www.balticbiogasbus.eu1 aims, objectives and achievements regional seminar tartu 23-24 of march 2011...
TRANSCRIPT
![Page 1: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/1.jpg)
www.balticbiogasbus.eu 1
Aims, objectives and achievementsRegional Seminar Tartu
23-24 of March 2011Lennart HallgrenProject Manager
![Page 2: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/2.jpg)
www.balticbiogasbus.eu 2
The Project: Baltic Biogas Busis a part of the solution A project to stimulate the use of biogas as fuel for city buses aiming to reduce environmental impact.
![Page 3: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/3.jpg)
23-04-19 www.balticbiogasbus.eu 3
BBB is a part of the EU Climate Change StrategyExtended use of Biogas buses in public transport will
- lower emissions
- improve urban air quality
- strengthen the role of public transport
- create energy autonomy
Photo: SL/Mikael Hedlund
![Page 4: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/4.jpg)
www.balticbiogasbus.eu 4
Goals and budget
• Generate regional strategies for biogas bus operations
• Developments in production, distribution and operations
• Disseminate biogas potential
• Period: 2009–2012.• Budget: 4,2 MEUR.• Financing: Partly by the EU
fund (ERDF)
A Pan-Baltic project within the Baltic Sea Region Programme
2007-2012
![Page 5: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/5.jpg)
www.balticbiogasbus.eu 5
12 partners around the Baltic Sea
SL, Stockholm Public Transport, SwedenBiogas East, Energy Agency Malardalen
Ruter, Public Transport for Oslo and Akershus, NorwayHOG Energy, the fuel interest organisation for Bergen region Hordaland County Council, Skyss
VTT Technical Research Centre, Finland
Tartu city, Estonia
Riga City, Latvia
Buses of Kaunas city, Kauno Autobusai, Lithuania
MTI, Motor Transport Institute, Poland ATI erc Education, Research and Furtherance of Cooperations,
GermanyITC Innovations and Trendcenter
![Page 6: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/6.jpg)
23-04-19 www.balticbiogasbus.eu 6
A project with several steps
WP3 Policies & Strategies
WP4 Biogas Supply
WP5 Distribution and bus
depots
WP6 Biogas buses
WP2 Communication
For efficient use of biogas buses
we work with:
![Page 7: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/7.jpg)
Some results • Strategies and policies (WP3)
- Strategies introduce Biogas buses
- Oslo, 14 buses, Ruter
- Stockholm, 160 buses, SL
- Bergen , 70 buses, HOG & Skyss
- Traffic plan, Tartu City
- LCCA analysis, VTT
- Biogas market
- Regulations affecting Intro. Biogas
- Internat. Seminar S:t Petersburg
- Discussions with decision makers in Germany and Poland, ATI, MTI
![Page 8: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/8.jpg)
23-04-19 www.balticbiogasbus.eu 8
![Page 9: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/9.jpg)
Some results • Strategies and policies (WP3)
- Strategies introduce Biogas buses
- Oslo, 14 buses, Ruter
- Stockholm, 160 buses, SL
- Bergen , 70 buses, HOG & Skyss
- Traffic plan, Tartu City
- LCCA analysis, VTT
- Biogas market
- Regulations affecting Intro. Biogas
- Internat. Seminar S:t Petersburg
- Discussions with decision makers in Germany and Poland, ATI, MTI
![Page 10: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/10.jpg)
Biogas buses in Bergen
![Page 11: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/11.jpg)
Process framework
www.balticbiogasbus.eu 11
1) Understanding the decision making process
2) Goal and goal scenarios
3) Insight and documentation
4) Communication
5) Creating and developing alliances
![Page 12: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/12.jpg)
Conclusion from HOG Energi’s work in Bergen
Decision from Hordaland County Council: •75 new gas buses to be purchased in Bergen•Climate Plan for Hordaland county states that use of biogas and other renewable energy sources will be increased towards 2020. Biogas will be a priority in public transportation
Decision from Bergen City Council:•Produced biogas from Rådalen production facility shall be used in the public transport sector
www.balticbiogasbus.eu 12
![Page 13: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/13.jpg)
Some results • Strategies and policies (WP3)
- Strategies introduce Biogas buses
- Oslo, 14 buses, Ruter
- Stockholm, 160 buses, SL
- Bergen , 70 buses, HOG & Skyss
- Traffic plan, Tartu City
- LCCA analysis, VTT
- Biogas market
- Regulations affecting Intro. Biogas
- Internat. Seminar S:t Petersburg
- Discussions with decision makers in Germany and Poland, ATI, MTI
![Page 14: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/14.jpg)
www.balticbiogasbus.eu 14
Strategies for Tartu City
• Transport development plan 2012-2020• Research for potential biogas production,
distribution and usage• Feasibility study of biogas buses• Awareness, dissemination of the potential for
sustainablecity transports and biogas
![Page 15: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/15.jpg)
Life cycle costs analysisBiogas Generation
-investment~5 M€
-specific cost21 €c/km
cumulative21 c/km
Upgrading
- investment~2 M€
- specific cost7 €c/km
cumulative28 c/km
Distribution20 km
- by vehicle CBG 3 €c/km
cumulative31 c/km
Refilling2 ∙ 50 buses
- investment~2.4 M€
- specific cost18 €c/km
cumulative49 c/km
Diesel
- investment~230 k€
- specific cost59 €c/km
cumulative104 c/km
Bus usage
Biogas
- investment~270 k€
- specific cost70 €c/km
cumulative119 c/km
Diesel production, refining, distribution and refilling specific cost 45 €c/km
Cost of biomethane as fuel approx. 14 % higher than diesel, immature market
![Page 16: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/16.jpg)
Greenhouse gas emissions Well-to-wheel, according to the RES directive
• WTT = Well-to-tank = from biogas generation to refilling• TTW = Tank-to-wheel = from bus usage
Specific emissions of well-to-wheel chain for natural gas, diesel and biomethane made from different substrates
0
500
1000
1500
2000
2500
3000
Municipalwaste
Wet manure Dry manure Natural gas Diesel
g C
O2e
q/k
m
TTW
WTT
![Page 17: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/17.jpg)
How to start a Biogas Market for traffic operators?
• Studies of biogas possibilities in the Stockholm region
• Co-operation between biogas producers and distributers
• Contracts• Operation• Legal agreements• Procurment
www.balticbiogasbus.eu 17
![Page 18: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/18.jpg)
www.balticbiogasbus.eu 18
Some results
• Supply of Biogas (WP4)
- Potential of biogas in the Baltic Sea region - Landfill study, a general
calc. model - Biogas with Hydrogen (ATI) - Supply and demand in
eastern Sweden - Baltic Biogas Foresight (MTI)
Biogas is the only commercially
available 2nd generation bio fuel
Photo: SL/Jan E Svensson
![Page 19: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/19.jpg)
Aim of StudyDevelop a knowledge base on biogas infrastructure in BSR countries in a manner that is useful to identify the influence that existing and planned infrastructure have on introduction of biogas as a transport fuel in BSR countries.
Objectives• Study biogas infrastructure overview
• Map biogas production and distribution
• Analyze the influence of infrastructure on introducing biogas as a vehicle fuel
•Discuss barriers and opportunities to promote biogas
09-11-2010www.balticbiogasbus.eu
![Page 20: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/20.jpg)
Approx. 4480
1,374 Ktoe
11,450+ Ktoe
Germany
Number of Plants
Installed capacity
Potential
09-11-2010www.balticbiogasbus.eu
Major biogas plants and natural gas grids
![Page 21: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/21.jpg)
8
5+ Ktoe
350+ Ktoe
Estonia
Number of Plants
Installed capacity
Potential
09-11-2010www.balticbiogasbus.eu
Major biogas plants and natural gas grids
![Page 22: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/22.jpg)
Per capita biogas production (kg of oil equivalent)
09-11-2010www.balticbiogasbus.eu
![Page 23: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/23.jpg)
Country plants Utilization
Sweden 39 82% vehicle fuel18% gas grid
Norway 3 66% vehicle fuel 34% gas grid
Finland 1 pilot plant 100% vehicle fuel
Germany 35 9% vehicle fuel91 % gas grid
Biogas upgrading plants in BSR countries
09-11-2010www.balticbiogasbus.eu
![Page 24: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/24.jpg)
Gas filling stations in BSR countries
09-11-2010www.balticbiogasbus.eu
![Page 25: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/25.jpg)
www.balticbiogasbus.eu 2525
• Landfill gas production
• Waste management sector
and transport sector co-
operation
• Biogas systems
• New upgrading technique
• Biogas transport, storage
and fuelling
Landfill Gas
![Page 26: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/26.jpg)
www.balticbiogasbus.eu 2626
Production potential for biogas in eastern part of Sweden
• Draft Study compiles
results from earlier
reports
• Biogas Potential;
apr. 15 TWh/year
• Current production;
apr. 0,5 TWh/year
![Page 27: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/27.jpg)
www.balticbiogasbus.eu 27
• Study with references to earlier
studies
• Definitions to separate SL
potential from the Regional
potential
• Production stability
• Economy
Biogas potential for Public Transport in Stockholm, 2010 -2020.
![Page 28: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/28.jpg)
www.balticbiogasbus.eu 28
Some results
• Biogas distribution (WP5)
- Regional distribution planning
- Fuelling systems, SL- Design bus depots for biogas- Biogas Cartridge systems, ATI
- CNG filling station and bus depot in Tartu, feasibility study
- Feasibility study, Rzeszow
Biogas is the only commercially
available 2nd generation bio fuel
Photo: SL/Jan E Svensson
![Page 29: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/29.jpg)
www.balticbiogasbus.eu 2929
• Demonstrate distribution planning
with Stockholm region as case
study
• Distribution techniques: pipeline
network, compressed gas in
bottles and liquefied gas
distribution.
• Comparison between different
distribution techniques based on
technical, economical and
environmental comparisons
Integrated regional distribution infrastructure planning
![Page 30: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/30.jpg)
www.balticbiogasbus.eu 30
Future gas grid distribution of biogas in Stockholm
![Page 31: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/31.jpg)
www.balticbiogasbus.eu 3131
• Build up of a biogas
fuelling system
• Fuelling systems compared
by costs, safety, fuelling
time and environment
aspects for
• Fast filling
• Slow filling
• SL’s bus depots and
fuelling systems
• Operational experiences
Analyse fuelling system alternatives
![Page 32: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/32.jpg)
32
Fuelling systems for biogas
Fast fuelling dispenser Slow fuelling by ramp
![Page 33: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/33.jpg)
www.balticbiogasbus.eu 3333
• Design of new bus depots
• Which existing depots are
most suitable to convert to
biogas?
• Design of new depots and
adapt existing depots
• Mobile modular fuelling
station (Investment)
Design for new bus depots and adapt existing depots for biogas buses
![Page 34: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/34.jpg)
34
Gubbängen Bus Depot
![Page 35: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/35.jpg)
Some results• Communication &
dissemination
- www.balticbiogasbus.eu (WP2)
- Show rooms, folder, posters …..
- Events/Regional seminars
Tartu, Launch Event, Dec 2009
Oslo – March 2010
Kaunas – Sept 2010
Rostock – Oct 2010
Uppsala – Nov 2010
S:t Petersburg - Nov 2010
Riga – Dec 2010
Tartu – March 2011 ………
![Page 36: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/36.jpg)
www.balticbiogasbus.eu 36
Our core messages
• Biogas is almost 100 percent renewable
• Biogas is a very efficient fuel
• Biogas will improve urban air quality
• Biogas is produced locally, improves energy autonomy
![Page 37: Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager](https://reader035.vdocuments.us/reader035/viewer/2022070323/56649da35503460f94a90262/html5/thumbnails/37.jpg)
www.balticbiogasbus.eu 37
Baltic Biogas Bus Project2009–2012
For further information please contact:
Lennart Hallgren, Stockholm Public [email protected]