Project Goals
Implement SAP Plant Maintenance system
Provide integration with Financials, HR, and Materials Allow enhanced scheduling and planning for work assignments Provide work scheduling as well as management reporting tools Accommodate the use of mobile technology to reduce paperwork Accommodate the use of GIS with SAP Improve automated updates to customers about the status of work Implement a Preventive Maintenance system for buildings, areas, and
equipment Utilize standard SAP functionality to collect utility usage and cost
information for recharge calculations
![Page 3: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/3.jpg)
Agenda
Introduction
Discussion of Task Lists
Discussion of Maintenance Plans
Discussion of Plan Scheduling
Preview of Next Blueprinting Session
Other Discussion
![Page 4: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/4.jpg)
What is a Task List?
A task list is a maintenance procedure.
It includes planned labor and materials.
There are three types of task lists:
General Task Lists
Functional Location Task Lists
Equipment Task Lists
A task list looks very much like a planned order, without dates!
![Page 5: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/5.jpg)
What is a Task List?
Why 3 Types?
The General Task List is used as a “model” maintenance procedure. The work goes into the procedure planning and then this is copied to specific Functional Location (building, room) and Equipment task lists.
A Functional Location task list may ONLY be used for preventive maintenance for that specific functional location.
An Equipment Task list may ONLY be used for preventive maintenance for that specific piece of equipment.
STOCK materials and labor may be planned on any task list type.NON-STOCK materials, services, and text items from the Equipment or
Functional Location BOM may be planned on Equipment or Functional Location Task Lists.
![Page 6: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/6.jpg)
Naming a Task List
Functional Location and Equipment task lists have sequentially assigned numbers. The task lists are found using the Equipment or Functional Locations.
General Task lists may have either numbers assigned by SAP or may have alphanumeric names. The length of the name field is 8 characters. (This may be useful for Medical Center WHUPOS).
![Page 7: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/7.jpg)
Creating a General Task List
There are separate transactions for Functional Location, Equipment, and General Task Lists.
![Page 8: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/8.jpg)
Creating a General Task List
This task list is being given the name “TEST0613,” rather than allowing SAP to assign a name.
![Page 9: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/9.jpg)
Creating a General Task List
The task list is given a description and default work center.
![Page 10: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/10.jpg)
Creating a General Task List
A short description, labor estimate, number of workers is entered.
![Page 11: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/11.jpg)
Creating a General Task List
As much long text as is required may be added. This is copied to the work order when it is created.
![Page 12: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/12.jpg)
Creating a General Task List
A stock part is added and the task list is saved.
![Page 13: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/13.jpg)
Creating an Equipment Task List
![Page 14: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/14.jpg)
Creating an Equipment Task List
The equipment number is the “name” of the task list.
![Page 15: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/15.jpg)
Creating an Equipment Task List
A task list already exists for this equipment. Select “+” to add another.
![Page 16: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/16.jpg)
Creating an Equipment Task List
A description and default work center are entered.
![Page 17: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/17.jpg)
Creating an Equipment Task List
A description for the operation, the labor, and number of workers is entered.
![Page 18: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/18.jpg)
Creating an Equipment Task List
From the component screen, the Component Selection button is chosen to select parts from the Bill of Material.
![Page 19: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/19.jpg)
Creating an Equipment Task List
As many parts as are appropriate are selected.
![Page 20: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/20.jpg)
Creating an Equipment Task List
Notice that stock, non-stock, and text items may be chosen from the BOM.
The Functional Location Task List is similar to the Equipment Task List.
![Page 21: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/21.jpg)
What is a Maintenance Plan?
A maintenance plan associates:
A Task List
An object to be maintained
Functional Location
Task List
A maintenance cycle
Some parameters around order creation
![Page 22: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/22.jpg)
Creating a Maintenance Plan
This example will create a simple “single-cycle” maintenance plan based on the calendar (rather than a measurement point).
![Page 23: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/23.jpg)
Creating a Maintenance Plan
There are also “strategy” and “multiple counter” maintenance plans.
![Page 24: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/24.jpg)
Creating a Maintenance Plan
SAP may assign a number or one may be entered. This is a 12 character alphanumeric field.
![Page 25: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/25.jpg)
Creating a Maintenance Plan
![Page 26: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/26.jpg)
Creating a Maintenance Plan
![Page 27: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/27.jpg)
Creating a Maintenance Plan
The “Call Horizon” determines how far into the maintenance cycle the order should be generated. This is a monthly plan, so 90% will generate the order 3 days before it is due.
The “Time-Key Date” tells SAP to generate the order on the same day each month (rather than every 30 days).
![Page 28: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/28.jpg)
Scheduling a Maintenance Plan
Creating the Maintenance Plan assigns a cycle and some order parameters.
Scheduling start this plan running to create orders.
![Page 29: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/29.jpg)
Scheduling a Maintenance Plan
Enter the plan number.
![Page 30: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/30.jpg)
Scheduling a Maintenance Plan
Notice that no scheduling has been done.
![Page 31: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/31.jpg)
Scheduling a Maintenance Plan
Click “Start”. SAP suggests the current date to start the plan.
Note: The first order is created at the END of the cycle. (If you want an order from a monthly plan tomorrow, start it 29 days in the past.)
![Page 32: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/32.jpg)
Scheduling a Maintenance Plan
The first order will be created with a start date of 6/14/2006.
![Page 33: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials](https://reader035.vdocuments.us/reader035/viewer/2022062318/5518d042550346881f8b5cd2/html5/thumbnails/33.jpg)
Topics For Next Blueprinting Session
Determine High Level Reporting Requirements
Please bring your thoughts on current reports which are used frequently in your area.