www. hawktechnologyllc · 2020. 8. 19. · •besiktas auditorium of bahcesehir university, 2004...
TRANSCRIPT
![Page 1: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/1.jpg)
About HAWK Technology LLC
HAWK Technology LLC has been established by: • B.Sc. Mohamed Al Hameli (Marryville University, St.
Louis, USA • M.Sc.EE Çınar KURRA (University of Evansville,
Evansville and Illinois Institute of Technology, Chicago, USA)
at April 2011 in Abu Dhabi, UAE.
www. hawktechnologyllc.com
![Page 2: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/2.jpg)
dB-KES Ltd. Co. has been established by: • M.Sc.ME Ferit BONFIL (Institut National des
Sciences Appliquées, Fransa) • M.Sc.EE Çınar KURRA (University of
Evansville and Illinois Institute of Technology, USA)
at September 2000 in Istanbul.
www. dbkes.com
About dB-KES
![Page 3: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/3.jpg)
About HAWK Technology LLC
HAWK Technology LLC, located in Abu Dhabi, U.A.E. is sister company with dB-KES which is located in Istanbul, Turkey.
Prof. Dr. Selma Kurra is our official consultant in all our acoustical projects .
Important Remarks…
![Page 4: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/4.jpg)
Our companies focuses on below fields
• Architectural acoustics • Environmental acoustics • Naval acoustics
• Mechanical vibration
• Measurements of sound, noise and vibrations
(continuous monitoring) • Predictive maintenance projects
![Page 5: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/5.jpg)
SALES
![Page 6: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/6.jpg)
• 01dB-Acoem; Sound and Vibration Measurement Systems
• Polytec GmbH; Vibration Measurement Systems by Laser
• Datakustik; Noise Mapping and Building Acoustics Software
• Sonimtech; Mobile devices • Viewsonic; Mobile devices • Push to Talk International Co.; PTT Services
dB-KES is the exclusive distributor of:
![Page 7: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/7.jpg)
dB-KES is the 3rd Party Solution / Service Provider for:
• TURKCELL (EU 3rd Largest GSM Operator) • KKTCELL (Northern Cyprus Only GSM Operator) • AVEA (TR 2nd Largest GSM Operator) • STM for Turkish Naval Forces • HEAŞ : Sabiha Gökçen Airport • TOYOTA
![Page 8: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/8.jpg)
Sound & Vibration Measurement Systems & Equipment
![Page 9: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/9.jpg)
EQUIPMENT LIST • 01dB, dB4, 4 Channel data acquistion system (x 1) • 01dB, NetdB, 12 Channel data acquisition system (x 1) • 01dB, Blue Solo, 1 Channel portable noise level meter (x 5) • 01dB, CAL21 Calibrator for microphone (x 2) • 01dB, CAL01 Calibrator for microphone (x 1) • GRAS, MCE212 Type 1 microphone (x 5) • 01dB, WED007 Dosimeter (x 1) • 01dB, dBLEXD Dosimeter Analysis SW • 01dB, dBTRIG Online measurement SW • 01dB, dBTRAIT, Noise Analysis SW • 01dB, dBFA, Industrial Noise and Vibration Analysis SW • PCB, IMPACT HAMMER (x 1) • POLYTEC, PDV100, Laser Vibration Measurement System (x 1) • 01dB, Dodeca, 10 Way Loudspeaker for Building Acoustics (x 1) • 01dB, dBBATI, Building and Hall Acoustics SW • DATAKUSTIK, CADNA, Noise Mapping SW • DATAKUSTIK, BASTIAN, Noise Insulation Calculation SW • F-MULAY, Sound Absorption SW (written by Prof. Dr. S. Kurra) • ODEON, Acoustical Simulation SW • Various amplifiers, tripods, preamps, cables (BNc and LEMO)
![Page 10: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/10.jpg)
Vibration Measurement Systems by Laser
Laser Vibration Measurement Systems
![Page 11: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/11.jpg)
SOUND AND VIBRATION
MEASUREMENTS AND
PROJECTS
![Page 12: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/12.jpg)
Building Acoustics Measurements
![Page 13: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/13.jpg)
Environmental Noise Measurements
![Page 14: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/14.jpg)
Applications: • Noise and vibration control projects and consultancy • Analysis and solutions for industrial noise and
vibration problems in environment and industry • Noise mapping (Transportation sources and industry)
• Hall and studio acoustics analysis and design and
evaluation of existing halls & modifications
• Implementation and construction practices based on the acoustical projects
![Page 15: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/15.jpg)
Noise and Vibration Measurements On The Field
![Page 16: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/16.jpg)
Baku Traffic Noise Measurements H. ALIYEV CULTURAL CENTER
![Page 17: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/17.jpg)
Ch. 1 [Instantaneous] Hz dB630 68.9
20
30
40
50
60
70
80
16 31.5 63 125 250 500 1 k 2 k 4 k 8 k 16 k
Lin* 78.7
Lin* Ec*
Ch. 1 Leq 100ms A dBWED 17/05/06 18h41m43s600 63.4 WED 17/05/06 18h47m57s200
50
55
60
65
70
75
80
85
90
18h40 18h42 18h44 18h46 18h48 18h50 18h52 18h54
Ch. 1 [Average] Hz dB630 59.7
30
40
50
60
70
16 31.5 63 125 250 500 1 k 2 k 4 k 8 k 16 k
Lin* 70.7
Lin* Ec*
Ch. 1 Leq 100ms A dBWED 17/05/06 20h15m27s000 67.5 WED 17/05/06 20h19m46s100
50
55
60
65
70
75
80
85
90
20h16 20h17 20h18 20h19
Noise and Vibration Analysis
![Page 18: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/18.jpg)
BORUSAN PIPE HOT MILL TESTING
ARCELIK WASHING MACHINE MOTORS TESTING
WARSHIP TESTING
BORUSAN LARGE PIPE TESTING
TOYOTA CLICKCHECK PROJECT
![Page 19: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/19.jpg)
Vibration Measurements and Analysis
Vibration Sources: Everything
that moves
![Page 20: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/20.jpg)
![Page 21: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/21.jpg)
Industrial Vibration Control Projects
• Arçelik Çerkezköy Electric Motors Production Factory : Continuous vibration measurements and quality control systems
• Milgem Istanbul Naval Shipyard Project Office: The New
Frigade (98m.) vibration control and monitoring project. • Borusan-Mannessman and Asil Çelik Gemlik Factories;
Steel pipe productions length measurements via Polytec Laser Vibrometer systems. (Hot and Cold Mill applications)
![Page 22: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/22.jpg)
ARCELIK DRYER MOTORS TESTING BORUSAN MFCT TESTING
FICOSA BMW SIDE MIRROR MOTOR TESTING UMRAN PIPE MFCT TESTING
![Page 23: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/23.jpg)
ASIL STEEL CO. SYSTEM SET UP
ASIL STEEL CO. HOT MILL BEAM TESTING
ASIL STEEL CO. COLD MILL BEAM TESTING
![Page 24: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/24.jpg)
• Matay Otomotiv; Noise and vibration control for exhaust systems R&D department.
• Toyota Türkiye A.Ş.; Acoustical quality control
system on the production line for new Verso and Auris models.
• BOSCH; Vibration measurements on the
production line for diesel injectors • Engineering of Defence Technologies (STM) –
Milgem; Special Design for vibration analysis quality control software
![Page 25: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/25.jpg)
HALL ACOUSTICS PROJECTS
![Page 26: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/26.jpg)
• Computer simulation for hall and auditorium acoustics • Evaluations of room acoustics parameters • Analysis of sound fields (geometrical, acoustical and
audial) • Conducting acoustical projects (all architectural details) • Stage design • Design of electroacoustic systems in halls • Acoustical design of studios (TV, radio, film etc) • Active system design for speech privacy in office
buildings
Hall Acoustics Projects
![Page 27: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/27.jpg)
Hall acoustics: Form, shape, material selection and layout
![Page 28: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/28.jpg)
Harbiye Cultural Center, ISTANBUL, TURKEY
![Page 29: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/29.jpg)
T SabinegfedcbT EyringgfedcbT Arau-Puchadesgfedcb
Quick estimated reverberation times (modified)
Frequency (Hz)
63 125 250 500 1000 2000 4000 8000
RT
(seconds) 1,5
1
0,5
0
Odeon©1985-2008 Licensed to: Bahcesehir University, Turkey
Harbiye Cultural Center
![Page 30: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/30.jpg)
SÝM.10 SÝM.11 SÝM.12SÝM.7 SÝM.8 SÝM.9
D2d2
D2d2
D2d2
HAREKETLI BOLUCU
PANONUN YERINE KARAR
VERILECEKTIR
SALON GIRISI
AKUSTIK TAMPON ALAN
(TUM IC YUZEYLERDE SES
YUTUCU YUZEY
KAPLAMALARI
UYGULANACAKTIR.)
D2c
YANSITICI HAREKETLI SAHNE PANOLARI
C1,D5c1
D2a
D2c
D6
D2c
AR
KA
DU
VA
R Y
UZE
YI T
UM
UYL
E SE
S YU
TUC
U M
ALZ
EMEY
LE K
AP
LAN
AC
AK
TIR
(MA
LZEM
E TI
PI V
E K
ON
STR
UK
SYO
NU
DA
HA
SO
NR
A V
ERIL
ECEK
TIR
)
D5b
D2b D6
D2a
D2a
D1b
D1b
D5c1D2d2
D2d2
D2d2
D2cD2c
D2a
D6
D2c
D5b
D2a
D2a
D2c
DOS1
SIMULTANE ODALARI ALTINDA KALAN PLAN DUZLEMI.
PERFORMANS DURUMU (SAHNE TIPI 1)
DOS3DOS3
D2c
SES YALITIMLIKAPI(RwC: 55)
SES YALITIMLIKAPI(RwC: 45)
SES YALITIMLI KAPI(RwC: 55)
SES YALITIMLI KAPILAR(RwC: 55)
SES YALITIMLIKAPILAR(RwC: 45)
SES YALITIMLIKAPILAR(RwC: 45)
SES YALITIMLI KAPILAR(RwC: 55)
SALON GIRISI
AKUSTIK TAMPON ALAN
(TUM IC YUZEYLERDE SES
YUTUCU YUZEY
KAPLAMALARI
UYGULANACAKTIR.)
SALON GIRISI
AKUSTIK TAMPON ALAN
(TUM IC YUZEYLERDE SES
YUTUCU YUZEY
KAPLAMALARI
UYGULANACAKTIR.)
SALON GIRISI
AKUSTIK TAMPON ALAN
(TUM IC YUZEYLERDE SES
YUTUCU YUZEY
KAPLAMALARI
UYGULANACAKTIR.)
SAHNEYE CIKIS MERDIVENI PLATFORM
ICINDE TASARLANACAKTIR.
CAM CAM CAM
CAM CAM CAM
PERFORMANS DURUMUKESIT
KENDILIGINDENKAPANABILIR KAPAK
100mm ARALIK
100mm ARALIK
1
23
4
5
NOT: YANSITICI AKUSTIK SAHNE PANOLARININ ARASINDA DEKORVEYA ISIKLIKLAR ICIN KIRISLER DE GOZETILEREK 5 AYRI ARALIKTASARLANMISTIR, PANOLAR KALDIRILDIGINDA ISE ISTENILDIGIKADAR INIS YAPILABILIR.
T2a T2b
T3
T4T5
T6 T7 T8 T8 T8T9a
T9bT9c
50mm DUZELTME SAPI100 mm HAVA BOSLUGU ICINDE MIN. 50mm TASYUNU LEVHA 70kg/m3
1 mm CELIK TRAPEZ100 mm IZGARA DEMIRLI BETON
OZEL TITRESIM YALITICISI
TA1a
DOS 1
DEKORASYON PROJESINE BAGLI OLARAK BU DETAYTAVANIN TUM DUZ KISIMLARINDA KULLANILABILIR.
TA1aTA1TA1
KECE VEYA SIKISTIRILMIS TASYUNU VEYA MINERAL LIFLI LEVHA
NOT: BU BOLUMDE YALITIMLI TAVAN YUKSELTILEBILIR.
D1b
DOS 3
SES YALITIMLI DOSEME DETAYICELIK KONSTRUKSIYONUNBELIRLENMESINDEN SONRAVERILECEKTIR.
DOS 3DOS 1
D2b D6
HALI 10mmMDF 20mmTASLIFI LEVHA 20mmMDF 20mmCELIK TASIYICI(BOSLUKTA TAS YUNU 100mm)
BOSLUK VE TASYUNU 50mmVINIL LEVHA 5mmAHSAP YANSITI TAVAN PANOSU(YUZEYINBICIMI DAHA SONRA BELIRLENECEKTIR)
PERFORE PANEL 5mm
TASYUNU DOLGU
ALCIPAN LEVHA 12.5mm
PERFORE PANEL 5mm
TASYUNU DOLGU
AKUSTIK SIVA
AKUSTIK SIVA
a
a a a
TAVAN PANOSU AYDINLATMA ARMATURLERI ICINDELINDIGINDE ARKADA SES YALITIMLI KUTULAROLUSTURULACAKTIR.
NOT: IMF TOPLANTISI DURUMUNDA T1, T2, T3 PANOLARININ KONUMLARIDEGISECEKTIR(BU PANOLARIN KONUMLARI DAHA SONRA VERILECEKTIR). T4, T5, T6PANOLARININ SABIT TUTULMASI ISTENDIGINDE EN IYI KOSULDA DOGAL SES 40m`YE KADARULASMAKTADIR. GERCEKTE IMF TOPLANTISINDAN SONRA PERFORMANS DURUMUDARALTILMIS SAHNE ILE KONFERANSLAR ICIN DE RAHATLIKLA KULLANILABILIR.
Harbiye Cultural Center
![Page 31: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/31.jpg)
Heydar Aliyev Cultural Center BAKU AZARBAIJAN ARCHITECT : ZAHA HADID
![Page 32: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/32.jpg)
P3
O
X
YZ
P3
P1
P2P3P6P7P8
P9 P10 P11P12
P13
P14P15 P16P17P18
P19P20
P22P23P24P30P31P32
SPL(Lin) 1000 Hz 88.3
87.1
85.8
84.4
83.2
81.8
80.6
79.3
77.9
76.7
75.3
74.1
72.8
71.4
70.2
68.8
67.6
66.3
64.9
63.7
62.4
61.0
59.8
58.5
57.2
55.9
54.5
53.3
52.0
50.7
49.4Odeon©1985-2008 Licensed to: Bahcesehir University, Turkey
Heydar Aliyev Cultural Center
With Loudspeakers On
![Page 33: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/33.jpg)
P3P3P6P7P8P9 P10P11P12
P13
P14P15 P16P17 P18P19P20
P22P23P24 P30P31P32
0.94
0.88
0.83
0.79
0.74
0.69
0.63
0.59
0.54
0.49
0.44
0.39
0.34
0.29
0.24
0.19
0.14
0.09
0.04
STI >= 0.99
<= 0.01Odeon©1985-2008 Licensed to: Bahcesehir University, Turkey
Heydar Aliyev Cultural Center
Natural Acoustics Analysis and Design
![Page 34: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/34.jpg)
Heydar Aliyev Cultural Center
Diffuser Design at Side Walls
![Page 35: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/35.jpg)
T30,63=2.03 s
T30,125=2.00 s
T30,250=1.12 s
T30,500=0.88 s
T30,1000=0.99 s
T30,2000=1.15 s
T30,4000=0.99 s
T30,8000=0.59 s
Estimated global reverberation times (Source 1, 19179 rays used)
Estimated room volume:77586.99 m³
Time (seconds)
21.81.61.41.210.80.60.40.20
SP
L (
dB
)
0
-10
-20
-30
-40
-50
Antalya Airport Indoor Acoustics Design, ANTALYA, TURKEY
![Page 36: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/36.jpg)
Antalya Airport Indoor Acoustics Design
![Page 37: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/37.jpg)
T Sabine
T Eyring
T Arau-Puchades
Quick estimated reverberation times (classic)
Frequency (Hz)
63 125 250 500 1000 2000 4000 8000
RT
(seconds)
3
2.5
2
1.5
1
0.5
0
Antalya Airport Indoor Acoustics Design
![Page 38: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/38.jpg)
Applications:
• Bodrum Cultural Center , 2000 • Izmit Suleyman Demirel Cultural Center ,1998 • Yesilkoy Mydonose Showland,2001 • Mine Erkaya Music Studio and Improvement Project, 2004 • Besiktas Auditorium of Bahcesehir University, 2004 • Heydar Aliyev Convention Center Acoustical Project, 2009 • Harbiye Kültür Merkezi Multipurpose Hall,2007 • Gaziantep Sanko College Cultural and Sports Center -
Acoustical project, 2005 • Bay Hotel Conference Hall Acoustic Project, 2006 • Antalya Airport International Terminal Building Acoustical
Project, 2006 • Şişhane Metro Station Acoustical Project”, 2007
![Page 39: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/39.jpg)
Bahcesehir University Auditorium Indoor Acoustics Design
![Page 40: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/40.jpg)
Ankara Opera binası
Odeon©1985-2009 Licensed to: Bahcesehir University, Turkey
Odeon©1985-2009 Licensed to: Bahcesehir University, Turkey
Ankara Opera Hall
![Page 41: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/41.jpg)
P1P1
P2 P3
P4
1.56
1.51
1.46
1.41
1.36
1.31
1.26
1.21
1.16
1.11
1.06
1.01
0.96
0.91
0.86
0.81
0.76
0.71
0.66
T30 at 1000 Hz >= 1.61
<= 0.63Odeon©1985-2009 Licensed to: Bahcesehir University, Turkey
OX
Y
Z
P1
P2 P3
P4
12
34
5
P1
Odeon©1985-2009 Licensed to: Bahcesehir University, Turkey
Muhsin Ertuğrul Theatre, ISTANBUL
![Page 42: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/42.jpg)
RT Hz s Correlation16
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
16 31.5 63 125 250 500 1 k 2 k 4 k 8 k 16 k
16Hz
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
31.5Hz RT = 0.53 s
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
63Hz RT = 0.86 s
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
125Hz RT = 0.62 s
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
250Hz RT = 0.47 s
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
500Hz RT = 0.31 s
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
1 kHz RT = 0.27 s
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
2 kHz RT = 0.31 s
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
4 kHz RT = 0.27 s
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
8 kHz RT = 0.22 s
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
16 kHz
20
25
30
35
40
45
50
55
60
65
70
75
0.0 0.5 1.0 1.5
M.Coşar Recording Studio Acoustics Measurements
[ID=14] Background noise Hz;(dB[2.000e-05 Pa], PWR) 50 38.3 100 24.2
10
15
20
25
30
35
40
45
50
16 31.5 63 125 250 500 1 k 2 k 4 k 8 k 16 k
A* 42.0
A* Ec*
Reverberation Time
![Page 43: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/43.jpg)
Bay Otel Conference Room Acoustics Project, ISTANBUL
![Page 44: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/44.jpg)
Gaziantep Sanko Multipurpose Hall, GAZIANTEP, TURKEY
![Page 45: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/45.jpg)
NOISE MAPPING PROJECTS
![Page 46: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/46.jpg)
Noise Mapping Applications: • Noise Mapping and Barrier Design for Trans-
European Motorways in Istanbul • Macka Square Noise map • Barbaros Avenue Yildiz section • Beşiktaş Ciragan Street • E5 (O1) Highway Sisli section • 4.Levent- TEM Connection road and barrier design
(2003) • Istanbul Bosphorus Bridges and Highway connections • Besiktas Square • Buca Municipality (İzmir)
![Page 47: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/47.jpg)
Noise Mapping
• Preparation of noise maps in accordance with EU Directive 49/EC for airports, highways, railroads and industrial buildings by using CADNA-A computer model.
Airport noise map samples (from other sources)
![Page 48: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/48.jpg)
Istanbul Sabiha Gokcen Airport Noise Monitoring System Set Up by dBKES - Hawk
SGA
![Page 49: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/49.jpg)
Traffic Noise Maps
TEM (Trans European Motorway)
![Page 50: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/50.jpg)
Various Noise Maps
![Page 51: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/51.jpg)
Industrial Noise Mapping
![Page 52: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/52.jpg)
Noise Mapping Projects; Besiktas District - Istanbul
![Page 53: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/53.jpg)
Noise Mapping Projects; Buca District - Izmir
![Page 54: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/54.jpg)
Design of Noise Barriers using CADNA SW DATAKUSTIK
![Page 55: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/55.jpg)
Noise Barrier Applications
![Page 56: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/56.jpg)
NOISE CONTROL AND
SOUND INSULATION
PROJECTS
![Page 57: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/57.jpg)
Sound Insulation
![Page 58: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/58.jpg)
Sound Insulation Design by Bastian SW DATAKUSTIK
![Page 59: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/59.jpg)
• Solutions for noise and vibration control according to ISO standards and the EU Norms.
• Evaluation of environmental noise pollution • Transportation noise control (i.e. road traffic noise,
aircrafts and airports, railway noise) • Industrial noise control systems • Acoustic solutions for office buildings
Noise Control Projects
![Page 60: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/60.jpg)
Noise Control Projects
• Speech privacy systems for open plan office spaces
• Sound insulation solutions for schools, hospitals, residential buildings and other noise sensitive spaces
• Noise and vibration control for mechanical rooms • Noise control for HVAC, sanitary and electrical systems
in buildings
![Page 61: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/61.jpg)
Noise Control Projects
• Solutions for entertainment noise problems (open air and indoor spaces)
• Design of noise barriers (for highways,etc) • Design of partial or complete enclosures for industrial
noise sources
![Page 62: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/62.jpg)
• Marriot Hotel (Halkalı) • Bay Hotel (Kadıköy) • Macka Hotel (Nisantasi) • Hyatt Hotel (Taksim) • Radisson Blu (Atasehir) • Bomonti Anthill Residences Sound Insulation Project
2008 • Metrocity Building (Levent)
Hotel & Residence Acoustics Projects: (Measurement, evaluation, noise control, sound insulation)
![Page 63: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/63.jpg)
Anthill Residences Acoustics Project
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm Ht: 60 cm
Ht: 60 cm
Ht: 60 cm Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 60 cm
Ht: 101 cmHt: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 100 cm
Ht: 100 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 100 cm
Ht: 100 cm
Ht: 100 cm
Ht: 100 cm Ht: 100 cm
Ht: 101 cm Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 101 cm Ht: 101 cm
Ht: 101 cm
Ht: 101 cm
Ht: 100 cm
Ht: 100 cm
Ht: 100 cm
Ht: 100 cm Ht: 100 cm Ht: 100 cmHt: 100 cm
Ht: 60 cm
Ht: 100 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cmHparapet: 13.5 cm Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Hparapet: 13.5 cm
Ht: 60 cmHparapet: 13.5 cm
Ht: 60 cmHparapet: 13.5 cm
Ht: 60 cm Hparapet: 13.5 cm
Ht: 60 cm
Hparapet: 13.5 cm
80X120 CM DUÞ TEKNESÝ
8 0X12 0 CM DUÞ TEK NESÝ
8 0X16 0 CM DUÞ TEK NESÝ
8 0X12 0 CM DUÞ TEK NESÝ
8 0x12 0 CM DUÞ TEK NESÝ
8 0X16 0 CM DUÞ TEK NESÝ 8 0X16 0 CM DUÞ TEK NESÝ
EVYE
ÇÖP KUTUSU
ÇEKMECE
M ÝKRODA LGA FIRINE LEK TRÝKLÝ FIRIN
A NKASTREB UZDO LABI
EVYE
A NKASTREB ULAÞIK MAK ÝNESÝ
ÇÖP KUTUSU
ÇEKMECEÇEKMECE
M ÝKRODA LGA FIRINE LEK TRÝKLÝ FIRIN
A NKASTREB UZDO LABI
ÇEKMECE
EV
YE
ÇÖ
P K
UT
US
U
ÇE
KM
EC
E
MÝK
RO
DA
LG
A F
IRIN
EL
EK
TR
ÝKL
Ý F
IRIN
AN
KA
ST
RE
BU
ZD
OL
AB
I
EV
YE
AN
KA
ST
RE
BU
LA
ÞIK
MA
KÝN
ES
Ý
ÇÖ
P K
UT
US
U
ÇE
KM
EC
EÇ
EK
ME
CE
MÝK
RO
DA
LG
A F
IRIN
EL
EK
TR
ÝKL
Ý F
IRIN
AN
KA
ST
RE
BU
ZD
OL
AB
IÇ
EK
ME
CE
*ASKILIKÇ.M.
*ASKILIK
*AS
KIL
IKÇ
.M.
*AS
KIL
IK
*AS
KIL
IKÇ
.M.
Ç .M. *ASKILIK
Ç.M. *ASKILIK *ASKILIK
*ASKILIK
RAF
Ç.M.
1
2
*AS
KIL
IK
Ç.M
.
*AS
KIL
IKR
AF
1
2
Ç .M.
ÇÖ
P K
UT
US
U
EV
YE
ÇE
KM
EC
E
EL
EK
TR
ÝKL
Ý OC
AK
AN
KA
ST
RE
MÝK
RO
DA
LG
A F
IRIN
EL
EK
TR
ÝKL
Ý F
IRIN
AN
KA
ST
RE
BU
LA
ÞIK
MA
KÝN
ES
Ý
A NKASTRE M ÝKRODA LGA FIRINE LEK TRÝKLÝ FIRINB ULAÞIK MAK ÝNESÝ
ÇÖP KUTUSU
EVYE
ÇEKMECE
E LEKTRÝKL Ý OCAK
ÇEKMECE
A NKASTREB UZDO LABI
ÇE
KM
EC
E
EV
YE
AN
KA
ST
RE
BU
LA
ÞIK
MA
KÝN
ES
Ý
EL
EK
TR
ÝKL
Ý OC
AK
ÇE
KM
EC
EÇ
EK
ME
CE
ÇE
KM
EC
E
MÝK
RO
DA
LG
A F
IRIN
EL
EK
TR
ÝKL
Ý F
IRIN
AN
KA
ST
RE
BU
LA
ÞIK
MA
KÝN
ES
Ý
ÇÖ
P K
UT
US
UÇ
EK
ME
CE
EL
EK
TR
ÝKL
Ý OC
AK
AN
KA
ST
RE
BU
ZD
OL
AB
I
D
E
D
C2
C3
BALKON
B I B2
K
J2
H
GF
A
KE ÇE VEYA SIKIÞTIRILMIÞ
TAÞYÜNÜ DOLGU
KAU ÇUK PROFÝL
KAU ÇUK PROFÝL
KAU ÇUK PROFÝL
KE ÇE
SERTLE ÞMEZ MACUN
SERTLE ÞMEZ MACUN
KAU ÇUK PROFÝL
KEÇE
SERTLE ÞMEZ MACUN
KAU ÇUK PROFÝL
KEÇE VEYA SIKIÞTIRILMIÞ TAÞYÜNÜ
KAU ÇUK PROFÝL
SALON+MUTFAK
BALKON
KAU ÇUK PROFÝL
KE ÇE 20mm
YATAK
ODASI
BANYO
SERTLE ÞMEZ MACUN
KAU ÇUK PROFÝL
KEÇE 20mm
KAU ÇUK PROFÝL
KEÇE 20mm
KAUÇUK PROFÝL
SERTLEÞMEZ MACUN
BANYO
YATAK
ODASI
GÝRÝÞ
HOLU
TAÞYÜNÜ 50mm
BANYO
YATAK
ODASI
BOÞLUK
SALON+
MUTFAK
YATAK
ODASI
GÝRÝÞ
HOLU
E. YATAK
ODASI
BANYO GÝRÝÞ
HOLU
SALON+
MUTFAK
E. YATAK
ODASI
SALON+
MUTFAK
E. YATAK
ODASI
GÝRÝÞ
HOLU
SALON+
MUTFAK
SALON+
MUTFAK
SALON+
MUTFAKDÝÐER
SALON+
MUTFAK
YATAK
ODASI
BANYO
SERTLE ÞMEZ MACUN
KAU ÇUK PROFÝL
KE ÇE 20mm
E
C1
C2
C3
B
C4
I
B2
KH
J2G
A
J
F
NOT: TESÝSAT BORULARI VARSA KESÝNLÝKLE
SES YALITIMI YAPILMALI VE YATAK O.
DUVAR KABUÐU ÝLE TEMASI OLMAMALIDIR.
ESNEK BAÐLANTI RAYI 10mm
KEÇE 20mm
NOT: BOÞLUK ARTTIRILMALIDIR
SERTLE ÞMEZ MACUN
TAÞYÜNÜ 50mm
ESNEK BAÐLANTI RAYI 10mm
NOT: D ÝKME DUVAR ÝLE TEMAS ETMEMELÝ
ESNEK BAÐLANTI RAY I 10mm
ESNEK RAY
ALT KAT AL ÇIPAN
SES YALITIMLI KAPI
RwC: 58
KE ÇE 20mm
SERTLE ÞMEZ MACUN
ESNEK RAY
SALON TARAFINDA ÝKÝ TABAKA
ALÇIPAN OLMALI VEYA ÇÝFT YÜZ
ALÇIPAN KULLANILMALIDIR.
ESNEK BAÐLANTI RAY I 10mm
KEÇE 20mm
TAÞYÜNÜ 20mm
KEÇE 20mm
KEÇE 20mm
ESNEK BA ÐLANTI RAYI 10mm
KEÇE 20mm
TAÞYÜNÜ 50mm
SERTLE ÞMEZ MACUN
KE ÇE 20mm
TAÞYÜNÜ 50mm
KEÇE 20mm
PROF ÝL
KEÇE 20mm
ALÇIPAN
KE ÇE 20mm
KE ÇE 20mm
SERTLE ÞMEZ MACUN
TAÞYÜNÜ 50mm
ESNEK BAÐLANTI RAYI 10mm
ALÇIPAN
KEÇE 20mm
KEÇE 20mm
KAU ÇUK PROFÝL
ALTERNATÝF
KE ÇE VEYA SIKIÞTIRILMIÞ TAÞYÜNÜ DOLGU
KAU ÇUK PROFÝL
KAU ÇUK PROFÝL
SES YALITIMLI KAPI
RwC: 58
KEÇE 20mm
KAU ÇUK PROFÝL
KAU ÇUK PROFÝL
SERTLE ÞMEYEN MACUN
ALTERNATÝF
KE ÇE 20mm
KE ÇE 20mm
KEÇE 20mm
KAU ÇUK PROFÝL
KAU ÇUK PROFÝL
KAU ÇUK PROFÝL
KAU ÇUK PROFÝL
KAU ÇUK PROFÝL
![Page 64: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/64.jpg)
Some Other Applications
• Acoustical project of Digiturk Building, 2004
• TEM noise (4.Levent and TEM connection) barrier design, 2003
• Akmerkez Bowling Hall Noise and Vibration Control
Project, 2005 • Limonlu Bahçe Sound Control Project, 2006 • Acoustics Project for Antalya International Airport,
2006
![Page 65: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/65.jpg)
OTHER ACTIVITIES
![Page 66: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/66.jpg)
• Organized by both Bahçeşehir Üniversitesi Technology Development Center and dBKES Ltd. The readers : Prof.Dr.Selma Kurra (Bahcesehir University), Frantz Leguy ve S. Bloquet (01 dB Metravib), Ferit Bonfil (Polytech). Nov. 17-18 2003
• dB-KES Ltd. applies user training programs (1-3
days) for the 01dB - ACOEM and Polytec products.
• On The Road training activities and workshops, once a year May – June timeframe, since 2004.
Training Activities
![Page 67: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/67.jpg)
REFERENCES
![Page 68: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/68.jpg)
• Anadolu University • Atatürk University • Bahçesehir University • Bilkent University • Bosphorus University • Istanbul Technical University • Kocaeli University • Koç University • Middle East Technical University • On Dokuz Mayis University • Sabanci University • Yildiz University
Universities Who Selected dB-KES
![Page 69: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/69.jpg)
• Alarko • Arçelik • Aselsan • Borusan • Bosch • DIA Holding • Erdemir Steel • Ford • Izocam Glass • Matay • Mebant
Some of the Companies Who Selected dB-KES
• Medikal Galeri • Roketsan • SANKO • Schneider Electric • STM • TACA Construction • TCMA • Tekno Kauçuk • Toyota • Turkish Naval Forces • Urban Sys
![Page 70: www. hawktechnologyllc · 2020. 8. 19. · •Besiktas Auditorium of Bahcesehir University, 2004 •Heydar Aliyev Convention Center Acoustical Project, 2009 •Harbiye Kültür Merkezi](https://reader036.vdocuments.us/reader036/viewer/2022071510/612f79bf1ecc51586943783b/html5/thumbnails/70.jpg)
THANK YOU EMNIYET EVLERI YAMAC SOKAK NO:8/3 4: LEVENT ISTANBUL, TURKEY www.dbkes.com [email protected] +90 212 324 3446 +90 533 627 3627
AVENUE BUSINESS CENTER BIN SALEM BUILDING, NO114
MARINA MALL ABU DHABI, UAE
www.hawktechnologyllc.com [email protected]
+971 505 824 802