1) Aims
2) Organisation
3) Plans
AimsAims
• Three jobs:
Management of DS
Dissemination of information
Comparison between facilities
• Carried out by 3 bodies:
GB + MB + CB
DB + members of EURO
“Experts” led by Carlo Wyss (input from WPM, MB, etc)
TasksTasks
Coordination task: coordination of the contractual, financial and administrative aspects of the Design Study, including delivery of annual reports and control of the funds.
Oversight task: oversight of the technical and scientific aspects of the Design Study, including the monitoring of milestones and ensuring that deliverables are produced on time.
Knowledge task: management of the knowledge generated by the Design Study, including its protection, use and dissemination.
Comparison task: comparison between the three facilities, based on their physics reach and cost, taking into account the knowledge of the neutrino oscillation parameters available at that time. Determination of the criteria to be used. Production of a priority list, based on this comparison.
DisseminationDissemination
• All publications (internal & external) on website
• All external publications refereed:
journals – DB member + consortium expert
proceedings – expert
• Referees responsible for getting comments
• Making sure they’re implemented
• Reporting to DB
• DB authorisation required before publication
ComparisonComparison
• Needs to be independent:
Carlo Wyss identified as chair
Other experts to be identified
Use IAP
• Exact mode of operation still to be defined
• Will use
performance from machine design
performance of detectors
physics reach
• Output:
Comparison
Recommendations for next step(s)
PlanningPlanning
Action Done by
Create website M1
Create IAP M1
Create DB M1
Find other external “experts” M3
Define how comparison should be made M6
Report of 1st year activities M12
Define criteria for comparison M18
Interim report M24
Project review documentation M36
Comparison between facilities M46
Final report M48