workshop on space plan services...

7
1 Workshop on Space Plan services (AP30/30A/30B) Workshop on Space Plan services (AP30/30A/30B)

Upload: others

Post on 17-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Workshop on Space Plan services (AP30/30A/30B)staging.itu.int/en/ITU-R/space/plans/Documents/Seminar/WRS12_Spa… · Today’s Program in the afternoon Time Subject Description 12:10-13:30

1

Workshop on Space Plan services

(AP30/30A/30B)

Workshop on Space Plan services

(AP30/30A/30B)

Page 2: Workshop on Space Plan services (AP30/30A/30B)staging.itu.int/en/ITU-R/space/plans/Documents/Seminar/WRS12_Spa… · Today’s Program in the afternoon Time Subject Description 12:10-13:30

Objectives of the workshop:

Deepen the technical & regulatory knowledge about procedures in AP30/30A/30BHow to use BR tools (Version 7) to:• Submit notices / comments• Get BR examination’s results• Perform examinationsNew! Use of GIBC/AP30B including Reporting tool,

GIBC/PFD for AP30/30A/30B

Page 3: Workshop on Space Plan services (AP30/30A/30B)staging.itu.int/en/ITU-R/space/plans/Documents/Seminar/WRS12_Spa… · Today’s Program in the afternoon Time Subject Description 12:10-13:30

Today’s Program in the morning

Time Subject Description

09:00- 09:10 Introduction

09:10-09:30 AP30/30A regulation Introduction and regulatory aspect

09:30-10:05 AP30/30A exercise on submission Exercise on validation of a sample with a correction of few often wrongly submitted parameters using SpaceCap and cross check with GIMS data

10:05-10:25 Coffee break

10:25-10:45 AP30/30A technical examination Technical examination introduction (list of specific concepts, list of examination...)

10:45-11:05 AP30/30A exercise on SPS_REPORTs Exercise on viewing results of MSPACE available in BR IFICs

11:05-11:25 AP30B regulation Introduction and regulatory aspect

11:25-12:10 AP30B exercise on submission Exercise on validation of a sample with a correction of few often wrongly submitted parameters using SpaceCap and cross check with GIMS data

12:10-13:30 Lunch break

Page 4: Workshop on Space Plan services (AP30/30A/30B)staging.itu.int/en/ITU-R/space/plans/Documents/Seminar/WRS12_Spa… · Today’s Program in the afternoon Time Subject Description 12:10-13:30

Today’s Program in the afternoon

Time Subject Description

12:10-13:30 Lunch break

13:30-14:10 AP30B exercise on technical examination Exercise on technical examination (GIBC/ANX3, Art.21,ANX4)

14:10-14:40 AP30B exercise to analyze results of GIBC Exercise on viewing results available in BR IFICs using Reporting tool

14:40-14:55 AP30/30A/30B Comments on Special Sections

Description of all means to find if administrations are identified and to make comments

14:55-15:35 AP30/30A SpaceCom Exercise to comment on AP30(30A)/E Part A published in a BR IFIC

15:35-15:55 Coffee break

15:55-16:10 AP30/30A/30B information on Web and in BR IFIC

Getting information on the ITU/BR/WEB and in the BR IFIC DVD (SNL-on-line, SNS-on-line, Space Plan databases..)

16:10-16:25 AP30/30A/30B when BR IFIC is issued What to do on issue of a BR IFIC?

16:25-16:40 AP30/30A/30B Exercise on RES49 Exercise to create a Res 49 filing with SNS online

16:40-17:00 Q&A

Page 5: Workshop on Space Plan services (AP30/30A/30B)staging.itu.int/en/ITU-R/space/plans/Documents/Seminar/WRS12_Spa… · Today’s Program in the afternoon Time Subject Description 12:10-13:30

AP30B/A6BList

AP30B/A6A

Add. system

AP30B/A7New allot.

BR IFIC Part II-S/ Part III-SNotification

AP30-30A/F/CAP30-30A/F/DCoordination

BR IFIC Part I-SNotification

RADIO SPECTRUM

TERRESTRIAL SERVICES SPACE SERVICES

bands/servicesunder

AP30/30A/30B

FSSAP30B

SOFguard bandAP30/30A

MIFR

AP30BArt.6.7

AP30BArt.7

AP30BArt.8.5

AP30BArt.8.12

Tim

e be

twee

n re

gula

tory

dat

e of

rece

ipt o

f the

1st

sub

miss

ion

and

the

date

limit

for b

ringi

ng in

to u

se th

e ne

twor

k

AP30/30A Art.2A

Art. 11.28

Art. 11.43

bands/servicesunder

RR Art. 9/11

GSO non-GSO Earth station

API/A (+ API/B)Advanced publication Art. 9 Sect. I

CR/C + CR/DCoordination Art. 9 Sect. II

AP30/30A/EPart A + DPending

AP30/30A/EPart BList(R13) Plan(R2)

BSSAP30/30A

AP30/30AArt.5.1.6/5.1.10

AP30/30AArt.5.2.2/4

AP30/30AArt.4.1.5 (R13)Art.4.2.8 (R2)

AP30/30AArt.4.1.15 (R13)Art.4.2.19 (R2)

RR Art. 5 Table of Frequency Allocations

AP30BArt.6.23/25/35

GSO

PLAN

Due diligenceinformation RES49

Submission provisions and publication references

Operator requirements(type of space service, freq. band,

station type, ITU Region...)

Selecting the appropriate band in the Radio

Spectrum

Selecting the appropriate PLAN / regulatory

procedure

Submitting to ITU satellite network characteristics

Seeking agreementswith affected/affecting

Administration

Submitting to ITU agreements and

final characteristics

Submitting to ITU notification for recording

assignments in MIFR

Assistance

Submitting to ITUdate of bringing into use

confirmation and due diligence

Internationally recognisedOperating space network

From 9KHz to 275GHz

Resolutions RESxxx

AP30/30ANew member

AP30/30AArt. 4.1.26

Page 6: Workshop on Space Plan services (AP30/30A/30B)staging.itu.int/en/ITU-R/space/plans/Documents/Seminar/WRS12_Spa… · Today’s Program in the afternoon Time Subject Description 12:10-13:30
Page 7: Workshop on Space Plan services (AP30/30A/30B)staging.itu.int/en/ITU-R/space/plans/Documents/Seminar/WRS12_Spa… · Today’s Program in the afternoon Time Subject Description 12:10-13:30

Main contact person for Space Plan Services:

[email protected]

Workshop on Space Plan services (AP30/30A/30B)Workshop on Space Plan services (AP30/30A/30B)