railways

Page 11: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

11

Slab track system – Why ???

Construction (space requirements,...)

Method (sensitivity of laying,...)

Quality (track set, acoustics,...)

Economy

Technologies and Solutions for modern railways

Page 12: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

12

Slab Track

Slab track system - Track Alignment Quality

Technologies and Solutions for modern railways

Page 13: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

13

Austria – Tauern Tunnel

• 10 km of slab track• In tunnel• Reduction of track gradient• Increased tunnel clearance

• Construction during single-track operation

Slab track projects

Technologies and Solutions for modern railways

Page 14: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

14

Austria – Arlberg Tunnel

• 20.8 km of slab track

• Double track old tunnel • 3.5m between track

centerlines • Widening tunnel

clearance

• Installation water supply line

• Track accessible for emergency road vehicles

Slab track projects

Technologies and Solutions for modern railways

Page 15: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

15

• Slab track system provider since 1989

• 18 projects at approx. 70 km mass-spring systems

• 30 slab track projects at over 270 km total length

• Approx. 120 turnouts in slab tracks

• 50 track interface constructions at bridge joints

• Slab track in tunnels / on bridges / on open land

• 6 rail expansion joints in slab track

• Slab track for heavy rail / urban railway / subway

Technologies and Solutions for modern railways

Slab track system - Experience

Page 16: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

16

Slab track system - Advantages

Large openings possible

Even surfaced concrete quality

Little reworking

High added value

High degree of prefabrication

High early strength of SCC

Great driving comfort

Small construction dimensions

Low maintenance

Repair and replacement plan

High track precision

Structural-born noise and vibration control

Fast installation

Settlement adjustments possible

Technologies and Solutions for modern railways

Page 17: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

17

Technologies and Solutions for modern railways

Slope protection – Anchored Netting

Page 18: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

18

• Elastic-plastic Deformation

• Requires FE-Analysis

• Requires Certifications

• Future with pretensionedanchor systems

Technologies and Solutions for modern railways

Slope protection – Anchored Netting

Page 19: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

19

Technologies and Solutions for modern railways

Slope protection – Anchored Netting

Page 20: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

20

Seeding and plants structure

Low rate of work sequences

No limitation on slope surfaces

No limitation an anchor

systems

Low weight of material

Flexible System

Structural-born low construction costs Fast installation

Environmental Protection

Technologies and Solutions for modern railways

Anchored Netting - Advantages

Page 21: Www.porr.ro 29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies

www.porr.ro

29/09/2011

Bucuresti

21

Thank you for your attention!

Technologies and Solutions for modern railways