work rpt on claim 1230993 hindon tp...l, tl/orximg t f-be determini (pleas* print full name)...

12
FAX cover sheet PROVINCIAL RECORDING OFFICE - SUDBURY RECEIVED jui 1 1 2004 A.M. P.M. ALGONQUIN WOODLAND METIS ABORIGINA TRIBE ARENDAHANO RESOURCE DEVELOPMENT COMPANY lo: Lisette Prud-homme MN DM FAX 1-877-670-1555 From: /ane Bell Fax 1-707-268-1827 Voice 286-6118 Pages: includiim cover JUL i z GEOSCIENCE ASSESSMENT OFFICE 31E02SW2004 2.28048 HINDON 010

Upload: others

Post on 17-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

FAX cover sheet

PROVINCIAL RECORDING OFFICE - SUDBURY

RECEIVED

jui 1 1 2004A.M. P.M.

ALGONQUIN WOODLAND METIS ABORIGINATRIBE

ARENDAHANO RESOURCE DEVELOPMENTCOMPANY

lo: Lisette Prud-homme MN DM

FAX 1-877-670-1555

From: /ane BellFax 1-707-268-1827

Voice 286-6118

Pages: includiim cover

JUL i zGEOSCIENCE ASSESSMENT

OFFICE

31E02SW2004 2.28048 HINDON 010

Page 2: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

Assessment Report for Claim # 1230993

By Yvonne C'. Fulton-bell Licence Number C390037 Client Number 393261

Julv 8. 2004

On June 30 2003 Zane Bell and the undersigned proceeded to the claim to re-establish (he boundary. New boundary flagging was needed as again the locals are removing the flagging tape on this and other claims. There are numerous cross country ski trails established by the locals and the flagging tape confuses the trails it appears, so they remove it. 150 x 2 - T- S300.00

Two old blast pits were discovered on this claim (photos attached) and samples were removed for later analysis. One good exposure was identified of a pegmatite intrusion in the handed-

On July 2. 2004 Zane Bell and Ken Sibley travelled to Tweed to conduct research at the Tweed office of the Ministry of Northern Development and Mines on the total claim. The assessment files for all the claims ( 1230991. 1230992, 1230994, 1230996, 3000316. and 300031 7 ) including this claim #1230993 were opened and the files photocopied for reference. The old claim which inadvertently expired this spring which joined all these claims was reclaimed by Ken Sibley on June 30. 2004 for our company Arendahano (6205836 Canada Inc.) The paper work for the Application to record Staked Mining Claims is in the mail. All these claims are in the process of being transferred to Arendahano under the client Number 401880. of 6205830 Canada Inc., (Arendahano Resource Development Company) 150 x 2 ~~ S300.00

Requests for the copies of the previous magnetometer surveys and drill records were requested from The Sudbury office of MNDM. The plans were to large to photocopy. Samples were also given to the Regional Geologist for her review and comment and cutting and polishing .

On Saturday Zane Bell and Ken Sibley again frequented the site to obtain large si/.e rock samples from this claim to submit to 4 quarry operations for rock assessment for the dimensional slone and art stone market. The assessment of the rocks tor th writing of this report. 150 x 2 ^ 5300.00

Sincerelv

Yvonne C. Fulton-Bell

is not received by the

Jut~ J 2 2m

Page 3: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

Ontario Ministry ofNorlrnm Developmentand Mines

Declaration of Assessment Work Performed on Mining Land

Mining Act, Subsection 65(2) and 68(3), R.3.0.1990

Transaction Number (Office Use)

Personal information collected on this form is obtained under the authority of subsection 65(2) and 66(3) of the Mining Act. Under section 8 of the Mining Act, this information is a public record. This information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to a Provincial Mining Recorder, Ministry of Northern Development and Mines, 3rd Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5.

Instructions: - For work performed on Crown Lands before recording a claim, use form 0240. - Please type or print in ink.

1. Recorded holder(s) (Attach a list if necessary)Name ^

Address Vt* t 'f- T T. O t^- 1 '^J'lS ii fXl O -"O

"TyOJ-\. 2^ 'f viName

Address

Client Number ^r 2- J *-) q q -T. ^'— i i ^

Telephone Number

Fax Number ^ U (6*7Client Number

Telephone Number

Fax Number

2. Type of work performed: Check K) and report on only ONE of the following groups for this declaration.

m^tjeotechnical: prospecting, surveys, LJ assays and work under section 18 (regs) D Physical: drilling stripping,

trenching and associated assaysn Rehabilitation

Work Type

Dates Work From To Performed '^.2 D"y | Month t l Yew 2-OO i. Day 3 l Month 7 1 Year t CO V

Global Positioning System Data (if available) township^ JL( , /w b (f rO

MorG-PlanNumber

Office Use

Total S Value of Work Claimed

Mining Division

Resident Geologist District

Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.

3. Person or companies who prepared the technical report (Attach a list if necessary)Name

Z/}Address

*

~X- bfcU-

i)0v ^fc ^-(/vb/J^ 0/0-rName

Address

Telephone Number o fa

Fax Number ^ - ^5 ^

Telephone Number

Fax Number

Name

Address

4. /Certification (^.Recorded Holder or Agentl, Ado type C t- v l-"tu t-0 ' ^^^-c , do hereby certify thai

{Print Name)this Declaration of Assessment Work having caused the work to be perfoi completionrtaniOo the best of my knowledge, the annexed report is true.

JUL 1 2 2004l have personal knowledge of the facts set fa th i

1(03/97}

Page 4: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

/"\m4-.tv:^-v flEL"! , Statement of Costs UntariO rr^' ' for Assessment Credit

Transaction Number (Office Use)

Personal information collected on this form is obtained under the authority of subsection 6 (1) of the Assessment Work Regulation 6/96. Under section 8 of the Mining Act, this information is a public record. This information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to a Provincial Mining Recorder, Ministry of Northern Development and Mines, 3rd Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5.

Work Type

P^O*Sf^c5^ \ r*/ U

t-VK.(u ^i^L^)fi ACc-V-4. .

yi^R^w O ^1-T" "-"^^ t""C* i** o

Unit* of workDepending on the type of work, list the number of hours/day worked, metres of drilling, kilometres of grid line, number of samples, etc.

H d^a."2— *^^-TC*i

f- VC Ci Si ("2-*:*-

Associated Coste (e.g. supplies, mobilization and demobilization).

Transportation Costs

4 0 ^ K/v^ .

Food and Lodging Coste

f~ ^U^t^Wvr *^-

Cost Per Unit of work

; ts o "YA*x*./ SO'/ofc^"

/tT'/^x.

Total Cost

^oo 00-^ OL^ J

^2.*'

.1^

Total Value of Assessment Work

\ 1)4. C

4o.v\

iss |! M.Calculations of Filing Discounts:

1. Work filed within two years of performance is claimed at IOQ.% of the above Total Value of Assessment Work.2. If work is filed after two years and up to five years after performance, it can only be claimed at SO.% of the Total

Value of Assessment Work. If this situation applies to your claims, use the calculation below:

TOTAL VALUE OF ASSESSMENT WORK x. 0.50 ^ SO Total S value of worked claimed.

Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of a request for verification and/or correction/clarification. If verification and/or correction/clarification is not made, the Minister may reject all or part of the assessment work submitted.

Certification verifying costs:

l, Tl/OrXiMg t f-

be determini(pleas* print full name)

Declaration t f

0212(03/97)

d and l sis

, do hereby certify, that the amounts shown are as accurate as may reasonably

g assessment work on the lands indicated on the accompanying

com any position with signing authority)

JUL 1 l 2004

^-*"*K ASSESSMENT

_ l am authorized to make this certification.

Page 5: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

5. Work to be recorded and distributed. Work can only be assigned to claims that are contiguous (adjoining) to the mining land where work was performed, at the time work was performed. A map showing the contiguous link must accompany this

Mining Claim Number. Or ifwo* was done on other eligible mining land, show in this

column the location number indicated on the claim map.

eg

eg

eg

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

TB7827

1234567

1234568

(2^ o'm

Column Totals

Number of Claim UnH*. For othermining land, list hectares.

16 ha

12

2

l

1 -e-"

Value of work performed on thisclaim or other mining land.

S26.825

0

S 8,892

U24.W

t\?b ^" SKf

Value of work applied to this claim.

N/A

S24,000

S 4,000

Uit-CaW

HZl-M-4*r^

Value of work assigned to other mining claims.

524,000

0

0

so

Bank. Value of work to be distributed at a future date

S2.825

0

S4.892

SO

C\ , do hereby certify that the above work credits are eligible under(Print Full Name)

subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to the claim

where the wopk, was done.. LAgent AuthcfizeJ ip-Wnfirtg^ - vxV L/ f

DateC lf 7

6 iction for cutting back credits that are not approved.''

Some of the credits claimed in this declaration may be cut back. Please check (S) in the boxes below to show how you wish to prioritize the deletion of credits:

H^fTcredits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated. Q 2. Credits are to be cut back starting with the claims listed last, working backwards; or Q 3. Credits are to be cut back equally over all claims listed in this declaration; or D 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary.

JUL 1 2 2004

GEOSCIENCE ASSESSMENTOFFICE____^

Page 6: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are
Page 7: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are
Page 8: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

O -J?

(-iVJ:

Page 9: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

Cn

Page 10: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINES

Transaction No: W0490.01075

Recording Date: 2004-JUL-09

Approval Date: 2004-JUL-16

Work Report Summary

Status: APPROVED

Work Done from: 2002-JUN-30

to: 2004-JUL-03

Client(s):

393261

Survey Type(s):

FULTON-BELL, YVONNE CLAIRE

PROSP

Work Report Details:

Perform Applied Assign Reserve Claim* Perform Approve Applied Approve Assign Approve Reserve Approve Due Date

SO 1230993 31,127 31,127 31,127 31,127 50 O SO SO 2006-JUL-10

31,127 31,127 S1.127 31,127 SO SO SO SO

External Credits:

Reserve:

SO

SO Reserve of Work Report*: W0490.01075

SO Total Remaining

Status of claim is based on information currently on record.

31E02SW2004 2.28048 HINDON 900

2004-Jul-27 16:05 armstrong-d Page 1 of 1

Page 11: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

Ministry ofNorthern Developmentand Mines

Date:2004-JUL-16

Ministers duDeveloppement du Nord et des Mines Ontario

GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E 6B5

YVONNE CLAIRE FULTON-BELL BOX 496MINDEN, ONTARIO KOM 2KO CANADA

Tel: (888) 415-9845 Fax:(877)670-1555

Dear Sir or Madam

Submission Number: 2.28048 Transaction Number(s): W0490.01075

Subject: Approval of Assessment Work

We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.

At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.

If you have any question regarding this correspondence, please contact STEVEN BENETEAU by email at [email protected] or by phone at (705) 670-5855.

Yours Sincerely,

/P.Ron.C. Gashinski

Senior Manager, Mining Lands Section

Cc: Resident Geologist

Yvonne Claire Fulton-Bell (Claim Holder)

Assessment File Library

Yvonne Claire Fulton-Bell (Assessment Office)

Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:19648

Page 12: WORK RPT ON CLAIM 1230993 HINDON TP...l, Tl/OrXiMg t f-be determini (pleas* print full name) Declaration t f 0212(03/97) d and l sis, do hereby certify, that the amounts shown are

ONTARIO SSSSS'SSK' Mining Land TenureV-' ^ . ., . ^ . ..UMfUMttlt ——-MM MS DCANADA

to o o

665000E M8000E 6870006 668000E

4897000N "."T"'-; 4897000N

4691DOON

498WOON

678000E

/O) r >

/d)

lilnt) :,hcn*l tomutt-*fln ilw Provinctei MWattorWl, MjrvWY-or ISFK] mie aetartMnatfm IKHIVKUIS *s ilw *Ko*irotton 5(w*mii thwajh lira kwtl Unrid TiUm W Ftegtitrr OIIM. vi itn MtnMrr o* Natural no

<cu General Information and Limitations* nut y run ih^Wunnsglnujiotl Mi-rt Hinwe*nt tmprosfl* in lunj mMtHni^ coilWfi pn

Date l Time of l&sue: Wed Jul 28 08:28:49 EOT 2004

TOWNSHIP 7 AREA PLAN HINDON M-1301

ADMINISTRATIVE DISTRICTS 7 DIVISIONSMining Division Southern OntarioLand Titles/Registry Division HALIBURTONMinistry of Natural Resources District BANCROFT

TOPOGRAPHIC Land Tenure

atntir* Mil Mt(*ju Hi

ra ali)

LAND TENURE WITHDRAWALS

Wt MAt.1 RWiti-V W*t*''i

l IMPORTANT NOTICES

to** 1:3*00*

LAND TENURE WITHDRAWAL DESCRIPTIONS

BO* PUBUCKESBRVEaoinl J.O.IW PORTAL FIE SERVE

B"K"i LAKE ADOBES W1707itXn O MO RE SERVE tlSQialoon PuDtic rcdEfMi 1-371 IVOL. li((oi PUBLIC. nesBWwff a?*OT

IMPORTANT NOTICES

2.28048 PROSP