![Page 1: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/1.jpg)
Workshop Manchester02 06 15
Jim Chapman– DQI Advisor to CICArchitect/Client Advisor
![Page 2: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/2.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
What is the Challenge ?
At the moment many hospital environments say to the patient and staff :
“How you feel is unimportant. You are not of value. Fit in with us, not uswith you.”
With very little effort and money this could be changes to something like:
“ Welcome, do not worry! We are here to reassure you and yourtreatment will be good and helpful to you”
Maggie Jenks
![Page 3: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/3.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
DH Briefing/Procurement
• Best Buy/Harness/Nucleus/PfI/Procure 21/Smart PfI/Procure21+
• Constant investment centrally, excellent knowledge base.
Why; to reduce risk, improve quality, reduce cost, promote the use of“standard” solutions.
![Page 4: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/4.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Introducing DQI
• Design Quality Indicator is…
…a process that enables all aspects of design quality to be assessed frombriefing to post occupancy.
DQI empowers stakeholders to be involved actively in workshops withdesign professionals and construction teams at appropriate stages to settargets for design quality.
![Page 5: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/5.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Workstages
![Page 6: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/6.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Initial Use of DQI
• Developed between 2000 and 2003
• Over 1400 projects mainly schools
• 55% new build; 10% refurbishment; 34% mixed
• 2014 used in Health supporting NHS England
• It is being used on a range of projects of varying scales
• Feedback……..
![Page 7: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/7.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Benefits of the DQI Process
• Early stakeholder engagement
• Stakeholder ownership of and understanding of the needs before thedesign and construction process
• Set quality standards
• Fit for purpose
• Measure quality/value
• Importance of place and individual needs
• Establish quality of environment for patients and staff
![Page 8: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/8.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Who attends the “workshops”?
• Medical Staff, consultants and nurses
• External groups patients/carers
• Trust management representatives
• Design Champion......
• Design team and contractors
• Local Authority [Planners and Highways]
![Page 9: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/9.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Format of Discussions/Panels
• Will vary over time from briefing to completion
• Initially develop realistic aspirations, what are the major concerns/needs?
• Encourage forward thinking [Encourage visits!]
• DQI enables the team to evaluate design from briefing through the designstages to completion and PoE
• Link to other processes, gateway reviews and design reviews, [see NHSEngland advice]
![Page 10: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/10.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Linkages
![Page 11: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/11.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
DQI Framework
![Page 12: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/12.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Briefing
Functionality Default Notes Value
17 The brief and design will facilitate the[patient care model of theNHE/Client organisation
Required Critical early question ?
Build Quality
30 The engineering systems will be welldesigned and will be unobtrusive,flexible and efficient to use
Required Difficult to answer for some panelmambers at an early stage
?
Impact
50 The building will respect the needsof patients and allow appropriatelevels of privacy, dignity andconfidentiality
Inspired “A given” ?
![Page 13: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/13.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Timing
![Page 14: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/14.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
DQI in the project cycle – 5 stages
![Page 15: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/15.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
The Future
• Is standardisation speeding up theprocess, improving quality?
• Does standardisation meet localneeds?
• Capex/opex ,do we evaluate this well?
• Sustainability
• How will the healthcare estate beprocured in the future?
![Page 16: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/16.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
BIM
• Is BIM the panacea for all our ills?
• Feedback fromLondon and UCH
![Page 17: Workshop Manchester 02 06 15 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi... · 02 06 15 Jim Chapman– DQI Advisor to CIC Architect/Client Advisor. ©Design](https://reader034.vdocuments.us/reader034/viewer/2022042419/5f356ceee9178e1cbe4cb135/html5/thumbnails/17.jpg)
www.dqi.org.uk©Design Quality Indicator 2013
Quality
• “...quality, above all, is about care ,people,passion, consistency, eyeball contact and gutreaction.
• Quality is not atechnique, nomatter how good”