wp1 – management & knowledge dissemination wp1 – management & knowledge dissemination...

6
WP1 – Management & WP1 – Management & Knowledge Dissemination Knowledge Dissemination 1) Aims 2) Organisation 3) Plans

Upload: haley-higgins

Post on 28-Mar-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WP1 – Management & Knowledge Dissemination WP1 – Management & Knowledge Dissemination 1)Aims 2)Organisation 3)Plans

WP1 – Management & WP1 – Management & Knowledge DisseminationKnowledge Dissemination

1) Aims

2) Organisation

3) Plans

Page 2: WP1 – Management & Knowledge Dissemination WP1 – Management & Knowledge Dissemination 1)Aims 2)Organisation 3)Plans

AimsAims

• Three jobs:

Management of DS

Dissemination of information

Comparison between facilities

• Carried out by 3 bodies:

GB + MB + CB

DB + members of EURO

“Experts” led by Carlo Wyss (input from WPM, MB, etc)

Page 3: WP1 – Management & Knowledge Dissemination WP1 – Management & Knowledge Dissemination 1)Aims 2)Organisation 3)Plans

TasksTasks

Coordination task: coordination of the contractual, financial and administrative aspects of the Design Study, including delivery of annual reports and control of the funds.

Oversight task: oversight of the technical and scientific aspects of the Design Study, including the monitoring of milestones and ensuring that deliverables are produced on time.

Knowledge task: management of the knowledge generated by the Design Study, including its protection, use and dissemination.

Comparison task: comparison between the three facilities, based on their physics reach and cost, taking into account the knowledge of the neutrino oscillation parameters available at that time. Determination of the criteria to be used. Production of a priority list, based on this comparison.

Page 4: WP1 – Management & Knowledge Dissemination WP1 – Management & Knowledge Dissemination 1)Aims 2)Organisation 3)Plans

DisseminationDissemination

• All publications (internal & external) on website

• All external publications refereed:

journals – DB member + consortium expert

proceedings – expert

• Referees responsible for getting comments

• Making sure they’re implemented

• Reporting to DB

• DB authorisation required before publication

Page 5: WP1 – Management & Knowledge Dissemination WP1 – Management & Knowledge Dissemination 1)Aims 2)Organisation 3)Plans

ComparisonComparison

• Needs to be independent:

Carlo Wyss identified as chair

Other experts to be identified

Use IAP

• Exact mode of operation still to be defined

• Will use

performance from machine design

performance of detectors

physics reach

• Output:

Comparison

Recommendations for next step(s)

Page 6: WP1 – Management & Knowledge Dissemination WP1 – Management & Knowledge Dissemination 1)Aims 2)Organisation 3)Plans

PlanningPlanning

Action Done by

Create website M1

Create IAP M1

Create DB M1

Find other external “experts” M3

Define how comparison should be made M6

Report of 1st year activities M12

Define criteria for comparison M18

Interim report M24

Project review documentation M36

Comparison between facilities M46

Final report M48