development – project management – procurement – construction – operation

Installation of FINO II

wpd offshore

Page 2: Wpd Offshore Eow 2009 Final
Page 3: Wpd Offshore Eow 2009 Final

France:3 windfarms, 39.5 MW2 windfarms under construction, 20 MW

Operational wpd onshore projects Europe

04/10/23 3

Portugal:1 solarfarm, 9 MWp

Spain:2 windfarms, 64.5 MW

Italy:3 solarfarm, 2.892 MWp

Sweden:1 windfarm under construction, 4 MW

Belgium:1 windfarm in operation, 9 MW

Croatia:1 windfarm i.o., 11.9 MW1 windfarm u.c., 9.6 MW

Germany:164 windfarms i.o., 1,437.27 MW17 windfarms u.c., 118.9 MW9 solarfamrs, 7.37 MWp11 biogas, 8 MW

Page 4: Wpd Offshore Eow 2009 Final

wpd onshore projects worldwide

04/10/23 4

Australia:1 windfarm in planning stage (2011), 30 MW

Argentinia:1 windfarm in planning stage (2011), 1.8 MW

Canada:4 windfarms in planning stage (2010/2011), 40 MW

Panama:3 windfarms in planning stage (2010/2011), 32 MW

Taiwan:4 windfarms i.o. , 199.5 MW1 windfarm u.c., 43.7 MW12 windfarms in planning stage (2010/2011), 243.8 MW

Europe:RE-Projects in operation, 1,589.64 MWRE-Projects under construction, 152,5 MWRE-Projects in planning stage, 6,100 MW

Page 5: Wpd Offshore Eow 2009 Final

Strategy

Development of a diversified European offshore wind farm portfolio

Expertise in project and construction management – also offered to third parties

Opportunity to ownership and operation at later stage

Achievements

2.0 GW projects consented and sold

9 - 10 GW projects under development

Resources

European presence (project developments in 8 countries)

60 employees, combining the record of developing 18 offshore-windfarms in Europe with the construction experience of five offshore wind projects

wpd Offshore Wind Business Highlights wpd Offshore Wind Business Highlights

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

wpd offshorewpd offshore

04/10/23

Page 6: Wpd Offshore Eow 2009 Final

Site evaluation Micrositing Permission process Environmental and technical studies Public relations

Site evaluation Micrositing Permission process Environmental and technical studies Public relations

Ongoing development of 9 -10 GW in ongoing permission procedures in Europe

Background: Successful completion of the development of 5 wind farm projects(all permissions granted):

Swedish Kriegers Flak II

2 German Baltic Sea projects (Baltic I, Kriegers Flak I)

2 German North Sea projects (Hochseewindpark Nordsee, He Dreiht)

Bird watching at Suurheikka (FI), September 2008

Dropping of C-PODs counting porpoises at North-Sea project Aiolos (DE), July 2008

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

wpd offshorewpd offshore

04/10/23

Page 7: Wpd Offshore Eow 2009 Final

Project PipelineProject Pipeline

Baltic I, GER (76 MW)

Kriegers Flak I, GER (329 MW)

HochseeWP Nord-see, GER (400 MW)

He Dreiht, GER (595 MW)

Kriegers Flak III, DAN (455 MW)

Korsnäs, FIN(600-800 MW)

Suurhiekka, FIN(400-600 MW)

Klocktärnan**, SE(660 MW)

Storgrundet**, SE(230-265 MW)

Finngrunden, SE (1,300-1,400 MW)

Kriegers Flak II, SE (640 MW)

Aiolos, GER (1,050 MW)

5 projects with a total capacity of ~ 2,040 MW permitted and sold

7 projects with a total capacity of ~ 4,500 MW (net) in advanced permission process

10 projects with a total capacity of ~ 5,000 MW (net) in early permission stage

Several projects under site evaluation

Calvados, F(250 MW)

Several projects in siteevaluation

Kaikas, GER (440 MW)

Notos, GER (250 MW)

Fecamps, F(260 MW)

Projects X+Y+Z, F (450+250+750MW)

Vendée, F(600MW)

Several projects in site evaluation/ early development stage

Gargano N*, IT(680 MW)

Gargano S*, IT(855 MW)

* 75% owned** 80% owned

Participation in round3 with JV partner

10.04.23

Page 8: Wpd Offshore Eow 2009 Final

Kriegers Flak I (80 turbines)

sold to EnBW Kriegers Flak II (128 turbines)

sold to Vattenfall Kriegers Flak III (91 turbines)

owned by wpd

Total of 320 turbines (up to 1,600 MW)

Developed by wpd since 2001

Europes largest advanced project area in terms of area, turbines and capacity

Area in the focus of EU: -Adamovitsch´s „best practice area“-150m € for grid connection

Example: Development of Kriegers Flak AreaExample: Development of Kriegers Flak Area

10.04.23

Page 9: Wpd Offshore Eow 2009 Final

Installation of met mast for Storgrundet (SE), Oktober 2008

Excellent relationships with banks Background: term sheets negotiated for Baltic I project

Calculations/ financial modelling Business/deal structuring Preparation of fact books/ project presentations Coordination of approach of and negotiations with banks Syndication of debt facilities

Calculations/ financial modelling Business/deal structuring Preparation of fact books/ project presentations Coordination of approach of and negotiations with banks Syndication of debt facilities

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

wpd offshorewpd offshore

10.04.23

Page 10: Wpd Offshore Eow 2009 Final

M. Lehnhoff - 10

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

• Budget planning• Time Scheduling• Resource planning and set up of project team,

work packages and responsibilities• Identification of requirements and constraints of project and market• Management of resources and project team with spirit and commitment

Project Management

wpd offshorewpd offshore

15.09.2009

Page 11: Wpd Offshore Eow 2009 Final

wpd offshorewpd offshore

15.09.2009 M. Lehnhoff - 11

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

• Core Competences in all work packages of an offshore wind farm:• Geotechnical know-how• Foundation concepts• Wind turbine technology• Offshore transformer station for structural as well as electrical

design• Inter array grid

Project Management

Page 12: Wpd Offshore Eow 2009 Final

• Permission management and Compliance• Management of EIA studies• Certification• Park Concept and Layout• Cooperation with transmission system operator

M. Lehnhoff - 12

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

Design Basis & Certification

wpd offshorewpd offshore

15.09.2009

Page 13: Wpd Offshore Eow 2009 Final

M. Lehnhoff - 13

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

Design Basis & Certification

• Reports on site conditions• Supervision of soil investigation• Basic Reports on site conditions

and technical concept • Design Basis• Project certification

management

wpd offshorewpd offshore

15.09.2009

Page 14: Wpd Offshore Eow 2009 Final

M. Lehnhoff - 14

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

Procurement & Contract Management

• Multi-contracting or EPC Concept • Identifcation of applicable rules• Establishing of ITTs• Market Analysis and evaluation of alternatives• Legal Management of contracts• Contract Management

• Interface Management• Risk Analysis

• Compliance of all contracts and procedures to the permission and applicable rules and regulations

wpd offshorewpd offshore

15.09.2009

Page 15: Wpd Offshore Eow 2009 Final

M. Lehnhoff - 15

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

Construction ManagementDesign & Manufacturing

• Design evaluation, consultancy• Production Planning• Health, Safety and Environment:

Concept and Implementation• Claim Management• Commissioning onshore

wpd offshorewpd offshore

15.09.2009

Page 16: Wpd Offshore Eow 2009 Final

Construction ManagementQuality Control

• Factory Audits• Material testing• Welding tests• Coating monitoring• Factory acceptance

tests

M. Lehnhoff - 16

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

wpd offshorewpd offshore

15.09.2009

Page 17: Wpd Offshore Eow 2009 Final

M. Lehnhoff - 17

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

Construction ManagementTransport & Installation

• Logistics for harbours, transport or accommodation vessels, construction vessels

• Site Management for preassembly, transport, installation and commissioning offshore until complete take-over

wpd offshorewpd offshore

15.09.2009

Page 18: Wpd Offshore Eow 2009 Final

M. Lehnhoff - 18

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

Operation Management

• Technical management• Commercial management• Assistance according to service concept

(transport and installation vessels, disposals etc.)• Continuous optimisation by evaluation of

operating and service data

wpd offshorewpd offshore

15.09.2009

Page 19: Wpd Offshore Eow 2009 Final

M. Lehnhoff - 19

ProjectDevelopment

ProjectDevelopment IRPPIRPP ServiceService

Project Management

Project Management

Design Basis& Certification

Design Basis& Certification

ConstructionManagement

ConstructionManagement OperationOperationProcurementProcurement

wpd offshorewpd offshore

The Team

• Well experienced team of engineers, lawyers, geologists and marine-, QA- and HSE experts

• 20 employees, constantly growing• Team members bring in experience from several offshore projects such

as: Utgrunden, Beatrice, Alpha Ventus, Baltic I, Kriegers Flak• Vast project management experience• Know-how in desktop studies, design evaluations and manufacturing as

well as installation survey

15.09.2009

Page 20: Wpd Offshore Eow 2009 Final

contact

Achim Berge Martin LehnhoffManaging Director Managing Director

wpd offshore GmbH wpd offshore service [email protected] [email protected]

T+49 421 168 66 10 T+49 421 168 66 10www.wpd.de www.wpd.de