  • Workshop CW 38ATMN proceduresPacket 317. 19. september 2002

  • GeneralAbout 50 people announcedSplit into 2 groupsRoom 222 (meeting point)Room 337 (next floor)

  • Agenda room 222If testbed available

    Tabelle1

    Day 1Day 2Day 3

    Room 222Room 337Room 222Room 337Room 222Room 337

    9:00

    9:30Upgrade 4 rackIur configurationNB 440 DatabaseATM measuring methods

    10:00Bearer ServicesPower ControlIMA function

    10:30Diagnosis hintsUpgrade 4 rackNB 440 diagnosis

    11:00Hand OverPerformance ManagementIur configuration

    11:30IMA functionDiagnosis hints

    12:00

    12:30

    13:00Power ControlSystem InformationInterface TAC 2 - TAC 3Symptom savingATM measuring methodsNB 440 Database

    13:30Data base handlingInterface TAC 2 - TAC 3

    14:00Performance ManagementBearer ServicesSymptom savingData base handlingNB 440 diagnosis

    14:30

    15:00System InformationHand Over

    15:30

    16:00

    16:30

    Tabelle2

    Day 1Day 2Day 3

    9:00

    9:30Upgrade 4 rackNB 440 Database

    10:00Bearer Services

    10:30Diagnosis hints

    11:00Hand OverIur configuration

    11:30IMA function

    12:00

    12:30

    13:00Power ControlInterface TAC 2 - TAC 3ATM measuring methods

    13:30Data base handling

    14:00Performance ManagementSymptom savingNB 440 diagnosis

    14:30practical demonstration

    15:00System Information

    15:30

    Tabelle3

  • Agenda room 337If testbed available

    Tabelle1

    Day 1Day 2Day 3

    Room 222Room 337Room 222Room 337Room 222Room 337

    9:00

    9:30Upgrade 4 rackIur configurationNB 440 DatabaseATM measuring methods

    10:00Bearer ServicesPower ControlIMA function

    10:30Diagnosis hintsUpgrade 4 rackNB 440 diagnosis

    11:00Hand OverPerformance ManagementIur configuration

    11:30IMA functionDiagnosis hints

    12:00

    12:30

    13:00Power ControlSystem InformationInterface TAC 2 - TAC 3Symptom savingATM measuring methodsNB 440 Database

    13:30Data base handlingInterface TAC 2 - TAC 3

    14:00Performance ManagementBearer ServicesSymptom savingData base handlingNB 440 diagnosis

    14:30

    15:00System InformationHand Over

    15:30

    16:00

    16:30

    Tabelle2

    Day 1Day 2Day 3

    9:00

    9:30Upgrade 4 rackNB 440 Database

    10:00Bearer Services

    10:30Diagnosis hints

    11:00Hand OverIur configuration

    11:30IMA function

    12:00

    12:30

    13:00Power ControlInterface TAC 2 - TAC 3ATM measuring methods

    13:30Data base handling

    14:00Performance ManagementSymptom savingNB 440 diagnosis

    14:30

    15:00System Information

    15:30

    Tabelle3

    Day 1Day 2Day 3

    9:00

    9:30Iur configurationATM measuring methods

    10:00Power ControlIMA function

    10:30Upgrade 4 rackNB 440 diagnosis

    11:00Performance Managementpractical demonstration

    11:30Diagnosis hints

    12:00

    12:30

    13:00System InformationSymptom savingNB 440 Database

    13:30Interface TAC 2 - TAC 3

    14:00Bearer ServicesData base handling

    14:30

    15:00Hand Over

    15:30

    Thomas BareissICM N PG SI TM R3Phone: +49 89 722 [email protected]

    RNC standard configuration (RNC 1.5)Prerequisites for the following procedure:Cabling complete, SW installed and runningOffice data (HW configuration part) ready.Different types of extension frames available depending on capacity enhancement requirements.Up to 8 extension frames possible.

    First extension frame needs to contain a HUBM module for expansion of HUB ports.Comment to item 5):Check if all modules of 3 rack RNC are INS,HUB, SVC, CMXG, HUB links, C1HW links

    Comment to item 7):Check if all modules of RNC are INS,HUB, SVC, CMXG, HUB links, C1HW links

    Second procedure for standard bring-up of 4-rack RNC. Use the first procedure at the beginning for testing and bugfixing.