world cup 2014 iata

25
Safety and Flight Operations IATA May 1 st 2014 Brazilian Airspace Operational Plan for the Worldcup 2014

Upload: jose-fregnani

Post on 19-Aug-2015

412 views

Category:

Technology


2 download

TRANSCRIPT

Page 1: World cup 2014 iata

Safety and Flight OperationsIATA

May 1st 2014

Brazilian Airspace

Operational Plan for the

Worldcup 2014

Page 2: World cup 2014 iata

� A IATA (International Air Transport Association) is an internationalorganization that supports the global commerce related to the aviation

industry.

� Founded in 1945, has 240 member airlines representing 84% of the worldair traffic.

� Our mission is to represent, lead and serve the industry.

� IATA delivers standards and solutions in order to ensure a successful andsafe air transport worldwide.

About IATA

Page 3: World cup 2014 iata

The Brazilian Airspace

Page 4: World cup 2014 iata

The Brazilian Airspace Control System

Civilian ATC Air Defense

INTEGRATION

DECEA AIR DEFENSE CONTROL

AIRSPACE SOVERIGNTY

AIR NAVIGATION SAFETY

24H / 365 days per year

Page 5: World cup 2014 iata

FIFA 2014 Worldcup Plan

CIVIL AVIATION

AUTHORITY

(ANAC)

AIR DEFENSE

COMMAND

INTEGRATION

COORDINATION

SECRETARY OF CIVIL

AVIATION

DECEA

Page 6: World cup 2014 iata

Worldcup 2014 - Airspace Coordination Plan (PCEA)

� All airspace users involved with the public security and defense actions for the

Worldcup must know the Plan and be familiarized with its content.

� Under this scope, the Brazilian ANSP (DECEA) is the entity responsible for the coordination and control of the airspace.

Page 7: World cup 2014 iata

Regulations – All Operators MUST know!

� AIC 08-14 “TEMPORARY AIR SPACE

CHANGES IN THE BRASILIAN AIRSPACE

FOR THE FIFA SOCCER WORLD CUP BRASIL 2014”. (Effective by 01MAY14).

� Objective:

“..To present the temporary changes in the

Brazilian airspace throughout the FIFA Soccer World Cup Brasil 2014, as well as

the general and specific procedures to be followed by the pilots in command and by

the air traffic control facilities (ATC)

belonging to the Brazilian Air Space Control System (SISCEAB) in the course

of the event.”

Page 8: World cup 2014 iata

Exclusion Zones

Page 9: World cup 2014 iata

Exclusion Zones

3H Before – 4h after the beginning of the gameOpening Game

(Sao Paulo)

1H Before – 3h after the beginning of the game1ª Phase

1H Before – 3h after the beginning of the gameOther Phases

3H Before -4h after the beginning of the gameFinal Game

(Rio de Janeiro)

OUTSIDE THESE PERIODS

THE AIRSPACE REVERTS TO NORMAL OPERATIONS

Page 10: World cup 2014 iata

Airspace Defense

� Pilots, ATCOs and troops specially trained to

handle normal and extreme security demands

(terrorism, hi-jacks and unauthorized aircraftidentification).

� All air traffic that misconduct from rules will be

subject if “Air Defense Measures”:

� Seven Alert Levels with the objective toidentify the aircraft and interception

procedures.

� Objective to avoid the penetration in redzones.

Page 11: World cup 2014 iata

Airport Operational Restrictions – Brasilia (BSB)

� No restrictions on operations.

Page 12: World cup 2014 iata

Airport Operational Restrictions – Belo Horizonte (CNF)

� SBBH : No landings. Takeoffs authorized on Rwy13 (no right turns).

� SBCF : No Restrictions.

Page 13: World cup 2014 iata

Airport Operational Restrictions – Cuiaba (CGB)

� No landings. Takeoffs authorized on Rwy17.

Page 14: World cup 2014 iata

Airport Operational Restrictions – Curitiba (CWB)

� Landings on Rwy 11/29.

� Takeoffs on Rwys 11,15 and 29.

Page 15: World cup 2014 iata

Airport Operational Restrictions – Fortaleza (FOR)

� No Landings.

� Takeoffs authorized for all runways (no turns towards the stadium).

Page 16: World cup 2014 iata

Airport Operational Restrictions – Manaus (MAO)

� No Landings.

� Straight takeoffs authorized for all runways (no turns towards the stadium).

Page 17: World cup 2014 iata

Airport Operational Restrictions – Natal (NAT)

� SBSG: Takeoffs and Landings authorized on Rwy30.

� SBNT: Takeoffs and Landings authorized for all runways (no turns towards the

stadium).

Page 18: World cup 2014 iata

Airport Operational Restrictions – Porto Alegre (POA)

� Takeoffs and Landings authorized (no turns towards the stadium).

Page 19: World cup 2014 iata

Airport Operational Restrictions – Rio de Janeiro (GIG)

� Takeoffs and Landings authorized on all runways (no turns towards thestadium). Straight takeoffs until exiting the yellow zone.

Page 20: World cup 2014 iata

Airport Operational Restrictions – Recife (REC)

� No Landings. Takeoffs authorized on Rwy18.

Page 21: World cup 2014 iata

Airport Operational Restrictions – Salvador (SSA)

� No Landings on Rwy10. Takeoffs authorized on Rwys 10,17 and 35.

� Takeoff on Rwy 28 may be authorized if avoiding the red zone.

Page 22: World cup 2014 iata

Airport Operational Restrictions – Sao Paulo (GRU)

� No Takeoff and Landing restrictions.

.

Page 23: World cup 2014 iata

Heads up!

� Many airport WIP will be still on-goingduring the Worldcup.

� Attention to NOTAMs.

� Airport ground charts not

updated timely (specially BSBand GRU).

� General aviation aprons may be on

different parking configuration...

.

Page 24: World cup 2014 iata

Lessons Learned from Germany and South Africa events

� Private pilot response (behavior) and strengthened plans accordingly.

� Implementation of penalties for non-conformance to NOTAMs.

� Late requests which resulted in changes to the plan should not be

accepted.

� Active management of private aircraft delays on the day.

� Close real-time coordination and communication with airports network.

Page 25: World cup 2014 iata

José Alexandre.T.G. Fregnani

Assistant Director – Safety & Flight Operations

IATA Brazil

[email protected]

Tel: +55 11 2187 4236

“Represent, lead and serve the

industry.”