wv mine drainage task force symposium

44
Improvements to the Cheat River Watershed’s Fisheries in Response to Reductions in Acid Mine Drainage Pollution Prepared by: Frank Jernejcic – WV Division of Natural Resources David Wellman – WV Division of Natural Resources Rick Buckley – Office of Surface Mining Doug Ferris – Friends of the Cheat WV MINE DRAINAGE TASK FORCE SYMPOSIUM March 26, 2014

Upload: others

Post on 16-May-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Improvements to the Cheat River Watershed’s Fisheries in Response to Reductions in Acid Mine

Drainage Pollution

Prepared by:Frank Jernejcic – WV Division of Natural ResourcesDavid Wellman – WV Division of Natural Resources

Rick Buckley – Office of Surface MiningDoug Ferris – Friends of the Cheat

WV MINE DRAINAGE TASK FORCE SYMPOSIUM March 26, 2014

Page 2: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Document improvements to the waterquality and fisheries in Cheat Lakeand Cheat River resulting from acidmine drainage (AMD) remediationprojects funded through theAbandoned Mine Lands (AML), theWV Special Reclamation programs,and other participating partners.

Purpose

Page 3: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

• 1,424 mi2

drainage area

• Elevations range from 800 ft to 4,500 ft

• Coal high in sulfur and other metals

Cheat River Watershed

0 70 140 Miles

N

EW

S

West VirginiaCheat River Watershed

Charleston

Cheat Lake

Page 4: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

• Formed by Black Fork and Shavers Fork at Parsons, WV

• Mainstem flows 75 miles north to state line.

• 2nd largest Monongahela River tributary

• Average annual flow of 2,300 cfs

• November 4, 1985 flood: 200,000 cfs

Cheat River

Page 5: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Cheat Lake

• Located at base of the

Cheat watershed

• 1,730 acres: 13 miles long

• Maximum depth 106 feet

• Operated for hydropower,

not for flood control

• High angling and boating

use

Page 6: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Coal Mining in the Cheat Watershed

Many deep mines were developed beginning in the 1920’s and ranged in size from small family owned mines to mines large enough to support company towns.

Subsequent strip mining has occurred on about 1% of the watershed area (U.S. Geological Survey, 1992).

Page 7: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

AMD impacts 69 miles of Cheat mainstem and 53 streams listed on state 303D list

0 30 60 Miles

N

EW

S

Non-AMD impacted

AMD impacted

Page 8: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Surface Mining Control and Reclamation Act (SMCRA)

Two major programs: before and after 1977.

U.S. Department of the Interior’s Office of Surface Mining distributes federal money to states by SMCRA guidelines.

1. Regulation of active coal mines after 1977 (bond forfeitures). Special Reclamation Program.

2. AML Program – reclamation of mine sites prior to 1977. Priorities of public safety and health, not necessarily AMD.

Page 9: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Special Reclamation SitesActive chemical treatment methods often used at bond forfeited sites.

Alkaline materials introduced into water for neutralization.

64 complete projects

~$30 million

Page 10: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

AML Sites

Passive treatment*methods often used at AML sites. Natural chemical and biological reactions used for neutralization.

66 sites reclaimed ~$16 million

173 unreclaimed

* longevity / maintenance ?

Page 11: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

1994 Cheat River Deep Mine Blowout

No fish kill

T & T mine

$ 30,000 month

Page 12: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Cheat Watershed Groups

Signatories include state and federal agencies, industry, and conservation groups.

Friends of Cheat organized in 1995 to restore and promote the Cheat watershed. Cultivated a wide range of support from watershed stakeholders.

Organized River of Promise in 1995 to reduce AMD and restore sport fisheries.

Page 13: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

#

0 7 14 Miles

N

No AMD

Moderately AMD impacted

Greatly AMD Impacted

# YSI Locations

Big Sand

y Cre

ek

M

ud

dy

Cre

ek

Greens Run

Bull

Run

Cheat Lake

Cheat River

R

oarin

g C

reek

#

##

Cheat Lake YSI

# Albright YSI

Muddy Creek 1996 – 2006

Mean pH: 4.2

Mean tons of acid/year: 4,000

Heavily AMD Impacted

Page 14: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Continuous Water Quality Monitoring

YSI Model 6600

Is AMD treatment positively impacting Cheat River water quality???

Start in 2004

Page 15: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Continuous Water Quality Monitoring

Period of record: May 2004 – April 2013

~115,000 readings

Page 16: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

5.6

5.8

6.0

6.2

6.4

6.6

6.8

7.0

7.2

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Mea

n p

H

Mean Annual pH, 2006 - 2013

Head of Cheat Lake

H

HL

Page 17: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

5.5 6.5 7.7 5.7 5.6 6.0 6.2 5.8 5.90

1

2

3

4

5

6

7

8

9

WQ1 Rubles Run

Morgans Run

WQ1a WQ2 Sunset Quarry Run

WQ3A YSI @ Head of

Lake

pH

at

2-m

ete

rs d

ep

th

Cheat Lake pH - May 7, 2009

pH 6 - 9 suitable for fish

Upstream

pH Depression

Page 18: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

5.0

5.5

6.0

6.5

7.0

4/1 4/8 4/15 4/22 4/29 5/6 5/13 5/20 5/27

Mean

Daily

Flo

w, c

fsM

ean

Daily p

H

Date

Mean Daily pH vs Flow for Cheat River

pH flow, cfs

pH > 6.0 suitable for fish

Page 19: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Mean Seasonal pH

7.4

7.2

6.87.0

7.3

7.16.9

7.2 7.3

6.9

6.6

7.67.4

7.3 7.2

7.0

6.7 6.8 6.9 6.86.6

6.86.9

6.86.7

6.5

5

6

7

8

Sp

rin

g

Su

mm

er

Fa

ll

Win

ter

Sp

rin

g

Su

mm

er

Fa

ll

Win

ter

Sp

rin

g

Su

mm

er

Fa

ll

Win

ter

Sp

rin

g

Su

mm

er

2004 2005 2006 2007

Mea

n p

H

Albright Cheat Lake

Page 20: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Cheat Lake pH

Page 21: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Cheat Lake’s Fish Community48 species collected

1 atherinids

4 catostomids

10 centrarchids

1 clupid

11 cyprinids

2 esocids

4 ictalurids

2 moronidae

9 percids

1 percithyids

1 sciaenid

2 salmonids

White bass - Morone chrysopsRainbow darter – Etheostoma caeruleum

Golden redhorse – Moxostoma erythurum

Channel catfish – Ictalurus punctatus

Page 22: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

1955 Cheat Lake Gill and Trap Net Survey

80%

13%

4%

Catfish

Suckers

Crappie

Sunfish

Black bass

Carp

2006 Cheat Lake Gill Net Surveys by WVDNR

39%

16%1%

31%

3%Catfish

Suckers

Crappie

Sunfish

Black bass

Carp

Yellow Perch

Walleye

Cheat Lake’s Fishery

Page 23: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Core 1959: “yellow perch and walleye became

extinct by 1940 from the watershed”

Best yellow perch fishery in WV 2005

Page 24: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

15 per day limit in 2006

Page 25: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Walleye Stocking

1999 2000 2004 2005 2006 2007 2009 2010 2012 2013 Total

Fry 1,700,00 1,000,000 . . . . . . . . 2,700,000

Fingerling . . 50,000 44,000 46,000 25,000 6,800 87,712 31,775 . 291,287

Stocking Year

Walleye

Spring pH fluctuations affect walleye spawning success ??

Page 26: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

29-inch Walleye

Telemetry study

Page 27: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Cheat Lake Fish Monitoring

0

2

4

6

8

10

12

0

50

100

150

200

250

300

350

1997 1998 2001 2005 2008

CP

UE (fish

/ne

t-nigh

t)N

o. o

f Co

llect

ed F

ish

1997 - 2008 Cheat Lake Gill Nets

Total Catch CPUE

Page 28: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

0

5

10

15

20

25

30

35

40

Nu

mb

er

of T

ou

rnam

en

ts

Cheat Lake Bass Tournaments, 1990 - 2013

Cheat Lake Bass Tournaments

Page 29: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Cheat Lake Bass Tournaments

Page 30: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

0.00

0.05

0.10

0.15

0.20

0.25

0.30

No

. Ba

ss p

er H

ou

r

Cheat Lake Bass Tournament Success Rate, 1990 - 2013

Cheat Lake Bass Tournaments

Page 31: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

Stonecoal Burnsville Cheat Summersville Sutton Tygart

No

. Ba

ss p

er

Ho

ur

Bass Tournament Success Rates, 2012

Cheat Lake Bass Tournaments

Page 32: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Cheat River Fish Surveys

#

0 10 20 Miles

N

Upper Cheat Watershed

Lower Cheat Watershed

Cheat River and tributaries

High gradient 25 fpm

Low gradient 10 fpm

lower

upper

Page 33: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

1720

2224

60

27

21

58

0

10

20

30

40

50

60

70

1959 1973 1980 1999

No of Species lbs of fish per acre

Upper Cheat River

1994

Page 34: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

166

24

57

289

11 5 418

0

50

100

150

200

250

300

350

1959 1973 1980 1999

No. of Smallmouth Bass lbs of Smallmouth Bass per acre

Upper Cheat River

Page 35: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Lower Cheat500 cfs

Page 36: WV MINE DRAINAGE TASK FORCE SYMPOSIUM
Page 37: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

All Species Smallmouth Bass

Y

e

a

r

Number

Species

Number

Individuals

Number

Individuals

CPUE

(fish/hour)

Size

Range,

inches

1

9

9

7

1 1 0 0 -

2

0

0

5

7 123 100 4 6 - 14

Lower Cheat River

The best way to sample fish ?

Page 38: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Conclusions

1.Seasonal mean pH values did not approach threshold criteria of 6.0;

2. pH is lowest during periods of high flow, specifically during the winter season. Could affect egg and fry development in April or May;

3. Increase in both sport and forage fishes have occurred in Cheat Lake and Cheat River;

4. Cheat Lake has become a fishing destination for recreational and tournament anglers.

Page 39: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

The continuation of the Cheat Lake and Cheat River fisheries are dependent upon:

Take Home Message

2. Continual efforts to address sources of acid discharging from the multitude of remaining abandoned coal mines in the watershed.

3. Must maintain future funding !!

1. Maintenance of existing AMD remedial projects; and

Page 40: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Muddy Creek—still a problem !!!

August 2013

Page 41: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Questions ?

Page 42: WV MINE DRAINAGE TASK FORCE SYMPOSIUM
Page 43: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Questions??

Page 44: WV MINE DRAINAGE TASK FORCE SYMPOSIUM

Cheat Lake Fish Monitoring

0

100

200

300

400

500

600

700

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

1997 1998 2001 2005 2008

CP

UE

(fish/h

ou

r)N

o. o

f Co

llect

ed F

ish

1997 - 2008 Cheat Lake Electrofishing

Total Catch CPUE