Page 1: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

WPM ad-hoc group report TP#17 closing

Group Name: WPM (TP adhoc)Source: convener WPM Roland Hechwartner, [email protected] Date: 2015-05-22Agenda Item: TP#17, Item: 11

TP-2015-0697-WPM_status_report_at_TP17_closing

Page 2: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

Target Timeline for Release 2

2

TP15Jan 2015

TP17 TP18July 2015

TP20Nov 2015

TP23May 2016

R1 Publication and ratification

TP15.1

R2 feature WIs

R2 work program

Marcom provides

market view

Initial version of Release

description - check list for

release finalization

Target date for Stage 1 freeze R2

Essential Corrections - MNT

Small Technical Enhancements - STE (R2)

Target date for Stage 2 freeze R2

Target date for Stage 3 freeze R2

Source: TP-2015-0578R03-Release_2_planning_considerations

Page 3: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

Feature Work Item View“Release 2 candidates”

© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening

Prim. WG Work Item Name related TS / TR

Start / RE-APPROVAL Target Date % compl

WG5, WG1, WG2, WG3,

WG4WI 0025 Generic Interworking with Area Networks

CRs to TR-0007 TS-0001 TS-

0003

TP#15 TP#21 20%

WG1, WG2, WG3, WG5 WI-0026 Efficient Communications

CRs to TR-0001 TS-0002 TS-0001 TS-

0004 TS8,9,10 TS-

05,06

TP#15 TP#21 5%

WG2, WG1 WI-0024 LWM2M Interworking TS-0014 TP#16 TP#23 40%WG2 WI-0011 Service Component Architecture TS-0007 TP#9 TP#17 100%WG4 WI-0021 Secure Environment Abstraction TS-0016 TP#14 TP#20 10%

WG5 WI-0005 Abstraction & Semantics Capability Enablement

TR-0007 TS-0002 TS-0001 TS-0004 TS-0011 TS-

0012

TP#16 TP#23 15%

WG1, WG2, WG3, WG4 WI-0029 App-ID Clarification

CRs to TS-0001, TS-0002, TS-0003, TS-0004, TS-0011

TP#16 TP#18 25%

WG1, WG2, WG4, WG5 WI-0030 M2M Application & Field Domain Component Configuration CRs to TS-

0002 TP#16 TP#18 5%

WG1, WG2, WG3, WG4 WI-0031 Optimized Group-based Operation

CRs to TS-0001, TS-0002, TS-0004, TR-0001, TR-00012

TP#16 TP#19 TP#20 TP#21

10%

Page 4: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

Work Item Status

© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening

Prim. WG Work Item Name related TS / TR

Start / Re-Approval

Target Date

% compl

WG1 WI-0015 oneM2M Use Case Continuation TR-0001 n.a. n.a. n.a.WG1 WI-0028 Industrial Domain Enablement TR-0018 TP#15 TP#18 45%

WG1, WG5 WI-0017 Home Domain Enablement TR-0013 TR-0017 TP#13 TP#21 50%

WG2 WI-0018 oneM2M and AllJoyn Interworking TR-0014 TP#14 TP#18 70%WG3 WI-0020 Service Layer API Core Principles TR-0015 TP#14 TP#19 5%

WG4 WI-0016 End-to-End Security and Group Authentication

TR-0012 TP#11 TP#20 40%

WG4 WI-0019 Dynamic Authorization for IoT TR-0019 TP#14 TP#18 5%

WG4 WI-0023Study of Authorization Architecture for Supporting Heterogeneous Access Control Policies

TR-0016 TP#14 TP#20 35%

WG6 WI-0022 Interoperability Testing TS-0013 TP#14 TP#25 80%

WG6 WI-0027 Testing Framework TS-0015 TP#15 TP#22 30%

WG6 WI-0032 Conformance TestTS-0017, TS-0018, TS-0019

TP#16 TP#26 5%

Page 5: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

Items for INFORMATIONRelease-1 Deliverables in Maintenance

WG ID Name Rel 1Version

latestVersion

WG1 TS-0002 Requirements V1.0.1

WG1 TS-0011 Common Terminology V1.2.1 V1.3.0

WG2 TS-0001 Functional Architecture V1.6.1 V1.8.0

WG3 TS-0004 Service Layer Core Protocol V1.0.1 V1.1.0

WG3 TS-0008 CoAP Protocol Binding V1.0.1

WG3 TS-0009 HTTP Protocol Binding V1.0.1

WG3 TS-0010 MQTT Protocol Binding V1.0.1 V1.1.0

WG4 TS-0003 Security solutions V1.0.1 V1.1.0

WG5 TS-0005 Management enablement (OMA) V1.0.1 V1.1.0

WG5 TS-0006 Management enablement (BBF) V1.0.1 V1.1.0

© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening

Page 6: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

Items for INFORMATIONRelease-2 Deliverables

WG ID Name latestVersion Start Change

ControlRel.2

FreezeRel. 2

Approval

WG1 TS-0002 Requirements V2.0.0 n.a. TP18 TP25?WG1 TS-0011 Common Terminology V2.0.0 n.a. TP23 TP25?WG2 TS-0001 Functional Architecture V2.1.0 n.a. TP20 TP25?WG2 TS-0007 Service Components V0.8.0 TP9 TP15 TP15 TP17WG2 TS-0014 LWM2M Interworking V0.2.0 TP16 TP21 TP21 TP23WG3 TS-0004 Service Layer Core Protocol V1.1.0 TP17 TP23 TP25?WG3 TS-0008 CoAP Protocol Binding V1.0.1 TP23 TP25?WG3 TS-0009 HTTP Protocol Binding V1.0.1 TP23 TP25?WG3 TS-0010 MQTT Protocol Binding V1.1.0 TP17 TP23 TP25?WG4 TS-0003 Security solutions V1.0.1 TP23 TP25?

WG4 TS-0016 Secure Environment Abstraction V0.0.1 TP16 TP18 TP19 TP20

WG5 TS-0005 Management enablement (OMA) V1.1.0 TP23 TP25?

WG5 TS-0006 Management enablement (BBF) V1.1.0 TP23 TP25?

WG5 TS-0012 Base Ontology V0.2.0 TP15 TP18 TP19 TP20

© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening

Page 7: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

Items for INFORMATIONTesting Deliverables

WG ID Name latestVersion Start Change

Control Freeze Approval

WG6 TS-0013 Interoperability Testing V0.0.4 TP15 TP18 TP21 TP22

WG6 TS-0015 Testing Framework V0.2.0 TP16 TP18 TP21 TP22

WG6 TS-0017 Implementation Conformance Statements V0.0.1 TP17 TP21 TP22 TP26

WG6 TS-0018 Test Suite Structure and Test Purposes V0.0.1 TP17 TP21 TP24 TP26

WG6 TS-0019Abstract Test Suite & implementation eXtra Information for Test

V0.0.1 TP19 TP23 TP24 TP26

© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening

Page 8: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

Items for INFORMATIONTechnical Reports in development

© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening

WG ID Name LatestVersion Freeze Approval

WG1 TR-0001 Use Cases Collection V1.6.0 n.a. n.a.

WG1 TR-0005 Roles and Focus Areas V0.0.4 n.a. n.a.

WG1 TR-0013 Home Domain Enablement V0.2.1 TP17 TP18

WG1 TR-0018 Industrial Domain Enablement V0.1.1 TP17 TP18

WG2 TR-0014 oneM2M and AllJoyn Interworking V0.0.0 TP17 TP18WG3 TR-0015 Service Layer API Core Principles V0.1.0 TP18 TP19

WG3 TR-00yy Language Bindings for specific target programming languages V0.0.0 TP18 TP19

WG4 TR-0012 End-to-End-Security_and_Group_Authentication V0.3.0 TP18 TP20

WG4 TR-0016 Authorization Architecture and Access Control Policy V0.1.1 TP19 TP20

WG4 TR-0019 Dynamic Authorization V0.0.1 TP18 TP20

WG5 TR-0007 Study on Abstraction and Semantics Enablement V2.5.0 TP17 TP18

WG5 TR-0017 Home Domain Abstract Information Model V0.3.0 TP20 TP21

Page 9: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

Next Steps• Update of report post TP#17

– latest versions of TSs and TRs– WIs agreed during TP17

• Work program status information on member portal – Work in progress

• Prepare Release 2 description for TP#18 finalization– Goal: high level technical description of Rel. 2– Input / review comments invited

• See initial draft skeleton in TP-2015-0688 Release-2 control document

– WPM 17.1 targeted to progress Release 2 description – Final drafting and agreement during TP#18

© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening

Page 10: WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date:

Next Meetings / Calls• Conference Call– WPM 17.1: July 1 @ 14:00 -15:00 (GMT)

• Face-to-Face– WPM#18.0: July 20-24, ad-hoc as required