wrpc.nic.inwrpc.nic.in/wrpc/34wrpc_agenda.pdf · (madhya pradesh)- dharni (maharashtra) line as an...
TRANSCRIPT
-
Baart sarkar
Government of Indiakond̀Iya ivaVut p`aiQakrNa
Central Electricity Authority
piScama xao~Iya ivaVut saimaitWestern Regional Power Committee
t sa sa /p xao iva sa kIidnaaMk 27 jaulaa[- 2017 evaM 28 jaulaa[- 2017 kao
mauMba[- maoM Aayaaoijat haonao vaalaI 34 vaI baOzk kI kaya-saUcaI
Agenda of 34th Meeting of TCC/WRPC to beheld on 27th July 2017 & 28th July 2017
at
MUMBAIhosted by
TATA POWERmauMba[-
MUMBAI
Baart sarkar
Government of Indiakond̀Iya ivaVut p`aiQakrNa
Central Electricity Authority
piScama xao~Iya ivaVut saimaitWestern Regional Power Committee
t sa sa /p xao iva sa kIidnaaMk 27 jaulaa[- 2017 evaM 28 jaulaa[- 2017 kao
mauMba[- maoM Aayaaoijat haonao vaalaI 34 vaI baOzk kI kaya-saUcaI
Agenda of 34th Meeting of TCC/WRPC to beheld on 27th July 2017 & 28th July 2017
at
MUMBAIhosted by
TATA POWERmauMba[-
MUMBAI
Baart sarkar
Government of Indiakond̀Iya ivaVut p`aiQakrNa
Central Electricity Authority
piScama xao~Iya ivaVut saimaitWestern Regional Power Committee
t sa sa /p xao iva sa kIidnaaMk 27 jaulaa[- 2017 evaM 28 jaulaa[- 2017 kao
mauMba[- maoM Aayaaoijat haonao vaalaI 34 vaI baOzk kI kaya-saUcaI
Agenda of 34th Meeting of TCC/WRPC to beheld on 27th July 2017 & 28th July 2017
at
MUMBAIhosted by
TATA POWERmauMba[-
MUMBAI
-
C o n t e n t s
Item no. ParticularsPageno.
Item no. 1 Confirmation of the Minutes of 33rd Meeting of WRPC 1
Part-A
Item no. 2 Error in computation of MVARh by SEM at 400/220kVMagarwada(PG)
1
Item no. 3LILO of 220 KV S/C Haldarva – Jhagadia line at NTPCJhanor PS – Regarding extending necessary support byJhanor to GETCO
4
Item no. 4 Increase in GETCO Transmission loss due to high power flowon + 500 KV Mundra-Mohindergarh Bi-Pole HVDC line
5
Part-B
Item no. 5 Status of alternate/standby supply arrangement by IndianRailways when source of power (RGPPL) is not available.
8
Item no. 6 Establishing pump mode operation at SSP. 10
Item no. 7 Operation of Kadana and Bhira in Pumping Mode 11
Item no. 8Power Swing Studies for Multiple tripping of evacuation linesat CGPL (Leading to tripping 5x830 MW generators) and 400kV lines at 400 kV Bachhau S/S.
12
Item no. 9
Interconnection between CGPL UMPP and Adani MundraSTPS in Gujarat – provision of 400/220 KV ICT at CGPLMundra 14
Item no. 10 Reliable Communication Scheme under Central Sector forWestern Region
15
-
Item no. 11 Progress of downstream network whose terminating bays areunder construction by POWERGRID
16
Item no. 12 Proposals approved in the 41st Meeting of StandingCommittee on Power System Planning in Western Region
21
Item no. 13Proposals approved in the 24th Meeting of WR constituentsregarding Connectivity & LTA Applications held on21.12.2016
21
Item no. 14 Transmission charges for RGPPL power share allocation toother state i.e. (Gujarat, Jharkhand and Madhya Pradesh)
22
Item no. 15MSETCL Proposal for declaration of 132 kV Nepanagar(Madhya Pradesh)- Dharni (Maharashtra) line as an InterState Transmission Line (ISTS) .
25
Item no. 16Technical specifications for Interface Energy Meters(IEM),Automated Meter Reading (AMR) system and Meter DataProcessing system (MDP) for Western Region
26
Item no. 17 Extension of LILO Arrangement For Evacuation of Power ByEssar Power M.P. Ltd., 2x600 Mw (“EPMPL”)
27
Part-C
Item no. 18 STOA charges and operating charges applied for the FY-2017-18 by RLDCs for STU systems in WR
30
Item no. 19 Status of implementation of SAMAST reportrecommendations
32
Item no. 20 SPS and Islanding Schemes 34
Item no. 21 Declaration of Transmission elements into commercialoperation by ISTS licensees
37
Item no. 22 Status of Letter of credit (LC) opening against Deviationcharges liability for 2017-18.
39
Item no. 23 Status of Deviation & RRAS charges 41
Item no. 24 Status of Reactive Energy charges 43
-
Item no. 25 Status of Congestion Charges 44
Item no. 26 Status of Reconciliation of Deviation and REC pool accountfor the period Jan’17 to Mar’17.
46
Item no. 27 Interest calculation statement of Deviation Pool Account forthe period from July 2016 to Sept 2016
49
Item no. 28 Interest calculation statement of Reactive Charge Account forthe period from July 2016 to Sept 2016
51
Item no. 29 Interest calculation statement of Congestion Charge Accountfor the period from Apr 2016 to Jun 2016
51
Item no. 30 Performance of WR grid during January 2017 to June 2017 53
Item no. 31 Anticipated power supply position in western region forthe period from august 2017 to October 2017
56
Item no. 32Status of completion of 765/400 kV and above on goingtransmission schemes being executed/implemented bytransmission agencies.
56
Item no. 33Commissioning of new generating units in western regionand the capacity expected to be commissioned during thecurrent year 2017-18.
59
Item no. 34 Default in payment of outstanding dues by beneficiaries 61
Item no.35 MPPMCL Scheduling of Un-requisitioned Surplus Power(URS) on 50% Capacity
62
Item no.36 Relay co-ordination groups at State level: 65
Item no.37 Maintaining reserves to handle contingencies, forecast errorsand variability
68
Item no.38 Any other item 70
Item no.39 Date and venue of next WRPC meeting 70
-
Annexures
************************
Annexure Particulars
Annexure-12 List of proposals approved in 41st SCM
Annexure – 13 List of Connectivity & LTA Applications
Annexure-20Minutes of SPS meeting of Mouda on stage-II unit-1 on01.02.2017 & Minutes of SPS meeting of Mouda on stage-IIunit-2 on 30.05.2017
Annexure-30.1(a)Frequency profile for the months from January 2017 to June2017
Annexure-30.1 (b)The details of unrestricted peak demand, demand met andenergy requirement and availability
Annexure- 30.2The detail of voltages at important 400 kV and 765 kV sub-stations during the period of during January 2017 to June2017
Annexure-31The anticipated power supply position in the region for theperiod from August 2017 to October 2017
-
1
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Agenda Notes for the 34th Meeting ofWestern Regional Power Committee (WRPC)
to be held on 28th July 2017 (Friday)preceded by TCC Meeting on 27th July 2017 (Thursday)
at Mumbai
Item No.1: Confirmation of the Minutes of 33rd Meeting of WRPCThe minutes of 33rd meeting of WRPC held on 1st February 2017 at Diu
were forwarded to the members vide letter No. WRPC/33rd WRPC Mtg.
/AS/2017/3445 dated 23.03.2017.
No comments have been received. Committee may confirm theminutes.
Part-A
Item No. 2: Error in computation of MVARh by SEM at 400/220kVMagarwada (PG)
Background from 75th CCM:
WRLDC vide its letter no. WRLDC/MO/1551/217 dated 03.05.17
intimated that the Main and Standby SEMs installed at the HV and LV
side of the 400/220 kV ICTs at Magarwada (PG) are considered for
computing the drawal of UT Daman and Diu from Magarwada (PG).
Electricity Department, UT of DD vide their letter dtd. 23/03/17 had
reported error in computation of MVARh by SEM at 400/220KV
Magarwada (PG) since 16th March 2015.
After analysis it was understood that the available PT ratios used for Main
Meters on 400 kV and Standby Meters on the 220 kV side of the 400/220
kV ICTs at Magarwada (PG) are 420 kV/110 V and 245 kV/110 V
-
2
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
respectively instead of the standard PT ratios 400 kV/110 V and 220
kV/110 V respectively. Consequently, on the 400 kV side of the ICT, the
voltage range referred for computation of reactive energy interchange of
UT of DD at Magarwada (PG) by the Main SEM is “407.4 kV (LV) to 432.6
kV (HV)” instead of “388 kV (LV) to 412 kV (HV)” as stipulated in the
IEGC. Likewise on the 220 kV side the voltage range referred by Standby
SEMs for computation of reactive energy interchange of UT of DD at
Magarwada (PG) is “237.65 kV (LV) to 252.35 kV (HV)” instead of “213.4
kV (LV) to 226.6 kV (HV)” as stipulated in the IEGC. As a result, the
computation of reactive interchange of UT of DD at Magarwada (PG) by
Main as well as Standby Meters is incorrect.
WRLDC advised WRTS-2 to explore the various possibilities of correcting
the computation error either with the help of the meter manufacturer or
by replacing the PTs having appropriate ratio. POWERGRID vide their
email dated 01st May 2017 informed as under:
“We had discussed the matter with the R&D head of M/s Elster
(Honeywell). R&D head suggested to change the reference voltage in the
meter configuration. Subsequently with the help of M/s Elster Engineer we
could able to change the reference voltage successfully as below.
w.r.t 400/220 kV ICT 1&2 at Magarwada, POWERGRID
1. Reference voltage of Energy meter installed on 400kV side of ICT = 60.5
volts
2. Reference voltage of Energy meter installed on 220kV side of ICT = 57.0
volts
Date of change of above configuration : 21-APR-2017 at Appx 12:45 hrs
afternoon.
The meter is kept under observation for MVAH reading.
-
3
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Kindly do the required changes at WRLDC and WRPC end to nullify the
Error in MVARH calculation for high and low accumulators in Energy
meter.”
Executive Engineer DD vide letter no. ED/EE/SLDC/2016-17/2415
dated 08.06.17 has requested to issue the revised reactive energy charges
for the period 16.03.2015 to 21.04.2017 accounts as they have paid the
REC due to erroneous VAR meter readings.
WRPC vide letter no. WRPC/Comml-I/corr./2017/ dated 14.06.17 has
requested WRLDC to provide the revised VAR data for DD for the above
period so that necessary revisions may be issued.
Further regarding the methodology for settlement of the reactive energy
charges paid by DD due to erroneous data, following option was
suggested/proposed in CCM:
The total amount paid by DD toward the REC on account of
erroneous recording may be settled/reimbursed from the amount
attributed to PSDF fund from weekly accounts.
Discussions in 75th CCM:WRLDC representative opined that the adjustment on account of excess
amount paid by D&D could be possible from weekly DSM pool accounts
and further she stated that this arrangement needs to be ratified in the
34th WRPC/TCC.
CCM recommendations:-The committee recommended that the total amount (to be revised)paid by D&D towards REC due to erroneous reactive data should bereimbursed. The adjustments to D&D shall be made weekly byadjusting any excess leftover amount in the DSM pool fund aftercompleting obligations towards ancillary services operations. Afterthe adjustment is made towards DD the remaining amount shall bepassed on to PSDF.
-
4
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Further the committee recommended the above methodology shallbe put up in the ensuing 34th TCC/WRPC for further guidance/ratification.TCC/WRPC may like to discuss the same.
Item No. 3: LILO of 220 KV S/C Haldarva – Jhagadia line at NTPCJhanor PS – Regarding extending necessary support by Jhanor toGETCO
CE, SLDC Gujarat vide letter dated 03.07.2017 informed that in36th Standing Committee meeting of CEA on Power System Planning inWR held on 29th August 2013 at NRPC, Katwaria Sarai, New Delhi, theLILO of 220 KV S/C Haldarva – Jhagadia line at NTPC Jhanor PS wasproposed by GETCO. NTPC stated that no space was available within thefenced area of present switchyard. However, Space for extension of theswitchyard was available for two no. 220 kV bays for LILO of Haldarva –Jhagadia 220 kV S/C line at Jhanor TPS.
After further discussion, LILO of Haldarva – Jhagadia 220 kV S/C line atJhanor TPS by GETCO was agreed. The line work of LILO is completed.For extension of 220 KV bus and for construction work of bays, thenecessary drawings and documents are submitted by GETCO to NTPCbased on various site visits and inputs from NTPC Jhanor.
During peak conditions, at least two machines of Jhanor remains on bar.The loading on each 220 KV D/C Jhanor - Haldarva line (existing) alwaysremains on higher side around 180 to 225 MW. Many times, generation atJhanor have been restricted due to higher loading on 220 KV D/C Jhanor–Haldarva line. In addition, it is very difficult to permit outages on 220 KVD/C Jhanor – Haldarva line.
Therefore, it is utmost necessary that joint efforts by NTPC Jhanor &GETCO shall have to be made for extension of 220 KV bus andconstruction work of bays for LILO of 220 KV Haldarva – Jhagadia line atJhanor to improve system reliability.
TCC/WRPC may like to discuss the same.
-
5
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No. 4: Increase in GETCO Transmission loss due to high powerflow on + 500 KV Mundra-Mohindergarh Bi-Pole HVDC line
Managing Director, GETCO vide letter No. MD/STU-ISTS/505/572/08
dated 05.07.2017(Copy enclosed) informed that + 500 KV Mundra –
Mohindergarh Bi-Pole HVDC line was established by M/s. Adani as a
dedicated line to provide power supply to Haryana from Unit No. 7, 8 and
9 each having capacity of 660 MW located at Mundra, Gujarat. Initially,
power flow on above HVDC line was restricted within 1250-1500 MW by
NLDC to handle N-1 contingency criteria as per CEA transmission
planning criteria.
Subsequently, M/s. Adani was issued an ISTS transmission license by
CERC for its dedicated transmission system associated with Mundra and
Mohindergarh complex. Later on, to balance regional power flow through
other tie-lines between WR-NR & ER-NR corridors, NLDC is allowing high
power flow of the order of 2500 MW on + 500 KV Mundra – Mohindergarh
Bi-Pole HVDC line.
It is observed that power flow on + 500 KV Mundra – Mohindergarh
HVDC line is maintained high as compared to generation from Unit No 7,
8 & 9 of APL, Mundra TPS. This is resulting into additional Inter-State
power flow through GETCO network thereby increased current flow and
higher I2R losses for the State network. Related data is as under:
Sr.No. Month
HVDCFlow
Tr.Loss
APL Unit 7-8-9 Generation
in MUs
AdditionalPower flowin HVDC
%AdditionalPower flow
1 2 3 4 5 6=3-5 7=6/3%1 Apr-15 1674 3.82 1287 388 23.1
2 May-15 1706 3.70 1353 353 20.7
3 Jun-15 1707 3.96 1209 498 29.24 Jul-15 1579 4.61 1081 497 31.5
-
6
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
5 Aug-15 1496 3.96 1120 376 25.16 Sep-15 1671 3.66 1173 497 29.87 Oct-15 1677 3.64 1358 319 19.08 Nov-15 1441 3.63 1199 242 16.89 Dec-15 1582 3.45 773 809 51.110 Jan-16 1736 3.57 1206 530 30.511 Feb-16 1609 3.39 1200 409 25.412 Mar-16 1798 3.73 1288 510 28.413 Apr-16 1712 4.09 1215 497 29.014 May-16 1621 4.18 1187 434 26.815 Jun-16 1599 4.90 892 708 44.216 Jul-16 1490 4.32 1170 320 21.517 Aug-16 1403 3.88 1146 256 18.318 Sep-16 1536 3.66 1234 302 19.619 Oct-16 1464 3.47 1247 217 14.8
It can be seen from above that additional power flow in HVDC line
(Column-6 of above Table) has been maximum in June’16 and this flow
through GETCO network is causing higher I2R losses. In addition to
above, following data clearly depicts impact on local transmission network
due to additional power flow on + 500 KV Mundra – Mohindergarh Bi-Pole
HVDC line:
System Data 26-04-2017(22:03Hrs)
05-05-2017(8:33Hrs)
05-05-2017(00:00Hrs)
10-05-2017(16:36Hrs)
18-05-2017(12:27Hrs)
23-05-2017(16:05Hrs)
Gujarat catered 13885 13457 14704 14453 14407 14403Total State (GSECL)Generation
2353 3620 3809 2941 2439 2542
Total Private (IPP)Generation
8938 6280 6785 6721 5874 6523
Total Central SectorDrawl
2462 3448 3961 4670 4062 3568
APL, Mundra : Unit No.1 to 6
2444 1257 1245 805 751 676
APL, Mundra : Unit No.7 to 9
1901 1090 1235 882 1097 1198
Flow from (1-6) to (7-9)at APL
423 912 787 1146 905 802
HVDC flow 2300 2001 2002 2004 2002 2000CGPL 3016 2133 2729 2911 2262 1514
-
7
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
System Data 26-04-2017(22:03Hrs)
05-05-2017(8:33Hrs)
05-05-2017(00:00Hrs)
10-05-2017(16:36Hrs)
18-05-2017(12:27Hrs)
23-05-2017(16:05Hrs)
Power flow at APL complex400 KV APL - Varsana -1
236 -315 -369 -638 -525 -380
400 KV APL - Varsana -2400 KV APL - Hadala 188 21 22 -41 -9 -85400 KV APL - Zerda 323 84 143 0 94 98400 KV APL - Dehgam -1
906 241 367 359 356 357
400 KV APL - Dehgam -2220 KV APL -Nanikhakhar - 1
88 73 77 -130 -216 -268
220 KV APL -Nanikhakhar - 2220 KV APL - Tappar - 1 193 138 131 14 33 38220 KV APL - Tappar - 2Net export to Gujaratnetwork from APLComplex
1934 242 371 -436 -267 -240
It is observed from above data that, along with other local grid
parameters, power flow from Unit No. 1-6 to Unit No. 7-9 at APL complex
is having large impact on local Gujarat system in the area. Many times,
APL complex is drawing power from Gujarat system to feed excess power
on HVDC system. Further, such scenarios must be resulting into excess
power drawl by Gujarat system through Inter-State tie lines, which will
have huge commercial impact on GUVNL under PoC mechanism.
The implementing agency i.e. NLDC is already requested to look into the
matter vide our letters dated 31/01/2017 & 03.05.2017. However,
response from NLDC is awaited.
-
8
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Also, any commercial impact viz. increase in Intra-State transmission
losses and sharing of ISTS transmission charges & losses under PoC
mechanism may be compensated to GUVNL.
493rd OCC meeting decision:
The issue was discussed in detailed in 493rd OCC meeting and it was
suggested that WRLDC in consultation with Gujarat shall study the
quantum of power that circulated though the loop.
TCC/WRPC may like to discuss the same.
Part-B
Item No. 5: Status of alternate/standby supply arrangement byIndian Railways when source of power (RGPPL) is not available.
Background from 75th CCM:
GUVNL vide its letter no. Guj-SLDC/SCH/F-12/2008 dated 25.04.17 has
intimated that in the previous CCM/WRPC/TCC meetings, Indian
Railways was asked to take up the above issue seriously and suggested to
enter in to standby arrangement. The action taken by Indian Railways in
the matter is to be discussed.
WRPC received a draft Power Supply Agreement (PSA) from GUVNL vide
letter no. GUVNL/COM/GM(IPP)/RE/284 dated 22.03. The draft PSA is
sent to RGPPL, MPPMCL, MSEDCL and other concerned entities and the
comments are awaited from the concerned entities.
-
9
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Discussions in 75th CCM: -
GUVNL representative stated that on receipt of the PSA (Power Supply
Agreement), Indian railways has requested for block-wise tariff instead of
temporary tariff. He stated that the temporary tariff quoted to Indian
Railways is the tariff approved by Hon’ble GERC and the block-wise tariff
as suggested by Indian Railways is not feasible. Further he requested the
committee to insist on Indian Railways for signing of PSA at the earliest.
Maharashtra representative also agreed to the views of GUVNL.
RGPPL representative stated that Indian railways are willing to sign the
PSA and the process is being delayed due to need of certain clarifications
by Indian Railways which have been communicated to Gujarat and
Maharashtra. Further he requested for an urgent meeting of Indian
railways, Gujarat,MP and Maharshtra for signing of PSA and clarification
of any queries.
Decision / Recommendation of 75th CCM :
Committee recommended to RGPPL / Indian Railways requesting toconvene a meeting with Maharashtra, GUVNL and RGPPL at theearliest so that the matter can be resolved amicably.
Subsequently, WRPC coordinated with the concern entities to participate
in a meeting to resolve this issue amicably. The meeting is scheduled to
be held on 21/07/17 at WRPC. The outcome of this meeting will be put
up before TCC /WRPC
TCC/WRPC may like to discuss the same.
-
10
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
ITEM No. 6. Establishing pump mode operation at SSP:
Background from 496th OCC:
The matter for establishment of pumped mode operation at SSPwas discussed in 496th OCC meeting. In the meeting following wasinformed.
1. Construction of Garudeswar weir (will take at least one year)
2. Up-gradation of RBPH Units. (will take at least one and halfyears)
The construction work of weir is awarded in May – 2012. Presently,approx. 35% of Construction work of Garudeshwar Dam is completed.
For pumping mode operation of 6 x 200 MW RBPH Units, thesupply, installation and commissioning of isolated phase bus ducts,Static Frequency converter and phase reversal switch along with allrequire accessories will be required.
The SSNNL has prepared estimates amounting around 68 CroreRupee for equipment required for operating RBPH in pumping mode andsubmitted to CWC/CEA for their scrutiny and then same will besubmitted to Planning Commission by SSNNL.
In the meeting, CE, SLDC Gujarat stated that up-gradation ofRBPH Units (for establishing pump mode operation) is a very neededproject and it will be helpful for sorting out the problems of all threeassociated states of Gujarat, MP and Maharashtra. Representative fromMP informed that approval for above project has to be taken from Govt ofMP. GM, WRLDC suggested that since the project will be funded fromPSDF, there will not be any financial burden on any state. He alsosuggested that a high level meeting involving Gujarat, MP, Maharashtraand NCA can be convened and the project can be carried ahead.
CE, SLDC Gujarat vide letter dated 03.07.2017 requested WRPCsecretariat to discuss the above matter once again in TCC/WRPCmeeting. In the above letter subsequent development in this matter hasbeen communicated as follows;
“As per the information received from the Chief Engineer (D & V),SSNNL, Vadodara on 08.06.17 (letter attached), the schedule date ofcompletion of Garudeswar weir is Nov’17. Looking to present status, it
-
11
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
may be completed in June’18. For upgradation of RBPH units to operatein pump mode, the principal approval from SSCAC (Sardar SarovarConstruction Advisory Committee) and NCA is pending. The expected timeframe for upgradation of RBPH units for operation in pump mode wouldbe two to two and half years from date of placement of order.”
TCC/WRPC may like to discuss the same.
Item No. 7. Operation of Kadana and Bhira in Pumping Mode
WRLDC vide email dated 11.07.2017 intimated that out of the installedgeneration capacity of 109 GW in Western Region, 78 % capacity iscoal/gas fired, 15.4 % (16.8 GW) is RES and only 6.7% (7.4 GW) is hydro.Even with limited hydro capacity, the power generation from hydrostations is often constrained due to scarcity of water or other socialobligations with respect to water releases (e.g. constant schedule).
In view of the above, efforts need to be urgently made to rejuvenate theavailable pumping facility at Kadana (4x60 MW) and Bhira (1x150 MW)HEP that are not being utilized due to various commercial and technicalconstraints.
The matter has already been discussed in several OCC meetings.
TCC/WRPC may like to deliberate on the measures to be taken toexpedite
1. Utilization of 1x150 MW capacity at Bhira PSP in Maharashtra2. Utilization of 4x60 MW capacity at Kadana PSP in Gujarat
TCC/WRPC may like to discuss the above.
-
12
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No. 8 : Power Swing Studies for Multiple tripping of evacuationlines at CGPL (Leading to tripping 5x830 MW generators)and 400 kV lines at 400 kV Bachhau S/S.
Back ground:
A complete blackout at CGPL took place on 13.07.2016. A groupcomprising of CGPL, GETCO, Powergrid WR-II, WRLDC and WRPCrepresentatives met at Vadodara on 18.07.2016 to discuss the blackout.Later in the 127th PCM, Committee suggested that CGPL, GETCO,WRLDC will form a group to study the power swing phenomenon observedin the CGPL system. CGPL, GETCO and WRLDC were requested to sendthe details of the incidental system before the occurrence and relevanttripping data (DRs, PMU recordings etc.) to WRPC. Based on thediscussions and details received, a report is prepared by WRPC and it isavailable in WRPC website under PCM Minutes.
The following conclusions and recommendations based on reportprepared by the above group were discussed in the 128th/129th PCM &33rd WRPC meeting;
Power Swing phenomenon:Prior to the event, the CGPL generation was around 2875 MW. During theevent CGPL Units had fed the three phase fault at Varsana for a durationof 350 ms. Along with this event, three 400 kV lines also got trippedwhich was followed by a continuous decline of voltage for 290ms. Thevoltage started rising, this was detected as a power swing entering inzone-1 by the line DPS at CGPL end and the lines tripped.
The reasons for excitation of the oscillations need to be found out sincethese oscillations were not damped out resulting in a severe power swing.A transient study by modeling the proper network is required to done.
128th PCM discussion: The sub-Committee deliberated on the issue andit was recommended that the studies be carried out through IIT-B. Thescope of these studies shall be to examine the cause of power swing,various factors that contributed to CGPL machines going Out of Step andsuggest remedial measures. CGPL would provide overall coordination incarrying out the studies. WRLDC would provide necessary coordination in
-
13
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
providing the system data to IIT-B. The matter may be put up to theTCC/WRPC for its approval for funding the studies.
33rd WRPC: In the 33rd WRPC meeting the PC recommendation wasagreed. It was informed that the quotation for carrying out the abovestudies has been received from IIT-B. It was decided that CGPL wouldfund the studies. CGPL informed that they would revert back afterconsulting their management.
129th PCM Discussions : CGPL representative informed that theirmanagement is not ready to fund the studies. Further he stated that thedisturbance originated from the grid side, the studies shall be done byeither WRPC/WRLDC. Member Secretary enquired as to whether thegroup studied the disturbance and could figure out the exact cause.EE(P), WRPC informed that the group of protection experts in WR haddone the analysis and based on the analysis the report was prepared andrecommended to carry out above studies through external agency havingexpertise in the field of studies. Accordingly IIT-B was approached forcarrying out these studies. A quote of around 35 lakhs was received fromIIT-B.
PGCIL and GETCO were requested to prepare/process the proposal ofgetting the studies carried out by IIT-B through the PSDF.
GETCO representative informed that they are not in a position toprepare/process the proposal. PGCIL representative also informed theirinability on taking up the proposal through the PSDF route.
M/s APL representative stated that at APL Tirora generating station thereare two nos. of 400kV evacuating lines to 400kV Wardha S/s. At thisgenerating station they have adopted delayed tripping in Zone-1 on powerswing. As soon as the swing is detected on the lines, generation unit istripped at this plant. This helps in damping out the oscillations and theseverity of the swing is reduced. The power swing phenomenon wasobserved on many occasions on these lines and the situation was verywell handled with this scheme of tripping one unit immediately ondetection of power swing and adopting settings for delayed tripping oflines under Zone-1 power swing detection.
It was informed that as per Task Force recommendations the DPS shouldtrip instantaneously if the power swing is detected in Zone-1.
-
14
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
CGPL representative stated that they may consider even generating unittripping under the scenario of power swing.
After detailed discussions on the issue and inability expressed byGETCO and PGCIL for the proposal for getting the studies fundedthrough PSDF, the matter may be referred to WRPC.
TCC/WRPC may like to discuss the same.
Item No. 9: Interconnection between CGPL UMPP and Adani MundraSTPS in Gujarat – provision of 400/220 KV ICT at CGPL Mundra andcompensation mechanism for 220 KV S/C CGPL Mundra –Nanikhakhar line & bays
Background:In the 33rd WRPC meeting, WRPC recommended that since this ICT is being
brought for system benefit, it should be under PSDF funding. Therefore it
was recommended that GETCO shall apply for the project with PSDF
authorities and WRPC approval for the same is accorded.
Managing Director, GETCO vide letter no MD/STU/505/07 dated
05.07.2017(Copy enclosed) that technical requirement of 400/220 KV ICT
at CGPL Mundra is already agreed in SCM as well as TCC / WRPC
forums.
In this regard this is to clarify that the generation switchyard belongs to a
private party (CGPL) and entire evacuation scheme is developed by PGCIL
under ISTS scheme. GETCO being a STU for Gujarat State has no direct
role in entire project. Therefore, if GETCO will apply for PSDF funding
then there will be issues related to implementation / execution,
ownership and operation & maintenance of the said asset at CGPL
switchyard.
-
15
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
At this juncture, it is pertinent to note that 2 Nos. of 400 KV feeder bays
at CGPL Mundra switchyard is under implementation by PGCIL for
accommodation of 400 KV D/C CGPL Mundra – Bhuj Pool line identified
as a strengthening scheme after implementation of planned evacuation
scheme. Therefore, looking to the above mentioned issues and PGCIL
presence in CGPL switchyard, it is suggested that PGCIL shall apply for
PSDF funding for 400/220 KV ICT at CGPL Mundra and implement the
same.
Also, 220 KV S/C CGPL Mundra – Nanikhakhar line & associated 220 KV
bay at Nanikhakhar is to be maintained by GETCO, suitable commercial
mechanism may be developed for compensation.
TCC/WRPC may like to discuss the same.
Item No. 10 Reliable Communication Scheme under Central Sectorfor Western Region
PGCIL informed vide email dated 12.07.2017 that WRPC in its 33rd
TCC/WRPC meeting held on 31st Jan 17 and 01st Feb’17 at Diu,
approved Reliable Communication scheme of 3402 Kms of OPGW based
communication network at an estimated cost of Rs. 85 Cr. Subsequently,
POWERGRID worked out detailed cost estimate of the scheme and
prepared DPR for the same. The estimated cost comes out to Rs. 89.74
Cr. Tender activities have also been initiated based on DPR.
TCC/WRPC may like to discuss / note as above.
-
16
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No. 11: Progress of downstream network whose terminatingbays are under construction by POWERGRID
PGCIL informed vide email dated 12.07.2017 that CERC vide some of its
recent orders has strongly commented against assets mismatch noticed at
the time of declaration of DOCO & has advised the following:
"In case of cost plus, the mismatch between Generation / Downstream
network / upstream network, Transmission licensee will not burden the
consumers and the charges would be compensated through the IA
between the parties".
CERC has not included such assets in PoC and in cases of declaration of
DOCO, it has been directed to recover transmission charges from
concerned Generator / STU / Discoms. Further, following has been
mentioned in the CERC (IEGC) (Fourth Amendment) Regulations, 2016,
dated 6/4/16 under 5.4. Proviso (iii):
“Where the transmission system executed by a transmission licensee is required to be
connected to the transmission system executed by any other transmission licensee and
both transmission systems are executed in a manner other than through tariff based
competitive bidding, the transmission licensee shall endeavor to match the commissioning
of its transmission system with the transmission system of the other licensee as far as
practicable and shall ensure the same through an appropriate Implementation
Agreement.”
Keeping above in view, STUs are requested to ensure utilization of the
220kV line bays at following new / under implementation ISTS
substations planned under various transmission schemes:
-
17
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
1.1 Status of unutilized 220kV line bays at Existing Substations in WR
Sl ISTSSubstationVoltage
ratio in use Status of Bays220kV Lines
emanating fromSubstation
No ofckt
Status of220kV lines
1Raipur
(PG)3x315MVA,400/220 kV
2no Bays ready since01.07.2011 (WRSS-6)
Raipur (PG) – Doma220 kV D/c
2CSPTCL may
update
2Mapusa
(PG)
3x315MVA,
400/220kV
2 nos Bays readysince : 01.11.2013
Mapusa – Cuncolin220 kV D/c
2GED may
update
3 Pirana2x315MVA,400/220kV
2nos Bays ready since19.03.15 (WRSS-6)
Pirana – Barjadi 220kV D/c
2GETCO may
update
4 Boisar2x315
+500MVA,400/220kV
1no Bays ready since30.05.15
Boisar – STU lineS/c
1MSETCL may
update
5 Magarwada2x315MVA,400/220kV
2nos Bays ready since03/11/14
Magarwada –Ringanwada 220 kVD/c
2D&D mayupdate
6 Wardha2x315MVA,400/220kV
2 nos Bays readysince 01.02.2011
Wardha – Yavatmal220kV D/C
2MSETCL may
update
7 Solapur
2x315+1x500MVA
,400/220kV
2 nos Bays readysince 01.04.2011 &
2 nos Bays readysince 02.11.2015
Solapur – Bhale(MS) 220kV D/c
Solapur –Narangwadi (MS)220kV D/c
2
&
2
MSETCL mayupdate
Solapur – Bhalwane(MS) 220 kV D/c 2
MSETCL mayupdate
8 Damoh1 x 500
MVA400/220 kV
2 Nos of Bays readysince Nov ‘16
LILO of 2nd 220 kVCircuit ofDamoh(MPPTCL) –Sagar 220 kV line atDamoh (PGCIL) 400kV S/S (1km)
1MPPTCL may
update
-
18
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Sl ISTSSubstationVoltage
ratio in use Status of Bays220kV Lines
emanating fromSubstation
No ofckt
Status of220kV lines
9Vadodara
GIS
2 x 500MVA,
400/220 kV
Bays Ready since May2017
220 kVVenkatpura-Vadodara D/C Line220 KV Jambua –Vadodara D/C Line
4GETCO may
update
1.2 Status of Under Construction 220 kV line bays at New Substations /Substation Extensions in WR
S.No. ISTS Substation
ProposedBays
Commissioning Schedule
220kV Linesemanating from
Substation
Noof
ckt
Status of220kVlines
Remarks
1Betul GIS 2x315MVA, 400/220 kV
4August ’17(Mauda-II)
Betul (PG) - Betul D/C220 kV line (3 Km)
2 UCMPPTCL
mayupdate
LILO of Sarni -Pandhurna 220kV lineat Betul GIS(PGCIL)400 kV S/s (41 Km)
2 UC
2Morena (TBCB) 2 x315, 400/220 kV
4May’18(Chhattisgarh& WR SS)
i) LILO of one circuit ofMalanpur – Mehgaon220kV line at Morena(TBCB) 400kV S/s(8Km from Loc. No.12).
ii) Morena(TBCB)400 -Sabalgarh 220kVDCDS line (92Km) withLILO of one circuit ofMorena(TBCB)400 -Sabalgarh 220kV lineat Morena 220kV S/sof MPPTCL (0.5Km)
4 Planned
MPPTCLmay
update
3NaviMumbai 2 x 315,400/220 kV
4Bays readysince Mar’14(WRSS-V)
STU line 4 PlannedMSETCL
mayupdate
4
Indore (PG) 2x500MVA,
400/220 kV6
Jul’18(WRSS-14)
Indore (PG) – Indore(MP) 220 kV D/c
2 UCMPPTCL
mayupdate
Indore (PG) – Ujjain(MP) 220 kV D/c
2 UC
-
19
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
S.No. ISTS Substation
ProposedBays
Commissioning Schedule
220kV Linesemanating from
Substation
Noof
ckt
Status of220kVlines
Remarks
Future 2To be
planned byMP
5
Itarsi (PG) 1x500MVA,
400/220 kV
2Jul’18
(WRSS-14)
LILO of 2nd 220kVcircuit of Itarsi(MPPTCL) -Hoshangabad 220 kVline at Itarsi (PGCIL)400kV S/s (Existing)
2To be
planned byMP
MPPTCLmay
update
6Parli (PG) 2x500MVA, 400/220 kV
6Jun/Jul’18(WRSS-16)
Parli (PG) - Harngul220 kV D/c
2 UCMSETCL
mayupdate
7
Parli (PG) 2x500MVA, 400/220 kV
6Jun/Jul’18(WRSS-16)
Parli (PG) - Parli (MS)220 kV D/c
2 UCMSETCL
mayupdate
Parli (PG) - Parli (MS)220 kV S/c
1 UC
Osmanabad (MS) -Parli (PG) 220 kV S/c
1 UC
8Mapusa (PG)
3X315 MVA,400/220
2Jun/Jul’18(WRSS-16)
Mapusa - Tuem220kV D/c
2 UC
GEDmay
update
9
Satna (PG)1x500MVA,
400/220kV
2Jun/Jul’18(WRSS-16)
LILO of one circuit ofSatna (MPPTCL) -Chhatarpur 220 kVline at Satna (PGCIL)400 kV S/s (3Km)
2To be
planned byMP
MPPTCLmay
update
10Bijawar (TBCB) 2 x500 MVA, 400/220kV
4 RfQ stageLILO of Tikamgarh –Chhattarpur 220kVD/c line at Bijawar
4 PlannedMPPTCL
mayupdate
11Navsari 2x315MVA +1x500MVA,400/220kV
2 May’18Navsari – Bhestan220kV D/c line
- PlannedGETCO
mayupdate
-
20
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
S.No. ISTS Substation
ProposedBays
Commissioning Schedule
220kV Linesemanating from
Substation
Noof
ckt
Status of220kVlines
Remarks
12Rewa PS 2x500MVA,400/220kV
6 August ‘17Rewa UMSPP – RewaPS 220kV 3xD/c line
- UCMPPTCL
mayupdate
13Khandwa S/S
500MVA, 400/220kV2 Sept ‘19 STU Line - UC
MPPTCLmay
update
STUs may provide status of implementation of their 220kV lines. Further,
constituents are requested to complete the 220 kV lines in matching time
frame of the 220 kV bays.
For the new schemes implementation agreement needs to be signed
between POWERGRID and the STU, as per the CERC amendment
mentioned above. But until that is finalized, the constituents can give
their commitments for implementation of the 220 kV lines for the new
220 kV bays that is yet to be taken up for implementation by
POWERGRID so that they could be implemented in matching time frame.
For other 220 kV line bays constituents needs to implement the
associated 220 kV lines. The constituents would furnish a realistic
schedule for implementation of 220 kV lines associated with 220 kV bays
at new 400/ 220 kV substations / substation augmentation, so that 220
kV bays (by POWERGRID) along with the associated 220 kV lines (by
STUs) could be implemented in matching time frame. The same was
agreed in 41st Meeting of Standing Committee on Power System Planning
in Western Region held on 21.12.2016 at NRPC, Katwaria Sarai, New
Delhi.
TCC/WRPC may like to discuss as above.
-
21
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No. 12: Proposals approved in the 41st Meeting of StandingCommittee on Power System Planning in Western Region
A number of ISTS schemes were approved in the 41st Meeting of Standing
Committee (SCM) on Power System Planning in Western Region held on
21.12.2016 at CEA, New Delhi. The list of proposals approved in 41st
SCM is enclosed at Annexure-12 for ratification.
TCC/WRPC may like to note as above.
Item No. 13: Ratification of proposals approved in the 24th Meetingof WR constituents regarding Connectivity & LTA Applications heldon 21.12.2016
In the 24th WR Connectivity / LTA meeting held on 21.12.2016, CTU
informed that total twenty five nos. of connectivity applications of about
8768 MW quantum of power have been received for ISTS connectivity at
Bhachau, Bhuj Pool, Parli, Solapur, Kolhapur and Rajgarh Substations of
POWERGRID from various RE generation developers in WR.
The list of Connectivity & LTA Applications is attached at Annexure – 13.
TCC/WRPC may like to note as above.
-
22
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No. 14: Transmission charges for RGPPL power share allocationto other state i.e. (Gujarat, Jharkhand and Madhya Pradesh)
Background from CCMs:
MSETCL vide letter no. MSETCL/CO/C.E.-STU-R&C/5887 dated
03.06.17 intimated that it has granted the Long term open access to
Indian Railway in RGPPL power allocation with injection and drawl as-
Maharashtra State (230 MW)
Point of Injection Details:Name of the Generator: Ratnagiri Gas & Power Pvt. Ltd. (RGPPL)
Point of Drawal Details:50 nos. TSS (39 nos. MSEDCL + 11 no. TPC- Distribution), in the
Maharashtra.
Gujarat State (90 MW)Point of Injection Details:Name of the Generator: Ratnagiri Gas & Power Pvt. Ltd. (RGPPL)
Point of Drawal Details:TSS at Gujarat State
Jharkhand State (100 MW)Point of Injection Details:Name of the Generator: Ratnagiri Gas & Power Pvt. Ltd. (RGPPL)
Point of Drawal Details:TSS at Jharkhand State
Madhya Pradesh State (200 MW)Point of Injection Details:Name of the Generator: Ratnagiri Gas & Power Pvt. Ltd. (RGPPL)
Point of Drawal Details:TSS at Madhya Pradesh State
-
23
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
MSETCL has raised the bills to Railway as per the LTOA capacity granted
to respective State on Railway.
However as per discussion under 72nd CCM, if RGPPL –New Koyna
(Maharashtra) and RGPPL –Nagothane (Maharashtra) declared as ISTS
lines then it is to be clarified in the meeting regarding the recovery of
transmission charges for RGPPL allocation to other State i.e. (Gujarat,
Jharkhand and Madhya Pradesh).
Discussions in 75th CCM: -
MSETCL representative sought clarification regarding the recovery of
transmission charges for RGPPL allocation to other state , if RGPPL –NewKoyna (Maharashtra) and RGPPL –Nagothane (Maharashtra) declared as
ISTS lines as per the discussin under 72nd CCM.
WRLDC representative stated that in this case para VII of sub clause (t)
of clause (1) of regulation 7 of CERC (Sharing of Interstate Transmission
Charges and losses) regulations,2010 is applicable which is reproduced
below :
“ ……….in case an ISGS is connected only to STU network and the shares
of the beneficieries of the said station are being delivered through the STU
network,such a line of the STU network shall be considered as an ISTS for
the purpose of this regulation………”
Further WRLDC stated that lines emanating from RGPPL may be treated
as ISTS; Maharashtra may approach the Hon’ble commission and get the
tariff approved for such transmission lines.
RGPPL representative stated that if the clause 2-k and para VII of sub
clause (t) of clause (1) of regulation 7 of CERC (Sharing of Interstate
Transmission Charges and losses) regulations,2010 when read together,
-
24
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
it is clear that until these lines are approved as ISTS , the POC charges
cannot be applied to a beneficiary for drawl of power.
Further RGPPL quoted Hon’ble CERC order in a similar case under
Petition no.291/MP/2015 dated 30.03.2017,para no. 12 of which is
reproduced as below:
“We are of the view that since the injection point and drawal point for
evacuation of power to Andhra Pradesh are the same, there cannot be
losses and therefore, for computation of drawal schedule of Andhra
Pradesh from Simhadri STPS Stage-I, PoC injection losses and drawal
losses shall not be applied. Further, ISTS transmission charges shall not be
leviable on Andhra Pradesh for drawal of its share from Simhadri STPS
Stage-I as ISTS is not used for transmission of power.”
In conclusion RGPPL stated that , since injection point and drawl points
for drawl of Railways’ share in Maharashtra are same and these lines
have not been declared deemed ISTS and approved by commission, no
PoC charges and losses can be levied for drawl of Railway’s share from
RGPPL Maharashtra.
In response to the statement made by RGPPL, WRLDC expressed the view
that para-12 of CERC order under Petition no.291/MP/2015 cannot be
applied to any other cases.
MSETCL representative informed that as the line is not ISTS, CTU
charges are not applicable. Therefore for RGPPL power, no CTU charges
should be applied.
-
25
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Decision of 75th CCM :75th CCM noted the varying arguments of MSETCL, RGPPL andWRLDC, therefore consensus could not be developed in the CCMforum.
In this context RGPPL vide its letter REF.No.:RGPPL/WRLDC/201712.07.2017 requested to discuss this issue in TCC/WRPC meeting.
TCC/WRPC may like to discuss the same.
Item No. 15: MSETCL Proposal for declaration of 132 kV Nepanagar(Madhya Pradesh)- Dharni (Maharashtra) line as an Inter StateTransmission Line (ISTS) .
33rd WRPC/TCC Discussions:TCC members deliberated the issue in depth and in principal approved
charging/commissioning of 132kV Nepanagar (MPPTCL)-Dharni
(MSETCL) Inter- State line, subject to following;
(i) The 132kV Nepanagar (MPPTCL)-Dharni (MSETCL) Inter-State line
from Dharni S/S to Nepanagar S/S would be operated in radial mode.
(ii) The commercial settlement of power between MSEDCL and MP Discom
will be decided as per mutual agreement between them in the due course
of time.
(iii) Till the commercial settlement of power between MSEDCL and
MPDiscom is decided, the line be kept idle charged.
(iv) The 132kV Nepanagar (MPPTCL)-Dharni (MSETCL) line will not be
treated as ISTS or deemed ISTS line, which was agreed by MSETCL.
Subsequently, CE, STU, MSETCL vide letter dated 29th May, 2017,
requested to take up this issue in next WRPC meeting and declare 132 kV
Nepanagar (Madhya Pradesh)- Dharni' (Maharashtra) line as an Inter
-
26
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
State Transmission Line (ISTS), also this scheme will be taken in
upcoming CEA standing Committee meeting. The issue was also
discussed in 75th CCM.
Decision in 75th CCM:
The CCM recommended that the MPPMCL and MSETCL resolve thecommercial issue bilaterally.
No communication has been received so far from either MSETCL or
MPPMCL regarding bilateral settlement of this commercial issue.
TCC/WRPC may like to discuss the same.
Item No. 16: Technical specifications for Interface Energy Meters(IEM), Automated Meter Reading (AMR) system and Meter DataProcessing system (MDP) for Western Region
33rd WRPC decision:
WRLDC vide letter no. WRLDC/MO/1551/217 dated 03.05.17 (soft copy
is available at www.wrpc.nic.in ) have forwarded technical specifications
for “Interface Energy Meters (5-min compatibility), Automated Meter
Reading and Meter Data Processing” for Western Region. The draft
technical specifications were circulated by WRLDC on email on 01st May
2017.
-
27
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Discussions in 75th CCM:
WRLDC representative gave a brief presentation stating in brief the
specifications for Interface Energy Meters (IEM), Automated Meter
Reading (AMR) system and Meter Data Processing system (MDP). (Copy of
presentation and specifications is available at www.wrpc.nic.in).
SE (C), WRPC requested members of the committee to give their
comments/feedback within 10 days so that the same may be incorporated
in the technical specifications of Interface Energy Meters (IEM) and put
up before the 34th TCC/WRPC for further necessary guidance.
TCC/WRPC may like to discuss the same.
Item No. 17 EXTENSION OF LILO ARRANGEMENT FOR EVACUATIONOF POWER BY ESSAR POWER M.P. LTD., 2X600 MW (“EPMPL”)
Agenda Background:
As per CERC order dated 28.09.2016 on Petition no. 30/MP/2014, “CTU
shall take up all the existing cases of connectivity on interim LILO with the
RPC of respective regions within a period of one month from the date of
issue of this order for review and decision on disconnection of the interim
arrangements through LILO. All such interim arrangements through LILO
shall be disconnected within a period of three months of the issue of this
order unless the RPC grants extension for continuation of LILO keeping in
view of all relevant factors.”
The progress of all dedicated transmission lines of IPPs in Western
Region, which were connected through interim arrangement, was
reviewed in 41st SCM in WR held on 21.12.2016
-
28
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Out of 6 dedicated transmission lines to different IPP’s only following two
dedicated lines have not been completed:
1. VVL – Dharamjaygarh PS 400kV D/c line for evacuation
of Vandana Vidyut Ltd. (VVL) (2x135+270MW) (IPP) which
was connected through LILO of 1st ckt of 400kV Korba -
Birsinghpur D/c line. This LILO arrangements is presently
disconnected as per Hon’ble CERC order.
2. EPMPL - Bilaspur PS 400kV D/c (triple) line forevacuation of Essar Power M.P. Ltd (EPMPL)(2x600MW)(IPP) which is presently connected throughLILO of 1st ckt of 400kV Korba STPS – Vindhyachal STPSD/c line. .
The SCM directed VVL to complete the balance work by march 2017whereas EPMPL was also directed to complete the line before monsoon of2017. LILO arrangements of VVL was disconnected due to non completion ofdedicated line.
The matter of contuation of interim LILO of Essar was also discussedduring 33rd TCC/WRPC meeting. The relevant abstract is follows:
Quote:
“TCC discussed the issue and recommended that the decision to grant
interim connectivity to M/s VVL was taken by Standing Committee on PSP,
and further they have decided to remove the interim connectivity to M/s
VVL. Also M/s VVL agreed for the same in the SCM. Hence the TCC
endorsed the decision of SCM and recommended to open the interim
connectivity for M/s VVL by 31st March 2017, if not already done.
Regarding EPMPL case, SE(Comml) WRPC informed that SCM had
permitted interim connectivity only upto June 2017 to complete the works
otherwise the interim connectivity shall be opened..
-
29
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
As given in the agenda, TCC discussed the Hon’ble CERC order and noted
that Hon’ble CERC has directed CTU to bring such cases to RPC.
Accordingly future cases may be brought to RPC notice.
In the EPMPL case, TCC recommended that hitherto the SCM on PSP
decided on such decisions. It noted that representatives from EPMPL, CTU,
CEA & STUs of WR had deliberated in detail and had given directions to
EPMPL to complete the line by 30th June 2017. Considering this TCC
endorsed the decision of SCM and recommended that EPMPL shall
complete the line by 30th June 2017, else the interim connection would be
removed by CTU. Hence forth such cases shall be brought to the RPC forum
by CTU.
WRPC:
WRPC agreed to TCC recommendation of opening the interim connectivity
for M/s VVL by 31st March 2017, if not already done. Further WRPC agreed
to the TCC recommendation for EPMPL case to complete the line by 30th
June 2017 and CTU to discuss such issues in WRPC forum.”
Unquote:
M/s Essar Power M.P. Ltd., 2x600 MW (“EPMPL”) vide letter no. 4003/10Dated: 1st June, 2017 requested WRPC Secretariat for extension of LILOarrangement for evacuation of power on 400 kV Vindhyachal – Korbacircuit-I of PGCIL.
Subsequently, WRPC Secretariat informed to M/s Essar Power thatextension of interim LILO arrangement for injection of firm power can notconsidered since the extension can only be granted by WRPC forum butnot WRPC Secretariat alone. Also it was not convenient to call a specialWRPC meeting within short notice as the next meeting of WRPC is alreadyscheduled in July, 2017.
-
30
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Subsequently M/s Essar Power filed a petition before Hon’ble CERC forextension of LILO arrangement. Hon’ble CERC vide Petition no127/MP/2017 with I.A.No. 36/2017 Order dated 30.06.2017 directed toWRPC to take decision on the matter on or before 05.07.2017.
Since the 34th TCC/WRPC meeting is scheduled on 27th & 28th July,2017, WRPC secretariat after taking approval from competent authorityintimated CTU to continue interim LILO arrangement till a decision istaken in the said WRPC meeting.
TCC/WRPC may like to discuss the same.
Part –C
Item No. 18: STOA charges and operating charges applied for the fy-2017-18 by RLDCs for STU systems in WR
WRLDC vide its letter no. WRLDC/MO/1551/217 dated 03.05.17 has
informed that the following charges have been applied to STOA
transactions wrt STU system in WR
SHORT TERM OPEN ACCESS TRANSMISSION CHARGES
WR Constituents
STU
Rate(Rs./Mwh) From Date
As per letter dt.
MSETCL 320 01-Apr-17 22nd July 2016
MPPTCL 95.07 01-Apr-17 18th March’2017
CSPTCL 240 27-Apr-17 26th April’2017
GETCO 159.25 02-Apr-17 1st April’2017
GOA 80 07-Jan-08 Asper OA Regulation
-
31
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
DD 80 07-Jan-08
As per OA
Regulation
DNH 80 07-Jan-08
As per OA
Regulation
SHORT TERM OPEN ACCESS OPERATING CHARGES
WR Constituents SLDC Rate(Rs./Day) From Date
MSETCL 2250 23-Jul-16
MPPTCL 3000 25-May-15
CSPTCL 2000 01-Jun-15
GETCO 1000 15-May-15
GOA 1000 15-May-15
DD 1000 15-May-15
DNH 1000 15-May-15
WRLDC 1000 15-May-15
TCC/WRPC may like to note the same.
-
32
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No.19: Status of implementation of SAMAST reportrecommendations
WRLDC vide its letter no. WRLDC/MO/1551/217 dated 03.05.17
intimated that a committee had been constituted on 18 Nov 2015, by the
Forum of Regulators (FOR) to evolve a roadmap for implementation and
ensure timely action on the following:
Deployment and implementation of framework on forecasting,
scheduling and deviation settlement of wind & solar generating
stations at the state level
Introduction /implementation of Availability Based Tariff (ABT)
framework at the State level as mandated in the National Electricity
Policy and Tariff Policy
Introduction of Ancillary Services and Reserves at the State level
Implementation of Automatic Generation and primary control
within States
Provide periodic reports to the FOR
Based on the extensive discussions with the State, Regional and National
Load Despatch Centres and deriving from the learning from the
experience at the State and Interstate level a comprehensive report titled
“Scheduling, Metering, Accounting and Settlement of Transactions in
Electricity” (SAMAST), was submitted by the Technical Committee to the
FOR. The FOR had endorsed the report and recommended its
implementation at the State level. The Report provided a roadmap for
implementation of the recommendations. The report is available at
http://www.forumofregulators.gov.in/Data/WhatsNew/SAMAST.pdf
-
33
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Financial support from Power System Development Fund was also
envisaged. Few of the key recommendations of SAMAST report are listed
below:
Demarcation of Interface boundary & identification of Pool Members
Adequate Interface Energy Meters with AMR infrastructure
Ex-Ante Scheduling
Uniform Energy Accounting System
Simple, robust, scalable but dispute-free settlement system
Administration of transmission losses
Transmission Charges
Reactive Energy Pricing
STOA Registry and Clearing Agency
Transparency
Integrity and Probity of Accounts
Disbursal and Clearing
Statutory Compliances
Payment Security Mechanism and Risk Mitigation
Archival and Utilization of Energy Meter Data
Logistics for SAMAST
Adequacy of Human Resource
Governance Structure
Facilitating enhanced Grid Security and Economic Despatch
Implementation of Dispatch with Ancillary Services
-
34
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Discussion in 75th CCM:
The committee requested SLDC from DD, DNH and Goa to update theprogress in the implementation of the SAMAST report as they havenot been received yet.
TCC/WRPC may like to discuss/note the same.
Item No 20: SPS and Islanding Schemes:
A) Commissioning of NEW SPS in connection with synchronizationof SR AND NEW Grid
Revision in SPS : With commissioning of 765kV Kolhapur-Kudgi (PG) D/C(initially charged at 400kV), revision of SPS and the present status ofimplementation of the SPS by various agencies involved was communicatedby NLDC vide letter dated 23.12.2015. NLDC vide letter dated 16th March2016, superseding all the previous communications in relation to the NEW-SR SPS have intimated revision in the SPS on NEW-SR corridor forimplementation.
All the revised NLDC SPS has been implemented except generation backdown & load shedding of 200-300MW in Maharashtra envisaged at SPS-5and load shedding of 200-300MW in Maharashtra at SPS-6.
33rd TCC/WRPC discussions :NDLC representative sated that SRconstituents have already implemented the SPS. There is objection ofMaharashtra for SPS-5 and the same is not implemented byMaharashtra. He requested that MSETCL may implement the aboveSPS.
GM WRLDC informed that this stalemate is more than two years old. Ifregional constituents have an issue, the same should be discussed andresolved at a national level.
SE(C&P) WRPC informed that right from the time SR was synchronised,WR constituents had implemented the SPSs suggested by NLDC. Nowhere WR has failed to comply to NLDC SPS. However whether so muchreduction in generation or tripping loads is required or not was not
-
35
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
clear from the start. There were many questions on the logic,assumptions and subsequent field experience which were raised byWRPC to NLDC by way of letters. However NLDC has yet to respond tothe same. Now Maharashtra also has raised concerns on SPS-5. Theseand other concerns have to be addressed. He opined that there has to befirst discussions involving NLDC and constituents of WR so that one canunderstand, appreciate or moderate NLDC logic. However there is noresponse from NLDC on the meeting nor replies to queries of WR sincethe first time SR was integrated. Unless there is first clarity in eachother’s view points, it would be futile to take the issue at a nationallevel.
TCC agreed with suggestion to hold meeting involving NLDC and WRconstituents and studying the issues including SPS-5 and other SPSbefore taking up at a National Level.
WRPC agreed to TCC suggestions for meeting to discuss NLDC SPS.
129th PCM discussion : MSETCL representative stated that the meetingwas not held. He further informed that manual actions such asgeneration pick up at New Koyna Hydro station and load shedding isbeing done in Maharashtra System immediately, on instructions fromWRLDC. Further he informed that more Automatic Under Voltageschemes have been implemented in Western Maharashtra to take care ofloadings and under Voltage scenarios in Western Maharashtra. Furtherthe network has changed significantly, since formulation/last revision ofthe SPS by NLDC.
Member secretary WRPC requested WRLDC to coordinate withNLDC in arranging the meeting.
B) SPS for 765kV Agra-Gwalior for load shedding in NR andautomatic generation backing down in WR:
The 765kV Agra-Gwalior for load shedding in NR and automaticgeneration backing down in WR was discussed in the PCM and the statusas regards to improvement in the SPS is as follows;
129th PCM Discussion : PGCIL representative informed that the OPGWlaying on Gwalior-Satna section would be completed by July 17 andSasan-Satna section would be completed by Oct 17.
-
36
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
WRLDC representative regarding non sensing/operation of SPS on 12thApril 2017, informed that though the loadings on the lines prior totripping at Agra was more than the SPS condition, the MW flow droppedsignificantly after the fault which persisted for the duration of un-clearedfault and hence the loss of load was not sensed at Gwalior end. FurtherWRLDC sought clarification as to whether the redundancy in the SPS byway of sensing the SPS conditions and sending both from Agra end andGwalior end has been done by PGCIL.
PGCIL representative informed that the same has not been done. Hefurther stated that the SPS at Gwalior end was checked and a drift in theMW transducer was observed. The faulty transducer was replaced.
PCM suggested that the SPS conditions at both Agra and Gwalior endbe sensed independently and if SPS conditions at either end aresatisfied their shall be independent signal generation and a decisionbased on the signals generated at both ends should be transmitted tothe generators of WR and loads in NR, as the case may be, so thatthere is adequate redundancy in the SPS. Further as regards totesting the SPS, secondary injection method should be done whilecarrying out the mock testing of SPS, so that any deviations in themeasurements and the measurement circuit for the SPS is alsothoroughly checked.
C) : New SPS for evacuation of power from Unit No.1 at Mauda Stage-II NTPC Generating station :
Back ground: Mouda Stage-I (2x500MW has already been commissioned.The Mouda Stage-II 660MW unit has been declared CoD on 01.02.2017.The total IC of Mouda Complex has became 1660MW. Presently powerfrom Mauda NTPC complex comprising of Stage-I & Stage-II is evacuatedthrough 400kV Mouda-Wardha D/C. The line length is 124km/ckt., withquad moose conductor. CTU intimated that the system remains stableunder full dispatch of about 1520MW on this D/C lines. To addresssevere contingency, CTU has proposed that a suitable SPS is required tobe planned for evacuation of 660MW Unit-1 of Stage-II of Mauda STPS.
An SPS for evacuation of power from Unit No.1 at Mouda Stage-II NTPCwas formulated in the meeting held on 01.02.2017 at Diu.
-
37
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
The SPS formulated and forwarded vide WRPC letter dtd. 13.02.2017(copyenclosed at Annexure-20)
Further in a meeting (date: 30.05.2017) held on review of SPS forevacuation of Mouda SPS in view of trial run of the 2nd 660MW unit atMouda the SPS was further modified (enclosed at Annexure-20).
TCC/WRPC may like to discuss/ note the same.
Item No. 21: Declaration of Transmission elements into commercialoperation by ISTS licensees
PGCIL vide email dated 13.06.17 has intimated the list of transmission
elements into commercial operation for the period from 01.10.2016 to
31.05.2017.
S.No.
Name of the Transmissionelement/Communication Project Name DOCO
1
SCADA/EMS systemupgradation of Main and BackupSLDCs and Sub-SLDcs ofWestern Region
Expansion/Upgradation ofSCADA and EMS systemat SLDCs of WesternRegion
01.10.2016
2 400/220 kV, 500 MVA ICT 3 atDamoh S/S with associated baysInstallation of Bus Reactorand ICT in Western Region 18.11.2016
3Part of 400 kV D/C Navsari –
Boisar from AP 45A/0 to AP332/0
Mundra 31.12.2016
4Part of 400 kV D/C Navsari –
Boisar from AP 332/0 to Boisargantry
Transmission SystemStrengthening in WesternPart of WR for IPPgeneration Projects inCHATTISGARH (IPP D)
31.12.2016
5
400 kV D/C Khandwa Indoreckt 1& 2 along with 2*80 MVArswitchable Line reactors atIndore and associated bays.
Transmission SystemAssociated with Maudastage-II (2x660 MW)generation project
01.01.2017
6500 MVA, 400/220/33 kV ICT 1& 2 at Vadodara GIS along withassociated bays
Installation of ICT and BRin Western Region 24.03.2017
-
38
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
7Pole 1 of 800 kv,3000 MWChampa -KurukshteraHVDCTransmission line
WR - NR HVDCINTERCONNECTOR FORIPP PROJECTS INCHHATTISGARH (Leadregion -NR-II)
24.03.2017
8
Raipur Pooling station-Wardha765kV D/c 2nd line alongwithbay extension at 765kV RaipurPooling station & Wardha S/s.
System Strengthening inRaipur-Wardha Corridorfor IPP projects inChhattisgarh.
31.03.2017
9
1500MVA 765/400kVTransformer(ICT-2) andassociated Bays at 765/400kVRaipur Pooling Station
Installation of Bus Reactorand ICT in Western Region 1.04.2017
10
1500MVA 765/400kVTransformer(ICT-4) andassociated Bays at 765/400kVRaigarh Pooling Station(Tamnar)
Installation of Bus Reactorand ICT in Western Region 01.04.2017
11
Conversion of existing LineReactor at Gwalior end of Satna -Gwalior ckt 1 TL (to be LILOed atOrai) into Switchable LineReactor
INTER-REGIONALSYSTEMSTRENGTHENINGSCHEME FOR WR ANDNR - PART-B
01.04.2017
12
315 MVA 400/220kV Satna ICT –III (as contingency arrangementin parallel with ICT – II)[interimarrangement till thecommissioning of 500MVA400/220kV ICT at Satna(POWERGRID) ][40th SCM onPower System Planning held on01.06.2016]
WESTERN REGIONSTRENGTHENINGSCHEME XVI (cost will bebooked )
15.05.207
13
4 nos. 220 kV line bays (fordownstream system of GETCO )at 765/400/220 kV VadodaraGIS.
Installation of Bus Reactorand ICT in Western Region 20.05.2017
14
2 nos. of 765kV line bays atJabalpur Pooling Station (forGadarwada STPS (NTPC) –Jabalpur Pooling Station 765kVD/C line (TBCB route))
POWERGRID worksassociated with Part-A ofTransmission System forGadarwada STPS of NTPC
31.05.2017
TCC/WRPC may like to note the same.
-
39
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No: 22: Status of Letter of credit (LC) opening against Deviationcharges liability for 2017-18.
WRLDC vide letter No.: WRLDC/MO/2017-18/ dt 03.05.17 has
informed LC amount to the entities who have to open LC for the year
2017-18. The details of LC to be opened by WR entities for the FY 2017-
18 and the status is given below
SlNo.
WR Entity who haveto open LC
No of weeksin which UI
payable
Averagepayable
weekly UI(Rs inlakhs)
LCAmount(Rs inlakhs)
Remarks
1 CSPDCL 40 218 240
2 MSLDC UISettlement account
24 129 142
3 Goa 42 106 117 LCamended
to 5Lakhs on27 June2017
4 D&D 46 36 40
5 JINDAL POWERLIMITED
7 49 54
6 HVDC Bha. 14 1 1
7 Lanco AmarkantakPower Ltd
11 10 11
8 ACBIL 30 39 43
9 RGPPL 13 10 11
10 BALCO 51 152 167
-
40
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
11 CGPL UMPPMUNDRA
34 71 78
12 DCPP JSPL 23 21 23
13 Essar Power MP ltd 29 38 42
14 KSK Mahanadi 10 13 14
15 Vandana Vidyut Ltd 50 8 9
16 GMR Warora Energyltd
18 23 25 LCamended
to 25Lakhs on22 May2017
17 KORBA WESTPOWER Corp. LTD
46 48 53
18 D. B.Power 20 17 19
19 JAYPEE NIGRI TPP 8 89 98
20 Essar Steel Ltd 49 104 114
21 DGEN (TorrentEnergy Limited)
51 9 10
22 GMR ChhattisgarhEnergy ltd
45 17 19
23 DhariwalInfrastructure Ltd.
4 4 4
24 RKM POWERGEN 46 10 11
25 MB POWER 22 40 44
26 JHABUA POWER 46 23 25
27 SKS POWER 52 6 7
-
41
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
28 TRN Energy ltd 32 23 25
29 BARC 4 1 1
All entities who are yet to open LC are requested to open LC at theearliest.
TCC/WRPC may like to note the same.
Item No. 23: Status of Deviation & RRAS charges
Payable/Receivable by WR entities to WR Deviation pool account fundmaintained by WRLDC as on 12th July 17 is given below
Name of DSM Pool Member Total duesPayments
overdue
Principal Principal
CSPDCL 1,34,66,285 9,09,460
MP Power Management Co.Ltd.
0
GETCO LTD. 4,26,22,533
MSLDC UI Settlement account 0
Goa 47,57,693
D&D 0
D&NH 0
NTPC 1
NR
SR
ER
JINDAL POWER LIMITED 20,94,369
-
42
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
HVDC Vin. 0
HVDC Bha. 0
Lanco Amarkantak Power Ltd 0
NSPCL 54,618
ACBIL 44,08,106 6,63,493
RGPPL 0
BALCO 4,75,42,292 9,91,589
CGPL UMPP MUNDRA 1,59,99,894
DCPP JSPL 0
Essar Power MP Ltd 47,03,913
SASAN Power Limited 0
KSK Mahanadi 70,56,549 45,02,653
Vandana Vidyut Ltd 9,99,61,147 9,99,61,147
GMR Warora Energy Ltd. 32,20,607 20,42,546
KORBA WEST POWER Co. LTD 2,24,59,948 2,18,31,711
D. B.Power 0
JAYPEE NIGRI TPP -59,218
Essar Steel India Ltd 6,17,08,533 3,11,81,198
DGEN (Torrent EnergyLimited)
9,78,961
GMR Chhattisgarh Energy Ltd 22,48,905 18,93,615
Dhariwal Infrastructure Ltd. 0
RKM Powergen Pvt Ltd. 2,59,07,522 1,84,22,744
MB Power (Madhya Pradesh)-23,89,959
-
43
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Ltd.
Jhabua Power Ltd 3,11,45,760 2,93,10,777
SKS POWER GENERATION(CHHATTISGARH) LTD
0
TRN Energy Ltd. 46,88,891
BARC (PAO, PREFRE, Tarapur) 5,42,853 2,37,395
HVDC CHAMPA 0
KAPS 3&4(INFIRM) 1,36,885
Major Defaulters in DSM Pool account –Payable
1. Vandana Vidyut – Rs. 9.99 Crores2. Korba West – Rs. 2.24 Crores3. Essar Steel- Rs. 6.17 Crores4. RKM – Rs 2.59 Crores5. Jhabua Power – Rs. 3.11 Crores
In addition to above, the following payments are to be received inDSM Pool account
1. GETCO - Rs 4.26 Crores2. CGPL Mundra - Rs 1.59 Crores3. BALCO – Rs 4.75 Crores
TCC/WRPC may like to note the same.
Item No. 24: Status of Reactive Energy charges
Payable/Receivable by WR entities to Reactive pool account fund
maintained by WRLDC as on 12th July 17 is given below:
-
44
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Total dues Total overdues
Principal Principal
GETCO -1,69,735 -1,69,735
MPMPCL -3,36,634 -3,36,634
CSPDCL -3,63,790 -3,63,790
MSEDCL -6,69,528 -6,69,528
Goa -33,225 -33,225
DD 15,29,360 15,29,360
DNH 36,896 36,896
TCC/WRPC may like to note the same.
Item No. 25: Status of Congestion Charges
Payable/Receivable by WR entities to Congestion charges account fund
maintained by WRLDC as on 12th July 17 is given below
Status of Congestion Charges Payable/Receivable
Last updated on 12/07/17
(+) Payable / (-) Receivable from Pool Amount in Rs.
Totaldues
Paymentsoverdue
Principal Principal
GETCO 0 0
MPPTC 0 0
-
45
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
CSPDCL 0 0
MSEDCL 0 0
Goa 0 0
D&D 0 0
D&NH 0 0
NTPC 0 0
JINDAL POWER 0 0
HVDC Vin. 0 0
HVDC Bha. 0 0
Lanco power ltd 0 0
NSPCL 0 0
ACBIL 0 0
RGPPL 0 0
BALCO 0 0
CGPL UMPP MUNDRA 0 0
DCPP JSPL 0 0
Essar Power MP Ltd 0 0
SASAN Power limited 0 0
KSK Mahanadi 0 0
Vandana Vidyut Ltd -1,348 -1,348
EMCO Energy ltd. 0 0
KORBA WEST POWER Corp. LTD -20,003 -20,003
D. B.Power 0 0
-
46
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
JAYPEE NIGRI TPP 0 0
Essar Steel India Ltd 0 0
DGEN (Torrent Energy Limited) 0 0
GMR Chhattisgarh Energy ltd 0 0
Dhariwal Infrastructure Ltd. 0 0
RKM Powergen Pvt Ltd. 0 0
MB Power (Madhya Pradesh) Ltd. 0 0
Jhabua Power Ltd 0 0
SKS POWER GENERATION (CHHATTISGARH) LTD 0 0
TRN ENERGY 0 0
BARC 0 0
Net Total in Congestion A/c -21,351 -21,351
Major Default by Entities towards Congestion charges –Payable-None
TCC/WRPC may like to note the same.
Item No. 26: Status of Reconciliation of Deviation and REC poolaccount for the period Jan’17 to Mar’17.
WRLDC vide letter dated 20.04.2017, has sent the signed reconciliation
statement for the period Jan’17 to Mar’17 to allDeviation/Congestion/REC pool members as on 15st Apr‘2017. All the
details of payments/receipts of Deviation charges, Congestion charges
and REC during Jan’17 to Mar’17 are also uploaded on WRLDC website(www.wrldc.com/commercial/Pool Reconciliation). The following
members are yet to send back the signed reconciled statement to WRLDC
for the period mentioned above.
-
47
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
DSM Pool Members REC Poolmembers Congestion Pool Members
1CSPDCL
1MPPMCL 1 CSPDCL
2MP PowerManagementCo. Ltd.
2 CSPDCL
2MP Power Management Co.Ltd.
3MSLDC UISettlementaccount
3 MSEDCL
3MSLDC UI Settlementaccount
4 D&D 4 DD 4 D&D
5 NR 5 JINDAL POWER LIMITED
6 ER 6 HVDC Vin.
7 HVDC Vin. 7 HVDC Bha.
8HVDC Bha.
8Lanco Amarkantak PowerLtd
9LancoAmarkantakPower Ltd
9 ACBIL
10 NSPCL 10 CGPL UMPP MUNDRA
11CGPL UMPPMUNDRA 11 DCPP JSPL
12SASAN PowerLimited 12 Essar Power MP Ltd
13KSKMahanadi 13 SASAN Power Limited
-
48
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
As per financial audit, signed reconciled statement is required, all the
above entities are requested to reconcile at their end and send the signed
statement to WRLDC at the earliest. Non receipt of signed statementsfrom the above mentioned entities by 15th July’2017 shall betreated as deemed reconciled and WRLDC shall not reopen anydiscrepancy/mismatch after that.
TCC/WRPC may like to note the same.
14VandanaVidyut Ltd 14 KSK Mahanadi
15Essar SteelIndia Ltd 15 Vandana Vidyut Ltd
16
DGEN(TorrentEnergyLimited)
16KORBA WEST POWER Co.LTD
17RKMPowergen PvtLtd.
17Essar Steel India Ltd
18BARC (PAO,PREFRE,Tarapur)
18 DGEN (Torrent EnergyLimited)
19HVDCChampa 19 RKM Powergen Pvt Ltd.
20MB Power (MadhyaPradesh) Ltd.
21 Jhabua Power Ltd
22SKS POWER GENERATION(CHHATTISGARH) LTD
23 HVDC Champa
-
49
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No.27: Interest calculation statement of Deviation Pool Accountfor the period from July 2016 to Sept 2016
The summary of interest payable/receivable for Deviation pool account ason 12.07.17 is as given below.
Constituent Net interest payable/receivable (in Rs.)
CSPDCL 85,485
MP Power Management Co.Ltd.
GETCO LTD.
MSLDC UI Settlementaccount
Goa
D&D
D&NH
NTPC
JINDAL POWER LIMITED
HVDC Vin.
HVDC Bha.
Lanco Amarkantak Power Ltd
NSPCL
ACBIL
RGPPL
BALCO 31,54,850
-
50
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
CGPL UMPP MUNDRA
DCPP JSPL
Essar Power MP Ltd
SASAN Power Limited
KSK Mahanadi
Vandana Vidyut Ltd 2,76,85,720
GMR Warora Energy ltd.
Korba West Power Co.Ltd
D. B.Power
Jaypee Nigrie TPP
Essar Steel India Ltd
DGEN (Torrent EnergyLimited)
GMR Chhattisgarh EnergyLtd
Dhariwal Infrastructure Ltd.
RKM POWERGRN Pvt Ltd. 4,43,520
MB POWER LTD
JHABUA POWER LTD 9,13,016
SKS 12,147
TRN
BARC
Note: +ve indicates payable by the constituent and –ve indicates
receivable by the constituent
TCC/WRPC may like to note the same.
-
51
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No. 28: Interest calculation statement of Reactive ChargeAccount for the period from July 2016 to Sept 2016
The summary of interest payable/receivable for Reactive Charge accountas on 12.07.17 is as given below
Constituent Net interest payable/ receivable (inRs.)
CSPDCL -76,645
MP Power Management Co.Ltd. -3,56,140
GETCO LTD. -2,45,518
MSEDCL
Goa
D&D
D&NH
Note: +ve indicates payable by the constituent and –ve indicatesreceivable by the constituent.
TCC/WRPC may like to note the same.
Item No. 29: Interest calculation statement of Congestion ChargeAccount for the period from Apr 2016 to Jun 2016
The summary of interest payable/receivable for Congestion Chargeaccount as on 12.07.17 is as given below.
Constituent Net interest payable/receivable (in Rs.)
CSPDCL 10,496
MP Power Management Co. Ltd. 13,06,160
-
52
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
GETCO LTD.
MSLDC UI Settlement account
Goa
D&D
D&NH 10,960
NTPC
JINDAL POWER LIMITED
HVDC Vin.
HVDC Bha.
Lanco Amarkantak Power Ltd 95,646
NSPCL
ACBIL
RGPPL
BALCO
CGPL UMPP MUNDRA
DCPP JSPL 1,731
Essar Power MP Ltd -10,57,458
SASAN Power Limited 2,61,723
KSK Mahanadi
Vandana Vidyut Ltd -2,25,836
EMCO Energy ltd.
Korba West Power Co.Ltd
D. B.Power -47,582
-
53
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Jaypee Nigrie TPP
Essar Steel India Ltd
DGEN (Torrent Energy Limited) 1,143
GMR Chhattisgarh Energy Ltd
Dhariwal Infrastructure Ltd.
RKM POWERGRN Pvt Ltd. -4,555
MB POWER LTD 5,226
JHABUA POWER LTD -36,434
SKS POWER
TRN
Note: +ve indicates payable by the constituent and –ve indicatesreceivable by the constituent.
TCC/WRPC may like to note the same.
ITEM NO. 30: Performance of WR Grid During January 2017
To June 201730.1 System Performance
Frequency:During the period of January 2017 to June 2017, the grid operated in the
IEGC frequency range of 49.90 Hz to 50.05 Hz for 70.46 % to 74.49 % of
time. The frequencies below 49.9 Hz were from 5.30 % to 9.09 % of time
during January 2017 to June 2017. In higher frequency regime, system
frequency remained above 50.05 Hz from 16.45 % to 23.35 % of time
during January 2017 to June 2017. The monthly average frequency was
around 50.00 Hz. Summary of frequency particulars is given below
-
54
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Frequency
particular
January
17 (% of
time)
Feb17(%
of time)
Mar17(%
of time)
Apr17(%
of time)
May17(%
of time)
June17(%
of time)
IEGC band
(49.9-50.05) 70.46 73.99 73.56 74.49 71.45 75.50
f>50.05 23.35 20.71 17.50 16.45 19.46 18.69F
-
55
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
2017 is placed at Annexure- 30.2. In order to control incidences of highvoltages during low load periods, installation of reactors at following
locations as planned by various utilities is in the process as per following
schedule:
Sl.No.
400 kVSub/Stn.
Size(MVAr)
Implementingagency
Expected date ofcommissioning
1 Nanded 125 MSETCL June – 2017
2 Sholapur 125 MSETCL Dec – 2017
3 Kolhapur 125 MSETCL Dec – 2017
4 Akola 125 MSETCL June – 2017
5 ISP 125 NHDC June – 2017
(Tendering done)
6 Satpura 50 MPPGCL Dec-2017
In Maharashtra network following more reactors are under progress tocommissioned:
a. Commissioning of 125 MVAR shunt reactor at Karad, Kolhapur,Solapur, by MSETCL –Tender are floated for above 3 Numbersubstation.
b. Planning of additional shunt reactors in south Maharashtra –shunt reactors are planned under phase- II by MSETCL.Proposed 125 MVAR Bus reactors are at following 400 KVsubstations:-
1. Chandrapur-II2. Koradi-II3. Khaparkheda4. Bhusawal-II5. Lonikand-II6. Chakan7. Kudus
He further informed that MSETCL is under process to avail grantthrough PSDF to install Phase-II reactors.
TCC/WRPC may like to update/note as above.
-
56
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Item No. 31: Anticipated Power Supply Position In WesternRegion For The Period From August 2017 To October2017
The anticipated power supply position in the region for the period from
August 2017 to October 2017 is at Annexure-31. The period underconsideration is monsoon season and it is lean demand period. The
anticipated regional demand is likely to vary between 42500 MW to 49000
MW and the capacity surplus will be around 10.0 - 15.0 %. In terms of
energy, the unrestricted requirement is expected to range from 28500
MUs to 32700 MUs with regional energy surplus of around 10.0 % to 14.0
%.
TCC/WRPC may like to note as above.
Item No. 32. Status of completion of 765/400 kV and above on goingtransmission schemes being executed/implemented bytransmission agencies.
The updated status on various ongoing transmission schemes for the year2017-18 as per the current information available is as follows : -
Sl.No.
Name of the Line Cktkm
TargetCompletion
Date
Remarks
Powergrid
1 400 kV Vapi – Kudus D/CLine
234 Dec -17 ROW/Forestproblem
2 765 kV Wardha Nizamabad-Hyderabad D/C
577+486
July 17 765 kV WardhaNizamabadcommissioned inMarch-17.
765 kVNizamabad-
-
57
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Hyderabad D/C –expected in July2017.
3 400 kV Aurangabad –Boisar line D/C line
690 Sept -17
4 765 kV Aurangabad (PG) –Padghe (PG) D/C
570 Dec -17
5 800 kV Champa –Kurukshetra Bipole
2574 One pole testcharged on25.01.2017
Pole two expectedat end of July2017.
6 400 kV MOUDA –BETUL PG LINES
393 July -17
7 800 kV Raigarh-PugalurHVDC Bipole
3676 Nov-19 4 out of 10packagesawarded
8 400 kV Lara-Champa 224 July 17
9 765kV Bhuj-Banaskamta DC 583 July 18
10 400 kV Mundra UMPP – BhujDC
190 Dec 18
Chhattishgarh
1 400 kV DCDS Raipur (Raita)-Jagdalpur(DCDS)
Commissioned on26.05.2017
2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILS/s Raigarh. Idle charged on11.8.2015 for anti theftreason
July -17
Gujarat
1 400 kV D/C Vadinar-Amreliline
116.85 Dec -17
2 400kV APL-Hadala LILO toHalvad
89.40 Oct -17
-
58
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
3 400 kV D/C Amreli-Kasorline(Part-1)
160.95 March -18
4 400 kV D/C Amreli-Kasorline(Part-2)
164.34 March -18
5 400 kV D/C Amreli-Kasorline(Part-3)
145.26 March -18
6 400 kV Varsana-Halvad 143.39 March -18
7 400 kV Wanakbori-Soja DC 213.17 May 18
8 400 kV Soja-Zerda DC 268.92 Nov 18
9 400 kV Hadala-Shapar D/c 124.34 Mar 19
10 400 kV Bhogat- Kalawad D/C 260.57 Mar 20
11 400 kV Bhachuunda-VarsanaD/c
276.16 June 20
Madhya Pradesh
Maharashtra (STU)
1 400 kV Bableshwar-KudusD/C (Quad)
July -18 Forest clearanceawaited, severeROW problem
Adani Transmission Ltd
1 765 kV switching station atRajnandgaon.
- July 2017
2 Raipur Pool - Rajnandgaon765 kV D/C line.
40 Completed
3 Rajnandgaon – new poolingstation at near Warora 765 kVD/C line.
266 Mar’2018
4 400 / 220 kV Substation atMorena.
- Dec’2017
5 Gwalior 765 /400 kV – Morena400 kV D/C
48 July 2017
6 Vindhyachal-IV&V STPP -Vindhyachal
27 Dec’2017
-
59
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Pool 400 kV D/C (Quad)2nd line.
7 2-Nos 400 kV Line bays atVindhyachalIV. STPP Switchyard.
- Dec’2017
8 1-No 765 kV line bay at SasanUMPP.
- Dec’2017
9 Sasan UMPP - VindhyachalPooling station 765 kV S/Cline.
6 Dec’2017
10 LILO of one circuit ofAurangabad – Padghe 765 kVD/C line at Pune.
64 Mar’2018
11 Raigarh (Kotra) – Champa(Pool) 765 kV 2nd S/C Line.
94 Dec’2017
12 Champa (Pool) –Dharamjaygarh 765 kV2nd S/C line.
49 Dec’2017
13 Bilaspur pooling station –Rajnandgaon765 kV D/C line.
162 Dec’2017
14 Sipat – Bilaspur Poolingstation 3rd 765 kV S/C line.
Dec’2017
15 1 No 765 kV Line bay at SipatSTPPS of NTPC.
Completed &Charged on30.05.2017
TCC/WRPC may like to note as above.
ITEM No. 33 Commissioning of New Generating Units In WesternRegion and the capacity expected to be commissionedduring the current Year 2017-18.
The status regarding Generating units, commissioned /expected tobe commissioned during the current year 2017-18 according the availableinformation is as below:
-
60
Agenda notes for 34th TCC/WRPC Meeting on 27-28.07.2017
Name of the Power Projects UnitNo.
Capacity(MW)
Date of Commissioning/Schedule Date
Gujarat
NIL
Chhattisgarh
NIL
Maharashtra
CHANDRAPUR 8 500 COD on 04.06.2016
CHANDRAPUR 9 500 Commissioned on21.03.2