workshop: eta 9134 (part 2) section d.1.—quarterly narrative accountability and grants management:...

19
Workshop: Workshop: ETA 9134 ETA 9134 (Part 2) (Part 2) Section Section D.1.—Quarterly Narrative D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region U.S. Department of Labor, ETA, Region 4 4 Discretionary Grantee Training Discretionary Grantee Training Conference Conference March 1-2, 2011 March 1-2, 2011

Upload: jemimah-cox

Post on 21-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

Workshop:Workshop:

ETA 9134 (Part 2)ETA 9134 (Part 2) Section D.1.—Quarterly NarrativeSection D.1.—Quarterly Narrative

Accountability and Grants Management:Connecting the Dots

U.S. Department of Labor, ETA, Region 4 U.S. Department of Labor, ETA, Region 4 Discretionary Grantee Training ConferenceDiscretionary Grantee Training Conference

March 1-2, 2011March 1-2, 2011

Page 2: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

ObjectivesObjectives

Review/Explain the components of the quarterly narrative (Section D.1. of the ETA 9134)

Terminology

Reporting Expectations

Common Issues

2

Page 3: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

3

ETA 9134 / Section D.1. ETA 9134 / Section D.1.

A. Summary of Grant Activities

B. Status Update on Leveraged Resources

C. Status Update on Strategic Partnership Activities

D. Timeline for Grant Activities/Deliverables

E. Capacity Building Activities

F. Key Issues and Technical Assistance Needs

G. Best Practices and Lessons Learned

H. Common Measures

I. Additional Information

Page 4: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

Section D.1. and “Tabs”Section D.1. and “Tabs”

Some subsections also have separate “Tabs” in the on-line reporting system

Leveraged Resources

Capacity Building

Common Measures

4

Page 5: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

5

Section D.1.A.Section D.1.A.Summary of Grant ActivitiesSummary of Grant Activities

• Capacity building and training activities supported by the grant for the current quarter, highlighting key activities

• Similar to Executive Summary

• < 1 page per reporting instructions

• Details provided _______________

• Issues –Unnecessary information, information here that’s required in another section (and not included there)

Page 6: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

6

Section D.1.B.Section D.1.B.Status Update on Leveraged ResourcesStatus Update on Leveraged Resources

• This section should explain/clarify what was reported under the Leveraged Resources tab; the detail goes here

• The data reported should be “consistent” with what’s reported on the 9130 (financial)

• Paragraph form okay but using a chart is recommended to ensure complete information

• WHO contributed, AMOUNT (quarterly and cumulative); TYPE (federal/non-federal, cash/in-kind); HOW USED (activities, supplies, space)

Page 7: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

7

Section D.1.B.Section D.1.B.Status Update on Leveraged Resources (2)Status Update on Leveraged Resources (2)

• Grantees need to say something in this section

• Issues – Inconsistent information between Section D.1.B. and Leveraged Resources “tab”; information hard to follow (e.g., not in chart form)

Page 8: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

8

Section D.1.C.Section D.1.C.Status Update on Strategic PartnershipsStatus Update on Strategic Partnerships

• What to include:

• How partners were engaged during the quarter (e.g., specific roles, contributions)

• Challenges encountered/resolved

• New partners brought in

• What not to include:

• Meeting minutes; verbiage indicating status quo; capacity building information (Issues)

Page 9: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

9

Section D.1.D.Section D.1.D.Timeline for Grant Activities/DeliverablesTimeline for Grant Activities/Deliverables

• Two Components

1. Capacity Building and Training

2. Grant Products and Deliverables

• Expectation: ALL major program activities – both capacity building and training – for the entire life of the grant, updated each quarter and the status of grant products

Page 10: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

10

Section D.1.D.Section D.1.D.Timeline for Grant Activities/Deliverables (2)Timeline for Grant Activities/Deliverables (2)

• For Grant Activities (Capacity Building and Training)…. include

• Specific Activity (CB or Trng); Break out progress to date by quarter; Projected date of completion (update as necessary and note if completed); chart recommended

• For Grant Deliverables (Products) …. include

• Updated description; Anticipated delivery date; Percentage of completion; Notes/concerns regarding status

• Product Reference Guide available the beginning of each quarter in EBSS

Page 11: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

11

Section D.1.D.Section D.1.D.Timeline for Grant Activities/Deliverables (3)Timeline for Grant Activities/Deliverables (3)

• Issues –

• Activities/Products expected to be completed but were not – no clarification provided in some cases

• Presentation of the information sometimes confusing (e.g., no dates)

Page 12: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

12

Section D.1.E.Section D.1.E.Capacity Building ActivitiesCapacity Building Activities

• NOTE: There is a Capacity Building section in the narrative and a Capacity Building “tab” in the reporting system

• Information in D.1.E. = Information in CB Tab

Status of CB activities and strategies, including

deliverables, highlighting those completed or

percentage complete

Status of CB activities and strategies, including

deliverables, highlighting those completed or

percentage complete

1. Instructors;

2. Students; and

3. Other People

1. Instructors;

2. Students; and

3. Other People

Page 13: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

13

Section D.1.E.Section D.1.E.Capacity Building Activities (2)Capacity Building Activities (2)

• Capacity Building Tab*

1. Instructors (e.g., number who contributed to development of grant-funded curriculum)

2. Students (e.g., number who attended a course taught by an instructor who contributed to the development of the curriculum)

3. Other People (e.g., number attending a recruitment seminar)

• “Students” and ”Other People” are not necessarily participants

*Participation should include verifiable measures of participation*Participation should include verifiable measures of participation

Page 14: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

14

Section D.1.F.Section D.1.F.Key Issues and Technical Assistance NeedsKey Issues and Technical Assistance Needs

• Key Issues = TA Needs

• For Key Issues – Summarize issues, challenges, resolution of previous issues (e.g., pertaining to recruitment, staff turnover) or say nothing to report

• For Technical Assistance Needs – Opportunity to request assistance (e.g., guidance working with a partner, access to information) or say nothing to report

• Issues – Info in other sections only

Page 15: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

15

Section D.1.G.Section D.1.G.Best Practices and Lessons LearnedBest Practices and Lessons Learned

• This section represents an opportunity to do two separate things

1. Describe promising practices, approaches and lessons learned, and

2. Include participant success stories (with express permission from individual)

• Issues – Info not updated and “issues” located here versus previous section

Page 16: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

16

Section D.1.H.Section D.1.H.Common MeasuresCommon Measures

• There are only 3 possibilities:

1. Provide exiter information with four required data elements to ETA and ETA calculates common measures (using Common Measures “tab”)

2. Calculate adult common measures and provide info to ETA in this section (either based on wage records or supplemental data)

3. Combination

Page 17: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

17

Section D.1.I.Section D.1.I.Additional InformationAdditional Information

• All the good stuff that doesn’t fit anywhere else… put here! (include info clarifying what’s reported elsewhere, other outcomes, other info to share (e.g., evaluations))

• Issues –

• Underutilized (e.g., could have used this section to report “no students began training because this quarter falls in the middle of the fall semester”)

• Information in other sections should have gone here (e.g., “Two individuals did not disclose race so there is a discrepancy in Section B of the 9134”)

Page 18: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

18

Section D.1.I.Section D.1.I.Additional Information (2)Additional Information (2)

• Fifth Round CBJTs have additional information to report here:

1. Type of degree, certificate, credential (for those receiving a degree)

2. Of those who complete and enter employment, the number still employed in 1st and 2nd quarters after placement

3. Supportive services (what, how, impact)

Page 19: Workshop: ETA 9134 (Part 2) Section D.1.—Quarterly Narrative Accountability and Grants Management: Connecting the Dots U.S. Department of Labor, ETA, Region

U.S. Department of Labor, ETA, Region 4 U.S. Department of Labor, ETA, Region 4 Discretionary Grantee Training ConferenceDiscretionary Grantee Training Conference

March 1-2, 2011March 1-2, 2011

Accountability & Grants Management: Connecting the Dots

19