WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
1
PART 1 - GENERAL
A. Provide labor, equipment and material to perform one-time preventive maintenance as described below. All work shall be performed continuously during the month of January/February. Contractor shall submit final report showing “as found” and “as left” conditions. Contractor is responsible for field verifying the location of all equipment before submitting pricing.
B. Ensure equipment is properly de-energized isolated, properly grounded and properly locked and tagged out prior to performing, testing, and maintenance.
C. All work shall be done in accordance with manufacturer instructions.
D. Open all spare 480V cubicles, inspect and clean. See items below for more specific requirements.
E. Notify owner’s representative immediately if any equipment calibration is unobtainable.
F. All equipment outages will be coordinated through owner’s representative. Contractor will be introduced at onset of work. A minimum of 24 hours’ notice shall be required prior to any outage in the plant.
G. A final test report will be submitted that includes verification of each item on this work scope. The report will include “as found” and “as left” condition. Partial payment of invoice may be held until report is received and accepted. Report shall be structured and divided similar to this work scope.
PART 2 - LOW VOLTAGE DRAWOUT SWITCHGEAR
A. Breaker and Instrument Compartments.
Periodic inspection of the circuit breaker is recommended at least once a year. More frequent inspections are recommended where severe load conditions, dust, moisture or other unfavorable conditions exist, or if the vital nature of the load warrants it. Always inspect the breaker after a short-circuit current has been interrupted
Breakers – Test for proper operation: Test and inspect all circuit breakers for proper operation as follows:
a. Operate each breaker while in the TEST position and check all functions. This is particularly important for breakers that normally remain in either the opened or closed positions for long periods of time.
WARNING: Primary equipment must be completely de-energized while tests on control circuits, etc. are being conducted. Be sure that all areas of feedback from secondary circuits, as well as outside sources, are disconnected.
b. Remove the breakers from their compartments to a clean maintenance area. Close compartment door and cover the breaker cutout to prevent access to live parts.
WARNING: De-energize equipment completely before doing maintenance work on any devices, connection, bus work, breaker, or feeder cable compartments. This
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
2
includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.
B. Checks After Breaker is De-energized.
At the time of inspection, the following checks should be made after the breaker has been de-energized:
Manually operate the breaker several times, checking for obstructions or excessive friction. Manual closing of an electronically operated breaker may be performed by the following steps:
a. To charge the mechanism springs, pull the operating handle down until it stops (about 900) ten times for the EntelliGuard breaker. The charge indicator will show CHARGED on a yellow background.
b. Depress the CLOSE button on the front of the breaker. The springs should discharge and, if the latch is properly reset, the breaker will close.
Electrically operate the breaker several times to check performance of the electrical accessories.
Visually check the breaker for loose hardware on the breaker; also, check the bottom of the compartment for any hardware that has fallen from the breaker.
Remove and inspect the arc quenchers and contacts for breakage or excessive burning.
The performance of the solid-state current trip devices may be checked with a suitable
test set. Check electro-mechanical devices for positive trip in accordance with the instructions in the proper Maintenance Manuel.
Check insulating parts for evidence of overheating and for cracks that indicate excessive
thermal aging.
Lubrication: In general, the circuit breaker requires moderate lubrication. Bearing points and sliding surfaces should be lubricated at the regular inspection periods with a thin film of manufacturer approved lubricant. Before lubricating, remove any hardened grease and dirt from the latch and bearing surfaces with mineral spirits then wipe with a clean rag.
CAUTION: All excess lubricant should be removed with a clean cloth to avoid accumulation of dirt or dust.
On draw-out breakers, the contact surface of the disconnect fingers should be cleaned
and greased with manufacturer approved lubricant.
C. Instruments, Instrument Transformers, and Relays
Check and inspect all devices to see that they are functioning properly. Check that all electrical connections are tight. Check mounting of the device.
Under normal conditions, the protective relays do not operate; therefore, it is important to check the operation of these devices regularly. Refer to Relay Instruction Books for detailed instruction.
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
3
Breaker Compartment Interiors
WARNING: De-energize equipment completely before doing maintenance work in compartments. This includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.
Thoroughly clean the interior of the breaker and instrument compartments. Use a vacuum cleaner and clean rags only. Do not use steel wool or oxide papers. Blowing with compressed air is not recommended.
Check indicating devices, mechanical and key interlocks.
Check primary disconnecting device contacts for signs of abnormal wear or overheating. Discoloration of the silvered surfaces is not ordinarily harmful. These contacts should be cleaned only by wiping with a lint-free cloth.
Clean the racking mechanism and lubricate with manufacturer approved lubricant.
Before replacing the breaker, wipe off the primary disconnecting device contacts. Apply
a thin coat of manufacturer approved lubricant to the stationary studs and to the primary disconnects on the breaker.
D. Bus Area
WARNING: De-energize equipment completely before doing maintenance work on any devices, connections, bus work, breaker or feeder cable compartments. This includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.
Inspect the buses and connections carefully for evidence of overheating or weakening of the insulating supports. If bus insulation is present, remove the molded covers over the main bus connection to expose joints for inspection.
Check all connection bolts in the bus compartment and all bracing bolts for tightness.
Vacuum and, with a clean rag, wipe the buses and supports.
Visually inspect the insulation on the bars that run from the breaker studs through the bus structure to the cable area.
After cleaning, megger and record the resistance to ground and between phases of all
insulated bars and all buses and connections. Disconnect all control circuits before checking resistance. Do not use over a 1500-volt megger. Since definite limits cannot be given for satisfactory insulation resistance values, a record must be kept of the readings.
E. Cable and Busway Compartment Inspect and check the cable and busway compartment as follows:
Inspect all power cable connections for signs of overheating and tighten all connections. If severe discoloration or if damage is apparent, remove the damaged portion of the cable.
CAUTION: Be sure the condition which caused the over-heating has been corrected before energizing.
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
4
Check all bolts that hold cable terminals to the connection bars for tightness.
Check the neutral bus and ground bus connection and mounting bolts for tightness.
Check that all secondary control wiring connections are tight and that all control cabling is
intact.
F. Overall Switchgear
Make the following checks on the complete switchgear equipment.
Clean and inspect all painted surfaces and retouch where necessary.
Check to see that all anchor bolts and other structural bolts are tight.
Check that all breaker and instrument compartment door latches operate properly.
If the switchgear is equipped with heaters, check to see that all heaters are energized and operating.
For exterior vent opening in equipment furnished with air filters, the foam filter elements
should be removed and washed in warm soapy water, rinsed and reassembled at least annually. Elements should be inspected before re-assembly and replaced if any signs of deterioration are evident.
G. Circuit Breaker Lifting Mechanism
Under normal conditions, no special maintenance procedures or lubrication is required for this device. If the cable is abraided under any condition, it should be inspected for broken strands or other damage and replaced if necessary.
H. Torque all bolted connections to manufacturing specifications.
SWITCHGEAR LIST:
USHGA/B – GROUND FLOOR
PART 3 - SWITCHBOARDS
A. Bus Compartment
WARNING: De-energize equipment completely before doing maintenance work in compartments. This includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.
Inspect and check the bus area as follows:
Inspect the buses and connections carefully for evidence of overheating or weakening of the insulating supports.
Check all connection bolts in the bus compartment and all bracing bolts for tightness.
Vacuum and, with a clean rag, wipe the busses and supports.
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
5
Visually inspect the insulation on the bars that run from the breaker studs through the bus
structure to the cable area.
After cleaning, megger and record the resistance to the ground and between phases of all insulated bars and all buses and connections. Disconnect all control circuits before checking resistance. Do not use over a 1500-volt megger. Since definite limits cannot be given for satisfactory insulation resistance values, a record must be kept in the readings.
Weakening of the insulation from one maintenance period to the next can be recognized from the recorded readings. The readings should be taken under similar conditions each time, if possible, and the record should include the ambient temperature and humidity.
B. Cable Compartment
Inspect and check the cable and busway compartment as follows:
Inspect all power cable connections for signs of overheating and tighten all connections. If severe discoloration or if damage is apparent, remove the damaged portion of the cable.
CAUTION: Be sure the condition which caused the overheating has been corrected before energizing.
Check all bolts that hold cable terminals to the connection bars for tightness.
Check the neutral bus and ground bus connection and mounting bolts for tightness.
Check that all secondary control wiring connections are tight and that all control cabling is
intact.
C. Breaker and Switch Compartment
WARNING: De-energize equipment completely before doing maintenance work in compartments. This includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.
Inspect and check the device compartments as follows:
Thoroughly clean the interior of the breaker and instrument compartments. Use vacuum
clean rags only. Do not use steel wool or oxide papers. Blowing with compressed air is not recommended.
Check indicating devices, mechanical and key interlocks.
Check primary disconnecting device contacts on drawout devices for signs of abnormal wear or overheating. Discoloration of the silvered surfaces is not ordinarily harmful. These contacts should be cleaned only by wiping with a lint-free cloth.
Clean the racking mechanism and lubricate with manufacturer approved lubricant.
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
6
Before replacing the drawout breaker, wipe off the primary disconnect contacts. Apply a thin coat of manufacturer approved lubricant to the equipment stabs and to the primary disconnect fingers on the breaker.
Operate each drawout breaker while in the TEST position to be sure it functions properly.
This is particularly important for breakers that normally remain in either the opened or closed positions for long periods of time.
D. Metering and Control Devices
1. Check and inspect all devices to see that they are functioning properly. Check that all electrical connections are tight. Check mounting of the device. Under normal conditions, the protective relays do not operate; therefore, it is important to check the operation of these devices regularly.
E. Overall Equipment
Make the following checks on the complete switchgear equipment:
Clean and inspect all painted surfaces and retouch where necessary.
Check to see that all anchor bolts and other structural bolts are tight.
Check that all breaker and instrument compartment door latches operate properly.
If the switchboard is equipped with heaters, check to see that all heaters are energized and operating.
For exterior vent opening in equipment furnished with air filters, the foam filter elements
should be removed and washed in warm soapy water, rinsed, and reassembled at least annually. Elements should be inspected before reassembly and replaced if any signs of deterioration are evident.
F. Breaker Lifting mechanism (Hoist)
Under normal conditions, no special maintenance procedures or lubrication is required for this device. If the cable is abraided under any condition, it should be inspected for broken strands or other damage and replaced if necessary.
G. Ambient Temperatures and Circuit Loading
Switchboards are designed for installation where average ambient temperature will not exceed 40 degrees Celsius (104 degrees Fahrenheit). For higher temperatures, derating may be required. The conductor temperatures within the enclosure may be as high as 105 degrees C (220 Degrees F). Some parts of breakers, switches, and fuses may run hotter. Refer to the NEMA or UL standards for those devices and for switchboards for their maximum allowable or anticipated temperature rises above ambient.
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
7
H. Short Circuits
Normally, the overcurrent protective device on the circuit will prevent any electrical damage except at the actual point of short-circuit. A thorough inspection of the entire system after any fault current should be made to ensure that there has been no mechanical damage to the conductors, insulation or equipment.
In addition, the individual overcurrent protective device or devices which performed the short-circuit interruption MUST be inspected for possible arcing damage to contacts, arc chutes and/or insulation. Do not open sealed devices such as breaker trip units. If there is any possibility that sealed units may have been damaged, they should be replaced.
I. Arcing damage kk
Some organic insulating materials carbonize when subjected to the heat of an electrical arc and lose their insulating qualities. Any insulation found to be carbon tracked must be replaced before applying power.
J. Bolt torque for electrical joints
Torque all bolted connections per manufacturer’s specification.
SWITCHBOARDS LIST:
SWBD ESB1-A, SWBD ESB1-B, SWBD ESB2-A, SWBD ESB2-B, SWBD USHBA, SWBD USHBB
PART 4 - PANELBOARDS
A. Accumulation of Dust and Dirt:
If there is an accumulation of dust and dirt, clean out the panelboard by using a brush, vacuum cleaner, or clean lint-free rags. Avoid blowing dust into circuit breakers or other components. Do not use a blower or compressed air.
1. Carefully inspect all visible electrical joints and terminals in the bus and wiring system.
2. Visually check all conductors and connections to be certain that they are clean and
secure. Loose and/or contaminated connections increase electrical resistance which can cause overheating. Such overheating is indicated by discoloration or flaking of insulated and/or metal parts. Pitting or melting of connecting surfaces is a sign of arcing due to a loose or otherwise poor connection. Parts which show evidence of overheating or looseness should be cleaned and re-torqued or replaced if damaged. Tighten bolts and nuts at bus joints to manufacturer’s torque specification.
B. Proper Ampere, Voltage , And Interrupting Ratings
1. Check circuit breakers, switches and fuses to ensure they have the proper ampere, voltage and interrupting ratings. Ensure that non-current-limiting devices are not used as replacements for current-limiting devices. Never attempt to defeat rejection mechanisms which are provided to prevent the installation of the incorrect class of fuse.
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
8
C. Mechanisms Free and In Proper Working Order
1. Operate each switch or circuit breaker several times to ensure that all mechanisms are free and in proper working order. Replace as required. See NEMA-AB-4 for maintenance of molded case circuit breakers.
D. Operation of All Mechanical Components
1. Exercise switch operating mechanisms and external operators for circuit breakers to determine that they operate freely to their full on and off positions.
2. Check the integrity of all electrical and mechanical interlocks and padlocking mechanisms. For key interlocked systems, ensure that only the required numbers of keys are accessible to the operator.
3. Whenever practical, check all devices for missing or broken parts, proper spring tension, free movement, corrosion, dirt, and excessive wear.
4. Adjust, clean and lubricate or replace parts according to the manufacturer’s instructions.
5. Use clean nonmetallic light grease or oil as instructed.
6. Do not oil or grease parts of molded case circuit breakers.
7. If no instructions are given on the devices, sliding copper contacts, operating mechanisms, and interlocks may be lubricated with clean, light grease.
8. Wipe off excess lubrication to avoid contamination.
CAUTION: Hydrocarbon spray propellants and hydrocarbon based sprays or compounds will cause degradation of certain plastics. Contact the panelboard manufacturer before using these products to clean, dry, or lubricate panelboard components during installation or maintenance.
9. Clean and dress readily accessible copper electrical contacts, blades and jaws according to the manufacturer’s instructions when inspection indicates the need.
E. Damaged Insulating Material and Assemblies
Look for and replace damaged insulating material and assemblies where sealing compounds have deteriorated.
F. Moisture or signs of previous wetness or dripping
Look for any moisture or signs of previous wetness or dripping inside the cabinet.
NOTE: Condensation in conduits or dripping from outside sources is one known cause of panelboard malfunction.
1. Seal off any conduits which have dripped condensate and provide means for further condensate to drain away from the panelboard.
2. Seal off any cracks or openings which have allowed moisture to enter the enclosure. Eliminate the source of any dripping on the enclosure and any other source of moisture.
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
9
3. Replace or thoroughly dry and clean any insulating material, which is damp or wet or shows an accumulation of deposited material from previous wettings.
4. Inspect all component devices. Replace any component device which shows evidence of moisture damage or has been subjected to water damage or flooding. Additional information may be found in the NEMA document “Guidelines For Handling Water Damaged Electrical Products”
G. Before Cleanup and Corrective Action Is Attempted
In the event of water damage, e.g., flooding or sprinkler discharge, the manufacturer should be consulted before cleanup and corrective action is attempted.
H. Severe Electrical Short Circuit
If a severe electrical short circuit has occurred, the excessive currents may have resulted in structural component and/or bus and conductor damage due to mechanical distortion, thermal damage, metal deposits, or smoke. Examine all devices and bus supports for cracks or breakage. The manufacturer should be consulted before cleanup and correction is attempted.
I. Ground Fault Protection System
Test the ground fault protection system (if furnished) in accordance with the manufacturer’s instructions. See Section 230.95 of the National Electrical Code and NEMA PB 2.2 Application Guide for Ground Fault Protective Devices for Equipment.
PANELBOARDS LIST:
See one-line diagrams.
PART 5 - AUTOMATIC TRANSFER SWITCHES
A. Interior Wiring and Components:
Visual inspection of all wiring and connections for signs of tracking, overheating and insulation deterioration.
Check and tighten, where necessary, all control circuit wiring terminals.
Check manual switches and relays for contact continuity.
Check all common and ground wires. Measure and record resistance to ground readings. Ohms
Check lug connections and mounting hardware.
B. Mechanical Checks:
The following inspection can only be done when the ATS has all power removed from the switch (complete shutdown):
Tighten all bus connections (Normal, Emergency & Load). Inspect Main contacts (clean & burnish where necessary). Inspect Arcing contacts (clean & burnish where necessary). Inspect Relay Finger contacts (clean & burnish where necessary).
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
10
Inspect Auxiliary contacts (clean & burnish where necessary). Check length of linkage. Check motor mounting hardware. Check heim joints. Check interlock rod. Check handle bracket for free movement. Lubricate all necessary mechanical parts.
C. Timer Setup:
Check and record all time delay settings: TD1 TD2 TD3 AUT TDBT TDMI TETD TNTD Others
D. Check and record Normal and Emergency Source Voltages
Normal Voltage:
A-B B-C C-A Rotation
A-N B-N C-N
Emergency Voltage:
A-B B-C C-A Rotation Hz
A-N B-N C-N
Engine Battery VDC
E. Check Normal and emergency Sensing Voltages
Check normal voltage sensing Corrected pick-up and dropout Pick-up and drop-out Settings. Settings.
B1 – P.U. D.O. B1 – P.U. D.O.
B2 – P.U. D.O. B2 – P.U. D.O.
B3 – P.U. D.O. B3 – P.U. D.O.
Emergency source voltage sensing pick-up:
Relays and other devices:
F. Verify the following functions
Engine Start Signal
Transfer to Emergency
Transfer to Normal
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
11
Load Test
Miscellaneous Functions (review accessory sheet and list/test additional functions below):
G. Infrared Test
With an ambient rise infrared heat scanner or tracker, check for ambient rise on energized main contacts, bus work and cable lugs (preferably at full load conditions).
Pass Fail
H. Enclosure
Wipe down and touch up minor exterior scratches.
Clean interior of enclosure and remove accumulated dust and/or dirt.
Check door closure, locking bars and mechanism for proper
I. Miscellaneous (ATS Section)
Note any corrective actions taken.
Report unsafe conditions.
Report recommendations for replacement of major components.
RTB CHECKOUT (Bypass and Isolation type ATS only) (Write N/A on the check-off line if not an "RTB")
J. Interior Wiring and Components:
Visual inspection of all wiring and connections for signs of tracking, overheating, and insulation deterioration.
Check and tighten, where necessary, all control circuit wiring terminals.
Check manual switches and relays for contact continuity.
Check all common and ground wires. Measure and record resistance to ground readings. Ohms
Check lug connections and mounting hardware.
K. Mechanical Checks:
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
12
The following inspection can only be done when the ATS has all power removed from the switch (complete shutdown):
Check all mounting hardware. Tighten all bus connections (normal, emergency & load). Inspect Auxiliary contacts (clean & burnish where necessary). Inspect Main contacts (clean & burnish where necessary). Check operation of bypass handle. Check operation of isolation handle. Check all finger clusters on the ATS rollout for tightness and overheating (clean & burnish
where necessary). Check heim joints. Lubricate all necessary mechanical parts.
L. Verify the following Functions/Lights:
Verify amber light (LT1) is operational (normal power available). Verify Bypass to Normal operation. Verify blue light (LT3) is constant when load is bypassed to normal. Verify isolation of the "ATS" when load is bypassed to normal. Verify blue light (LT3) is flashing when load is bypassed to Normal and the switch is isolated. Verify amber light (LT2) is operational (emergency. power available). Verify bypass to emergency operation. Verify blue light (LT4) is constant when load is bypassed to emergency. Verify Isolation of the "ATS" when load is bypassed to emergency. Verify blue light (LT4) is flashing when load is bypassed to emergency and the switch is
isolated.
M. Miscellaneous (RTB Section)
Note any corrective actions taken.
Report unsafe conditions.
Report recommendations for replacement of major components.
ATS LIST: SECOND FLOOR - ATS ETSP PENTHOUSE - ATS A, ATS B,
PART 6 - 600V FEEDER CABLES
A. Megger cables at 1000 VDC.
B. Visual and Mechanical Inspection
C. Inspect exposed sections of cables for physical damage.
D. Inspect bolted electrical connections for high resistance.
E. Inspect compression-applied connections for correct cable match and identification.
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
13
F. Inspect shielding and grounding, cable supports, and terminations.
G. Perform a shield-continuity test on each power cable.
H. Verify tightness of accessible bolted electrical connections by calibrated torque wrench they shall be in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.12 in ANSI/NETA std. publication.
PART 7 - DRY-TYPE TRANSFORMERS
A. Clean and inspect insulators, bushings and windings. Inspect anchorage, alignment, and grounding. Inspect bolted electrical connections for high resistance.
B. Perform a Double insulation test.
C. Verify tightness of accessible bolted electrical connections by calibrated torque wrench they shall be in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.12 in ANSI/NETA std. publication.
TRANSFORMER LIST:
XF2-00894 (XFMR LOAD BANK SWGR), XFMR BLXA, XFMR BLXA1, XFMR BLXAA, XFMR ET2A, XFMR ET2C, XFMR ET2D, XFMR ET2E, XFMR ET2F, XFMR ET3B, XFMR GLXA, XFMR GLXB, XFMR GLXD, XFMR PL, XFMR FP, XFMR USHBA, XFMR USHBB
PART 8 - LIQUID FILLED TRANSFORMERS
A. Oil Temperature Gauge
Verify gauge calibration.
2. Verify and clean the oil temperature gauge.
B. Tank and Radiators
1. Clean the heat dissipation surface.
2. Apply painting where necessary.
3. Tighten all vibrating parts per manufacturer recommendations.
4. Check radiator valve operation.
C. Oil Level Gauge
Clean the mask.
Fill with oil if level is under the normal level
D. Insulating Liquid
Perform Dissolved gas analysis (ANSI C57-104)
-
WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB
14
Perform Dielectric Strength (ASTM D-1816)
Check water content (ASTM D-1533 and ANSI C57-106).
TRANSFORMER LIST:
XFMR USHGA, XFMR USHGB, XFMR USHXA
PART 9 - POWER/MOLDED CASE BREAKERS
A. Clean and inspect each breaker and cubicle.
B. Perform a primary current injection test to verify trip points (This is required for electronic trip breakers rated from 400 amps to 3200 amps) for long-time and short-time ranges.
C. Perform a contact resistance test.
D. Other standard tests. Follow all ANSI/NETA standardized test methods.
Verify tightness of accessible bolted electrical connections by calibrated torque wrench they shall be in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.12 in ANSI/NETA std. publication. Tightness shall be verified for line and load connections
PART 10 - VFD’S
A. Inspect and clean. No testing.
B. Verify tightness of accessible bolted electrical connections by calibrated torque wrench. This shall be in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.12 in ANSI/NETA std. publication.
VFD LIST:
Basement – CHWP-1, Condensate return pump, MRAP-1, MRAB-2, MACB-3, MACB-4, MACB-5, MACB-6,
Ground Floor – MACF-2, MACG-1, MACG-2, MACF-1, MRAGF-1, MRAGF-2
First Floor – MACF-3
Penthouse – AHU-1A, AHU-1B, AHU-2A, AHU-2B
PART 11 - INFRARED SURVEY
A. Perform infrared survey during January/February of 2020 for all connections for all of the equipment noted above. Survey shall be for all terminations and Busing while equipment is energized with normal building loads.
-
52
5,000 KVA34.5 KV-4.16Y/2.4 KV
CNP34.5 KV CKT.
52
N.O.
SERVICE NO. 2
4.16Y/2.4 KV34.5 KV-5,000 KVA
34.5 KV CKT.CNP
52
250MVA1200A
1200A250MVA
FP-A
1200A BUS
MSB
250MVA1200A
SERVICE NO. 1
MSA
MSWGRA
2-4"C EA/W3-500KCMIL, 8KVSHIELDED1#3/0 600V GND1-4"C SPARE
2-4"C EA/W3-500KCMIL, 8KVSHIELDED1#3/0 600V GND1-4"C SPARE
K1
MSWGRB
CNP
UTHSC
1200A250MVA
1200A250MVA
1200A250MVA
52
1200A250MVA
1200A250MVA
1200A250MVA
1200A250MVA
1200A250MVA
1200A250MVA
EQUIPPEDSPACE
VAULT BLDGAT GRADE
PENTHOUSE
5KV, 1200A, 3PH, 3W, 250MVA -LOCATED IN PENTHOUSE - SEE E201 FOR LOCATION. SWITCHGEAR IS EATON G.O. MHU03549.PSWGRA/B
SEE DETAILEDONE LINE DIAGRAMON E011
TOFIREPUMPXFMRSEE E035
TIEN.O.
K
USLB - A/B, 208Y/120V - PENTHOUSE
USHC - A/B, 480Y/277V - PENTHOUSE
USHBA, 480Y/277V
USHGA-SW2,480Y/277V
SEE DETAILEDONE-LINE DIAGRAMON E013
SEE DETAILEDONE-LINE DIAGRAMON E014
3#1/0MV-105 SHLD133%1#2 600V GND4"C
USHGB
N.C.SW2
N.O.SW2
N.C.SW1
N.O.SW2
N.O.SW2
N.C.SW1
3#1/0MV-105 SHLD133%1#2 600V GND4"C
3#1/0MV-105 SHLD133%1#2 600V GND4"C
USHBB, 480Y/277V
SPARE
TO 5KVPARALLELINGSWGR PSESEE E012
3-500KCMIL,SHLD133%1#1/0 600V GND4"C
1200A250MVASPARE
3#4/0MV-105 SHLD133%1#2 600V GND4"C
SPARESPARE
3-250KCMILMV-105 SHLD133%1#2 600V GND4"C
SPARE
3#4/0MV-105 SHLD133%1#2 600V GND4"C
3-250KCMILMV-105 SHLD133%1#2 600V GND4"C
3#1/0MV-105 SHLD133%1#2 600V GND4"C
3#4/0MV-105 SHLD133%1#2 600V GND4"C
1A 1B 2A 2B 3A 3B
SPARE EQUIPPEDSPACE
EQUIPPEDSPACE
4A 4B
1200A250MVA
5A 5B
1200A250MVA
1200A250MVASPARE
9A 9B
1200A250MVA
EQUIPPEDSPACE
10B10A 11B11A 12B12A 13B13A
MSA2
250MVA1200A
K
PSWGRA PSWGRB
1200A250MVA
MSB2
K
TO SWGR PSESEE E012
USHXAGROUND FLOOR
3#4/0MV-1054"C
1200A250MVA
JBOX
1200A250MVA
6B 8B
SEE DETAILEDONE-LINE DIAGRAMON E030
SEE DETAILEDONE LINE DIAGRAMON E035
SEE DETAILEDONE-LINE DIAGRAMON E037
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
6:1
8 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E010
5KV OVERALL ONE LINEDIAGRAM
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE15KV OVERALL ONE LINE DIAGRAM
No. Description Date
-
3
3
3
3
3
3
1200A250MVA
1200A BUS
3333
100/5 100/5 100/5
1200A
100/5
250MVA1200A
250MVA
1200A250MVA
100/5
600/5
600/5
3
1200A250MVA
100/5
3600/5
600/5
100/5
600/5
600/5
100/5
100/5
1200A
600/5
600/5
3
250MVA1200A
3
250MVA
100/5 100/5
3600/5
3600/5
1200A250MVA
100/5
600/53
250MVA1200A
600/53
3
3
600/5
600/5
100/5 100/5
200/5
1200A
3
250MVA
1200A250MVA
100/5 100/5
1200A BUS
250MVA1200A
1200A250MVA
3600/5
3600/5
3
3
600/5
600/5
100/5 100/5
PSWGRB
12A11A10A9A 13A
2A 3A 4A 5A
R
5150
R
G
CS86
5150
R
R
G
CS86
G
R
5051
86CS
R
G86
CS
R
5051
R
5150
R
RG86
CS
R
86R
CS
G
5150
R
5051
G86
R
CS
R
86G
CS
5051
R
CS
R
5051
G86
R
5150
R
RG86
CS
R
R
CS
G
5150
86
86RG
50
R51
CS
R
86
51
G
50
CS
R
RG
5051
R
CS86
R
51
CS
RG86
50
G R
50
R51
CS86
R
51
CS
86G R
50
RG
5051
R
86CS
R
51
G86
50
CS
R
48VDC CONTROL BUS
GROUND BUS
FROM 48VDCBATTERYPANEL DCBN-1
VT-24200-120V
-
TYP
TO MSWGRA(SEE E010)
4.16KV METAL-CLAD SWITCHGEAR250MVA, 10,717A SYM AVAILABLE
PDS
9B 10B 11B 12B
2B 3B 4B 5B
R
SPACEEQUIPEQUIP
SPACE
EQUIPSPACE
48VDC CONTROL BUS 48VDC CONTROL BUS
FROM 48VDCBATTERYPANEL DCBS-1
FROM 48VDC BATTERY PANEL DCBS-2
FROM 48VDCBATTERYPANEL DCBS-3
48VDC CONTROL BUS
FROM 48VDCBATTERYPANEL DCBN-2
48VDC CONTROL BUS
MSB2SW1USHBBN-SP3
S-SP3 S-SP4 USHBA SW2USHGA-
USHGA-
DM
1200/5
TIEN.O.
1200A250MVA
FROM 48VDCBATTERYPANEL DCBN-3
3
100/5
100/5
1200A
3600/5
600/5
250MVA
5150
86
R
5150
86
R
G R
CS
R
CS
G
GROUND BUS
48VDC CONTROL BUS
1200A BUS
SPACEEQUIPN-SP4
48VDC CONTROL BUS
GROUND BUS
VT-14200-120V
-
1200A250MVA
13B
48VDC CONTROL BUS
200/5
1200A
3
1200/5
250MVA
5150
86
R
K1
GROUND BUS
MSA2
DM1
1A
1B
RG
CS
CPT-15KVA4200-120V/240V
PANELLS2
K1
TO MSWGRBMSB-SEE E010
GROUND BUS GROUND BUSGROUND BUS
48VDC CONTROL BUS
R
LS2-1
1200A BUS
PSWGRA4.16KV METAL-CLAD SWITCHGEAR250MVA, 10,717A SYM AVAILABLEEATON G.O. MHU03549
LS2-2
K1
120V BUS
LS2-3 LS2-5 LS2-7 LS2-9 LS2-11
LS2-4 LS2-6 LS2-8 LS2-10 LS2-12 LS2-14
ATS
SE
E B
ELO
W F
OR
CO
NT
INU
AT
ION
SE
E A
BO
VE
FO
R C
ON
TIN
UA
TIO
N
CPT-25KVA4200-120V/240V
R
CS
G
3 2
3 2
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
TOSUBSTATIONUSHC-ASEE E013
1200A250MVA
5150
G
5150
G5150
G5150
G5150
G5150
G
5150
G5150
G5150
G5150
G5150
G
5150
G 5150
G 5150
G5150
G5150
G
5150
G 5150
G5150
G5150
G 5150
G
5150
G
TOUSHGA-SW1SEE E030
TOUSHBBSEE E037
TOUSHBASEE E037
TOUSHGA-SW2SEE E030
TO SUBSTATIONUSHC-BSEE E013
1200A250MVA
TO PSESEE E012
SPARE SPARE SPARE
TO USLB-ASEE E014
TO USLB-BSEE E014
SPARE SPARE SPARE SPARE
5150
TO CT'S AT USHCSECONDARY
5150
TO CT'S AT USLBSECONDARY
5150
TO CT'S AT USHCSECONDARY
5150
TO CT'SAT USLBSECONDARY
USHBA USHGA-SW1
SPACE
USHGA-SW2USHBB
36" (TYP)
1A 2A 3A 4A 5A 6A 13A12A11A10A9A
1B 2B 3B 4B 5B 6B 9B 10B 11B 13B112B
SPACE
MAIN BRKMSA
MAIN BRKMSB
TIEBREAKER
VT-1,2 VT-3,4
8A
8B
S-SP3EQUIPPEDSPACE
S-SP4EQUIPPEDSPACE
N-SP3EQUIPPEDSPACE
CPT-2PNL LS2
7A
7B
36" (TYP)
39'-0"
3 1/2"PAD
FINISHEDFLOOR
PSWGRA PSWGRB
SPARE
USHC-A
SPARE PSE PFCC-A (400kVAR) USLB-A USLB-B
USHC-B
SPARE SPARE SPARE
N-SP4EQUIPPEDSPACE
PFCC-B (400kVAR)
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
6:2
4 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E011
5KV SWGR PSWGRA ANDPSWGRB
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE1
MAIN 5KV SWGR PSWGRA ANDPSWGRB - ONE LINE DIAGRAM
NOT TO SCALE2
MAIN 5KV SWGR PSWGRA ANDPSWGRB - FRONT ELEVATION
No. Description Date
-
MAIN BUS
DM
GEN 3
PARALLELING SWITCHGEAR PSE5KV, 1200A, 3PHASE, 3WIRE W/GND,250MVALOCATED IN PENTHOUSE -SEE E201
GEN 11#4/0
DM
GEN 2
DM
800KW0.8PF4160Y/2400VNATURAL GAS GENSETCUMMINS
800KW0.8PF4160Y/2400VNATURAL GAS GENSETCUMMINS
750KW0.8PF4160Y/2400VNATURAL GAS GENSETCUMMINS
2 2
4200-120V
2
4200-120V
DM
2
4200-120V
NORMAL MAIN POWER FEED FROM MAIN SWITCHGEAR - PSWGRSEE E011
750KVA4.16KV-480Y/277V
LOAD BANK750KW,480V NEMA 3RON ROOFSEE E201
3#2/0,MV-105 5KV133% SHLD,1#2 600V GND3"C
4-3"C EA/W3-350KCMIL#3/0 GND
#4/01"C
3-3KVMOV2.55KVMCOV
TO GND BARIN PSE SWGRRM
3#2/0MV-105 5KV133% SHLD,1#2 600V GND3"C
3#2/0MV-105 5KV133% SHLD,1#2 600V GND3"C
3#2/0MV-105 5KV133% SHLD,1#2 600V GND3"C
1#4/0 1#4/0
EQUIPPEDSPACE
3#4/0MV-105 5KV133% SHLD,1#1 600V GND3 1/2"C
1600AS1600AF
1200ATLSIG
N.O1200A52
N.C1200A52
N.C1200A52
N.C1200A52
N.C52N.O
1200A52N.O1200A52
N.O1200A52
GROUND BUS
3-500KCMILMV-105 5KV133% SHLD,1#1/0 600V GND4"C
3#4/0MV-105 5KV133% SHLD,1#1 600V GND3 1/2"C
3#2/0MV-105 5KV133% SHLD,1#2 600V GND3"C
FROM USHGBSEE E010
1000/1150KVA4.16KV-480Y/277V
1600AS1600AF
1600ATLIG
800AS800AF
400ATLIG
SWGR USHXA1600A,480Y/277V3PH,4W, 65KAICGROUND FLOOR
N.O.N.C.
3#4/05KV1#2 GND4"C
4200-120V
1200A
N.O.TIE52 BUS
VT4200-120V
GEN 1 GEN 2 GEN 3MAINNORMAL1200A
MAINMAINMAIN
1500KVA4.16KV-480Y/277V
TO GND BARIN PSE SWGRRM
#4/01"C
1500KVA4.16KV-480Y/277V
EQUIPPEDSPACE
CUBICLE 1 CUBICLE 2 CUBICLE 3 CUBICLE 4 TRANSITION CUBICLE 5 CUBICLE 6
SWGR USHXB-A/B3200A,480Y/277V3PH,4W, 65KAICSEE E015
CUBICLE 7 CUBICLE 8
TO RELAY IN PSESEE E012
3
1600:5
PULLBOX IN7TH FLOOR CHASESEE E206
3#4/0MV-105 5KV133% SHLD,1#2 600V GND IN 4"C
3-3KVMOV2.55KVMCOV
3-3KVMOV2.55KVMCOV
SWGR LB3200A,480Y/277V3PH,4W, 65KAICSEE E0
SEE DETAILEDONE LINE DIAGRAMON E035
SEE DETAILEDONE LINE DIAGRAMON E015
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NO SCALE
8/2
2/2
01
9 1
0:4
6:3
1 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E012
NEW 5KV PARALLELINGSWITCHGEAR PSE
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NO SCALE1NEW 5KV PARALLELING SWITCHGEAR PSE
SEQUENCE OF OPERATION FOR PSE
A. NORMAL/ EMERGENCY
1. UNDER NORMAL CONDITIONS, THE NORMAL POWER FEEDER PROVIDES POWER TO THE LOADS VIA NORMALLY CLOSED MAIN BREAKER INSWITCHGEAR PSE.
2. ON A LOSS OF NORMAL POWER, GEN 1, 2, & 3 WILL START AND THE MAIN NORMAL POWER BREAKER WILL OPEN AND BUS TIE BREAKER WILL CLOSE. THE FIRST GENERATOR TO REACH RATED VOLTAGE AND FREQUENCY WILL RESULT IN THE MAIN GENERATOR BREAKER IN PSE CLOSING INTO THE BUS AND SERVING ALL LOADS SHOWN WHICH ARE PRIORITY 1 LOADS. THE PRIORITY 2 LOAD IS THE DATA CENTER WHICH IS SERVED FROM A 480V BREAKER IN SWITCHGEAR USHXB. ON A LOSS OF POWER THIS BREAKER SHALL BE OPENED AND CLOSED AFTER THE SECOND GENERATOR COMES ONLINE. SEE KEYED NOTE 6 ON E027. THE SECOND AND THIRD GENERATOR WILL CLOSE INTO THE PSE BUS AS THEY ARE SYNCHRONIZED WITH THE FIRST GENERATOR.
3. WHEN NORMAL POWER RETURNS, AFTER A 5 MINUTE DELAY, THE TIEBREAKER WILL OPEN AND THE MAIN NORMAL BREAKER WILL CLOSE.THE LOAD WILL NOW BE SERVED FROM THE NORMAL SOURCE. AFTERA COOLDOWN PERIOD THE GENERATORS WILL SHUTDOWN.
B. LOAD BANK OPERATION
1. THE LOAD BANK ALLOWS TESTING OF ONE GENERATOR AT A TIME.UNDER NORMAL CONDITIONS, THE TIE BREAKER IS OPEN, ISOLATINGTHE NORMAL POWER SOURCE FROM THE EMERGENCY SOURCE.THIS ALLOWS FOR GENERATOR TESTING VIA THE LOAD BANK.
2. SHOULD NORMAL POWER FAIL WHEN THE LOAD BANK IS IN OPERATION,THE MASTER CONTROLLER SHALL IMMEDIATELY SHUTDOWN THE LOADBANK AND BEGIN THE SEQUENCE NOTED ABOVE.
No. Description Date
-
SWITCHGEAR USHC-A/B3000A,480Y/277V, 3PH, 4W, 65KAIC
TIEN.O.3200AF/3200ATLSIG
2000/2660KVA4.16KV480Y/277VAA/FA
NEUTRAL BUS
GROUND BUS
K
USHC - A
600AT800AF
LSIG600AT800AF
LSIG600AT800AF
LSIG600AT800AF
LSIG600AT800AF
LSIG1000AT1600AF
LSIG
2-3"C EA/W4-350KCMIL1#1 GND 3-2 1/2"C
EA/W3-350KCMIL1#2/0 GND
2-3"CEA/W4-350KCMIL1#1 GND
K
3200AFMAIN
3200ATLSIG
TOEPDPA(FED FROMUSHXB-A)SEE E015
NEUTRAL BUS
GROUND BUS
ATS B
600AT800AF
LSIG600AT800AF
LSIG600AT800AF
LSIG600AT800AF
LSIG600AT800AF
LSIG
K
3200AFMAIN
3200ATLSIG
2-3"CEA/W3-350KCMIL1#1 GND
TOEPDPA(FED FROMUSHXB-A)SEE E015
600AT800AF
LSIG1000AT1600AF
LSIG600AT800AF
LSIG600AT800AF
LSIG800AT800AF
LSIG
3-2 1/2"CEA/W3-350KCMIL1#2/0 GND
2-3 1/2"CEA/W4-500KCMIL1#1/0 GND
1000AT1600AF
LSIG600AT800AF
LSIG600AT800AF
LSIG
3-2 1/2"CEA/W3-350KCMIL1#4/0 GND
TOPSWGRASEE E011
3-3KVMOV2.55KVMCOV
2000KVA4.16KV480Y/277VAA/FA
USHC - B 3-3KVMOV2.55KVMCOV
TOPSWGRBSEE E011
PEAK DEMAND - 1161A
DOWN CHASETO 2ND FLOORSEE E026
PEAK DEMAND - 1230A
2-800AFEQUIPPEDSPACES
2-800AFEQUIPPEDSPACES
2-3"C EA/W4-350KCMIL1#1 GND
2-3"C EA/W4-350KCMIL1#1 GND
2-3"C EA/W4-350KCMIL1#1 GND
2-3"C EA/W4-350KCMIL1#1 GND
2-3"C EA/W4-350KCMIL1#1 GND
2-3"C EA/W4-350KCMIL1#1 GND
2-3"C EA/W4-350KCMIL1#1 GND
2-3"C EA/W4-350KCMIL1#1 GND
18"
5KVTERMCABINET
96"TYP TYP
1A
METERING
MAIN
ATS-A
1BC
1D
2A
PNL8DHA
2B
2D
22"TYP
3A
PNL8PA
3D
4A
PNL8PD
800AEQUIPPED
SPACE
4B
4D
5A
5D
800AEQUIPPED
SPACE
BUSRISER
HE
PNL8DHB
2C
3C
4C
3BC 5BC
TIE
800AEQUIPPED
SPACE
BUSRISER
HN
BUSRISER
HM
BUSRISER
HKXFMR
BUSRISER
HS
BUSRISER
HR
PNL8PC
ATS-B
BUSRISER
HC
BUSRISER
HF
BUSRISER
HD
PNL8PB
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
MAIN
800AEQUIPPED
SPACE
METERING
XFMR5KVTERMCABINET
BUSRISER
HB
BUSRISER
HA
#4/01"C
TO GND BARIN RM. P.113
2-3"C EA/W4-350KCMIL1#1 GND
2-3"C EA/W4-350KCMIL1#1 GND
PNL PBSEE E023
ATS A
PNL PASEE E023
1B/C 1D 2A 2B 2C 2D 3A 3B 3C 3D 4A 4B 4C/D
6A 6B 6C 6D
6A
6D
6B
6C
7A 7B 7C 7D
600AT800AF
LSIG
2-3"C EA/W4-350KCMIL1#1 GND
BUSRISER
HP
8A 8C/D
3-800AFEQUIPPEDSPACES
9D 9B/C
7A
7D
7B
7C
8A
8D
8B
8C
9A
9D
9BC
800AEQUIPPED
SPACE
3-800AFEQUIPPEDSPACES
5A/D
M
3
3000:5
TO RELAYIN 5KV SWGRPSWGRASEE E011
2#143/4"C
3
3000:5
BACNET TODDC PANEL
#18/2TWT SHLD3/4"C
TO RELAYIN 5KV SWGRPSWGRBSEE E011
2#143/4"C
BACNET TODDC PANEL
#18/2TWT SHLD3/4"C
M
3
3000:5
3000:5
3
18"TYP
96"TYP
TR
AN
SIT
ION
SE
CT
ION
TR
AN
SIT
ION
SE
CT
ION
22"TYP
8B
2-3"CEA/W4-350KCMIL1#1 GND
DIST PNL8PBSEE E017
DIST PNL8PCSEE E022
DIST PNL8PDSEE E018
DIST PNL8DHBSEE E016
DIST PNL8PASEE E017
DIST PNL8DHASEE E016
2-3"CEA/W4-350KCMIL1#1 GND
DOWN CHASETO 2ND FLOORSEE E024
600A HORIZONTALSPECTRABUSWAY HBG.E. ARMORCLADALUMINUM,3PH, 4W
DOWN CHASETO 2ND FLOORSEE E024
DOWN CHASETO 2ND FLOORSEE E027
DOWN CHASETO 2ND FLOORSEE E028
DOWN CHASETO 2ND FLOORSEE E027
600A HORIZONTALSPECTRABUSWAY HPG.E. ARMORCLADALUMINUM,3PH, 4W
600A HORIZONTALSPECTRABUSWAY HRG.E. ARMORCLADALUMINUM,3PH, 4W
DOWN CHASETO 2ND FLOORSEE E029
600A HORIZONTALSPECTRABUSWAY HSG.E. ARMORCLADALUMINUM,3PH, 4W
DOWN CHASETO 2ND FLOORSEE E026
600A HORIZONTALSPECTRABUSWAY HFG.E. ARMORCLADALUMINUM,3PH, 4W
DOWN CHASETO 2ND FLOORSEE E025
600A HORIZONTALSPECTRABUSWAY HCG.E. ARMORCLADALUMINUM,3PH, 4W
DOWN CHASETO 2ND FLOORSEE E025
600A HORIZONTALSPECTRABUSWAY HDG.E. ARMORCLADALUMINUM,3PH, 4W
TERMINALBLOCK
48 #16 - 2"C48 #16 - 2"C
48 #16 - 2"C48 #16 - 2"C
480-120VCPT
480-120VCPT
TERMINALBLOCK
800APNL
PDPH
600AT800AF
LSIG
2-2 1/2"CEA/W4-350KCMIL1#4/0 GND
DIST PNLPDPHSEE E022
600A HORIZONTALSPECTRABUSWAY HEG.E. ARMORCLADALUMINUM,3PH, 4W
600A HORIZONTALSPECTRABUSWAY HAG.E. ARMORCLADALUMINUM,3PH, 4W
600A HORIZONTALSPECTRABUSWAY HMG.E. ARMORCLADALUMINUM,3PH, 4W
600A HORIZONTALSPECTRABUSWAY HNG.E. ARMORCLADALUMINUM,3PH, 4W
600A HORIZONTALSPECTRABUSWAY HKG.E. ARMORCLADALUMINUM,3PH, 4W
DOWN CHASETO 2ND FLOORSEE E029
DOWN CHASETO 2ND FLOORSEE E028
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
6:3
6 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E013
ONE LINE DIAGRAM -USHC-A, USHC-B
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE1ONE LINE DIAGRAM - USHC-A, USHC-B
No. Description Date
-
SWITCHGEAR USLB-A/B4000A, 208Y/120V, 3PH, 4W, 100KAIC
PNL 8LA
1000AT1600AF
LSIG225AT800AF
LSIG1000AT1600AF
LSIG1000AT1600AF
LSIG
TIEN.O.4000AF/4000ATLSIG
K
4#4/01#4 GND2"C
PNL 8LC
225AT800AF
LSIG
4#4/01#4 GND2"C
PNL 8LB
1000AT1600AF
LSIG225AT800AF
LSIG
4#4/01#4 GND2"C
1000/1333KVA4.16KV208Y/120VAA/FA
NEUTRAL BUS
GROUND BUS
USLB - A
K
4000AFMAIN
4000ATLSIG
TOPSWGRASEE E011
3-3KVMOV2.55KVMCOV
NEUTRAL BUS
GROUND BUS
K
4000AFMAIN
4000ATLSIG
1000/1333KVA4.16KV208Y/120VAA/FA
USLB - B 3-3KVMOV2.55KVMCOV
TOPSWGRBSEE E011
#4/01"C
TO GND BARIN RM. P.113
PEAK DEMAND - 556A
PEAK DEMAND -1238A
3-3"C EA/W4-350KCMIL1#2/0 GND
1000AT1600AF
LSIG1000AT1600AF
LSIG1000AT1600AF
LSIG
800AFEQUIPPEDSPACES
1000AT1600AF
LSIG1000AT1600AF
LSIG1000AT1600AF
LSIG1000AT1600AF
LSIG1000AT1600AF
LSIG
18"
5KVTERMCABINET
96"TYP TYP
MAIN
22"TYP
800AEQUIPPED
SPACE
TIE
800AEQUIPPED
SPACE
BUSRISER
LS
1000KVA4160:208/120
BUSRISER
LR
BUSRISER
LK
BUSRISER
LE
BUSRISER
LF
BUSRISER
LC
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
BUSRISER
LB
BUSRISER
LA
4-800AFEQUIPPEDSPACES
BUSRISER
LD
BUSRISER
LP
BUSRISER
LM
PNL8LA
PNL8LC
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
BUSRISER
LN
PNL8LB
800AEQUIPPED
SPACE
MAIN 1000KVA4160:208/120
5KVTERMCABINET
34"TYP
2A
2B
2D
2C
1A 3A
3B
3D
3C
2A 2B 2C 2D1A 3A 3B 3C 3D 4A/B/C/D
4A
4B
4D
4C
5A 6A
6B
6D
6C
7A
7B
7D
7C
6A 6B 6C 6D 7A 7B 7C 9A
4-800AFEQUIPPEDSPACES
7D 8A/B/C/D
8A
8B
8D
8C
9A
TO RELAYIN 5KV SWGRPSWGRBSEE E011
2#143/4"C
BACNET TODDC PANEL
#18/2TWT SHLD3/4"C
M
3
4000:5
4000:5
3
M
3
4000:5
TO RELAYIN 5KV SWGRPSWGRASEE E011
2#143/4"C
3
4000:5
BACKNET TODDC PANEL
#18/2TWT SHLD3/4"C
22"TYP
TR
AN
SIT
ION
SE
CT
ION
TR
AN
SIT
ION
SE
CT
ION
3-3"C EA/W4-350KCMIL1#2/0 GND
3-3"C EA/W4-350KCMIL1#2/0 GND
3-3"C EA/W4-350KCMIL1#2/0 GND
3-3"C EA/W4-350KCMIL1#2/0 GND
3-3"C EA/W4-350KCMIL1#2/0 GND
3-3"C EA/W4-350KCMIL1#2/0 GND
NEW3-3"C EA/W4-350KCMIL1#2/0 GND
3-3"C EA/W4-350KCMIL1#2/0 GND
3-3"C EA/W4-350KCMIL1#2/0 GND
3-3"C EA/W4-350KCMIL1#2/0 GND
3-3"C EA/W4-350KCMIL1#2/0 GND
DOWN CHASETO 2ND FLOORSEE E025
DOWN CHASETO 2ND FLOORSEE E024
DOWN CHASETO 2ND FLOORSEE E024
DOWN CHASETO 2ND FLOORSEE E027
DOWN CHASETO 2ND FLOORSEE E027
DOWN CHASETO 2ND FLOORSEE E028
1000A HORIZONTALSPECTRA BUSWAY LNG.E. ARMORCLADALUMINUM,3PH, 4W
DOWN CHASETO 2ND FLOORSEE E028
DOWN CHASETO 2ND FLOORSEE E029
DOWN CHASETO 2ND FLOORSEE E029
DOWN CHASETO 2ND FLOORSEE E026
DOWN CHASETO 2ND FLOORSEE E026
DOWN CHASETO 2ND FLOORSEE E025
1000A HORIZONTALSPECTRA BUSWAY LCG.E. ARMORCLADALUMINUM,3PH, 4W
TERMINALBLOCK
48 #16 - 2"C48 #16 - 2"C
48 #16 - 2"C48 #16 - 2"C
480-120VCPT
480-120VCPT
TERMINALBLOCK
1000A HORIZONTALSPECTRA BUSWAY LMG.E. ARMORCLADALUMINUM,3PH, 4W
1000A HORIZONTALSPECTRA BUSWAY LKG.E. ARMORCLADALUMINUM,3PH, 4W
1000A HORIZONTALSPECTRA BUSWAY LAG.E. ARMORCLADALUMINUM,3PH, 4W
1000A HORIZONTALSPECTRA BUSWAY LBG.E. ARMORCLADALUMINUM,3PH, 4W
1000A HORIZONTALSPECTRA BUSWAY LDG.E. ARMORCLADALUMINUM,3PH, 4W
1000A HORIZONTALSPECTRA BUSWAY LEG.E. ARMORCLADALUMINUM,3PH, 4W
1000A HORIZONTALSPECTRA BUSWAY LFG.E. ARMORCLADALUMINUM,3PH, 4W
1000A HORIZONTALSPECTRA BUSWAY LSG.E. ARMORCLADALUMINUM,3PH, 4W
1000A HORIZONTALSPECTRA BUSWAY LRG.E. ARMORCLADALUMINUM,3PH, 4W
1000A HORIZONTALSPECTRA BUSWAY LPG.E. ARMORCLADALUMINUM,3PH, 4W
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
6:4
3 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E014
ONE LINE DIAGRAM -USLB-A, USLB-B
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE1ONE LINE DIAGRAM - USLB-A, USLB-B
No. Description Date
-
SWITCHGEAR USHXB - A/B3200A,480Y/277V, 3PH, 4W, 65KAIC
PNL 8DLXA
250AT800AF
LSIG250AT800AF
LSIG
PNL 8DLXB
200AT800AF
LSIG600AT800AF
LSIG
2-2 1/2"CEA/W4-350KCMIL1#1/0 GND
3#3/01#6 GND2"C
PNL 8DHXB
800AT800AF
LSIG
2-3 1/2"CEA/W4-500KCMIL1#1/0 GND
400AT800AF
LSIG
3-500KCMIL1#3 GND3"C
PNL 8DHXD PNL 8DLXD
800AT800AF
LSIG250AT800AF
LSIG
PNL 8DHXC PNL 8DLXC
XFMR8DLXC112.5KVA480-208Y/120VK-7
800AT800AF
LSIG250AT800AF
LSIG
1500/2000KVAAA/FA4.16KV480Y/277V
NEUTRAL BUS
GROUND BUS
USHXB - A
K
3200AFMAIN
3000ATLSIG
3-3KVMOV2.55KVMCOV
TOSWGR PSESEE E012
NEUTRAL BUS
GROUND BUS
K
3200AFMAIN
3000ATLSIG
1500/2000KVAAA/FA4.16KV480Y/277V
USHXB - B3-3KVMOV2.55KVMCOV
TOSWGR PSESEE E012
1200AT1600AF
LSIG
TOUSHGB
EXISTINGPANEL EPA2ND FLOORCHASE
ATS ETSP1200A480Y/277V2ND FLOORCHASE
18"
5KVTERMCABINET
96"TYP TYP
MAIN
22"TYP
800AEQUIPPED
SPACE
TIE
800AEQUIPPED
SPACE
1500KVA4160:480/277
ATSETSP
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
PNL8DHXD
MAIN 1500KVA4160:480/277
5KVTERMCABINET
PNL8DLXB
PNL8DLXA
PNL8MXB
PNLEPDPA
PNL8DHXB
PNL8DHXA
PNL8DHXC
PNL8DLXC
PNL8MXA
PNL8DLXD
3-2 1/2"CEA/W4-500KCMIL1#3/0 GND
PNL 8DHXA
800AT800AF
LSIG
2-3 1/2"CEA/W4-500KCMIL1#1/0 GND
3-350KCMIL1#3 GND2 1/2"C
2-3 1/2"CEA/W4-500KCMIL1#1/0 GND
2-3 1/2"CEA/W4-500KCMIL1#1/0 GND
XFMR8DLXD112.5KVA480-208Y/120VK-7
XFMR8DLXA112.5KVA480-208Y/120VK-7
XFMR8DLXB112.5KVA480-208Y/120VK-7
2-2 1/2"C EA/W3#4/02#4/0 NEUT1#1/0 GND
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
800AEQUIPPED
SPACE
PNL EPDPA
M
3
3000:5
TO RELAYIN 5KV SWGRPSESEE E012
2#143/4"C
3
3000:5
BACNET TODDC PANEL
#18/2TWT SHLD3/4"C
2#143/4"C
BACKNET TODDC PANEL
#18/2TWT SHLD3/4"C
M
3
3000:5
3000:5
3
TO RELAYIN 5KV SWGRPSESEE E012
800A, 3P EQUIPPED
SPACE
800A, 3P EQUIPPED
SPACE
TIEN.O.3200AF/3200ATLSIG
K
800A, 3P EQUIPPED
SPACE
800A, 3P EQUIPPED
SPACE
800A, 3P EQUIPPED
SPACE
800A, 3P EQUIPPED
SPACE
800A, 3P EQUIPPED
SPACE
800A, 3P EQUIPPED
SPACE
800A, 3P EQUIPPED
SPACE
800A, 3P EQUIPPED
SPACE
800A, 3P EQUIPPED
SPACE
TR
AN
SIT
ION
SE
CT
ION
TR
AN
SIT
ION
SE
CT
ION
22"TYP
800A, 3P EQUIPPED
SPACE
800AEQUIPPED
SPACE
SEE E021 SEE E021 SEE E019 SEE E019
SEE E019 SEE E011 SEE E020 SEE E020 PNL 8MXA
PNL 8MXB
#4/01"C
TO GND BARIN RM. P.113
3-350KCMIL1#3 GND2 1/2"C
3-350KCMIL1#3 GND2 1/2"C
3-350KCMIL1#3 GND2 1/2"C
1#2 GND3/4"C
1#2 GND3/4"C
1#2 GND3/4"C
1#2 GND3/4"C
480-120VCPT
480-120VCPT
TERMINALBLOCK
48 #16 - 2"C48 #16 - 2"C
48 #16 - 2"C48 #16 - 2"C
TERMINALBLOCK
2-2 1/2"C EA/W3#4/02#4/0 NEUT1#1/0 GND
2-2 1/2"C EA/W3#4/02#4/0 NEUT1#1/0 GND
2-2 1/2"C EA/W3#4/02#4/0 NEUT1#1/0 GND
400AT800AF
LSIG
PNL 8MXC
3-500KCMIL1#3 GND3"C
400AT800AF
LSIG
PNL 8MXD
3-500KCMIL1#3 GND3"C
CONTROLPOWER
UPS
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
6:4
9 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E015
ONE LINE DIAGRAM -USHXB - A/B
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE1ONE LINE DIAGRAM - USHXB - A/B
No. Description Date
-
600A, 480Y/277V, 3P, 4W, GND, 65KAIC
8DHA
3P20A
NEUTRAL
GROUND
TO USHC (SEE E013)
3P300
3-300KCMIL1#4 GND2 1/2"C
3P100A
4#31#8 GND1 1/4"C
3P70A
3#61#10 GND3/4"C
3P15A
3P30A
3#101#10 GND3/4"C
3P15A
3#121#12 GND3/4"C
3#121#12 GND3/4"C
3#121#12 GND3/4"C
TO PNL BHA TO CLINIC AIR COMP
TO PUMP HWP1,2
TO PUMP ROC1
TO PUMP LOG-2
TO PUMP ROC2
8
4-100A/3P EQUIPPED SPACES
800A, 480Y/277V, 3P, 4W, GND, 65KAIC
8DHB
3P225A
NEUTRAL
GROUND
TO USHC (SEE E013)
3#4/01#4 GND2"C
3P100A
3P100A
4#31#8 GND1 1/4"C
3P100A
3#31#8 GND1"C
3P15A
3#121#12 GND3/4"C
TO PNL 8HB
TO PANEL 8HC
TO SOUTH PHAIR
COMPRESSORS
TO PUMP ROC 3D 3A
TO PUMP ROC-3
4#31#8 GND1 1/4"C
4-100A/3P EQUIPPED SPACES
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
6:5
4 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E016
ONE LINE DIAGRAMPANELS 8DHA & 8DHB
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE1ONE LINE DIAGRAM - DISTRIBUTION PANEL 8DHA
NOT TO SCALE2ONE LINE DIAGRAM - DISTRIBUTION PANEL 8DHB
No. Description Date
-
1000A, 480Y/277V, 3P, 4W, GND, 65KAIC
DIST PNL 8PA
3P20A
NEUTRAL
GROUND
TO USHC-A (SEE E013)
3#121#12G3/4"C
3P15A
3#121#12G3/4"C
3P30A
3#10G1#10G3/4"C
3P20A
3#121#12G3/4"C
3P150A
3#1/01#6G1 1/2"C
3P40A
3P50A
3#81#10G3/4"C
3P15A
3#121#12G3/4"C
OAUNIT
AO/0-1
FANRA/0-1/1
UNITAC/0-1VFD
UNIT #1
3P200A
3#3/01#6G2"C
3P70A
3#41#8G1"C
3P30A
3#101#10G3/4"C
3P30A
3P300A
FANRA/0-1/2
FANRA/0-3/2
OAUNIT
OA/0-3
FANRA/0-3/1
UNITAC/0-3VFD
UNIT #3
FANEF/LC-1
FANEF/LC-2
UNITAC/L-1
FANEF/LC-3
SWGRROOFFCU
3P300A
UNITAC/L-3
VFDVFD VFDVFDVFD VFD
3-350KCMIL1#4G3"C
3#81#10G3/4"C
3#101#10G3/4"C
3-350KCMIL1#4G3"C
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER60A, 3P40AF
R G
SIZE 2
COMBINATIONSTARTER30A, 3P30AF
R G
SIZE 1
COMBINATIONSTARTER100A, 3P70AF
R G
SIZE 2
COMBINATIONSTARTER30A, 3P30AF
R G
SIZE 1
TO JOHNSONCONTROLPNL
3#12#12G3/4"C
TO JOHNSONCONTROLPNL
3#12#12G3/4"C
3#12#12G3/4"C
3#8#10G3/4"C
3#10#10G3/4"C
3#4#8G3/4"C
3#10#10G3/4"C
TO JOHNSONCONTROLPNL
TO JOHNSONCONTROLPNL
TO JOHNSONCONTROLPNL
TO JOHNSONCONTROLPNL
TO JOHNSONCONTROLPNL
2#183/4"C
2#183/4"C
2#183/4"C
2#183/4"C
2#183/4"C
2#183/4"C
4-100A/3P EQUIPPED SPACES
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
3#12#12G3/4"C
2#183/4"C
2#183/4"C
TO JOHNSONCONTROLPNL
3P100A
3#31#8G1"C
PNL 4HAD
3#31#8G1"C
3P20A
NEUTRAL
GROUND
TO USHC-A (SEE E013)
3P20A
3P20A
3#121#12G3/4"C
3P50A
3#81#10G3/4"C
3PSIZE 4
150A
3#1/01#6G1 1/2"C
3P20A
OA UINITOA/0-2
VFDUNINT #2
FANRA/0-2/2
3P150A
3P300A
3P100A
3P300A
3P15A
2#121#12G3/4"C
600A, 480Y/277V, 3P, 4W, GND, 65KAIC
DIST PNL 8PB
UNITAC/0-2
HW CIRCULATION
HWC 8/1
FANRA/0-2/1
OA UINITOA/0-4
VFDUNINT #4
3P20A
FANRA/0-4/1
FANRA/0-4/2
UNITAC/0-4
UNITAC/L-2
UNITAC/L-4
PNL
3#1/01#6G1 1/2"C
VFD VFDVFDVFD VFD
3#121#12G3/4"C
3#121#12G3/4"C
3#121#12G3/4"C
3#121#12G3/4"C
4#31#8G1"C
3-350KCMIL1#4G3"C
3-350KCMIL1#4G3"C
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
TO EXISTINGJOHNSONCONTROLPNL
3#12#12G3/4"C
TOJOHNSONCONTROLPNL
3#12#12G3/4"C
3#12#12G3/4"C
3#12#12G3/4"C
3#12#12G3/4"C
VFD 2#183/4"C
2#183/4"C
2#183/4"C
2#183/4"C
2#183/4"C
4-100A/3P EQUIPPED SPACES
TOJOHNSONCONTROLPNL
TOJOHNSONCONTROLPNL
TOJOHNSONCONTROLPNL
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
7:0
0 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E017
ONE LINE DIAGRAMPANELS 8PA & 8PB
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE1ONE LINE DIAGRAM - DISTRIBUTION PNL 8PA
No. Description Date
NOT TO SCALE2ONE LINE DIAGRAM - DISTRIBUTION PNL 8PB
-
3P30A
NEUTRAL
GROUND
TO USHC-A (SEE E013)
3P225A
3P225A
3P30A
3P30A
3P150A
3P100A
3P50A
4-100A/3PEQUIPPEDSPACES
AC/L-6 AC/L-8
3P40A
3P40A
3P20A
3P15A
3P15A
OA/0-6
FANRA/0-6/2
PNL4HAN
RA/0-8/2
AC/P-2
3P20A
600A, 480Y/277V, 3P, 4W, GND, 65KAIC
DIST PNL 8PD
FANRA/0-6/1
UNITAC/0-8VFD
UNIT #8
OA/0-8
RA/P-2/1
OA/P-2 EF/LC-5 EF/LC-6
3P20A
EF/M-4
3P15A
3P15A
3P15A
3P15A
PUMPHWC-8/4
PUMPCCW-4
PUMPCCW-3
PUMPHWC-8/3
3P20A
RA/0-8/1
3#4/01#4 GND2"C
3#4/01#4 GND2"C
3#81#10GND3/4"C
VFD VFD VFD VFDVFD
3#101#10GND3/4"C
3#101#10GND3/4"C
3#1/01#6GND1 1/2"C
3#101#10GND3/4"C
4#31#8GND1 1/4"C
3#121#12GND3/4"C
3#81#10GND3/4"C
3#121#12GND3/4"C
3#121#12GND3/4"C
3#121#12GND3/4"C
3#121#12GND3/4"C
3#81#10GND3/4"C
3#121#12GND3/4"C
3#121#12GND3/4"C
3#121#12GND3/4"C
3#121#12GND3/4"C
3#121#12GND3/4"C
DISCSW
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER60A, 3P40AF
R G
SIZE 2
COMBINATIONSTARTER60A, 3P50AF
R G
SIZE 2
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
CONTINUED BELOW
TO JOHNSONCONTROLPNL
3#12#12G3/4"C
2#183/4"C
TO JOHNSONCONTROLPNL
2#183/4"C
TO JOHNSONCONTROLPNL
2#183/4"C
TO JOHNSONCONTROLPNL
2#183/4"C
TO JOHNSONCONTROLPNL
2#183/4"C
TO JOHNSONCONTROLPNL
2#183/4"C
TO JOHNSONCONTROLPNL
2#183/4"C
TO JOHNSONCONTROLPNL
2#183/4"C
TO JOHNSONCONTROLPNL
2#183/4"C
TO JOHNSONCONTROLPNL
3#8#10G3/4"C
2#183/4"C
TO JOHNSONCONTROLPNL
3#8#10G3/4"C
2#183/4"C
COMBINATIONSTARTER30A, 3P30AF
R G
SIZE 1
TO JOHNSONCONTROLPNL
3#101#10GND3/4"C
2#183/4"C
COMBINATIONSTARTER30A, 3P30AF
R G
SIZE 1
TO JOHNSONCONTROLPNL
3#101#10GND3/4"C
2#183/4"C
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
TO JOHNSONCONTROLPNL
2#183/4"C
3P200A
AC-0-6
3#3/01#6GND2"C
VFD
3#12#12G3/4"C
3#12#12G3/4"C
3#12#12G3/4"C
3#12#12G3/4"C
3#12#12G3/4"C
3#12#12G3/4"C
3#12#12G3/4"C
3#12#12G3/4"C
3#12#12G3/4"C
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
7:0
6 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E018
ONE LINE DIAGRAMPANEL 8PD
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE2ONE LINE DIAGRAM - DISTRIBUTION PNL 8PD
No. Description Date
-
800A, 480Y/277V, 3P, 4W, GND, 65KAIC
8DHXB
3PSPARE
100A
NEUTRAL
GROUND
TO USHXB-A (SEE E015)
3P225A
3P100A
3P225A
3PSPARE
150A3PSPARE
150A3P200A
8HXB ELEV9&10
1HXE-7HXE
ELEV3&4
2PSPARE
50A
3#4/01#4 GND2 1/2"C
4#31#8 GND1 1/4"C
4#3/01#6 GND2"C
4#4/01#4 GND2 1/2"C
800A, 480Y/277V, 3P, 4W, GND, 65KAIC
8DHXA
NEUTRAL
GROUND
TO USHXB - A (SEE E015)
3P225A
3P100A
3P225A
3P400A
3P60A
3P225A
8HXA 1HXC-7HXC
EXISTLOAD
1HXA-7HXA
ELEV1&2
OTHERLOAD
4-100A/3P EQUIPPED SPACES
4#4/01#4 GND2 1/2"C
4#31#8 GND1 1/4"C
4#61#10 GND1"C
4#4/01#4 GND2 1/2"C
4#4/01#4 GND2 1/2"C
4-500KCMIL1#3 GND3 1/2"C
800A, 480Y/277V, 3P, 4W, GND, 65KAIC
8DHXC
3P225A
NEUTRAL
GROUND
TO USHXB-B (SEE E015)
3P200A
3P100A
3P60A
3P225A
3P100A
TO PNL 8HXC
TO ELEVATOR7 & 8
TO PANEL2HXN/7HXN
TO PANEL2HXR/7HXR
TO AIR COMPPRESSOR
EXHAUST
EX AIR COMP.
4-100A/3P EQUIPPED SPACES
4#31#8 GND1 1/4"C
3#61#10 GND3/4"C
4#4/01#4 GND2 1/2"C
3#31#8 GND1"C
4#4/01#4 GND2 1/2"C
3#3/01#6 GND2"C
600A, 480Y/277V, 3P, 4W, GND, 42KAIC
EPDPA
3P300A
NEUTRAL
GROUND
FROMUSHXB-ASEE E015
3P300A
ATS ASEE E013
ATS BSEE E013
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
7:1
3 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E019
ONE LINE DIAGRAMPANELS 8DHXA, 8DHXB,
8DHXC & EPDPA
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE2ONE LINE DIAGRAM - 8DHXB
NOT TO SCALE1ONE LINE DIAGRAM - 8DHXA
NOT TO SCALE3ONE LINE DIAGRAM - 8DHXC
No. Description Date
NOT TO SCALE4ONE LINE DIAGRAM - PANEL EPDPA
-
800A, 480Y/277V, 3P, 4W, GND, 65KAIC
8DHXD
3P175A
NEUTRAL
GROUND
TO USHXB-B (SEE E015)
3P200A
3P100A
TO PNL 8HXD
TO ELEVATOR5 & 6
TO PNL 2HXK/7HXK
4-225A/3PEQUIPPEDSPACES
3P15A
3P20A
FANEF/LC-4
(REFED FROM PNL 8PXA)
FANEF/T-1
(REFED FROM PNL 8PXA)
3#121#12 GND3/4"C
3#121#12 GND3/4"C
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P15AF
R G
SIZE 1
TO JOHNSONCONTROLPNL
3#12#12G3/4"C
2#183/4"C
TO JOHNSONCONTROLPNL
3#12#12G3/4"C
2#183/4"C
4#2/01#6G2"C
3#3/01#6G2"C
4#31#8G1 1/4"C
2P50A
3#81#10G3/4"C
TO GENERATOR
PNL #1
600A, 208Y/120V, 3P, 4W, GND, 65KAIC
8DLXD
3P200A
200% NEUTRAL
GROUND
TO USHXB-B(SEE E015)
3P200A
3P200A
3P200A
3P100A
3P200A
3P200A
3P100A
4-100A/3PEQUIPPEDSPACES
7LXM,6LXM,5LXM
7LXK,6LXK,5LXK
7LXP,6LXP,5LXP
8LXD 4LXM,3LXM
4LXK,3LXK,2LXK
4LXP,3LXP,2LXP
LOAD
4#3/01#6G2"C
4#3/01#6G2"C
4#3/01#6G2"C
4#31#8G1 1/4"C
4#3/01#6G2"C
4#3/01#6G2"C
4#3/01#6G2"C
4#3/01#6G2"C
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
7:1
9 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E020
ONE LINE DIAGRAMPANELS 8DHXD & 8DLXD
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE1ONE LINE DIAGRAM - 8DHXD
NOT TO SCALE2ONE LINE DIAGRAM - 8DLXD
No. Description Date
-
600A, 208Y/120V, 3P, 4W, GND, 65KAIC
8DLXC
3P200A
200%NEUTRAL
GROUND
TO USHXB -A (SEE E015)
3P200A
3P200A
3P200A
3P100A
3P200A
3P200A
8LXC
4-100A/3P EQUIPPED SPACES
7LXN,6LXN, 5LXN
7LXS,6LXS, 5LXS
7LXR,6LXR, 5LXR
4LXN,3LXN,2LXN,1LXN
4LXS,3LXS,2LXS
4LXR,3LXR,2LXR,1LXR
4#31#8 GND1 1/4"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
600A, 208Y/120V, 3P, 4W, GND, 65KAIC
8DLXA
3P200A
200% NEUTRAL
GROUND
TO USHXB-A (SEE E015)
3P200A
3P200A
3P200A
3P100A
3P200A
3P200A
3P100A
7LXA,6LXA,5LXA,4LXA
7LXB,6LXB,5LXB,4LXB
7LXC,6LXC,5LXC,4LXC
8LXA 3LXA,2LXA,1LXA
3LXB,2.221XA,
1LXB
3LXC,2LXC,1LXC,
OTHERLOAD
4-100A/3P EQUIPPED SPACES
4#3/01#6 GND2"C
4#31#8 GND1 1/4"C
4#31#8 GND1 1/4"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
600A, 208Y/120V, 3P, 4W, GND, 65KAIC
8DLXB
3P200A
200%NEUTRAL
GROUND
TO USHXB - A (SEE E015)
3P200A
3P200A
3P200A
3P100A
3P200A
3P200A
7LXD,6LXD,5LXD,4LXD
7LXE,6LXE,5LXE,4LXE
7LXF,6LXF,5LXF,4LXF
8LXB 3LXD,2.221XB,
1LXD
3LXE,2LXE,1LXE
3LXF,2LXF,
1LXF,1LXF-1
4-100A/3P EQUIPPED SPACES
4#31#8 GND1 1/4"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
4#3/01#6 GND2"C
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
019 1
0:4
7:2
5 A
MC
:\U
sers
\dnguye
n\ D
ocum
ents
\ 109
5-0
57-0
1_E
lec_R
19_
dngu
yen.r
vt
E021
ONE LINE DIAGRAMPANELS 8DLXA, 8DLXB &
8DLXC
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE3ONE LINE DIAGRAM - 8DLXC
NOT TO SCALE1ONE LINE DIAGRAM - 8DLXA
NOT TO SCALE2ONE LINE DIAGRAM - 8DLXB
No. Description Date
-
225A, 480Y/277V, 3P, 4W, GND, 65KAIC, RM P.117 - SEE E202
PDPH
NEUTRAL
GROUND
TOPNL USHC-BSEE 1/E013
3P100A
3#31#8G1"C
POWER UNIT
FOR LIFT
3P100A
3#31#8G1"C
POWER UNIT
FOR LIFT
4-100A/3PEQUIPPEDSPACES
M
CP
M
CPPNL PROVIDEDWITH LIFT, TYP.
3P15A
3#121#12G3/4"C
FCU-P-9
3/4
3P15A
FCU-P-11
2
3#121#12G3/4"C
3P15A
FCU-P-12
2
3#121#12G3/4"C
3P15A
FCU-P-13
2
3#121#12G3/4"C
30A3P5AF
1
R G
30A3P5AF
1
R G
30A3P5AF
1
R G
30A3P2-1/4AF
1
R G
100A, 480Y/277V, 3P, 4W, GND, 65KAIC
8HC
NEUTRAL
GROUND
TO PNL 8DHBSEE 4/E016
3P15A
3#121#12G3/4"C
FCU-P-10
3/4
30A3P2-1/4AF
1
R G
1000A, 480Y/277V, 3P, 4W, GND, 65KAIC
DIST PNL 8PC
3P250A
NEUTRAL
GROUND
TO USHC-A/BSEE E013
3-250KCMIL1#4GND2 1/2"C
3P200A
3P225A
3P30A
3P50A
3P100A
3P30A
AC/L-5 OA-0-5VFD
UNIT #5
3P100A
3P20A
3P40A
3P20A
FANRA/0-5-1
PNL4HAP
UNITAC-0-7
FANRA/0-7-1
AC/0-5 AC/L-7 FANRA/0-5-2
UNITOA/0-7
FANRA/0-7-2
VFD VFD VFD VFD VFD
3#101#10GND3/4"C
3#101#10GND3/4"C
3#31#8GND1"C
3#121#12GND3/4"C
3#121#12GND3/4"C
3#3/01#6GND2"C
3#4/01#4GND2"C
3#81#10GND3/4"C
4#31#8GND1 1/4"C
3#81#10GND3/4"C
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P20AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P30AF
R G
SIZE 1
COMBINATIONSTARTER30A, 3P30AF
R G
SIZE 1
3#12#12G3/4"C
2#183/4"C
3#12#12G3/4"C
2#183/4"C
3#10#10G3/4"C
32#183/4"C
TO JOHNSONCONTROLPNL
3#10#10G3/4"C
32#183/4"C
4-100A/3P EQUIPPED SPACES
VFD
TO JOHNSONCONTROLPNL
TO JOHNSONCONTROLPNL
TO JOHNSONCONTROLPNL
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
7:3
2 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E022
ONE LINE DIAGRAM -PANELS 8HC, 8PC &
PDPH
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
NOT TO SCALE2ONE LINE DIAGRAM - PANEL PDPH
NOT TO SCALE1ONE LINE DIAGRAM - PANEL 8HC
No. Description Date
NOT TO SCALE3ONE LINE DIAGRAM - DIST PNL 8PC
-
600A, 480Y/277V, 3PH, 4W, GND
PANEL PA
150A3P
NUUTRAL
GROUND
TO ATS ASEE E013
200A3P
ACA
250AMLO
225A, 480Y/277V, 3PH, 4W, GND
DISTRIBUTION PANEL "DPUPS"
50A3P
NUUTRAL
GROUND
125A3P
LUI125AMLO
400A, 208/120V, 3PH, 4W, GND
PANEL SFB
100A3P
NEUTRAL
GROUND
BB
125AMLO
250A3P
100A3P
DD
125AMLO
100A3P
FF
125AMLO
100A3P
HH
125AMLO
125A3P
400A, 208/120V, 3PH, 4W, GND
PANEL SFA
100A3P
NEUTRAL
GROUND
AA
125AMLO
250A3P
100A3P
CC
125AMLO
100A3P
EE
125AMLO
100A3P
GG
125AMLO
INPUT4#1/0, #1/0 GND2"C
3#6#10 GND1"C
5#1/0#8 GND2"C
3#1/0#1/0 GND1 1/2"C
5#300KCMIL#2 GND3"C
3#1/0#1/0 GND1 1/2"C
5#300KCMIL#2 GND3"C
45KVA480-120/208VHARMONICCANCELLATIONXFMR
75KVA480-120/208VHARMONICCANCELLATIONXFMR
75KVA480-120/208VHARMONICCANCELLATIONXFMR
ZZ ZZ ZZ
Y
S
S
S
BATTERYCABINET
UPS80KVA480Y/277VG.E.OFCI
S
N.C.
MBPNL
UPSMAINTENANCEBYPASSPANEL 150A,480Y/277V35KAIC3PH, 4WOFCI
N.O.
3PMBB
150A
K1K1 3P
150A
MIB3P150A
UIB
3#1/0#1/0 GND2"C
N.C.
NEUTRAL BUS
GROUND BUS
UPS INPUT3#3/0#1/0 GND2"C
UPS OUTPUT3#3/0#1/0 GND2"C
JB1
JB2
NEW3#1/0#1/0 GND2"C
JB3 JB42#143/4"C
K1
SKRU
PUSHBUTTON
CONTROLTRANSFORMER
600A, 480Y/277V, 3PH, 4W, GND
PANEL PB
200A3P
NUUTRAL
GROUND
TO ATS BSEE E013
ACB250AMLO
225A, 480Y/277V, 3P, 4W, GND, 65KAIC
MSPECA
3P60
3P15A
3P50A
NEUTRAL
GROUND
TO CONTROL PANEL FOR AHU IN VAULT BLDG
TO STARTER FOR FCU-SC-1 IN VAULT
TO VFD FOR CHILLED WATER PUMP IN CYCLOTRON MECH RM
3#121#12G3/4"C
3#81#10G3/4"C
3#81#10G3/4"C
Texas Registered Engineering Firm F-2113
Scale
Date
Designed By
Checked By
SSA Project Number
Drawing No.
2825 Wilcrest, Suite #350 Houston, Texas 77042
Ph. 713.780.7563 Fax.713.780.9209
Keyplan
NOT TO SCALE
8/2
2/2
01
9 1
0:4
7:3
8 A
MC
:\U
sers
\dnguye
n\D
ocum
ents
\109
5-0
57
-01_E
lec_R
19_dn
guyen
.rvt
E023
ONE-LINE DIAGRAMPANELS PA & PB
The University of TexasHealth Science Center at
Houston
MEDICALSCHOOL
BUILDING (MSB)
DBB
RBM/DDN
08/23/2019
1095-057-01
1095-057-01
No. Description Date
NOT TO SCALE1ONE LINE DIAGRAM - PANEL PA
NOT TO SCALE2ONE LINE DIAGRAM - PANEL PB
NOT TO SCALE3ONE LINE DIAGRAM - MSPECA
-
BUS5LA
100 70 70
PANEL5HA
225
5.24
1
5.24
3
5.24
5
100 225
PANEL5LA
5.60
2
5.60
8
5.61
2
5.61
6B
70 100 70 70
BUS4LA
100 70 70
4.23
7
4.24
1
4.24
3
PANEL4HA
100 225
4LAPANEL
150 100 705022570
4.23
5
4.61
0
4.60
6
4.61
2
4.60
0
3.23
3A
3.23
8B
3.23
4
100 100 70
PANEL3HA
100 225
3LAPANEL
3.60
0B
3.60
0A
3.60
4
3.60
6B
100 70
BUS3LA
225
3.60
6A
70 10070
2.23
4 PANEL2HA
100 225
2LAPANEL
225150 150 150 70
2.22
1C
2.23
6
2.23
8
BUS2LA
1.23
9
1.24
1
1.24
3
1HAPANEL
1LAPANEL
1.60
0A
1.60
0B
707022510070 100
1.23
7
70
100 225
225
225
5.62
2
5.62
6
5.63
0
70 70 70225
5LBPANEL
100
PANEL5HB
5.26
1
5.25
9
5.25
7
70 70 70
BUS5LB
100 100
4.62
8
4.62
4
4.63
2
4HBPANEL
4.25
3
4.25
5
4.25
7PANEL4LB
225 70100 7070 70 100
BUS4LB
70
4.62
0
70
4.25
9
BUS3LB
100 50 70
3.25
0
3.25
2B
3.25
2A 3HBPANEL
100 225
PANEL3LB
3.62
0
3.62
2B
3.62
2A
7070 100225
2HBPANEL
2.24
4
225
BUS2LB
225
100100
PANEL2LB
2.22
1A
70
3.62
8B
70
3.62
8A
50
1.24
7
1.24
9
1HBPANEL
10070
BUS1LB
225 70100 7070
1.62
4
1.62
0
1.61
6
1.61
2
1LBPANEL
100 100
706.
241
BUS6LA
6.60
8
6.60
4
6.60
0A
6.60
0B
6.24
5
6.24
3
100225
PANEL
225
6HAPANEL
70 70 50
6LA
70 70 7070
6.29
3B
6.23
3A
50
6.61
4
6.61
2
70 70
BUS7LA
100 100
PANELPANEL7HA 7LA
BUS7LB
100 100
PANEL7HB
PANEL7LB
70
7.25
3
7.25
5
7.25
7
70 70
BUS6LB
225 225
225
PANELPANEL6HB
7.26
1
7.25
9
70 70 100
6LB
7.61
8
7.62
0
100
7.62
6A
7.62
6B
7.63
2
70 7070
70
5.23
7
5.23
9
70
5.61
6A
50
3.61
2
70
1.60
4B
1.60
4A
7070
70
3.29
2
5.25
5B
5.25
5A
50 70
4.61
6
70
1.24
5
70
3.24
6
3.24
8
70 70
4.26
1
70
5.63
8
100
ROOF
7THFLOOR
6THFLOOR
5THFLOOR
4THFLOOR
3RDFLOOR
2NDFLOOR
1STFLOOR
CENTER TAP BOX (TYP.)225A PLUG-IN BUS