wt calcs enhance pro.xls
TRANSCRIPT
7/30/2019 WT calcs enhance pro.xls
http://slidepdf.com/reader/full/wt-calcs-enhance-proxls 1/3
WALL THICKNESS CALCULA
Version 1.0 (DSS pipes as per API 5LC)
Validation date
Project Name
Project Number 80166
Design Pressure (P) 120 bar g psi g
Design Factor (F) off plot
on plot per SP-1211
SMYS (psi) 69618 psi 480 Mpa at 20 Deg C as per SP-1189
Joint Factor (E) 1
Corrosion Allowance 0 mm as material is DSS
Temperature derating 0.871
factor (T)
Design code
Design Seamless
Factor (F) (S) OR Calculated Calculated
inch Welded (W inch mm
1 6.625 0.72 W 0.132 3.355
2 6.625 0.6 W 0.158 4.026
3 8.625 0.72 W 0.172 4.3684 8.625 0.6 W 0.206 5.241
5 10.75 0.72 W 0.214 5.444
6 10.75 0.6 W 0.257 6.532
7 12.75 0.72 W 0.254 6.456
8 12.75 0.6 W 0.305 7.748
9 22 0.72 W 0.439 11.140
10 22 0.6 W 0.526 13.368
Sl No
1740.45
Selected
Wall thickness calcs resultsDSS
Kauther Field Gathering System (with enhance property, 418 Mpa @ 130
0.4, 0.5 or 0.6
0.4, 0.5, 0.6 or 0.72
Outside
Dia. (D)
t
mm
5.7
3.6
7.8
13.4
11.4
6.6
6.6
4.1
4.6
5.3
146731507.xls.ms_office\WTcalcs 1 of 3
7/30/2019 WT calcs enhance pro.xls
http://slidepdf.com/reader/full/wt-calcs-enhance-proxls 2/3
7/30/2019 WT calcs enhance pro.xls
http://slidepdf.com/reader/full/wt-calcs-enhance-proxls 3/3
TONNAGE CALCULATIONSVersion 1.0
Validation date
Project Name Kauther Field Gathering System (with enhance property, 418 Mpa @ 130 deg C)
Project Number 80166
Design Pressure (P) 120 bar g 1740.45 psi g
Design Factor off plot
on plot per SP-1211
SMYS (N/mm2) 65000 psi 450 Mpa upto 110 Deg C as per SP-1189
Sl No Design DSS
Factor Length (m) wall thickness tonnage
inch mm tons
1 6.625 0.72 7136 3.600 104.33
2 6.625 0.6 592 4.100 9.83
3 8.625 0.72 31272 4.600 760.87
4 8.625 0.6 2046 5.300 57.17
5 10.75 0.72 7550 5.700 283.74
6 10.75 0.6 776 6.600 33.65
7 12.75 0.72 3617 6.600 186.77
8 12.75 0.6 94 7.800 5.71
9 22 0.72 5406 11.400 831.97
10 22 0.6 106 13.400 19.10
Total 58595 2293.15
Outside Dia.
(D)
Tonnage calculation results
0.4, 0.5, 0.6 or 0.72
0.4, 0.5 or 0.6
146731507.xls.ms_office\tonnage 3 of 3