work study to review the staff strength at diesel...
TRANSCRIPT
1
WORK STUDY TO REVIEW THE
STAFF STRENGTH AT
DIESEL LOCO SHED / TONDIARPET –
CHENNAI DIVISION
2
SOUTHERN RAILWAY
PLANNING BRANCH
G.275 / WSSR- 321718 / 2017-18
STUDIED BY
WORK STUDY TEAM OF
PLANNING BRANCH
DECEMBER 2017
WORK STUDY TO REVIEW THE
STAFF STRENGTH AT
DIESEL LOCO SHED / TONDIARPET
CHENNAI DIVISION
3
(i) I N D E X
SERIAL
NUMBER CONTENTS
PAGE
NUMBER
(i) ACKNOWLEDGEMENT 1
(ii) AUTHORITY
(iii) TERMS OF REFERENCE
(iv) METHODOLOGY
(v) SUMMARY OF RECOMMENDATIONS 2
CHAPTERS
I INTRODUCTION 3-6
II PRESENT SCENARIO 07-17
III CRITICAL ANALYSIS 18-30
IV PLANNING BRANCH’S REMARKS ON CO-ORDINATING OFFICER’S VIEWS
31 - 32
V FINANCIAL SAVINGS 33
ANNEXURES
I ‘S.A.V.E.’ STATEMENT OF DIESEL SHED/TNP 34
.
1
(i)
ACKNOWLEDGEMENT
The study team gratefully acknowledges the guidance rendered by DME/DSL/TNP
and the co-operation and assistance rendered by SSE/DSL/TNP, Supervisors and
staff of DSL/TNP.
(ii)
TERMS OF REFERENCE
To review the staff strength at Diesel Loco Shed – Tondiarpet - Chennai Division.
(iii) METHODOLOGY
The following methodology has been adopted while conducting the study.
1. Collection of data.
2. Analysing the data pertaining to workload.
3. Discussion with Officers, Supervisors and staff.
4. Application of Bench marking issued by Railway Board and provision of
staff on need base, wherever required.
.
2
(iv)
SUMMARY OF RECOMMENDATIONS
Recommendation No.1:
10 Vacant posts of Technician Gr.I in GP Rs.2800/- are found excess to the
requirement and the same may be surrendered and credited to the vacancy bank.
(10 POSTS)
Recommendation No.2:
On outsourcing of activities as given in the Annexure, 26 Vacant Posts of
Technician Gr.I in GP Rs.2800/- may be surrendered and credited to the vacancy
bank. (26 POSTS)
(Grand Total = 10 + 26 = 36 POSTS)
.
3
CHAPTER – I
1.0 INTRODUCTION
1.1 The Loco fleet is the life line of any Railway system. They are utilised for handling
passenger and freight trains. It is therefore imperative to have a healthy and
reliable fleet of locos. The primary responsibility of loco shed is to keep the locos
in good condition and free from troubles.
1.2 Southern Railway has four Diesel Loco Sheds at Erode, Ponmalai, Ernakulam and
TNP.
1.3 Historical perspective of Diesel Shed :-
The advent of diesel traction in the late 50s with its potential for high speed and
increased train loads brought about a significant change in the train operation
over the Indian Railways. Dieselisation gained further momentum in 1957 and an
order was placed for 20 locomotives with an American company and this led to
the setting up of Diesel Locomotive Works (DLW) Varanasi in August 1961.
4
Railway : Southern Railway
Shed : Diesel Loco Shed, Tondiarpet.
Shed Code : DSL / TNP / SR
Photo of Shed Loco of shed in Colour Scheme
I. Brief History
Diesel loco shed at Tondiarpet was started in the year 1972 with the induction of
WDS4B diesel locos to cater the shunting requirements of Tondiarpet marshalling
yard and goods shed in RPM, SO and coaching depot BBQ in Chennai division.
Later the fleet of WDS4B Loco got increased to 64 for further utilisation in other
division and work shops (i.e) TPJ, PGT, SBC, TVC, MYS divisions and LW/PER,
CW/PER, ICF. Consequent to the reduction of WDS4B locos, WDM7 main line
locos were inducted in TNP shed for utilization of Passenger and yard shunting
work in MAS, TPJ, MDU and PGT division from 2001. In addition mainline WDM2
locos were inducted in TNP shed from April 2007 to maintain goods outage. As on
June 2017 the holding of Tondiarpet shed is 49 (WDM7 – 7, WDM3A – 12,
WDG3A – 4, WDM7 – 14 & WDS6 - 12 (Total 49 Locos).
5
ELECTRONIC FAULTY TRACTION MOTOR DETECTOR
In Diesel Electric locomotives the loco pilot is not able to locate the faulty traction motor with the existing arrangement. Sometime the good traction motor is isolated by the driver from the circuit and defective traction motor gets major damages. To avoid such failures an Electronic Faulty Traction Motor Detector has been
developed. With the help of this kit, the loco pilot can easily locate and isolate the
faulty locate and isolate the faulty traction motor by using the change over switch
provided on the panel. This detector can be fitted on the locomotive without
disturbing the existing circuit.
BUFFER COUPLER VIEWER:
During the coupling of Diesel locomotives with Coaches/Wagons, one of the
operating staff gives the movement signal to the loco pilot and the other staff
performs the coupling operation. The loco pilot can’t see whether the loco is
properly coupled and the staff has come out or not. Due to this there is a possibility
of staff getting injured. In order to overcome this problem, a camera is provided
adjacent to the coupling and it is connected with a monitor fitted in driver’s cabin.
6
The driver can operate the selector switch and can see the coupling operation
performed in both LH and SH sides.
TRIPLE UNIT OF WDS4D
Diesel shed, Tondiarpet has formed Triple
unit comprising of three WDS4D locos
19676, 19701 and 19702 dual brake locos
fitted with Voith Transmission. Suitable
modifications were carried out in these locos
for hauling more load.
Subsequently load trial was conducted on 13.08.08 with Triple unit for hauling
BCN rake consisting of 42 wagons (21 Load + 20 Empties and 1 BV) ex.TNPM to
TO. The Triple unit has hauled 2317 Tones of load at a maximum speed of 45
KMPH.
1.4 To maintain the imported Diesel Locos and the locos turned out from
DLW/Varanasi, various diesel sheds came into being criss crossing the vast
Indian Railway network.
1.5 In the Southern Region, Gooty was the first BG Shed to be established in the early
60’s and the locos were utilised over the entire region. With the phased
withdrawal of steam locos and the progressive dieselisation, the need around for
one more BG shed in the regions and Erode with its central locations and the
availability of a big marshalling yard was chosen duly considering the existing infra
structural facilities and operational convenience.
7
CHAPTER – II
2.0 PRESENT SCENERIO
2.1 The organisational set up of Diesel Shed / TNP is as follows:-
DME/Diesel is the Head of the Diesel shed who is assisted by SSEs. SSE/G is the
overall incharge of all sections and co-ordinates with the SSEs of sections and
assist DME. DME is also supported by Ministerial staff as well as CMSs/CMAs.
The shed has Time Office for dealing with working hours, leave and claim of
salary, allowances etc. DME/Diesel directly reports to Sr.DME at Divisonal level
and CMPE/DSL at Headquarters level. AMM/Stores is also available at Diesel
shed for procurement of stores for the shed.
Information cell section headed by SSE provides Management Information
System (MIS) of Diesel Loco Shed and communicates with Headquarters, Other
department and customers related to Diesel loco failures etc.
2.2 Staff position:
The Sanction, Actual, Vacancy & Excess statement of staff position is appended
below.
S. No
Design. Sanction
Total Actual
Total Vacancy Total
vac. Mech Elec Mech. Elec. Mech. Elec.
1 SSE 13 9 22 16 7 23 -3 2 -1
2 JE 7 5 12 6 0 6 1 5 6
3 Sr.Tech. 41 27 68 45 14 59 -4 13 9
4 Tech.I 80 53 133 72 23 95 8 30 38
5 Tech.II 12 8 20 15 8 23 -3 0 -3
6 Tech.III 23 16 39 27 14 41 -4 2 -2
7 Welder III 1 0 1 0 0 0 1 0 1
8 Painter III 5 0 5 0 0 0 5 0 5
9 Mach/Tur 2 0 2 0 0 0 2 0 2
10 Millwright 3 0 3 0 0 0 3 0 3
11 Bench Fitter 2 0 2 0 0 0 2 0 2
12 Tin & Smith 1 0 1 0 0 0 1 0 1
13 Carpenter 2 0 2 0 0 0 2 0 2
8
14 Instrument 1 0 1 0 0 0 1 0 1
15 Welder 2 0 2 0 1 1 2 -1 1
16 Crane Driver 0 4 4 0 1 1 0 3 3
17 Millerig III 0 2 2 0 0 0 0 2 2
18 Armature 0 1 1 0 0 0 0 1 1
19 DKH 26 17 43 25 22 47 1 -5 -4
20 Ch.OS
1
0 0 0 0
21 OS
7
3 0 0 0
22 Peon
1
1 0 0 0
23 Sr.Clerk
4
1 0 0 0
24 Jr.Clerk
0
2 0 0 0
25 CMS-1
3
0 0 0 0
26 CMS-II
4
3 0 0 0
27 CMA-I
2
4 0 0 0
28 CMA-II
1
1 0 0 0
Total 221 142 386 206 90 311 15 52 67
2.3 The S.A.V.E. Statement issued by APO/Mech./MAS is enclosed as Annexure-I.
2.4 The loco holding of DSL/TNP is as follows:
WDM 7 - 07 Passenger fleet
WDM 3A - 12 Passenger fleet
WDG 3A - 04 FREIGHT
WDM7 - 14
WDS6 - 12 Passenger fleet
Total - 49
2.5 The types of schedules and the periodicity are as follows:
Type of heavy schedule
WDM 3D WDM 3A WDG 3A WDM 2
Quarterly Once in 4 months
Once in 4
months
Once in 4
months
Once in 4
months
Half yearly 12 months 12 months 12 months 12 months
Yearly Schedule
9
M 24 24 months 24 months 24 months 24 months
M 48 48 months 48 months 48 months 48 months
M 72 72 months 72 months 72 months 72 months
POH 96 months 96 months 96 months 96 months
2.6 Passenger fleet Locos:-
Type of Light
schedule WDM 3D WDM 3A WDG 3A WDM 2
T1 Between 7 – 10 days
Between 7 – 10 days
- Between 7 – 10 days
T2 Once in 15 days
Once in 15 days
- Once in 15 days
Monthly Once in 30 days
Once in 30 days
- Once in 30 days
2.7 Freight Locos:-
Type of Light
schedule WDM 3D WDM 3A WDG 3A WDM 2
T1 20 days 20 days - 20 days
T2 - - 30 days 20 days
Monthly - -
Once in 40 days or 60
days
Once in 60 days
10
2.8 WORK LOAD:
(1) POWER PACK:
SECTION IN-CHARGE : SSE/POWER PACK.
Power pack section covers Power Pack, Turbo Super Charger, Cylinder Head and
Fuel injection Pump section. This section is taking care of Major assemblies and
sub-assemblies of above mentioned sections. Based on the daily programme of
schedule attention from Phone Room in the morning, the supervisor will
nominate the staff for planned work. In case of absence or leave of designate
SSE/General/Mech. nominates the replacement. Material planning, disposal of
the scrap will be taken care by section in-charge.
(2) UNDER TRUCK:
Section Incharge – SSE/Under Truck.
Under truck section covers Bogie Frame along with wheel assembly used in
Diesel Electric Locomotives. This section is taking care of Major assemblies and
sub-assemblies like wheels, coil springs, Bogie Frame, Axle boxes etc.,. Based on
the daily programme of schedule attention from Phone room in the morning, the
supervisor will nominate the staff for planned work. In case of absence or leave
of designate SSE/General/Mech. nominates the replacement. Material planning,
disposal of the scrap will be taken care by section in-charge.
(3) HEAT EXCHANGER:
Section incharhge: SSE/Heat Exchanger.
Heat exchanger section covers Radiator core, Lube oil system, Cooling water
system, Blowers used in Diesel Electric Locomotives. This section is taking care
of Major assemblies and sub-assemblies as above mentioned Diesel Components.
Based on the daily Based on the daily programme of schedule attention from
Phone room in the morning, the supervisor will nominate the staff for planned
work. In case of absence or leave of designate SSE/General/Mech. nominates
11
the replacement. Material planning, disposal of the scrap will be taken care by
section in-charge.
(4)AIR BRAKE :
Section incharge SSE/Air Brake.
Air Brake section covers Brake system and Compressor/Expressor used in Diesel
Electric Locomotives. This section is taking care of Major assemblies and sub-
assemblies as above mentioned Diesel Components. Based on the daily Based
on the daily programme of schedule attention from Phone room in the morning,
the supervisor will nominate the staff for planned work. In case of absence or
leave of designate SSE/General/Mech. nominates the replacement. Material
planning, disposal of the scrap will be taken care by section in-charge.
(5) Special work/Modification:
Section incharge – SSE/Special work
Special work section covers fabrication/modification work at driver`s cabin used
in Diesel Electric Locomotives. The shed floor cleaning and maintenance of
machinery and plant available at Diesel shed. Based on the daily programme of
schedule attention from Phone room in the morning, the supervisor will nominate
the staff for planned work. In case of absence or leave of designate
SSE/General/Mech. nominates the replacement. Material planning, disposal of
the scrap will be taken care by section in-charge.
(6) LABORATORY:
Section in-charge – CMS/Laboratory.
Laboratory section is taking care of Physio chemical analysis of Lube oil, Fuel oil
and coolant water, spectro analysis, ultrasonic testing, zyglo testing and dye
penetrant testing for checking the health of loco and its components. In
addition, the chemical composition of the materials received from the trade is
12
also checked as per RDSO guidelines. Based on the daily programme of
schedule attention from Phone room in the morning, the supervisor will nominate
the staff for planned work. Material planning, disposal of the scrap will be taken
care by section in-charge.
(7) LIGHT SCHEDULE – (MECHANICAL):
Section in-charge – SSE/Light Schedule (Mechanical)
Light schedule (Mechanical) section is taking care of Minor schedule attention to
Diesel Electric Locomotives like Trip, Monthly etc. This section controls the entire
locomotives of Diesel shed and offers locomotives to traffic department based on
the demand. Based on the daily programme of schedule attention from Phone
room in the morning, the supervisor will nominate the staff for planned work. In
case of absence or leave of designate SSE/General/Mech. nominates the
replacement. Material planning, disposal of the scrap will be taken care by
section in-charge.
(8) MATERIAL CONTROL CELL :(MECHANICAL)
Section in-charge – SSE/Mechanical Control cell (Mechanical)
Material control cell (Mechanical) section provides the material for the day to-day
maintenance of Diesel Electric Locomotives. This section co-ordinates with
Stores depot, Headquarters and other sister diesel shed depots for the
procurement of Diesel spares or material assistance. In case of absence or leave
of designate, SSE/G/Mech. nominates the replacement. Entire scrap disposal
from shed to General Stores Depot is taken care by this section.
(9) INFORMATION CELL :
Section incharge – SSE/Information Cell
Information cell is the management information system (MIS) of Diesel Loco
shed. Information cell communicates with Headquarters, Other department and
13
customers’ related to Diesel electric locomotives failures, replies to queries raised
by HQ and other depots.
(10) INTEGRATED MANAGEMENT SYSTEM CELL (IMS):
Section in-charge : SSE/IMS CELL.
IMS cell is taking care of implementation of Integrated Management System (ISO
9001:2008, ISO 14001:2004 and OHSAS 18001:2007) to Diesel shed. This cell is
the nodal agency for external communication with Pollution Control Board for
any environmental issues. In addition, this cell takes care of Contract and
Budget and co-ordination with Divisional Headquarters.
(11) MACHINERY AND PLANT (PROCUREMENT):
Section in-charge: SSE/M&P (PROCUREMENT).
Machinery and Plant (Procurement) is the nodal agency for the procurement of
Machinery and Plant to Diesel shed. This section prepares the Proposal for
Machinery and Plant programme under Railway Board as well as GM`s out of
turn programmes, Preliminary works programme every year.
2.8: Other activities:
Apart from the scheduled activities like loco holding and attention, the additional
activities undertaken at DSL/Tondairpet are as follows:
a) Trouble shooting Points at MAS & MS.
To monitor the locos at interchange points of division for operational requirement
to ensure smooth and timely running of trains and to avoid detention to
locos/trains, trouble shooting points are functioning at MAS (3 shifts) and MS (2
shifts). At present 7 and 9 staff of Diesel shed/TNP are manning the trouble
shooting points at MAS and MS respectively.
14
b) Railway Consumer Depot:
A fuel installation with storage capacity of 70 KL and 50 KL is manned round the
clock. All locos working in shunting, pilot and BT services in Madras division and
out station locos are being fuelled at RCD/TNP. The average issue per day is 13
KL. At present 2 staff of DSL/TNP are working round the clock for issue of fuel
to locos and accountal purpose.
c) Self Propelled Accident Relief Train (SP – ART):
Diesel shed/TNP is also responsible for the maintenance of diesel engines,
control equipments, transmission systems, diesel generator sets for AC, lighting
systems and maintenance of air conditioning with fans and lights of SP-ART. In
addition to this the batteries of three coaches of SPART formation along with the
alternator, transformer and control coupler are being maintained. At present a
total of 5 staff are manning SPART formation.
d) 140 T BD Crane:
The hydraulic crane consisting of diesel engine of 295 hp and one kirlosker
generator of 19 KVA for breakdown operation consisting of Hydraulics,
pneumatics, electronic circuits are being maintained apart from locomotive. At
present 10 staff are involved in the maintenance of 140 T crane.
f) Power side:
The present electrical load capacity has risen to 555 KVA, in order to maintain
electrical installation at DSL/TNP a total of 7 staff involved.
g) Phone room:
Due to shortage of clerical staff the telephone room is maintained by 4
maintenance staff to monitor the locos deployed in open lines duly co-ordination
with power/trouble shooting points and other diesel shed for maintenance of
locos and to ensure smooth running of locos without detention.
15
2.9. There are 8 bays in the shed and their utilization is as follows:
i) Bays 1 & 2 - Light Schedule
ii) Bays 3, 4 & 5 - Heavy Schedule
iii) Bay 6 - Special schedule
iv) Bay 7 & 8 - Under frame overhauling
2.10 ELECTRICAL WING:
1. Power side – No. of staff – 07
a. The electrical power side maintenance, electrical installation in diesel loco shed.
b. Maintenance of M&P (Electrical).
c. Inspection and certification of material.
d. Condemnation and recoupment of spares.
e. Maintenance of compressor Electric motors. Over head cranes (25/10/3 tons.)
f. Sending of repair motors to Electrical work shop/PER.
2. Small motors – No. of staff – 08
a. The maintenance schedule of Small motors viz. FPM, CCEM, Tacho, ADA and DEM motors of WDS6, WDM7, WDM2, WDM3A & WDG3A locos.
b. Over hauling of FPM, CCEM, Tacho, ADA and DEM motors.
3. Electrical Material control store (MCC) – No. of staff – 02
a. Material planning
b. Processing of stock and non-stock material as per drawing.
c. Trail supply of stocks and chasing of vital items from stores, shops and traders.
d. Certification of budget requirements.
e. Condemnation and recoupment of spares.
16
4.Traction motor – No. of staff – 13.
a. The maintenance schedule of Quarterly, Half yearly, Yearly and
overhauling of Traction motors viz. WDM7, WDS6, WDM2, WDM3A &
WDG3A locos and its related activities vise under the frame cable
attention, traction motor cable connection and disconnection work.
b. Traction Generator/Alternator for quarterly, half yearly and yearly
maintenance schedule and major repair of Tr.Generators, Tr. Alternators
of locos.
5. Heavy schedule/LRR - No. of staff 17:
a. The maintenance schedule and major repairs of electrical panels, pneujmatic equipments of the Diesel locos of WDM7, WDM2, WDS6, WDM3A & WDG3A locos.
b. Modification and development works pertaining to locos.
c. Heavy schedule locomotives after Quarterly schedule (i.M4 Schedule).\
d. RDSO modification and trails including MEP, MCBG, VCD, ILIS, E-LWS of
indigenous components, Change over switch for FPM invertor, Shunting
mode of WDS6 locos on electrical side and submission of reports there on.
e. Load box testing of locos viz. WDS6, WDM7, WDM2, WDM3A & WDG3A
locos.
f. Maintenance of MCBG governor and power rectifiers in WDM3A, WDG3A &
WDM7 AC/DC locos.
6. Light schedule/Electrical – No. of staff 22.
a. Turn out of light schedule locos of WDM7, WDM2, WDM3A, & WDG3A
locos ie. Upto M2 schedule.
b. Turnout of light schedule locos after load box testing ie. During out of
course attention.
17
c. Monitoring of trouble shooting points viz MAS & MS.
d. Monitoring enroute messages and to arrange staff to accompany if
necessary and download the statistical datas viz. MEP, MBCS and VCD
during schedule attention and store of the datas.
e. Schedule attention and store the MEP data`s.
7. Auxiliary – No. of staff – 09
a. Maintenance of schedule and overhauling of Auxiliary Generator, Exciter
Generator, ECC and BKBL of WDS6, WDM7, WDM2, WDM3A & WDG3A
locos.
b. Loading and Unloading of FTTM during heavy schedule or out of course
attention.
8.Speedometer – No. of staff – 03.
a. To check the Schedule attention of SPM of locos and their memory status,
Time & date and other recording.
b. To down load the memory card if the card is full and speedometer details
according to the message received from PRC and submitting the reports
as per the messages.
c. Overhauling of Record units, Indicator & Pulse generator.
d. Calibration of SPM units during HLY, YLY schedules.
e. To collect and down load the statistical data of ILIS.
9.Battery – No. of staff – 04.
Maintenance and schedule attention of batteries, initial charging, discharging and
replacement of batteries in WDS6, WDM7, WDM2, WDM3A & WDG3A locos.
a. Maintenance of vehicle, genset and UPS batteries.
18
CHAPTER – III
3.0 CRITICAL ANALYSIS:
3.1 FIELD STUDY:
A field study was conducted at TNP Diesel shed, Trouble shooting/MAS & MS (
on 27.10.2017, 28.10.2017 & 31.10.2017. During the study, Sri Selvaraj,
SSE/G/TNP, Co-ordinating Supervisor was contacted and discussed about the
activities of the Shed. The following activities were observed and discussed with
the concerned SSE.
1.Time office: There are 6 staff working in this section.
OS-1, Clerk-1, Technician Gr.II -1, Khalasi – 2 and Peon -1. This section deals
with the Time office activities for the shed. Issue of Passes, maintenance of
leave, Salary bill preparation etc. There is no IPASS authorisation provides to
the staff and hence the OS is making entries in the IPASS of the Divisional
Headquarters. Hence, the IPASS authorisation may be given to the Time office
staff so that they can feed the entry directly at TNP shed itself.
2. Laboratory: Shri S. Nagaraj, CMS was available and he explained about the
working at Laboratory. The following are actual strength at Lab.
CMS - 3
CMA - 2
Total - 5
Actual strength on rolls is 8 and 3 staff are absent.
Monthly progress report for June 2017 is enclosed as Annexure for reference.
19
As per the data given by the DME/Diesel shed, Sanction – 10, actual strength is
8. Out of 8 staff, 3 are absent. Hence, the effective strength becomes 5.
During the discussion with CMS, it has been stated that at times staff are
deputed to other locations for testing work and during that period the work load
at this shed will be more and hence atleast 8 staff are required to meet out the
activities at this shed.
Hence, the total requirement for Laboratory is 8 staff.
3. Power Pack: The following are the actual staff strength. Sri Murugan, SSE
was available.
SSE - 2
JE - 1
Sr.Tech. - 9
Tech.Gr.I -14
Tech.Gr.II 5
Tech.Gr.III 3
Helper 4
Total 35. Out of 35 staff, one staff was retired recently and hence on
hand strength is only 34 staff.
As per the data furnished, 36 staff, 2 SSE and 1 SSE available in the shed. But
actually only 34 staff with SSE-2 & JE -1 total 37 staff are actually available.
Requirement of staff is as per the Bench marking concept given in the
subsequent paras.
20
4. Fuel Injection: Staff on rolls : 1 MCM & 3 Technician Gr.I Total – 4 staff.
Staff at this work place has stated that the existing strength is not adequate and
hence additional staff are required to meet out the activities of the shed.
5.Phone Room: This phone room is functioning round the clock. They are
taking and giving messages to Divisional office and Headquarters office. There
are 4 Technicians utilised in this section. Since clerks are not available,
technicians are utilised in this section.
6. Stores Section: Staff strength of this section is as follows.
SSE/Mechancial - 1
Sr.Technician - 2
Technician - 5
Total - 8
Clerk - 1
Total - 9
Two staff are due for retirement in Jan.2018.
7. Heat exchanger: This section is having 2 SSEs and 18 staff to meet out the
activities of this section.
As per the data furnished, the staff strength is 1 SSE and 19 staff are available.
8. Under truck: Actual strength is 2 SSE and 21 Staff. They are doing Quarterly
schedule, Half yearly, Yearly schedules of under truck activities. 3 Locos have
arrived for schedules.
21
1 loco on 06.10.2017, 1 loco – 24.10.2017 & 1 on 28.10.2017.
Material Management section: Sri Davis, SSE was available. He stated that
one clerk and 4 Technician are utilised in this section. Stock and Non-stock
indents are prepared for procurement of materials. On an average 300 Stock
indents per month are prepared and 100 N.S indents are prepared yearly. There
are about 650 stock items are available.
Information: Mr.K.Ravichandran, SSE is the incharge of this section. He prepares
PCDO. One technician is also utilised in this section.
Light Schedule: (Mechanical)
Mr. Shivaji SSE is the incharge of this section. On an average 4 locos are being
maintained daily. T-1, T-2, M-2 are done here. General maintenance is done
here. Before bring the loco to the Bay, water level and fuel level are checked. 8
staff are being sent to MS & MAS for trouble shooting activities. 4 staff are being
utilised at Phone room. Only 6 staff are utilised in the General shift for light
schedule activities. Proforma of M-2, T-1 & T-2 are enclosed as annexure.
Light schedule: (Electrical) :
Staff on roll is 2 SSE and 22 staff. For trouble shooting at MAS & MS – 3 staff
each given. Locos are monitored through Remote Monitoring and Management
of Locomotives and Train (RMMLT). Proforma of M-2, T-1 & T-2 are enclosed as
Annexure.
3.1 Despite the increase in freight loading and gross earnings, the raise in the
operation ratio does not augur well for the welfare of Railways. This
necessitates the deployment of labour force in an optimal manner.
3.2 Recently the concept of “Bench marking” has occupied a major role in the
industries and managerial institutions to evaluate and compare the performance
22
to achieve economy and quality of service. In the same lines RB started
implementing this concept to improve the efficiency of the Railway system
thereby providing better services to passengers.
3.3 Bench marking is a point of reference for a measurement. It is the process used
in management in which organization evaluate various aspects of their process in
relation to the best practice, usually within their own section to compare the
performance with the most successful competition who is maintaining maximum
productivity level.
It is a kind of applying PERT technique (Programme, Evaluation and Review
technique) once in a while if not every year.
3.4 The Bench marking of Diesel Loco sheds is broadly clarified into sheds holding
more than 80 locos, less than 80 locos and Benchmarking of other Diesel sheds
(Having primarily shunting, MG & NG locos). Diesel shed/TNP falls in the third
category viz. other Diesel sheds (Having primarily shunting, MG & NG locos).
The current Bench marking of Diesel Shed in the third category in July 2017 is
3.22 (MLY Shed/HYB), the I.R. average is 5.11 men per loco and Diesel
shed/TNP is 5.86 men per loco.
3.5 The staff working in Diesel Shed can be classified as:
(a) Supervisors – Mechanical & Electrical
(b) Artizan staff – Technician Mech & Electrical
(c) Unskilled Repairs
(d) Ministerial staff
(e) Laboratories staff
3.7 Direct maintenance staff (Mech. & Elect) sanctioned for maintaining
holding of 49 is as follows:
23
S. NO
Design Sanc.
Total Actual
Total Vacancy Total
vac. Mech. Elec Mech Elec Mech. Elec.
1 SSE 13 9 22 16 7 23 -3 2 -1
2 JE 7 5 12 6 0 6 1 5 6
3 Sr.Tech. 41 27 68 45 14 59 -4 13 9
4 Tech.I 80 53 133 72 23 95 8 30 38
5 Tech.II 12 8 20 15 8 23 -3 0 -3
6 Tech.III 23 16 39 27 14 41 -4 2 -2
7 Welder III 1 0 1 0 0 0 1 0 1
8 Painter III 5 0 5 0 0 0 5 0 5
9 Mach/Tur 2 0 2 0 0 0 2 0 2
10 Millwright 3 0 3 0 0 0 3 0 3
11 Bench Fitter 2 0 2 0 0 0 2 0 2
12 Tin & Smith 1 0 1 0 0 0 1 0 1
13 Carpenter 2 0 2 0 0 0 2 0 2
14 Instrument 1 0 1 0 0 0 1 0 1
15 Welder 2 0 2 0 1 1 2 -1 1
16 Crane Driver 0 4 4 0 1 1 0 3 3
17 Millerig III 0 2 2 0 0 0 0 2 2
18 Armature 0 1 1 0 0 0 0 1 1
19 DKH 26 17 43 25 22 47 1 -5 -4
20 Ch.OS
1
0 0 0 0
21 OS
7
3 0 0 0
22 Peon
1
1 0 0 0
23 Sr.Clerk
4
1 0 0 0
24 Jr.Clerk
0
2 0 0 0
25 CMS-1
3
0 0 0 0
26 CMS-II
4
3 0 0 0
27 CMA-I
2
4 0 0 0
28 CMA-II
1
1 0 0 0
Total 221 142 386 206 90 311 15 52 67
3.9 Applying the current All India Bench mark will have a sudden impact and adverse
effect on the present staff strength and also the working pattern of Dsl / TNP.
Hence the IR average of 5.11 men per loco is applied.
3.11 Requirement of direct maintenance staff.
Loco holding @ Dsl. TNP - 49 (inferior service)
Indian Railway Average - 5.11 Staff per loco
24
Required man power - 49 x 5.11 = 250.39 say 250
This Bench marking is inclusive of all Supervisory, artizans and RG. LR is
provided separately.
LR@ 12.5% - 250x12.5% = 31.25 or say 31
Total requirement of direct maintenance staff = 250+31=281
3.12. It has been mentioned in the data particulars, in addition to the normal
maintenance of locos, the following additional work are being carried utilizing the
number of staff mentioned against each.
(i) Trouble shooting at MAS & MS
MAS round the clock (Mech-4,Elec-4) - 8
MS (Morning & Night 2 shifts) (Mechanical-3+Elec.3 - 6
-----
Total 14
(ii) RCD depot manning round the clock - 02 Staff
(iii) SPART - 05 Staff
(iv) 140 T crane - 10 Staff
---- Total - 31 Staff ----
3.13 Hence the total requirement of Direct maintenance staff & other staff is as follows
Requirement as per coach holding (as per Para 3.11) - 281
Requirement of staff for other than loco maintenance - 31 (3.12.1) ----
Sub-total 312 Less Outsourcing of maintenance activities 26 ---- Nett requirement 286
----
25
3.14 Requirement of Clerical staff: There are 12 posts sanctioned under this category. Out of 12 sanctioned posts 8
are vacant i.e Ch.OS – 1, OS – 4, Sr.Clerk – 3. There are no sanctioned posts of
Jr.Clerk but 2 Jr.Clerks are available and hence there is nett vacancy of 6 posts.
Deployment of Staff:
RCD - 2
Stores/MCC - 1
DME Office - 1
SSE/G & Office - 3
Total - 8 Requirement of Ministerial staff on need basis:
Time Office - 4
RCD - 2
DME/O - 1 SSE/G/O - 1
- -- Total 8 --
Presently One Technician in Gr.II and 2 Khalasis are being utilized in Time Office.
These three staff may be utilized in sections to avoid staff shortage for
maintenance activities. Hence 4 clerical posts are found surplus and the same
be surrendered and credited to vacancy bank.
26
3.15 Requirement of Ancilliary staff: The following are the Sanction, Actual, Vacancy and Requirement Ancillary staff
position.
S. No
Design
Sanc.
To
tal
Actual
To
tal
Req.
To
tal
Vacancy
Total vac.
Me
ch
Ele
c
Me
ch
Ele
c
Me
ch
Ele
c
Me
ch
Ele
c
Ancillary staff
1 Welder III 1 0 1 0 0 0 1 0 1 1 0 1
2 Painter III 5 0 5 0 0 0 5 0 5 5 0 5
3 Mach/Tur 2 0 2 0 0 0 2 0 2 2 0 2
4 Millwright 3 0 3 0 0 0 3 0 3 3 0 3
5 Bench Fitter 2 0 2 0 0 0 2 0 2 2 0 2
6 Tin & Smith 1 0 1 0 0 0 1 0 1 1 0 1
7 Carpenter 2 0 2 0 0 0 2 0 2 2 0 2
8 Instrument 1 0 1 0 0 0 1 0 1 1 0 1
9 Welder 2 0 2 0 1 1 1 1 2 2 -1 1
10 Crane Driver 0 4 4 0 1 1 0 4 4 0 3 3
11 Millerig III 0 2 2 0 0 0 0 2 2 0 2 2
12 Armature 0 1 1 0 0 0 0 1 1 0 1 1
Total 19 7 26 0 2 2 18 8 26 19 5 24
During the discussion with the SSE/G, it has been stated that due to vacancies of
Ancillary staff are not filled up, the technicians are being given training and
utilized for these activities. Hence, the above Ancillary vacant posts are
kept as it is to fill up the same in future.
LABORATORY: The staff position is given below.
S. No
Designation
Sanction Actual Vacancy Requirement Surplus Laboratory staff
1 CMS-1 3 0 3 3 0
2 CMS-II 4 3 1 3 1
27
3 CMA-I 2 4 0 2 0
4 CMA-II 1 1 0 0 1
Total 10 8 4 8 2
During the discussion with the CMS, it has been stated that though 8 staff on
rolls, only 5 staff are available and 3 are absent. Further, it was stated that
atleast 8 staff are required to manage the activities of Lab. Accordingly, the
requirement of Lab. Staff is given as 8. The details of tests conducted by the
Lab are enclosed.
Outsourcing of Activities:
The Following Equipment/Machinery are given AMC.
1. Hot air oven 2. De-Mineralising Plant 3. SLI 4. ETP 150 MD capacity 5. Under Slung 6. 140 T BD crane 7. SPART 8. 140 T Main engine 9. RO Plant.
Activities proposed to be outsourced and the probable saving in terms of Man
power required:
S. No.
Name of the work Probable saving in
Man Power
1 Service and Maintenance Contract of 02 nos. of under slung
AC systems fitted in SPART & MRV No.98883
1
2 General House Keeping of shed floor including cleaning of
toilets. Cleaning of office/service buildings and De-weeding
of Maintenance area at Diesel shed at TNP for a period of 3
years
15
3 Loco washing 4
4 Annual Maintenance contract for 140T breakdown Crange 2
28
(Gottwald make Crane No.144006) of Diesel shed for all
components of Hydraulic, pneumatic and Mechanical
system (excluding Main & Auxiliary Engine for a period of 3
years
5 AMC for VOITH transmission in SPART 1
6 AMC for 140 T BD Crane – Main engine and Auxiliaries 1
7 AMC for 50 KVA Genset in SPART 1
8 AMC for RO Plant 500 LPH 1
Total 26
SUMMARY OF REQUIRMENT:
1. Supervisory Staff - 29
Technicians - 214
Diesel Khalasis - 43
------ Sub-Total - 286
2. Ministerial staff - 8 3. Ancillary staff - 26 4. Laboratory staff - 8 5. Peon - 1 Total Requirement of staff - 329
SANCTION VS REQUIREMENT:
Total Staff Sanction Actual Vacancy Requirement Surplus
386 314 75 329 57
29
Sanction Vs Requirement:
Recommendation No. 1
5 Vacant posts of SSE in GP Rs.4600/- are found excess to the requirement and
the same may be surrendered and credited to the vacancy bank.
(5 POSTS)
Recommendation No.2:
8 Vacant posts of Sr.Technician in GP Rs.2800/- are found excess to the
requirement and the same may be surrendered and credited to the vacancy
bank. (8 POSTS)
Recommendation No.3:
12 Vacant posts of Technician Gr.I in GP Rs.2800/- are found excess to the
requirement and the same may be surrendered and credited to the vacancy
bank.
(12 POSTS)
S. No
Category Sanction Actual Vacancy Requirement Surplus
1 Supervisors 34 29 5 29 5
2 Technicians 260 221 39 214 46
3 Diesel Khalasis 43 47 -4 43 0
4 Ancillary 26 2 24 26 0
5 Ministerial 12 6 6 8 4
6 Laboratory 10 8 2 8 2
7 Peon 1 1 0 1 0
Total 386 314 72 329 57
30
Recommendation No.4:
3 Vacant Posts of OS in GP Rs.4200/-, and 1 Vacant Post of Sr.Clerk in GP
Rs.2800/- are found excess to the requirement and the same may be
surrendered and credited to the vacancy bank.
(4 POSTS) Recommendation No.5:
One Post of CMSI in GP Rs.4800/- and One Post of CMSII in GP Rs.4600/- are
found excess to the requirement and the same may be surrendered and credited
to the vacancy bank. (2 POSTS)
Recommendation No.6: On outsourcing of activities as given in the Annexure, 26 Vacant Posts of
Technician Gr.I in GP Rs.2800/- may be surrendered and credited to the vacancy
bank. (26 POSTS)
(Grand Total = 31 + 26 = 57 POSTS)
31
CHAPTER – IV
4.0 PLANNING BRANCH’S REMARKS ON CO-ORDINATING OFFICER’S
VIEWS:-
DME/SL/TNP vide letter No.M/D/DSL/226/HQ dated 07.12.2017 has furnished the
following remarks to the draft work study reported submitted on 09.11.2017.
1. The vacancies shown in the work study arises due to change in staff ratio in
the DSL/Mech & Elec wing in the ratio 60:40 from the existing 80:20 vide
Sr.DPO/MAS Lr. No.M/P1(M)535/VI/DSL/Policy dated 03.8.2017 (letter enclosed).
2.15 Posts have already been surrendered due to implementation of Cadre
Restructuring vide Sr.DPO/MAS letter No.M/P1(M)535/VI/DSL/Restructing/Fitter
dt. 09.5.2017 (letter enclosed).
3.1% of total vacancy which worked out to be 4 was surrendered as per Rly. Bds
directive by division.
4.Also the activities such as Housekeeping, loco washing are just now initiated
and till such time it gets materialized it has be to taken care by the available
staff. Only after finalizing the same, surplus post can be surrendered.
Planning Branch`s remarks:
The study was opened and conducted as per the revised staff ratio only.
However, the C.O.`s remarks in respect of Sl.No.1 to 3 are considered and the
following changes are effected in the recommendations in view of the recent
surrender of 15 posts due to Restructuring and 4 posts on account of 1%
surrender of posts as per Rly.Bd`s directives.
Total no. of posts identified as surplus applying the
Bench marking (IR average) (excluding outsouring) : 31 Posts
32
Revised recommendation considering the C.O`s views: 10 Posts
(10 vacant posts of Technician Gr.I)
The remaining 21 posts which were earlier identified as surplus has been
allowed in view of revised ratio of DSL/Mechanic and DSL/Electric and also
considering the future requirements.
Regarding the C.O`s view that surrender of posts on account of outsourcing of
Housekeeping and Loco washing is accepted. On approval and sanction of the
Outsourcing of House keeping and Loco washing activities, the identified 26
surplus posts may be surrendered. It is requested that the outsourcing proposal
may be processed fast and give effect at the earliest.
REVISED RECCOMMENDATION:
Recommendation No.1:
10 Vacant posts of Technician Gr.I in GP Rs.2800/- are found excess to the
requirement and the same may be surrendered and credited to the vacancy
bank.
(10 POSTS) Recommendation No.2:
On outsourcing of activities as given in the Annexure, 26 Vacant Posts of
Technician Gr.I in GP Rs.2800/- may be surrendered and credited to the vacancy
bank. (26 POSTS)
(Grand Total = 10 + 26 = 36 POSTS)
33
CHAPTER – V
5.0 FINANCIAL SAVINGS:
5.1 If the recommendations made in the study report are implemented, the annual financial savings will be as under:
Sl. No.
Category Grade
Pay (Rs.)
No. of
Post
Mean Pay
(Rs.)
Annual Financial Savings (Rs.)
TECHNICIANS
1 Technician – Gr.I 2800/- 10 63788 76,54,560
2.
Technician – Gr.I
(On outsourcing of Housekeeping and Loco washing activities)
2800/- 26 63788 1,99,01,856
Total 36 2,75,56,416
34
ANNEXURE - I
S.A.V.E STATEMENT OF DISEL SHED/TNP
S. NO
Design Sanc.
Total Actual
Total Vacancy
Total
vac. Mech. Elec Mech Elec Mech. Elec.
1 SSE 13 9 22 16 7 23 -3 2 -1
2 JE 7 5 12 6 0 6 1 5 6
3 Sr.Tech. 41 27 68 45 14 59 -4 13 9
4 Tech.I 80 53 133 72 23 95 8 30 38
5 Tech.II 12 8 20 15 8 23 -3 0 -3
6 Tech.III 23 16 39 27 14 41 -4 2 -2
7 Welder III 1 0 1 0 0 0 1 0 1
8 Painter III 5 0 5 0 0 0 5 0 5
9 Mach/Tur 2 0 2 0 0 0 2 0 2
10 Millwright 3 0 3 0 0 0 3 0 3
11 Bench Fitter 2 0 2 0 0 0 2 0 2
12 Tin & Smith 1 0 1 0 0 0 1 0 1
13 Carpenter 2 0 2 0 0 0 2 0 2
14 Instrument 1 0 1 0 0 0 1 0 1
15 Welder 2 0 2 0 1 1 2 -1 1
16 Crane Driver 0 4 4 0 1 1 0 3 3
17 Millerig III 0 2 2 0 0 0 0 2 2
18 Armature 0 1 1 0 0 0 0 1 1
19 DKH 26 17 43 25 22 47 1 -5 -4
20 Ch.OS
1
0 0 0 0
21 OS
7
3 0 0 0
22 Peon
1
1 0 0 0
23 Sr.Clerk
4
1 0 0 0
24 Jr.Clerk
0
2 0 0 0
25 CMS-1
3
0 0 0 0
26 CMS-II
4
3 0 0 0
27 CMA-I
2
4 0 0 0
28 CMA-II
1
1 0 0 0
Total 221 142 386 206 90 311 15 52 67