work samples from kasia wlusz

13
KASIA WILUSZ 2015 Work Samples

Upload: kasia-wilusz

Post on 21-Jul-2016

226 views

Category:

Documents


2 download

DESCRIPTION

An abbreviated portfolio.

TRANSCRIPT

Page 1: Work Samples from Kasia Wlusz

KASIA

N1

A-113.00

1

A-115.00

1

A-114.00

1/8" = 1'-0"1 EAST

GROUND FLOORPLAN

0' - 2 7/8"

1-A FLOOR PLAN12' - 2 7/8"

3rd FLOOR PLAN24' - 2 7/8"

4th FLOOR PLAN38' - 2 7/8"

5th FLOOR PLAN52' - 2 7/8"

6th FLOOR PLAN66' - 2 7/8"

7th FLOOR PLAN80' - 2 7/8"

8th FLOOR PLAN94' - 2 7/8"

9th FLOOR PLAN108' - 2 7/8"

10th FLOOR PLAN122' - 2 7/8"

11th FLOOR PLAN136' - 2 7/8"

12th FLOOR PLAN150' - 2 7/8"

Roof164' - 2 7/8"

1Y176' - 2 7/8"

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-302.000' 4' 8' 16'

scale: 1/8" = 1'

N

01

A-502

01

A-504

01

A-501

RETACTABLE WALL

TOP PLAN +10’ 1/4” : 1’

WILUSZ

2015

Work

Samples

Page 2: Work Samples from Kasia Wlusz

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-101.00

UP

UNIT TYPE D

UNIT TYPE A

STAIR B

RESTROOM

UNIT TYPE A

UNIT TYPE B

STAIR A

RESTROOM UNIT TYPE A

UNIT TYPE C

CORRIDOR 6

1/8" = 1'-0"1 6th FLOOR PLAN

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

2000 sf

500 sf800 sf

1200 sf

1400 sf

VIEWS FROM FLOOR TO FLOOR

Vertical Mall Concept Fall 2013 Prof. Martin Stigsgaard Comprehensive StudioCollaborative Project

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-101.00

UP

UNIT TYPE D

UNIT TYPE A

STAIR B

RESTROOM

UNIT TYPE A

UNIT TYPE B

STAIR A

RESTROOM UNIT TYPE A

UNIT TYPE C

CORRIDOR 6

1/8" = 1'-0"1 6th FLOOR PLAN

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

2000 sf

500 sf800 sf

1200 sf

1400 sf

VIEWS FROM FLOOR TO FLOOR

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-101.00

UP

UNIT TYPE D

UNIT TYPE A

STAIR B

RESTROOM

UNIT TYPE A

UNIT TYPE B

STAIR A

RESTROOM UNIT TYPE A

UNIT TYPE C

CORRIDOR 6

1/8" = 1'-0"1 6th FLOOR PLAN

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

1/16" = 1'-0"2 6th FLOOR PLAN

UP

STAIR B

RESTROOM

STAIR A

RESTROOM

2000 sf

500 sf800 sf

1200 sf

1400 sf

VIEWS FROM FLOOR TO FLOOR

C - Code explaining the need to have a set back of 25’ for 60% of the building

B - Diagram showing lines of sight to be viewed from interior spaces in the mall

A - The mall was organized around the concept that different sized stores could all fit within the same building or floor plates. There is also changeable walls so stores have the ability to customize their spaces.

A

B C

Page 3: Work Samples from Kasia Wlusz

Plans & RCP’s

UP

GAS

WATER

ELECTRIC

RESTROOM

REST ROOM

STAIR A

1

A-401.00

1

A-400.00

1

A-402.00

6' - 5 1/2"

189'

- 8

"

64' -

11

1/2"

8' - 3 1/4"

5' -

1 1

/4"

5' -

0"

10' -

8 1

/4"

8' - 11"

34' -

10

3/4"

32' -

8 1

/2"

26' - 5"

48' -

1 1

/2"

24' - 5"

LOADING DOCK

MARKET

UTILITY CL

132'

- 4

"57

' - 6

"

93' - 0 3/4"

178' - 11 3/4"

A B C D E F G H

1

2

3

4

5

6

7

"3 - '12"4/3 6 - '91

"4/1 7 - '23"4/1 3 - '23

"2/1 3 - '23"4/3 1 - '72

"2/1 8 - '42

"4/3 2 - '51"2/1 5 - '23"4/3 4 - '61

"6 - '03"2/1 5 - '23"7 - '32"4/3 4 - '71

"4/1 01 - '12"2/1 0 - '82"6 - '03"2/1 5 - '23"7 - '32"4/1 11 - '71

"2/1 0 - '83"2/1 0 - '82"6 - '03"2/1 5 - '23"7 - '32"4/1 5 - '71

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-101.000' 4' 8' 16'

scale: 1/8" = 1'

N

FINISHED CONCRETEFLOORING

POTENTIAL LAYOUTFOR MARKET SPA CES

FREIGHT ELEVATORS

EGRESS STAIRSTO MESININE LEVEL

MAIN ENTRANCE

The first floor is an open floor market with access from above and below the high-line.

Page 4: Work Samples from Kasia Wlusz

Plans & RCP’s

UP

BUFFALOEXCHANGE

STAIR A

RESTROOM

STAIR B

RESTROOM

1

A-401.00

1

A-400.00

1

A-402.00

UTILITY CL

75' - 4 1/4"

39' -

1"

28' -

4"

53' -

6 1

/4"

28' -

0 1

/4"

34' -

4"

183'

- 3

1/2

"

12' - 8 3/4"

18' -

0 1

/2"

59' - 0"

A B C D E F G H

1

2

3

4

5

6

7

A-5042

UNIT TYPE B

UNIT TYPE B

CORRIDOR 4

STAIR A

RESTROOM

STAIR B

RESTROOM

1

A-401.00

1

A-400.00

1

A-402.00

UNIT TYPE C

UTILITY CL

UNIT TYPE B

UNIT TYPE C

UNIT TYPE A

UNIT TYPE E

UNIT TYPE D

25' - 2 1/4"

26' -

0 1

/4"

24' - 6 1/2"

"1 - '93"4/3 01 - '33

59' - 0"

24' - 8 1/4"

18' -

1 1

/4"

31' - 9 1/4"

22' -

8 1

/2"

20' -

10

1/2"

21' -

2 1

/2"

29' - 0 1/2"

"6 - '94"8 - '12

27' -

6 1

/2"

"2/1 11 - '4"4/3 01 - '6"0 - '95

"7 - '22"2/1 2 - '24

52' -

10

3/4"

"1 - '93"4/3 0 - '43

"6 - '94"8 - '12

71' - 1 3/4"

190'

- 1

0"

70' - 10 1/4"

12' - 9 3/4"

21' -

8"

A B C D E F

1

2

3

4

5

6

7

A-5034

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 13001

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

11/24/13

Author Checker

A-103.00 1/8" = 1'-0"1 3rd FLOOR PLAN

1/8" = 1'-0"2 4th FLOOR PLAN

0' 4' 8' 16'

scale: 1/8" = 1'

N

OUTDOOR PATIOACCESS TO THE HIGHLINE

END WOOD BLOCK MOHOGANY FLOORING

2’ X 2’ FLOOR LIGHTSSITS WITHIN WOOD BLOCK

6” X 6” FLOOR LIGHTSSITS WITHIN WOOD BLOCK

VERTICALGREEN WALL

FINISHED CONCRETEFLOORING

FINISHED CONCRETEFLOORING

FREIGHT ELEVATORSFREIGHT ELEVATORS

ENTRY FROM THE HIGHLINELEVEL

The third floor is a “typical” floor with spaces for stores to plug in of various sizes. All with access to the circulation hall and to the light from the exterior.

Page 5: Work Samples from Kasia Wlusz

Detail

FLOOR FINISHING

VISION GLASS

VIBRO WIND PANELS

DROP CEILING

SHADOW BOX

2’ BEAM

1’ FLOOR PLATE

STACK JOINT11th FLOOR PLAN136' - 2 7/8"

12th FLOOR PLAN150' - 2 7/8"

10th FLOOR PLAN122' - 2 7/8"

CONCRETE WALL WITHSMOOTH SURFACE

3/8" DIA SS WEDGE ANCHOR

2"

1 1/

2"

6 1/

2" 5"

3"

4" 11 7/8" TYP.

GSKY SS FRAME WATERPROOFING

GSKY TRIM MOUNTING ANGLE

STAINLESS OR ALUMINUM GSKYSIDE TRIM SECURE INTO TRIMMOUNTING ANGLE

GSKY STANDARDGREEN WALL PANEL

SEE 10-p AND 11-p FORIRRIGATION DETAIL

GSKY TRIM MOUNTINGANGLE

STAINLESS OR ALUMINUMGSKY TOP TRIM SECURE

INTO TRIM MOUNTING ANGLE

CONCRETE WALLWITH SMOOTHSURFACE

WATERPROOFING

GSKY STANDARDGREEN WALL PANEL

3/8" DIA SS WEDGEANCHOR

GSKY SS FRAME

5"

6 1/2"

3"4"11

7/8

"

GSKY IRRIGATIONDRIP LINE

3/8" DIA SS WEDGEANCHOR

NEOPRENE WASHERBETWEEN WALL ANDGSKY FRAME

GSKY FRAME

MIN

2" E

MBE

D1

1/2"

2"

CONCRETE WALL

WATERPROOFING

DESIGN NOTE:*STRUCTURE MUST SUPPORT 30 LB/SQ.FT SATURATED GSKY GREEN WALL SYSTEM*WALL SURFACE MUST BE SMOOTH*WATERPROOFING IS REQUIRED TO BE APPLIED (LIQUID OR SELF ADHESIVE TYPE IS RECOMMENDED)*ADEQUATE LIGHTING MUST BE DESIGNED AND INSTALLED (FOR INTERIOR GREEN WALL)*WALL MUST BE ACCESSIBLE FOR MAINTENANCE (LIFT ACCESS MAY BE REQUIRED)*EMBEDDED PIPE OR CONDUIT LOCATIONS MUST BE INDICATED TO GSKY*TRIM WIDTH MAY INCREASE DEPENDING ON LOCATION OF ZONE VALVES; SEE 9-p, 10-p AND 11-p FOR DETAIL*GREEN WALL BELOW MUST TO BE CLEAR FOR MAINTENANCE LIFT ACCESS

2 PLAN DETAIL / CONCRETE WALLSCALE 3/4" - 1'-0" (FILE # 1-p-2)

1 ELEVATION DETAIL / WIND PANEL & CURTAIN WALLSCALE 3/4" - 1'-0" (FILE # 1-p-3)

4 FASTENER DETAIL / CONCRETE WALLSCALE 3" - 1'-0" (FILE # 1-p-4)

#704 - 318 HOMER STVANCOUVER, BC V6B 2V2604-708-0611 ph 604-357-1315 faxwww.gsky.com

11 x 17

CONCRETE WALL STRUCTURE / INTERIOR OR EXTERIOR

AS NOTED

SCALE 1-1/2”-1’0”

SCALE 1-1/2”-1’-0”

CONCRETE WALL WITHSMOOTH SURFACE

3/8" DIA SS WEDGE ANCHOR

2"

1 1/

2"

6 1/

2" 5"

3"

4" 11 7/8" TYP.

GSKY SS FRAME WATERPROOFING

GSKY TRIM MOUNTING ANGLE

STAINLESS OR ALUMINUM GSKYSIDE TRIM SECURE INTO TRIMMOUNTING ANGLE

GSKY STANDARDGREEN WALL PANEL

SEE 10-p AND 11-p FORIRRIGATION DETAIL

GSKY TRIM MOUNTINGANGLE

STAINLESS OR ALUMINUMGSKY TOP TRIM SECURE

INTO TRIM MOUNTING ANGLE

CONCRETE WALLWITH SMOOTHSURFACE

WATERPROOFING

GSKY STANDARDGREEN WALL PANEL

3/8" DIA SS WEDGEANCHOR

GSKY SS FRAME

5"

6 1/2"

3"4"11

7/8

"

GSKY IRRIGATIONDRIP LINE

3/8" DIA SS WEDGEANCHOR

NEOPRENE WASHERBETWEEN WALL ANDGSKY FRAME

GSKY FRAME

MIN

2" E

MBE

D1

1/2"

2"

CONCRETE WALL

WATERPROOFING

1 3D VIEW / CONCRETE WALL SCALE 3/8" - 1'-0" (FILE # 1-p-1)

DESIGN NOTE:*STRUCTURE MUST SUPPORT 30 LB/SQ.FT SATURATED GSKY GREEN WALL SYSTEM*WALL SURFACE MUST BE SMOOTH*WATERPROOFING IS REQUIRED TO BE APPLIED (LIQUID OR SELF ADHESIVE TYPE IS RECOMMENDED)*ADEQUATE LIGHTING MUST BE DESIGNED AND INSTALLED (FOR INTERIOR GREEN WALL)*WALL MUST BE ACCESSIBLE FOR MAINTENANCE (LIFT ACCESS MAY BE REQUIRED)*EMBEDDED PIPE OR CONDUIT LOCATIONS MUST BE INDICATED TO GSKY*TRIM WIDTH MAY INCREASE DEPENDING ON LOCATION OF ZONE VALVES; SEE 9-p, 10-p AND 11-p FOR DETAIL*GREEN WALL BELOW MUST TO BE CLEAR FOR MAINTENANCE LIFT ACCESS

2 PLAN DETAIL / CONCRETE WALLSCALE 3/4" - 1'-0" (FILE # 1-p-2)

2 SECTION DETAIL / WIND PANEL & CURTAIN WALLSCALE 3/4" - 1'-0" (FILE # 1-p-3)

4 FASTENER DETAIL / CONCRETE WALLSCALE 3" - 1'-0" (FILE # 1-p-4)

#704 - 318 HOMER STVANCOUVER, BC V6B 2V2604-708-0611 ph 604-357-1315 faxwww.gsky.com

DRAWING #

DRAWING TITLE:

GSKY GREEN WALL PANELS

DATE:

REV DATE:SCALE:AUG 18, 2010

N/A PAPER SIZE: 11 x 17

3D VIEWPLAN DETAIL

SECTION DETAILFASTENER DETAIL

CONCRETE WALL STRUCTURE / INTERIOR OR EXTERIOR

AS NOTED

1-p

SCALE 1”-1’0”

SCALE 1-1/2”-1’0”

SCALE 1-1/2”-1’-0”

CONCRETE WALL WITHSMOOTH SURFACE

3/8" DIA SS WEDGE ANCHOR

2"

1 1/

2"

6 1/

2" 5"

3"

4" 11 7/8" TYP.

GSKY SS FRAME WATERPROOFING

GSKY TRIM MOUNTING ANGLE

STAINLESS OR ALUMINUM GSKYSIDE TRIM SECURE INTO TRIMMOUNTING ANGLE

GSKY STANDARDGREEN WALL PANEL

SEE 10-p AND 11-p FORIRRIGATION DETAIL

GSKY TRIM MOUNTINGANGLE

STAINLESS OR ALUMINUMGSKY TOP TRIM SECURE

INTO TRIM MOUNTING ANGLE

CONCRETE WALLWITH SMOOTHSURFACE

WATERPROOFING

GSKY STANDARDGREEN WALL PANEL

3/8" DIA SS WEDGEANCHOR

GSKY SS FRAME

5"

6 1/2"

3"4"11

7/8

"

GSKY IRRIGATIONDRIP LINE

3/8" DIA SS WEDGEANCHOR

NEOPRENE WASHERBETWEEN WALL ANDGSKY FRAME

GSKY FRAME

MIN

2" E

MBE

D1

1/2"

2"

CONCRETE WALL

WATERPROOFING

1 3D VIEW / CONCRETE WALL SCALE 3/8" - 1'-0" (FILE # 1-p-1)

DESIGN NOTE:*STRUCTURE MUST SUPPORT 30 LB/SQ.FT SATURATED GSKY GREEN WALL SYSTEM*WALL SURFACE MUST BE SMOOTH*WATERPROOFING IS REQUIRED TO BE APPLIED (LIQUID OR SELF ADHESIVE TYPE IS RECOMMENDED)*ADEQUATE LIGHTING MUST BE DESIGNED AND INSTALLED (FOR INTERIOR GREEN WALL)*WALL MUST BE ACCESSIBLE FOR MAINTENANCE (LIFT ACCESS MAY BE REQUIRED)*EMBEDDED PIPE OR CONDUIT LOCATIONS MUST BE INDICATED TO GSKY*TRIM WIDTH MAY INCREASE DEPENDING ON LOCATION OF ZONE VALVES; SEE 9-p, 10-p AND 11-p FOR DETAIL*GREEN WALL BELOW MUST TO BE CLEAR FOR MAINTENANCE LIFT ACCESS

2 PLAN DETAIL / CONCRETE WALLSCALE 3/4" - 1'-0" (FILE # 1-p-2)

3 DETAIL / WIND PANEL & CURTAIN WALLSCALE 3/4" - 1'-0" (FILE # 1-p-3)

4 FASTENER DETAIL / CONCRETE WALLSCALE 3" - 1'-0" (FILE # 1-p-4)

#704 - 318 HOMER STVANCOUVER, BC V6B 2V2604-708-0611 ph 604-357-1315 faxwww.gsky.com

DRAWING #

DRAWING TITLE:

GSKY GREEN WALL PANELS

DATE:

REV DATE:SCALE:AUG 18, 2010

N/A PAPER SIZE: 11 x 17

3D VIEWPLAN DETAIL

SECTION DETAILFASTENER DETAIL

CONCRETE WALL STRUCTURE / INTERIOR OR EXTERIOR

AS NOTED

1-p

SCALE 1”-1’0”

SCALE 1-1/2”-1’0”

SCALE 1-1/2”-1’-0”

CONCRETE WALL WITHSMOOTH SURFACE

3/8" DIA SS WEDGE ANCHOR

2"

1 1/

2"

6 1/

2" 5"

3"

4" 11 7/8" TYP.

GSKY SS FRAME WATERPROOFING

GSKY TRIM MOUNTING ANGLE

STAINLESS OR ALUMINUM GSKYSIDE TRIM SECURE INTO TRIMMOUNTING ANGLE

GSKY STANDARDGREEN WALL PANEL

SEE 10-p AND 11-p FORIRRIGATION DETAIL

GSKY TRIM MOUNTINGANGLE

STAINLESS OR ALUMINUMGSKY TOP TRIM SECURE

INTO TRIM MOUNTING ANGLE

CONCRETE WALLWITH SMOOTHSURFACE

WATERPROOFING

GSKY STANDARDGREEN WALL PANEL

3/8" DIA SS WEDGEANCHOR

GSKY SS FRAME

5"

6 1/2"

3"4"11

7/8

"

GSKY IRRIGATIONDRIP LINE

3/8" DIA SS WEDGEANCHOR

NEOPRENE WASHERBETWEEN WALL ANDGSKY FRAME

GSKY FRAME

MIN

2" E

MBE

D1

1/2"

2"

CONCRETE WALL

WATERPROOFING

DESIGN NOTE:*STRUCTURE MUST SUPPORT 30 LB/SQ.FT SATURATED GSKY GREEN WALL SYSTEM*WALL SURFACE MUST BE SMOOTH*WATERPROOFING IS REQUIRED TO BE APPLIED (LIQUID OR SELF ADHESIVE TYPE IS RECOMMENDED)*ADEQUATE LIGHTING MUST BE DESIGNED AND INSTALLED (FOR INTERIOR GREEN WALL)*WALL MUST BE ACCESSIBLE FOR MAINTENANCE (LIFT ACCESS MAY BE REQUIRED)*EMBEDDED PIPE OR CONDUIT LOCATIONS MUST BE INDICATED TO GSKY*TRIM WIDTH MAY INCREASE DEPENDING ON LOCATION OF ZONE VALVES; SEE 9-p, 10-p AND 11-p FOR DETAIL*GREEN WALL BELOW MUST TO BE CLEAR FOR MAINTENANCE LIFT ACCESS

2 PLAN DETAIL / CONCRETE WALLSCALE 3/4" - 1'-0" (FILE # 1-p-2)

2 ELEVATION PLAN / WIND PANEL & CURTAIN WALLSCALE 3/4" - 1'-0" (FILE # 1-p-3)

4 FASTENER DETAIL / CONCRETE WALLSCALE 3" - 1'-0" (FILE # 1-p-4)

#704 - 318 HOMER STVANCOUVER, BC V6B 2V2604-708-0611 ph 604-357-1315 faxwww.gsky.com

11 x 17

CONCRETE WALL STRUCTURE / INTERIOR OR EXTERIOR

AS NOTED

SCALE 1-1/2”-1’0”

SCALE 1-1/2”-1’-0”

CONCRETE BEAM

1.5”IGU

VISION GLASS

PIEZOLECTRIC CELLS

TIE BACK

ALIMINUM FRAME MULLION

4X6X4 FIBER WIND PANELS

COPPER WIRE

CW ANCHOR

2 PANEL GLAZED WINDOW

BATT INSULATION

WIRE INSIDE VERTICAL

METAL PANEL

SHDOW BOX

6”4”

4”

6”

1 1/2”

2’ - 0”1’ - 0”

4”MECHANICAL SYSTEMS

0' 1’ 2' 4'

scale: 1/2" = 1'

0' 1’ 2' 4'

scale: 1/2" = 1'

0' 2” 4” 8”

scale: 3" = 1'

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-502.00

0' 1’ 2' 4'

scale: 1/2" = 1'

Wind panel curtain wall which vibrates with the wind and collects energy for the building

Page 6: Work Samples from Kasia Wlusz

N1

A-113.00

1

A-115.00

1

A-114.00

1/8" = 1'-0"1 EAST

GROUND FLOORPLAN

0' - 2 7/8"

1-A FLOOR PLAN12' - 2 7/8"

3rd FLOOR PLAN24' - 2 7/8"

4th FLOOR PLAN38' - 2 7/8"

5th FLOOR PLAN52' - 2 7/8"

6th FLOOR PLAN66' - 2 7/8"

7th FLOOR PLAN80' - 2 7/8"

8th FLOOR PLAN94' - 2 7/8"

9th FLOOR PLAN108' - 2 7/8"

10th FLOOR PLAN122' - 2 7/8"

11th FLOOR PLAN136' - 2 7/8"

12th FLOOR PLAN150' - 2 7/8"

Roof164' - 2 7/8"

1Y176' - 2 7/8"

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-302.000' 4' 8' 16'

scale: 1/8" = 1'

N

01

A-502

01

A-504

01

A-501

N1

A-113.00

1

A-115.00

1

A-114.00

1/8" = 1'-0"1 EAST

GROUND FLOORPLAN

0' - 2 7/8"

1-A FLOOR PLAN12' - 2 7/8"

3rd FLOOR PLAN24' - 2 7/8"

4th FLOOR PLAN38' - 2 7/8"

5th FLOOR PLAN52' - 2 7/8"

6th FLOOR PLAN66' - 2 7/8"

7th FLOOR PLAN80' - 2 7/8"

8th FLOOR PLAN94' - 2 7/8"

9th FLOOR PLAN108' - 2 7/8"

10th FLOOR PLAN122' - 2 7/8"

11th FLOOR PLAN136' - 2 7/8"

12th FLOOR PLAN150' - 2 7/8"

Roof164' - 2 7/8"

1Y176' - 2 7/8"

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-302.000' 4' 8' 16'

scale: 1/8" = 1'

N

01

A-502

01

A-504

01

A-501

N1

A-113.00

1

A-115.00

1

A-114.00

1/8" = 1'-0"1 EAST

GROUND FLOORPLAN

0' - 2 7/8"

1-A FLOOR PLAN12' - 2 7/8"

3rd FLOOR PLAN24' - 2 7/8"

4th FLOOR PLAN38' - 2 7/8"

5th FLOOR PLAN52' - 2 7/8"

6th FLOOR PLAN66' - 2 7/8"

7th FLOOR PLAN80' - 2 7/8"

8th FLOOR PLAN94' - 2 7/8"

9th FLOOR PLAN108' - 2 7/8"

10th FLOOR PLAN122' - 2 7/8"

11th FLOOR PLAN136' - 2 7/8"

12th FLOOR PLAN150' - 2 7/8"

Roof164' - 2 7/8"

1Y176' - 2 7/8"

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-302.000' 4' 8' 16'

scale: 1/8" = 1'

N

01

A-502

01

A-504

01

A-501

East Elevation

I did a study with Visari to show where there was more wind intensity and put more wind panels in places where they would be more effective in creating electricity.

Page 7: Work Samples from Kasia Wlusz

01

A-504

01

A-502

01

A-503

1

A-400.00

1

A-402.00

1234567

1/8" = 1'-0"1 Section B

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-402.000' 4' 8' 16'

scale: 1/8" = 1'

N

GROUND FLOORPLAN

0' - 2 7/8"

1-A FLOOR PLAN12' - 2 7/8"

3rd FLOOR PLAN24' - 2 7/8"

4th FLOOR PLAN38' - 2 7/8"

5th FLOOR PLAN52' - 2 7/8"

6th FLOOR PLAN66' - 2 7/8"

7th FLOOR PLAN80' - 2 7/8"

8th FLOOR PLAN94' - 2 7/8"

9th FLOOR PLAN108' - 2 7/8"

10th FLOOR PLAN122' - 2 7/8"

11th FLOOR PLAN136' - 2 7/8"

12th FLOOR PLAN150' - 2 7/8"

Roof164' - 2 7/8"

1Y176' - 2 7/8"

GROUND FLOORPLAN

0' - 2 7/8"

1-A FLOOR PLAN12' - 2 7/8"

3rd FLOOR PLAN24' - 2 7/8"

4th FLOOR PLAN38' - 2 7/8"

5th FLOOR PLAN52' - 2 7/8"

6th FLOOR PLAN66' - 2 7/8"

7th FLOOR PLAN80' - 2 7/8"

8th FLOOR PLAN94' - 2 7/8"

9th FLOOR PLAN108' - 2 7/8"

10th FLOOR PLAN122' - 2 7/8"

11th FLOOR PLAN136' - 2 7/8"

12th FLOOR PLAN150' - 2 7/8"

Roof164' - 2 7/8"

1Y176' - 2 7/8"

01

A-504

01

A-502

01

A-503

1

A-400.00

1

A-402.00

1234567

1/8" = 1'-0"1 Section B

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

A-402.000' 4' 8' 16'

scale: 1/8" = 1'

N

GROUND FLOORPLAN

0' - 2 7/8"

1-A FLOOR PLAN12' - 2 7/8"

3rd FLOOR PLAN24' - 2 7/8"

4th FLOOR PLAN38' - 2 7/8"

5th FLOOR PLAN52' - 2 7/8"

6th FLOOR PLAN66' - 2 7/8"

7th FLOOR PLAN80' - 2 7/8"

8th FLOOR PLAN94' - 2 7/8"

9th FLOOR PLAN108' - 2 7/8"

10th FLOOR PLAN122' - 2 7/8"

11th FLOOR PLAN136' - 2 7/8"

12th FLOOR PLAN150' - 2 7/8"

Roof164' - 2 7/8"

1Y176' - 2 7/8"

GROUND FLOORPLAN

0' - 2 7/8"

1-A FLOOR PLAN12' - 2 7/8"

3rd FLOOR PLAN24' - 2 7/8"

4th FLOOR PLAN38' - 2 7/8"

5th FLOOR PLAN52' - 2 7/8"

6th FLOOR PLAN66' - 2 7/8"

7th FLOOR PLAN80' - 2 7/8"

8th FLOOR PLAN94' - 2 7/8"

9th FLOOR PLAN108' - 2 7/8"

10th FLOOR PLAN122' - 2 7/8"

11th FLOOR PLAN136' - 2 7/8"

12th FLOOR PLAN150' - 2 7/8"

Roof164' - 2 7/8"

1Y176' - 2 7/8"

Section

This section shows a green wall and the center circulation space, This space helps clean the air throughout the building and creating a chimney effect.

Page 8: Work Samples from Kasia Wlusz

Model Photos

Page 9: Work Samples from Kasia Wlusz

Model Photos

NO. DATE COMMENT

CONSTRUCTION OF:The Eco-Life Center

501 WEST 17 STREETNEW YORK, NY 10011

DATE:

JOB #: 00101

DWN BY: CHKD BY:

SHEET:

1 10/07/2013 SCHEMATIC DESIGN SET

PROJEKT SUKA

2 11/07/2013 DESIGN DEVELOPMENT SET

3 12/10/2013 CONSTRUCTION DOCUMENT SET

CONSULTANTS:

CODE/ZONING BRIAN GILLEN

40 Worth Street Suite 800New York, NY [email protected]

LANDSCAPE/SHOPPING

TAEWOOK CHA

Supermass Studio12-16 Vestry Street 5th FloorNew York NY [email protected]

STRUCTURALENGINEERS

CIRO CUONO

Cuono Engineering PLLC16 King Street Suite 3-2Port Chester, NY 10573914-305-5679

DOMINIC PILLA

Dominick R. Pilla Associates PCCONSULTING ENGINEERING +ARCHITECTURE23 Depew AvenueNyack, New York 10960845.727.7793Email: [email protected]

RETAILCONSTRUCTION

MICHAEL RATNER

1025 Fifth AvenueNew York, NY 10028718-344-5000

MECHANICALENGINEER

AARON MARTIN

AltieriSeborWieber LLC31 Knight StreetNorwalk, CT [email protected]

LIGHTINGDESIGN

PEIHENG TSAI

PHT Lighting Design401 Broadway Suite 1402New York, NY 10013917-957-4180

SUSTAINABILITY JASON VOLLEN

RPI/CASE14 Wall Street 24th FloorNew York, NY [email protected]

BUILDINGENVELOPE

WALTER MARTINEZ

Israel Berger and Associates360 Park Avenue South,15th Floor212-689-5389

COSTESTIMATING

DAVE MILLER

Triton Construction303 Fifth Avenue, Suite1807New York, NY [email protected]

SPECIFICATIONS JEFF FEINGOLD

Adamson AssociatesArchitects401 Wellington Street West,3rd FloorToronto, Ontario M5V 1E7 [email protected]

JILL BUNYEA & KASIA WILUSZ

12/10/13

JB & KW -------

X-103.00

Rendering Using 3DS Max

Rendering using Vray in 3ds Max as well as Photoshop to edit into photo. Shows the facade system as well as the interior green wall.

Page 10: Work Samples from Kasia Wlusz

Yarvis Renderings with 3DS MAXRendering Class with Vray Spring 2013 Prof. Chang

Page 11: Work Samples from Kasia Wlusz

Rendering made of an unbuilt project . Using speculative materials.

Page 12: Work Samples from Kasia Wlusz

Return

Supply

Boiler chimney

Fan exhaust

Fireplace

HVAC

- Coordination

BuildG

ENER

AL C

ON

TRAC

TOR

132 Kane & 6-8 Cheever

TOW

NHOUSE

REHABILITATION

Brooklyn NY11231

Dixon Advisory USA

Inc.O

WN

ERK&C

41 Union Square W

Suite#806N

YC10003

T: 212. 255. 4157F: 718. 395. 5117

MRTA

PRO

JECT

MAN

AGER

K 701

M.ARCH

ARCHITECTSAR

CH

ITECT

OF R

ECO

RD

SANTORA

ENIGEERING

LLCEN

GIN

EER132 KANE

ST

PRELIM

ANR

Y 7.25.14

Kane- HVAC Diagram - Cellar & L-1R-1

Return

Supply

Boiler chimney

Fan exhaust

Fireplace

HVAC

- Coordination

BuildG

ENER

AL C

ON

TRAC

TOR

132 Kane & 6-8 Cheever

TOW

NHOUSE

REHABILITATION

Brooklyn NY11231

Dixon Advisory USA

Inc.O

WN

ERK&C

41 Union Square W

Suite#806N

YC10003

T: 212. 255. 4157F: 718. 395. 5117

MRTA

PRO

JECT

MAN

AGER

K 701

M.ARCH

ARCHITECTSAR

CH

ITECT

OF R

ECO

RD

SANTORA

ENIGEERING

LLCEN

GIN

EER132 KANE

ST

PRELIM

ANR

Y 7.25.14

Kane- HVAC Diagram - Cellar & L-1R-1

HVAC ModelingRhino & Illustrator Diagram - MRTA Design

Page 13: Work Samples from Kasia Wlusz

HVAC ModelingRhino & Illustrator Diagram - MRTA Design

Stair DesignModels - MRTA Design

A - Rhino model of 90 degree U - stair to make sure the stairs and stringers work together and the stairs depths and angles could be done to code.

B - Mock up model done out of foam core and paper spray panted to show client what the dimension of the blackened steel stair case would look like.

Stringer needs to be 12” here

Cheever Level 1

8.18.14