wp 5 state of the art - vega november, 30th 2011 budapest

34
WP 5 State of the art - VEGA November, 30th 2011 Budapest

Upload: barbara-snider

Post on 03-Jan-2016

42 views

Category:

Documents


0 download

DESCRIPTION

WP 5 State of the art - VEGA November, 30th 2011 Budapest. Main tasks Pre-feasibility and feasibility study SMEs Database and interviews. What is WP 5?. How did we organize our work?. Common template for: Pre-feasibility study (do decide wich idea is the most suitable) - PowerPoint PPT Presentation

TRANSCRIPT

WP 5

State of the art - VEGA

November, 30th 2011

Budapest

What is WP 5?

Main tasks

- Pre-feasibility and feasibility study

- SMEs Database and interviews

How did we organize our work?

Common template for:

- Pre-feasibility study (do decide wich idea is the most suitable)

- Feasibilty study (to analize deeply this idea in all its aspects)

- SMEs Database and Interview

- Template proposed by the WP leader, discussed and approved by the partnership)

Lead PartnerMid Pannon Regional Development company

- From three possible parks, one idea was selected, Alba Innovation Zone

- The method used for developing the feasibility study was the following:1.Re-analysis of former results (WP3.1. and 3.2.)2.Document analysis3.Field survey4.Face-to-face consultations

Lead PartnerMid Pannon Regional Development company

No production activities planned in the park but R&D, services and education

There were two concepts for utilization:

- A ‘campus’ nature, which leaves the total area of land undivided and

- the new organisation move in share property rights on the basis of gross floor area (this is the preferred solution)

Lead PartnerMid Pannon Regional Development company

Number and type of possible tenants/utilization:

- 30 small and medium sized companies (mostly in technology incubator and R&D centre)

- 3 higher education institutes- 5 R&D organizations (with approx. 10 labs)- 1 technology incubator- 1 innovation service centre- Other service facilities

CERTHCenter for Research and Technology Hellas

Scale of Intervention

Regional innovation stakeholders point out the need for advanced liaison services to bridge the gap between Greek industry and

research community through extroversion activities

CERTHCenter for Research and Technology Hellas

General characteristics of Liaison Office

• CERTH is located in the eastern part of Thessaloniki, characterised by an intense rate of development on research as well as entrepreneurial – commercial level.

• CERTH is located near all main transportation nodes and very close to the MAKEDONIA airport.

• CERTH’s buildings occupy a total area of 20.000 square meters scattered over 45 hectares of land

• Business Incubator that occupies 1.200 s.m. providing office space for spin-off companies of CERTH

CERTHCenter for Research and Technology Hellas

Staffing

The Liaison Office will be staffed for the first three years with 4 employees of CERTH who should have substantial

knowledge of CERTH as a whole and should be experienced and have expertise in communication and liaison processes.

The permanent staff of the Liaison Office will be assisted by external experts who will perform specific tasks for specific durations, such as graphic designs, events catering, etc.

At least 2 members of the Office should be experienced researchers and one member should be experienced in

issues of innovation and diffusion of innovation on local and regional level.

CERTHCenter for Research and Technology Hellas

Sustainability Analysis

The funding of the Liaison Office will come for the first three years of its operation directly and solely from CERTH’s internal budget. During

those first three years the Office will bid for European, National, Regional projects that will reinforce its viability and sustainability.

It is anticipated that after the 3 first years, the Office will be viable through private and/or public contracts.

Furthermore, the Liaison Office will establish collaborations with external teams and organisations for the promotion of its

effectiveness, efficiency and efficacy.

CERTHCenter for Research and Technology Hellas

SB Sviluppo Basilicata

Have realised the feasibilty study with the following structure:

BENCHMARKING

ANALYSIS OF “LOCATION ADVANTAGES”

SURVEY ON INNOVATIVE COMPANIES

STRATEGIC GUIDELINES

SB Sviluppo Basilicata

The benchmarking activity has clearly revealed that, following the

gradual transition from old to new economy, incubators have become

“virtual conglomerates” and cognitive interfaces. We are witnessing

a sort of smart (r)evolution.

To sum up, last generation incubators have proven to be able to give

a comprehensive support to companies in the new processes and

challenges required by the “smart economy“ (globalization,

dematerialization, ICT development, etc.).

SB Sviluppo Basilicata

Sviluppo Basilicata

The information provided by the analysis of location advantages represent a further confirmation of what

has already emerged from the benchmarking activity.

There is a lack of an open and creative Integrated System, able to crossbreed and multiply knowledge, to

interconnect Institutions-Enterprises-Research, to generate a virtuous liaison among enterprises, to

reduce conflicts and generate new location conveniences.

Harghita County Council

Harghita County Council has launched and finalized the public procurement procedure regarding the outputs of WP5 (database and FS) on the summer

of 2011.According to the contracts for services the database will be finalized in

November, while the study will be prepared and handed only in the January of 2012.

The database will contain relevant data (based on the pre-agreed methodology and excel file sent) on not less than 400 local enterprises.

There were carried out deep interviews with 6 enterprises, potential tenants. The main aspects in selecting the 6 enterprises were: innovative potential,

economic performance and the profile of the future park.

Harghita County Council

The industrial park should be designed in such a way that:

-The dominant approach is the processing industry of agricultural and sylvicultural activities with high added value and nature friendliness

(organic).

- The synergic effects of the park, will makes possible the break out of the current limited market possibilities.

- The barrier of the lack of capital, necessary to carry out investments for satisfying the bigger markets, will be overcome

- It will offer support in marketing activities, basic infrastructure and an easy accessibility.

Harghita County Council

The feasibility study is not ready yet; it will contain surveys and interviews with different stakeholders (local and foreign enterprises, public

administrations sphere, administrators of operating industrial and business parks from Romania, etc.)

The main findings of the study so far may be resumed as:

- The profile of the park will be designed on the ground of using local resources (agriculture, forestry) and taking into consideration the main local economic activities.

- The park should promote local enterprises in the first place but it is open to host foreign companies also

- The viability of a new network based mini park model will be tested: 6 sites with 1 ha of area each, operated by local economic agents

WestPa- West-Pannon Regional Development Company

Task: Pre-feasibility study

3 potential sites in West-Pannon region: :

Industrial Park in Győr

Claudius Industrial and innovation Park in Szombathely

Innovation and Trade Park in Mosonmagyaróvár(MoWinPark)

WestPa- West-Pannon Regional Development Company

Task: To create the regional database of enterprises having innovative activities+ interviews

The database:

Creation of database with 82 micro-, small – and medium sized micro-, small – and medium sized enterprices with their details related to West-pannon region (Vas, enterprices with their details related to West-pannon region (Vas, Zala and Győr-Moson.Sopron county) Zala and Győr-Moson.Sopron county)

Detailed questionnaire+ personal interview with 6 enterprises- Detailed questionnaire+ personal interview with 6 enterprises- creation of questionlist, database of results►Feasibility Study

TP Lj – Technology Park Ljubljana Ltd

The Feasibility study on future development of Technology park Ljubljana is ready.

It analyses the possibilities for a further expansion in different directions.

Thereby the future use of several buildings is under consideration; one of the possibilities is the usage for life-sciences research centre

purposes which is discussed at the recent times. The study contains a recommendation for the creation of a research centre and laboratories for different life sciences

specialities including the necessary structural and technical equipments as well as a rough estimation of the required

investment costs and an assessment of the personnel resources and the expected overheads.

TP Lj – Technology Park Ljubljana Ltd.

At the moment TP Lj is in the middle of construction of the new building and one of the steps related to future plans is also the

development of the medical/biotechnology cluster.

Three interviews have been realized with potential residents in the new building and cluster partners.

Approx. 30 companies working in the field of biotechnology/medicine related sector have been selected as

potential stakeholders

The study will be also translated into Slovene language by the end of the project in order to assure a better dissemination of the results

TP Lj – Technology Park Ljubljana Ltd.

VEGA- Venice Gateway for Science and Technology

The experts have defined three possibilities among which the board of the park (director and president) chose one option

The SWOT analysis among on these three ideas has been prepared by the experts in order to favour the process of decision

VEGA- Venice Gateway for Science and Technology

Positive/ feasible

Negative/not feasible

I. Marketing viability ٭

II technical viability ٭

III - management model viability ٭

IV - economic and financial model viability ٭

VEGA- Venice Gateway for Science and Technology

Enterprises that will be involved by the expansion of the nanotechnology laboratory are selected and will be

soon interviewed

Size – 22.872,51 m2 – six floors5 phases of construction – separately independent Construction period – three yearsProject size – 18,3 mil €

BICRO

BICRO

Selected project by survey, face to face interviews and SWAT analysis of chosen criteria is TECHNOGOLY PARK VARAŽDIN – TPV II

Type – expansion of existing Technology park in a new location - industrial zone

Location – north – between Slovenia, Hungary and Zagreb – best international position for industrial and science development

INOVA - NOVAPotential project for IBP

Innovative technology park in Kechnec, Kosice region – European Integral School

INOVA - NOVA

Area divided into three parts:• 80 ha for SMEs• 200 ha for strategic investors• 52 ha for logistic center• Investments already made by companies: 600 mil. EUR• jobs created by 2010: 3000 (potential by 2020: 30 000)• Investments attracted per inhabitant: 555 000 EUR

Good trasport infrastructure:• connection to D1 highway (Budimir – Kosice – Miskolc

(HU)) – part of the north-south corridor Baltic – Poland – Slovakia – Hungary – Balcan

• Motorway under construction Kosice – Miskolc (HU)• Railway Kosice – Kechnec – Hidasnémeti (HU)• Broad railway transit point (3,5 kms)• International airport Kosice (20 kms)

INOVA - NOVA

Services already offered:Metropolitan IT network of Kechnec (highspeed net,

VoIP, IPTV, FTP,...)Sport center (terragreen surfaces, massages,

saunas, ice board)Social-health complex (phase II in preparation –

hospital)Appartments for employeesVenues for companies: congress halls, meeting

rooms, cultural center (with restaurants, bowling, accommodation..)

Under planning: aquapark and food processing complex

INOVA - NOVA

Services planned:

• complex offer of education services from kindergartens to university education

• Preparation of qualified workforce for the park• Possibilities of education of families of employees• Possiblities of education for inhabitants of the

region on international level• Laboratories for R&D• IT venues• Dormitory for students• Social infrastructure (gyms, pool, kindergartens,

doctor, parking)

INOVA - NOVA

Thank you!

Lidia Seravalli

Project Office - Area Ricerca ed Innovazione

VEGA S.c.a.r.l.

Parco Scientifico Tecnologico

Edificio Porta dell'Innovazione

Via Della Libertà n. 12 - 30175 Marghera (Venezia)

Tel. + 39 041 509 3589 Fax + 39 041 509 3065

www.vegapark.ve.it [email protected]