    WORK FLOW

    IN

    ENGINEERING OFFICES

    PREPARED BY

    ASHRAF AL RAFEI(CERTIFIED CONSULTANT)

  • 8/3/2019 Workflow in Engineering Offices

    2/15

    CLIENTS

    RELATIONS

    WORK FLOW

    INVITATION

    TO BID

    BID

    PROPOSAL

    PREQUALIFY

    .

    EXPERIENCE

    ARCHIVE

    STATISTICS

    INFO D. BASE

    STANDARDIZATION

    CLIENT

    ACCEPTANCE

    CHANGES

    COMMENTS

    CLIENT

    REVIEW

    - ENG. - CADD

    - FINAL PRODUCTS

    MODIFY

    WORK PLAN

    CONTINUOUS QA/QC FUNCTION

    MONITORING - REPORTING - SUPPORT - INVOICING

    PERFORMANCE &

    COST ANALYSIS

    ESTIMATING

    WORK

    PLAN

    V.P. APPROVALASSIGN BID

    COORDINATOR

    NEGOTIATIONCONTRACT

    AWARD

    ASSEMBLY

    OF TASK

    FORCE

  • 8/3/2019 Workflow in Engineering Offices

    3/15

    1- INTRDUCTION TO THE

    CLIENT

    PREQUALIFICATION

    DOCUMENT: PAST EXPERIENCE,

    RESOURCES, CLIENT LIST,ETC

    REGISTER AT CLIENTS

    PROCUREMENT DEPT.

    PERSONAL VISITS TO CLIENT

    ADVERTIZE IN THE MEDIA

    PARTICIPATE IN THE

    TECHNICAL FORUMS,

    CONFRENCES, ETC..

  • 8/3/2019 Workflow in Engineering Offices

    4/15

    2- HOW TO GET A PROJECT

    OPEN BIDDING

    SINGLE SOURCE

    COMPETETIONS

    PERSONAL

    CONTACTS

    NEGOTIATED

    TERMS

  • 8/3/2019 Workflow in Engineering Offices

    5/15

    3- BID PREPERATION

    SCOPE DEFINITION & WBS

    RESOURCES ALLOCATION

    PRELIMINARY WORKPLAN WORK BREAKDOWN STRUCTURE MANPOWER

    EQUIPMENT

    SCHDULE

    CLIENTS INPUT

    QUALITY MEASURES

    PLANNING,SCHEDULING & COST

    CONTROL PROCEDURES

  • 8/3/2019 Workflow in Engineering Offices

    6/15

    4- CONTRACT PREPERATION

    GENERAL CONDITIONS

    SPECIAL CONDITIONS

    SCOPE OF WORK

    SAFETY

    BILLS OF QUANTITIES &

    PAYMENT TERMS

    LUMP-SUM BASIS

    UNIT RATE BASIS

    UNIT RATE NOT TO

    EXCEED

    EXCUTION SCHEDULE

    TECHNICAL

    SPECIFICATIONS

    CONST. DRAWINGS QUALITY

    REQUIREMENTS

    CONTRACT

  • 8/3/2019 Workflow in Engineering Offices

    7/15

    5- PROJECT KICK-OFF

    MOBILIZE PROJECT MANAGER &

    TEAM

    FINALIZE THE WORK PLAN

    INTERNAL KICK-OFF & JOB

    EXPLANATION

    KICK-OFF MEETING W/CLIENT TO

    CONFIRM EXPECTATION AND

    SCOPE OF WORK

    COLLECT DATA & VISIT SITE

  • 8/3/2019 Workflow in Engineering Offices

    8/15

    6- PRELIMINARY STUDIES

    EXISTING FACILITIES & CONDITIONS TOPO SURVEY & GEOTECHNICAL

    INVEST.

    OBTAIN AS-BUILT DRAWINGS

    ENVIRONMENT CONDITIONS & IMPACT CLIENT & INTERNATIONAL STANDARDS

    TIE IN W/ EXISTINGUTILITIES/FACILITIES

    CONSTRUCTABILITY MATERIALS REQUIREMENTS ( OFF

    SHELFLONG LEAD)

    RISK ASSESMENT

  • 8/3/2019 Workflow in Engineering Offices

    9/15

    FUNCTIONALITY ALTERNATIVE SOLUTIONS

    VALUE ENGINEERING

    PRELIMINARY / SCHEMATICDRAWINGS

    MODLE PREPERATION

    REPORT ( PROJECT PROPOSAL)

    PRESENTATION TO CLINET FOR

    COMMENTS & APPROVAL

    6- PRELIMINARY STUDIES(CONTD)

  • 8/3/2019 Workflow in Engineering Offices

    10/15

    7- DETAILED DESIGN

    DETAILED CALCULATIONS

    DEVELOP & DETAIL THE PRELIM.

    DRAWINGS

    CONSTRUCTION DETAILS EQUIP. DATA SHEETS

    MATERIAL TAKE-OFF

    CONSTRUCTION SPECIFICATIONS

    CONST. CONTRACT DOCUMENT (

    SAME AS ITEM # 4)

    REPRODUCTIONPROJECT

    PROPOSAL

    DETAILED

    DESIGN

  • 8/3/2019 Workflow in Engineering Offices

    11/15

    8- CONST. CONTRACTING

    SCHEME LUMPSUM TURNKEY

    LUMPSUM PORCURE

    BUILD LUMPSUM BUILD

    UNIT RATES

    ONE CONTRACT

    MULTI CONTRACTS

    OTHER..

  • 8/3/2019 Workflow in Engineering Offices

    12/15

    9- BIDDING PROCESS

    CONTRACTOR SURVEY

    SHORT LIST CONTRACTORS

    INVITATION FOR

    PREQUALIFICATION PREQUALIFY CONTRACTORS

    SHORT LIST CONTRACTORS

    INVITATION FOR BID

    TECHNICAL & FINANCIAL BIDANALYSIS

    RECOMMENDATION

  • 8/3/2019 Workflow in Engineering Offices

    13/15

    10- CONSTRUCTION SUPERVISION

    REVIEW AND APPROVAL OF:-

    WORK PLAN

    CONTRACTOR RESOURCES

    SHOP DRAWINGS

    MATERIALS & SUPPLIERS

    QUALITY PLAN & PROCEDURES

    VARIATION ORDERS

    INVOICES

    AS-BUILT DRAWINGS

    OPERATION MANUALS

    RECORD BOOKS

    ROUTINE REPORTS

    SITE INSPECTION

  • 8/3/2019 Workflow in Engineering Offices

    14/15

    11- PROJECT DOCUMENTATION

    & ARCHIVING

    CONTRACTS & CORESPONDANCE PROJECT DOCUMENTS

    STANDARD DRAWINGS & TYP.DETAILS

    CONST. SPECIFICATIONS. MATERIAL SAMPLES

    PERFORMANCE RATES

    COST RATES

    EXPERIENCE D. BASE

    ACHIVEMENT CERTIFICATES ETC.

    $

  • 8/3/2019 Workflow in Engineering Offices

    15/15

    12- SUMMARY

    ENGINEERING BUSSINESS IS AMIXTURE OF:-

    - ENGINEERING

    - MANAGEMENT- SALES & PUBLIC RELATION

    - FINANCE & ACCOUNTING

    - STATISTICS

    ARCHIVING & DATA MGMT.

    LEARNIG STARTS AFTER

    SCHOOL!!

    MGMT SALES

    ENG.

    ARCHIVE ACCOUNT