Workplace Organization “5S’s”
PDM Bridge Palatka, Florida
January 26-27-28-29, 2004
2
Team Members• Jeorge McCartney• Tim Bass • Ronald J. Kowalczyk Jr.• Bobby Alford Sr.• Mark Hull• George Young• Craig Reed Sr.• Will Meyers• Daniel Lakadawala• Arthur Ward Sr.• Ralph White
Prep Bay Area Statistics
• 7560 square feet of space (area)• 150 square feet of available space
(estimated)• 625 Red Tags written• 7 trash dumpsters filled and dumped• 1.5 Large roll off scrap dumpsters
filled
3
SORT
SHINE
SET IN ORDER
STANDARDIZE
SUSTAIN
The 5S System
Before
4
5
6
7
8
9
10
“RED-TAGING”
11
12
13
14
After
15
16
17
18
19
20
21
Things Completed
• Built a Story Board• Swept area• Two machines power washed• Prep Bay Office cleaned• Two tool boards completed, Three in process• Necessary tools and tooling identified for all machines and work
areas• Repairs needed by machine list completed• “To Do List” with tasks, time frames and responsibility completed • Identified scrap removed (most)• Identified trash removed• Almost all remaining “Red-Tagged” items consolidated• Proto-type work center/job placement sign developed• “Report Out Report” completed
22
“To Do List”
Workplace Organization Checklist