WP3 24 July 2014 QMUL/GAB3 QMUL Wedge Bonder: believed to be K&S 484. Operated ok in 2013 but “very” obsolete. Presumably more so by onset of upgrade production.TRANSCRIPT
![Page 1: WP3 24 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Since 10 July 2014 16 th Re-installed blind on cabinet (JagM) 18 th Serviced Nitrogen](https://reader036.vdocuments.us/reader036/viewer/2022082600/5a4d1b237f8b9ab0599960ce/html5/thumbnails/1.jpg)
WP3 24 July 2014 QMUL/GAB 1
Status of Sensor Testing Setup at QMUL
Since 10 July 2014
16th Re-installed blind on cabinet (JagM)
18th Serviced Nitrogen generator
21st Mastic Cabinet for light-tghtness (JagM); ATLAS12 probeplan + drgs from Bart.
23rd Further checked probe station initialisation + motion control
24th Ran StripChecker.vi (v2013 + ATLAS07 mechanical) => Wafer alignment & strip probe pattern OK.
(essentially where we were before the 2013 evacuation)
![Page 2: WP3 24 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Since 10 July 2014 16 th Re-installed blind on cabinet (JagM) 18 th Serviced Nitrogen](https://reader036.vdocuments.us/reader036/viewer/2022082600/5a4d1b237f8b9ab0599960ce/html5/thumbnails/2.jpg)
WP3 24 July 2014 QMUL/GAB 2
In order to START scanning ATLAS Sensors:
• Install CAV/QMUL chuck adapter (returned by Bart + ATLAS12 Sensor W661) / Check chuck
planarity (uniform needle scrub)
• Re-cable GPIB to instruments
• Make/install Bias and Signal Cables (+ Patch panels if necessary)
• Make new bias stand-off box (1000V) for Wayne-Kerr LCR meter. (+ install protection unit).
• Check functionality of instruments & strip-checker measurements (using ATLAS07 mini-sensors?)
• Re-commission manual wire bonder <= needed to strap bias lines form sensor to frame!
• => not a show-stopper, but should consider whether to replace K&S 484.
• Trial-test ATLAS12 W661 sensor .. compare with Cambridge data..
Further ahead:
(trivially) incorporate UPS
Design/install vacuum reservoir and pump switch.
Replace video camera (flakey when cold)?
Install/ test updated Cavendish Labview suite (modify for QM “Nucleus” - Win2k).
Bart’s scheme to speed up probing using probe card / switch matrix.
Need new RA + training (GAB thinly spread and ageing).
![Page 3: WP3 24 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Since 10 July 2014 16 th Re-installed blind on cabinet (JagM) 18 th Serviced Nitrogen](https://reader036.vdocuments.us/reader036/viewer/2022082600/5a4d1b237f8b9ab0599960ce/html5/thumbnails/3.jpg)
WP3 24 July 2014 QMUL/GAB 3
QMUL Wedge Bonder: believed to be K&S 484. Operated ok in 2013 but “very” obsolete. Presumably more so by onset of upgrade production.