world bank documentdocuments.worldbank.org/curated/en/722541468016159962/pdf/779520pjpr0… · yr 1...
TRANSCRIPT
Document of
The World Bank
FOR OFFICIAL USE ONLY
Report No: 77952-BF
RESTRUCTURING PAPER
ON A
PROPOSED PROJECT RESTRUCTURING
OF
URBAN WATER SECTOR PROJECT
GRANT NUMBER H-482-BF
BOARD APPROVAL DATE: MAY 28, 2009
TO
BURKINA FASO
August 30, 2013
WATER AND URBAN II
COUNTRY DEPARTMENT AFCF2
AFRICA REGION
This document has a restricted distribution and may be used by recipients only in the performance of their
official duties. Its contents may not otherwise be disclosed without World Bank authorization.
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
2
ABBREVIATIONS AND ACRONYMS
ESMF Environmental and Social Management Framework
EOPT end-of-project-target
GoBF Government of Burkina Faso
IDA International Development Association
ISR Implementation Status and Results
MDGs Millennium Development Goal
M&E Monitoring and Evaluation
MTR Mid-term Review
ONEA National Water and Sanitation Agency (Office National de l’Eau et de
l’Assainissement)
PAD Project Appraisal Document
PDO Project Development Objective
RPF Resettlement Policy Framework
SDR Special Drawing Right
Regional Vice President: Makhtar Diop
Country Director: Madani M. Tall
Sector Manager: Alexander Bakalian
Task Team Leader: Matar Fall
3
BURKINA FASO
URBAN WATER SECTOR PROJECT
CONTENTS
Page
A. SUMMARY ........................................................................................................................... 4
B. PROJECT STATUS .............................................................................................................. 4
C. PROPOSED CHANGES ...................................................................................................... 5
ANNEX 1: RESULTS FRAMEWORK AND MONITORING ................................................. 7
ANNEX 2: REALLOCATION OF PROCEEDS ......................................................................... 9
4
URBAN WATER SECTOR PROJECT
RESTRUCTING PAPER
A. SUMMARY
1. This Restructuring Paper seeks the approval of the Country Director to amend the
Financing Agreement of the Burkina Faso Urban Water Sector Project (IDA-H4820) in
order (i) to make changes in the formulation and organization of the project performance
indicators of the project and, (ii) to reallocate Grant proceeds. These changes have been
requested by the Government in a letter dated May 2, 2013, following the Mid-Term-
Review (MTR) of the project carried out on February 14, 2013.
B. PROJECT STATUS
2. The Financing Agreement of the Burkina Faso Urban Water Sector Project was signed
on June 9, 2009 for an amount of SDR53.50 million (US$80 million equivalent), and the
project became effective on October 5, 2009. The development objective of the project
(PDO) is to increase access to sustainable water and sanitation services in selected urban
areas. This will contribute to achievement of the water and sanitation Millennium
Development Goals (MDGs). The project will achieve the objective through: (a)
facilitating access to services through programs for constructing social water service
connections, public standpipes, and on-site sanitation facilities; and (b) consolidating the
achievements of the urban water supply sub-sector reforms and strengthening capacities
to deliver and manage services.
3. The overall project implementation status is satisfactory. As of February 14, 2013,
304,500 additional people representing 58% of the end-of-project-target (EOPT) have
gained access to piped water and 203,900 additional people (83% of the EOPT) have
gained access to improved sanitation services thanks to the project. With regards to the
sector reform supported by the project, the financial equilibrium of the urban water sector
is maintained with a net positive cash balance of US$6M in December 2012. The staff
productivity of the water utility (ONEA) has improved from 4.3 to 3.5 staff per 1000
connections (EOPT achieved) and the bill collection ratio of private water consumers has
reached the EOPT of 97%.
4. The project good performance rating is also based on: (i) the satisfactory credit
disbursement level of 53% as of July 1, 2013, which is consistent with initial projections
in the Project Appraisal Document (PAD); (ii) effective procurement which resulted in
awarding by MTR, more than 75% of the civil works contracts initially planned; (iii)
adequate compliance with fiduciary and safeguards requirements; (iv) full compliance
with agreed covenants under the Financing Agreement with the Government of Burkina
Faso (GoBF) and the Project Agreement with ONEA and; (v) appropriate risks mitigation
- the overall project risk rating remains low.
5
5. Based on those findings, the project is fully on track to achieve its PDO which
remains valid and unchanged at MTR.
C. PROPOSED CHANGES
6. The following changes are proposed to be considered in a level 2 restructuring of the
project.
Results/indicators (refer to Annex 1)
7. The project indicators need to be reorganized, as recommended by a monitoring and
evaluation (M&E) review of projects with MTR in FY13. At the PDO level, the two
indicators expressed in terms of "percentage of people served", will be replaced with
their equivalent Core Indicators expressed in terms of "number of additional people
provided with improved water and sanitation services” which are mandatory for all Bank
funded water and sanitation projects. Actually, these core indicators had been initially
included in the Result Framework, but they were mistakenly classified as intermediate
result indicators and this need to be corrected. The "percentage of people served" which
cannot be solely attributed to the IDA project impact (other projects funded by various
sources are being implemented in the same intervention area) will continue to be
monitored for MDGs at the national level. As recommended by the M&E review, the
“urban water financial equilibrium” indicator will be upgraded from intermediate to
PDO level, to better value for sustainability and the “direct project beneficiaries of which
women” will be introduced in the Result Framework as a mandatory PDO level indicator
for all projects. Finally, costs savings under the onsite sanitation will allow building and
rehabilitating more latrines than initially planned. Therefore, the EOPT for the “number
of additional people in urban areas provided with access to improved sanitation under
the project” indicator will increase from 246,000 to 351,600 people. Both the Result
Framework (RF) and the Financing Agreement (FA) will be revised to reflect the above
mentioned changes.
Reallocation of Grant proceeds (refer to Annex 2)
8. As most of the civil works contracts initially planned have been awarded, the
Recipient has requested that the balance of the grant be optimized to finance additional
water supply activities and increase the impact of the project. The proposed additional
activities fit into the scope of the activities currently listed in the PAD and the FA, and
include water production works and the extension of water distribution networks to
informal settlements in Ougadaougou and Bobo-Dioulasso.
9. As a result, the following changes are proposed in the grant proceeds: Category (1)
“Goods, works and consutants’services for Part 1 of the Project” will increase by 13%,
Categories (2) “Goods, works and consultants’services for Part 2 of the Project,
including Training” and Category (3) “Goods, works and consultants’services for Part 3
of the Project including Training and audits” will be decrease respectively by 26% and
13%. Category (4) “Goods, works and consultants’services for Part 4 (b) of the Project
including Training” will remain unchanged.
6
Safeguards
10. Additional proposed activities are of the same nature as the urban water works
included in the initial project. The target secondary cities have been identified, but the
exact location of the works will be defined in the technical studies to be carried out. The
environmental and social aspects which result from the implementation of additional
activities will be dealt with in the same manner as for the works originally planned in the
project through the existing ESMF and RPF.
ANNEX 1: Results Framework and Monitoring
Burkina Faso - Urban Water Sector Project
Project Development Objective Indicators
# PDO Level Results
Indicators Co
re
Dropped
Continue
New
Revised
Unit of
Measure
Baseline
(2010)
Cumulative Target Values*
Frequency Data Source/
Methodology
Responsibility for
Data Collection YR 1 YR 2 YR3 YR 4 YR5
1
Number of additional people provided with
access to “Improved
Water Sources” under the project
Continue Number - 100,000 200,000 300,000 450,000 527,000 Bi-annual
reports
Calculations based on the number of
water connections
and standpipes built (*)
ONEA
Supervision
Committee of the
PNAEPA
2
Number of additional
people provided with
access to “Improved Sanitation” under the
project
Revised Number - 50,000 90,000 130,000 246,000 351,600 Bi-annual
reports
Calculations based on the number of
sanitation facilities
built (*)
ONEA Supervision
Committee of the
PNAEPA
3
Number of additional students provided with
access to appropriate
sanitation facilities in their schools under the
project
Continue Number - 20,000 60,000 80,000 100,000 120,000 Bi-annual
reports
Calculations based
on the number of
sanitation facilities built (*)
ONEA
Supervision
Committee of the PNAEPA
4
Direct project
beneficiaries, of which female (%)
New Number - 150,000
(50 %)
290,000
(50 %)
430,000
(50 %)
696,000
(50 %)
878,600
(50 %)
Bi-annual
reports = sum (1) +(2)
ONEA
Supervision
Committee of the
PNAEPA
5
Financial equilibrium of the urban sector
maintained with the
agreed tariff policy based on cost recovery
Continue - Achieved Maintained Maintained Maintained Maintained Maintained Annual Report
Updated financial
model and
technical audits
ONEA/Consultants/
IDA supervision
missions
Intermediate Results Indicators
# Intermediate Results
Indicators Co
re
Dropped
Continue
New
Revised
Unit of
Measure
Baseline
(2010)
Cumulative Target Values*
Frequency Data Source/
Methodology
Responsibility for
Data Collection YR 1 YR 2 YR3 YR 4 YR5
1
ONEA’s water
employees per 1,000
water connections
Continue Number 4.3 4.2 4.0 3.8 3.7 3.5 Bi-annual
reports Technical audits
ONEA/Consultants/
IDA supervision
missions
2 Bill collection ratio of Continue % 95% 96% 97% 97% 97% 97% Bi-annual Technical audits ONEA/Consultants/
8
private water customers
(% of bills collected)
reports IDA supervision
missions
3
New piped household water connections that
are resulting from the
project intervention
New Number - 10,658 21,317 31,975 47,963 56,170 Bi-annual
reports
Calculations of the number of
sanitation facilities
built
ONEA Supervision
Committee of the
PNAEPA
4
Improved community
water points constructed
or rehabilitated under the project
New Number - 20 40 60 91 106 Bi-annual
reports
Calculations of the
number of water
connections and standpipes built
ONEA
Supervision
Committee of the PNAEPA
5
Improved latrines constructed under the
project New Number - 5,682 10,227 14,773 27,955 39,955
Bi-annual
reports
Calculations of the
number of
sanitation facilities built
ONEA
Supervision
Committee of the PNAEPA
(*) The following ratios agreed at project appraisal for calculations of the project impact remain unchanged
8.8 people served by a household water connection
300 people served by a standpipe
8.8 people served by a household latrine
ANNEX 2:
Reallocation of Proceeds
1. Proceeds for Burkina Faso, Urban Water Sector Project, Grant No. H-482-BF,
(P106909) will be reallocated as follow:
Category
Amount of the Financing
Allocated (expressed in
SDR)
Percentage of
Expenditures to be
Financed (exclusive of
Value Added Tax,
Registration tax and
custom duties)
Current Revised Current Revised
(1) Goods, works and
consultants’ services for
Part 1 of the Project
34,600,000 39,100,000 100% 100%
(2) Goods, works and
consultants’ services for
Part 2 of the Project,
including Training
16,300,000 12,100,000 100% 100%
(3) Goods, works and
consultants’ services for
Part 3 of the Project
including Training and
audits
2,400,000 2,100,000 100% 100%
(4) Goods, works and
consultants’ services for
Part 4 (b) of the Project
including Training
200,000 200,000 100% 100%