work rpt claims 1077384 & 1229663 harvey … area that was observed was covered with a verity of...
TRANSCRIPT
IS:ST 20. S2 add
RECEIVED^
APR 2 5 2003GEOSCIENCE ASSESSMENT
FKorA Assessment Report For Claim
10773841229663
Client: 393100 - 946606 Ontario Limited April 212003
31D09NW2022 2.25467 HARVEY 010
20 BDtfd UI9262S0Z. E003/S2/170
04/25/2803 15:21 705292B171 PAGE 03
Contents
1. Overview
2. (Section 9)
3. Physical Work (Section 10)
4. Product Potential
5. Daily Production Report For MarathonDrilling Log. (section 16)
6. Map - R2
7. Time Sheets
8. Foot notes
EXTRfl PPGE. 001
Overview
This assessment report was based on the (section) 16 of Requirements of Prospecting
Submissions for Assessment Credit.
In this report it is are intent to do Diamond Drilling on Claim # 122963. We will be drilling to a depth greater than 45" in hopes to find materials other than limestone.
The drilling was done by Marathon Drilling of Ottawa. Drill core stored at Rigbe's head office.
Rigbe's sent two men John Reid and Peter Howland to cut grid lines to enable the drilling crew to locate their holes. The drill hole log by Mike Tomlinson provided.
EXTRfl PflGE. 002
Assessment Credit Section 9
Description:
Intent:Harvey township is rich in mineral deposits such as Fermiculight, White Marble, Red limestoneand has the potential to show may other deposits. It is my intent lo take core samples at deeps
greater than 45' In search of other Mineral formationsOverburden:
The area that was observed was covered with a verity of trees ( White pine, Oak, Junipers, and Maple.) Minerals that were visual were limestone and red granite. Minimal amounts oftopsoil.O"-6"
Wildlife:There was no distictive wildlife notice at the time of work.
Terrain Covered:The walk to reach the area was approx 3 hours covering 6 kilometers. Walking North on the Harvey Twp. road allowance. At the end of the trial we turned West and walk for 15 minutes
through brush.
Water:To the west I km the Mississauga river runs
Time A Cost:Time was 5 days with a cost of S12000.00
Date Preformed:April 14 to 19
Person How Preformed Work:John Reed Rigbes employee
Peter Bowland Rigbes employee Marathon Drilling CO.LT
EXTRfl PflGE. 003 ouwiaiiu jtvigocs employee
Marathon Drilling CO.LT
flPR 25 '03 15=22 7052926171 PflGE.03
134/25/2083 15:21 7052926171 PAGE 84
Physical Work lot 21 con 6 East HalfAssessment Credit
SectionlO
Grid line cutting for locating drill holes:
Equipment:Two Honda 350 ATV , two chainsaws, Drill rig supplied by Marathon.
Volume A Uses:There is 300' of core sample witch will be tested.
Equipment Used: CostHonda ATV S250 perdayChainshaw S50 perday
Operator: CostJohn Reed @S 750.00 per/weekPeter Howland @S 650.00 per/week
Report: (SeeR-1)
Map: (See R-2 )
Total Applied to Assessment from Phyisical Work S2000.00
fiPR 25 '03 15:22 7052926171 PPGE.04
04/25/2003 15:21 7052925171 PAGE 05
Product potential:
Not avalible at this time, do to time frame testing has not yet been done.
APR 25 '03 15=23 7052926171 PRGE.05
D~
w
(SLO
ro
-o s ui roU3ro en
UnOBf )**jn 1 1 fa Urmj AO, tit
Diamond Journal (to com*** m* fer snd
Drilling fof9.au S^/^S
Log diamant pr***n** (b* ** * la iauBdn.TMktemapulAcncoRl. fcx wnmt * fwtat i to It Uj, CM mnnftvrrsla fttmM l tem l low Mi *wm pwt*a.
Fid h on svay pasa a* cases
o ̂
0*4'/l V/03Co . 0-wf w Cffcme
Conje^r* d'**9*on#cr\ pf^pr^tare cu WutSK* cfopion
C 6Fcotsge-Avaxwrwo*
From/0* "rS)T
Roonjpa
Typ^iKmcha
CI a,,
;0 1,7 0.
Artongt
Mzband pu (fart, m
le *-*i [
OpofHcorl
^"^ lFlJfl
.^A f'/ffMl™ L .
CVscnptwr (Colouf. gran *z*. fertr*. mineral, aftsrsfcn, ate.)
nearnjHbn (Couteut, grarujlom^na. tuAit. nansrauic tryittiJnmkm, etc l
^dZ.y^
Ss^
dim(W/CO)
Tar laatimt autfi o ftijskw, b*Jdhg. scJBstosty. measured (ram the lor^ aw o* tw ox*.
fcomptea ae canOSHalKjuai: tetetkn actiBeai*. atntfBqBui. L'aVa at resort far ngport A Tms tootfoctlna de la qrote.
M^iuuloofan vAM* am AMd
(jo
LOJ2,
JSL
Uw Re* rental*(T d* reKr* ntM fa \* or*
Hote Mo. Forage n* .
Page No. Page n'
Ucvtnt (T-*o Ut. Oxv m Lsl Md Lao? j. CM ^efcJ* stteoptudt)
do tftqperty Nl
65L&Q-
S-L
TaH
AUso
hj(Jlv.^
N3ea csCO
en ro
ra en roLO
ro m
en m(S en
T)i? en m
ra tn
nTl -
M (Jl
(S
Ul
ro .b.
-oQ Ul t\J 03 [\J CTi
Tl IDen mQ-o
U**tf Kriter. 9 tf he Mrw-g Act tt s
Diamond Journal da Compk*. t*h tom isd
Log darrunt prtMaO tetmutt H l* cn^t* urxrfAputtCtacofd Pin tmmi ill dinite (1 rfali l m. ^TIJ niiijajummmrill Iflfiinnil l tmii t juu to friHMIpjLi.l
ra in on every psfld R*
Dif^tg Com^oy
y
0*4 W fan Co.. Owrw or
Cvrptgnia (f*^Jor^atx\ procr^lvnau truira tfoptort
Dirrwntxxiidf ta
OHM?
CotarBeiiton
7 J
fmrtKia '
Rock type
leat FcoteeeAwnernam utH
1 O^J ^ Hole di ju teraq*
Description (Calour, gran sas, teitun, mfnr^s. altmaion, ftc.)
Descrv*oo (CcxjBV. vmiomtofo, tsxtiru. rrerefeux trwtarmftnn, etc.)
OXHTot tenure* such aa (ofaScin, bt-ckfrng, scrtjtoriry, mmwirwi Irom *w Kxig utfi (X the oort. Bteirptei*! c**J*rn*jLwi: totafon. ich**toSft*, UJaHfcjfcm. L'angfe ea mewrt pu- report jtrna toogrftjctnai (it la curt**.
Ke ((y fat
t*css
(TO
C?
/OO
/M.
Hcte*. Forage n*
V
L^ottan (Tifv Lot. Con. or LEI.
1-4 or rt S L#i-
C 'a i
10-LS&
JJL
ro en
w cs csOJ
ui
IsD
o (Jl toLO rOm
T)
CDm
D ~0
WUl I-J-7
G)
" @0nta\j\ ^^™^^[^ UndwwctoUodheWr*
* Mti^rrof t^pi^fiKi* DiafTKMld JCHJITUf rja ^ r|n MortwnOwrtBTKrt Efeabnimn du Mm) IT.., wuvriwi m.IU vtfwrin M*. Una. Dnlttng forage au ^
Log dtemant pnlg Aa. Ma rfcrm*feni*uwdto94rtrin ipiirfcrKwi ^*a6tflnMdi fifWa a de !a Lg\ OM (*fl**ioo*mafltt ttrvrwrl t teff a jour te* dotM
npto*) Mf tom ind FI in on e*ery page *t*d tJcrtrfi h(M*C4t*. Ramp* CM cstsei rrptr w) tfwn uran^laln* tt ScJwpepupe tesrto fcnmtt*e* H cna^tH* •rme)*n^Ma.
AlOrYjT/l 0 ^ ' /'Z. /l/'// '"rt "r*1 1&& 1 ca**ta-
7*7^srComp*9rt*a"eij*aTflQO. propotoJB au tfcjUre (f Oftuo
Footage W*aoesrminl
frotrVDertP *?*?*9
-j•VUl M
[\J . ..CTi
^3
To/A
f? fQG(Oa
Rock type Type de raite
L,t* f A-Ai*idZ?mi'3i*'6 ~* f8*l j'T^'
^ComjWH ^J^W^^ !^?(Si) K1)B^,m9cl*,.) ™
dHftykt OLt m/Ol rf i^e iQ^t/rtCCrif UvgM ty (SignAw)
X y y AXJ /^ ^"X au*
r 9f i Q *- f C/ fi/f-i/ll^ — ^Onor^on (CcBur. grain ML*, ttr&im. mtncrala. s*sr3*on, s-\.)
Oescripton (Couteui. UfWXriufiHiliw, taadur^. rrWn^rau^ trvisformatfork, ale)
Iuhi4 f ll^Cpsll:- 1O' 1 Lvyff J^/.C/
fSinri L~*c,l.l Sa* IJ ^,'O,L-/ 4*0.
~VLS{f ftfipi.-Sf* fi C^lfi^^ . IsPt' y Zr-S
oco^yMWf^,
———— r^ v ̂ — : ——— T") —— i — 7^ —/^ * trf. 13 (^* (^Jk'tr toaSc**
'^
Aa^tMieodraati hc*mw e* BWi*
f^ Kttly&K
hot ir o~-
ooCi
H—1 00
tQ d
t gi -t?
;^^jL-
-3
K) (Jl
ro ra ra
-
Mtfi Rgteranci ND
Hols Md PtgeNo. " Fffagan* Ptgen*
h-*
5 1/y 7 (Ji^ ' MI-*
"/iT?r5UK^UII fr^tvi tot. Con. ve Ld *9d umg.) raE/rpwrvrrllcw^in, ki (nx***±n. o* Mtvl* 4b*v]OMta) (Jl
, . i ^^-, roHot*rcf t-er Z& ^
d^O -^ i'^fc' |-'^i
Nom de la prct-'ifctt
IsSJs-FrenOe
-^9^7
tKA
A
(Cirt
'S^T
fa-2. (J&
AM1^m)y-, l^lWuTWM
"r Of fetiuftv BUO) 8V fuAnlk^v bfltfd^Q, scftfaAovtfy, fTMMWM (Von VM fang sxja of (fv OD^D. OTM txsntte* de car8d6rt8*(pes : fatefon, s*tls(DS*6, s*rtfcsltai- U'evta *st mosur^ per rapfion d rrag lonojhialnal de la orette. (WAX))
T)I. CDm
-n
sOD
m
ra CD
04/25/2003 15:21 7052926171•~~.23.2BBS leSiwri 1.NUT* UKiLLir** OU WCC f fct
PAGE 09
DAILY PRODUCTION REPORT
MARATHON DRILLINGA DIVISION OF 3018*44 CANADA LTD.
^r/7/4
ZS01 DELZOTTO AVE., QLOUCBSTEfl. ONTARIO, KIT 3V6 T*!' (613) B22-0871 Fix: (813) 822^7178
Fromk*? Tb ite™?*r'll^.M* Kin mn /J9
Client job # ———
N O - fro"! To
7
m/SA/t.0*/ MAr***
•td. Aug*r* P*n. Cona*Fnjm To From TO
~3
— ——————————— 7^
Materlale ChargeableWell ScreenRiMrCapeSilioa SandHolsplug
t FT.y FT.
7l Bog(D)
7 BaB(8)Protactlwe Casing /CementShelby TubesQ no utPenetration Cone*
7 Bag(s)7
7 BflgO)7
Pleromelera 7Poly Tubing f FT.
Coreboxea ff a0t*jflfefa WCO4Diamond Bits ' 7Caning Shoes fMlac. 7
P* lar
- f?. rfo/MOfif^ Tirn* FrnmAfiflC To ftL^f*
(^ - \(fU*la. ""r"* Fropo oci2 TD 4&W
Trteenai Casing Coring RemarkaFrom To From Tb From To
o /W' ^/Q
, A
/s/^ A&jZ'* ^ ^t^A'-isafit// 1 ff •czi- r y fcj*^
ex
Client Hour* Chargeable3llWAoc**6j*reparatlon ^7r 5 Mrs.Set up Hra.Waterline/ Water hauling PT. Hre.Moving botween holes Hr*.Well Installation Hra.Packer Yeating Mrs.Standby Hra.Total OHMer* Hour* Hnt.Total HalpePB Houra Hra.Total Predudlon Houra Mrs.
MatoriaUt Lost ^ Bpotain 7 Left In h o 1 a
Special iqulpmenl Rentala Charoaable:
Additional Ramedca:
Travel F 'om - To: M) |M CH KM Q
Cllont Approval
WhltB-Cllom'a oopy
Marathon
oopy Phk-Foreman'i copy
PPR 25 '03 15=26 7052926171 PPiGE.09
04/25/2003 15:21 7052926171fiPR.33.28e3 12:4flPM MBRflTHOH DRILLING 613 822. 7176
DAILY PRODUCTION REPORT
PAGE 10NO. 131 P. 3/4
MARATHON DRILLINGA DIVISION OF 3018*1* OANADA LTD.
2601 DEUZOTTO AVE., QCOUCiSTER, ONTARIO, K1T3V8 TW: (613) 822-0871 Pax: (813) 822-717C
Location Client Nar Client Job
Hole
2.
Ajcf/tffJ
ne Mtwb#SLData/^fl*
j jj
p
c^a,HeOt
Her Ipe ner
r -A
f
•iZ ttnqtf Tin,.^i. AifLf/tolf Time"* fatV* TlfTia C^™,^:** Trt ^^
H.BtwnFnoni
0
Tb
Std. Aufl*r*From Tb
Atn. Cone*From T6
Materials ChargeableWell ScreenRkttr
FT.FT,
CapsSilica Sand Baa(B)Holeplug 9eg(a)ProtectiveClement
CooingBag(*)
Shelby TubesQ rout Bag(a)Penetration ConesPlBzomsteriPoly TubingCoreboxBs ft mvej eettd
FT.
VAXfDiamond BitsCasing ShoesMisc.
TttoonM CarinaFrom
CI
Tb From Ib
Coring RemarksFram To
O /op' AM
lent Houri ChargeableSlte/Aocess Preparation Hrs,Setup Hre.Waterline/ Water hauling FT. Hre.Moving between holesWell InstallationPacker TaringStandbyTotal Drlllere HouraTotal Helper* Houra
Hrs.Hre.Hre.Hw.Hnj.Hrs.
Total Production Houra H ra.
Material*: Loat /Broken 1 Left In hole
Special Equipment Rental* Chargeable:
Additional Remerke:
Travel From: To; Mile* 0 KM Q
Client Approval
cilent's copy
Marathon Representative
oopy PlnkcForamen's copy
flPR 25 '03 15:26 7052926171 PPGE.10
04/25/2003 15:21 705292G171KK.Z3.2SKB 12:.a9m nflRATHOn DRILLING 613 832 7176
PAGE 11NO.131 P.4'4
DAILY PRODUCTION REPORTMARATHON DRILLINGA DIVISION OF 3018644 CANADA LTD.
2S01 DSLZOTTO AVE., GLOUCESTER, ONTAPIO, K1T 3V6 7*l; (813) 622-0671 F*X (619) 42a-717e
ft L. f Location — ̂ f^Lfefiwi. Data fyt-ftfallon P Kl^mai f 4S^tijJ fc^Ajf}
U& Oru.
nilnnfjob* -,... - - — . Ot
HerIpe her
7^- tt/rif&tl Time From -^K Tn Zfe*r f". . ,l tMHkV f Time From &S. To ^if*
A x^^HoM H. atom BM. Augwi Pon. Con**Ne- From TB Frer* Tc From
J
TD
Matariala ChargeableWell Screen f FT.Riser f FTCaps XSilica Sand J Bag(e)Holeplug j Bafl(s)Protective Casing fC~ement f Bag(s)Shelby Tubes JGrout ~/ Bag(B)Penetration Con*vPiezometers ~/Poly Tubing / FT.Coreboxm fi *J**/ tutt^wtfDiamond BiteCasing ShoosMisc.
THoonti CNlnp Coring RemirkaFrom li From Tb From To
f
Client Hour* ChargaableSlte/AccsfikEreparatlon 2 ^ J^ Hrw,S*t up Mrs.Waterline/ Water hauling FT. Hre.Moving between holes Mrs.Well Installation Hrs.Packer Teellng Hrs.Standby Hrs.Total Driller* Hour* Hre.Total Helper* Hour* Mrs.Total Production Hour* Hre.
Materials: Loat ; iroton 7 L*fl in nol*
Special Bqulpment Rental* Chargeable:
Additional Rwmerto:
Travel From: To: Miles D KM a
Client Approval
Whlta-Cllsnt's copy oopy
Marathon Representative
PinkcForwnan's copy
flPR 25 '03 15:27 7052926171 PflGE.ll
"04/25/2003 15:21 7052926171 PAGE 12' ' l nun urvii-i-.i"v3 DJ.J oc-t. iiiw ..-.-.—
MARATHON DRILLING CO. LTD.CORPORATE MEAD OFHCB: zeoi DELZOTTO
OTTAWA. ONTARIO KIT 9V8 T*!| (819) 822-0671 F*xi (913) 622-7176
TeH nTM 1-800-869-eOMEmail: marathon B magrriB.CB
Edcndcrry AggregatesCustom Crushing St Recycling903 Kelly Blvd. April 23, 2003Bridgenorth, Ontario Invoice #04-0931KOL l HO
Attention: Mr, Mike Tomliiuou Location: Buekhorn, Ontario
Dsscriptioii af Sprvioes Extennion To supply a trackmoum CME auger l rotary f core drill unit, including an experienced two-man crew, augers, rods, casing, tools, pump and vehicle equipped with a 500 gallon water tanlc
Scope of Work;
To drill \hrec Nq coreholes to approximately 100 feet in depth at a specified location.
Drilling Ratea:
Coring of Nq coreholos: 300 feet @ J 23.00 per foot S 6,900.00Mobilization St. Demobilization: Lump Sum S 1,500.00Move-in: Lump Sum S 500.00Move-out: Lump Sum S 500.00Supply of Transportation: Lump Sum S 500.00
Agreed Total Lump Sum including GST: S 10,500.00
Terms: Net 30 daysInterest due on all overdye accounts m thi rate of 296 par month (W*per annum) Thank You For Your Prompt PaymentOST #873023191
Sirvlnj North Am*"loa Sfnca 1881
www.uarairionDMiiine.64m
RPR 25 '03 15=27 7052926171 PAGE.12
\fertiC3! HoteS
E4 C4 A1
m y
100m 4
2S
100m 3
sa
100m 2
75'
100m 1
Claim* 122963
Post3 A 100m
B 100m
J Hole 1 was in E4
l Hole 2 was in C4
? Hole 3 was in A1
c100m
500m
Post2
w ec/i'NcCompany Uftt. Rigbe's 705-292-5455 l
REVISION DESCRIPTION [ DATEDRAWN
Petef BovstendCHECKED
Mte ToniinEonENOINEER
APPROVEDMke Tcmliison
DATE
Grid Unes For Maraltxin Drilling
BYi
o*ro \PPaj
Rebadatnar
DISTRICT 9
FILE
SCALE NONE f" f5 ! j DWG NO.
JREV Ft2
DWG NO. 1
UJ
8CL
'Dnj en rvl l/i Q r-
Rin
ro o
04/25/2003 15:21 7052926171 PAGE 15
Foot Notes
Drill Crews:Marathon Drilling 2501 Dezotto Ave Ottawa Ontario KIT 3V6
Prospector:Mike G. Tomlinson Lie. A52196 Cli.303482
This Report Was Done By Mike Tomlinson
RPR 25 '03 15=28 7052926171 PfiGE.15
ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINES
Transaction No:
Recording Date:
Approval Date:
Client(s):393100
Survey Type(s):
W0390.00680
2003-APR-25
2003-M AY-01
Work Report Summary
Status: APPROVEDWork Done from: 2003-APR-14
to: 2003-APR-19
946606 ONTARIO LIMITED
PDRILL
Work Report Details:
Perform Applied Assign Reserve Claim* Perform Approve Applied Approve Assign Approve Reserve Approve Due Date
SO 1077384 S11.900 811,900 S800 S800 S800 800 310,300 S10.300 2004-APR-27
SO 1077399 SO SO S800 S800 SO O SO SO 2004-MAY-19
811,900 S11,900 S1.600 51,600 S800 S800 510,300 510,300
External Credits:
Reserve:
SO
510,300 Reserve of Work ReporW: W0390.00680
S10,300 Total Remaining
Status of claim is based on information currently on record.
31D09NW2022 2.25467 HARVEY 900
2003-May-06 14:18 Armstrong-d Page 1 of 1
Ministr'y ofNorthern Developmentand Mines
Date: 2003-MAY-01
Ministers duDeveloppement du Nord et des Mines Ontario
GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E 6B5
946606 ONTARIO LIMITED903 KELLY BLVD.RR#1BRIDGENORTH, ONTARIOKOL1 HO CANADA
Tel: (888) 415-9845 Fax:(877)670-1555
Dear Sir or Madam
Submission Number: 2.25467 Transaction Number(s): W0390.00680
Subject: Approval of Assessment Work
We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.
At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.
If you have any question regarding this correspondence, please contact LUCILLE JEROME by email at [email protected] or by phone at (705) 670-5858.
Yours Sincerely,
Ron GashinskiSenior Manager, Mining Lands Section
Gc: Resident Geologist
Mike George Tomlinson (Agent)
946606 Ontario Limited (Assessment Office)
Assessment File Library
946606 Ontario Limited (Claim Holder)
Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:18238
CANADA
MINISTRY OF NORTHERN DEVELOPMENT AND MINES
PROVINCIAL MINING RECORDER'S OF'ICl
Mining Land Tenure Map
NAD 83 S degree (jrld
Those wishing to stake mining daims should consult with the Provincial Mining Recorders' Office of the Ministry of Northern Development and Mines for additional information on the status of the lands shown hereon. This map fs not intended for navigational, survey, or land title determination purposes as the information shown on this map ie compiled from various sources. Completeness and accuracy are not guaranteed, Additional information may also be obtained through the local Land Titles or Registry Office, or the Ministry of Natural Resources.
The information shown is derived from digital data available in the Provincial Mining Recorders' Office at the time of downloading from the Ministry of Northern Development and Mines web site.
General Information and Limitations This map may not show unregistered land tenure and interests inContact Information: Toll Free Mop Datum: NAD 83 land Indudlnj certain patents, leases, easements, right of ways.Provincial Minim) Recorders' Office Tel: 1 (888) 415-6845 ext 57*|jjection: Geographic Coordinates flooding rights, licences, or other form* of disposition of rights andWillet Green Miller Centre 933 Ramsey Lsk* Road Fax: 1 (877) S70-1444 Topographic Data Source: Land Information Onlarto interest from the Crown. Also certain land tenure and land usesSudbury ON P3E 6B5 Mining Land Tenure Source: Provincial Mining Recorders' Office that '"strict or prohibit free entry to stake mining claims may not bsHome Page: www.mndm.gov.on.co/MNDM/MINES/LANDSfmlsmnpge.htm illustrated.
Date l Time of Issue: Thu May 01 10:48:42 EOT 2003
TOWNSHIP l AREA PLAN HARVEY-EAST G-1293
ADMINISTRATIVE DISTRICTS t DIVISIONS
Mining DivisionLand Titles/Registry DivisionMinistry of Natural Resources District
Southern OntarioPETERBOROUGHBANCROFT
TOPOGRAPHIC
: Administrative Boundaries
l l Townshipl.....,.!
'f ': Concession, Lot
SBB Provincial Park
iaFii Indian Raaerve
i""; Cliff, Pit t Pila
Land Tenum
Freehold Patent
Surface And MMnsiR
SunWRijlht! Only
K
eV
Contour
MM Shafts
Railway
Road
Trail
Natural OK Plpalltw
UUEtlei
Tower
LnuahcM Patent
f B j SurftiM And Mining Rights
f,." Surtae* Right* Only
ra Mining Wghti Only
Licence of Occupaltort
lil ra
Surface And Mining Rightl
Surface Righn Only
Mining Right! Only
Order Ir) Council {Noi open for staking)
Watac Powflr Lsaae Agreement
Mining CH'irn
LAND TENURE WITHDRAWALS
Wtrti WtWm
w iW"rn
AtMC VWHdrawtl from DSpoeltion
Mlnlna Aa* Withdrawal TypM
Minim) R*8h!s Oily WWxiraiwn Oder In Coundl Wrihdirawal Typra
a CMy wnwnwn
IMPORTANT NOTICES
Hll* 1;4148B
. 2
31D09NW2022 2.25467 HARVEY 200