WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE MSB 1 PART 1 - GENERAL A. Provide labor, equipment and material to perform one-time preventive maintenance as described below. All work shall be performed continuously during the month of January/February. Contractor shall submit final report showing “as found” and “as left” conditions. Contractor is responsible for field verifying the location of all equipment before submitting pricing. B. Ensure equipment is properly de-energized isolated, properly grounded and properly locked and tagged out prior to performing, testing, and maintenance. C. All work shall be done in accordance with manufacturer instructions. D. Open all spare 480V cubicles, inspect and clean. See items below for more specific requirements. E. Notify owner’s representative immediately if any equipment calibration is unobtainable. F. All equipment outages will be coordinated through owner’s representative. Contractor will be introduced at onset of work. A minimum of 24 hours’ notice shall be required prior to any outage in the plant. G. A final test report will be submitted that includes verification of each item on this work scope. The report will include as foundand as leftcondition. Partial payment of invoice may be held until report is received and accepted. Report shall be structured and divided similar to this work scope. PART 2 - LOW VOLTAGE DRAWOUT SWITCHGEAR A. Breaker and Instrument Compartments. Periodic inspection of the circuit breaker is recommended at least once a year. More frequent inspections are recommended where severe load conditions, dust, moisture or other unfavorable conditions exist, or if the vital nature of the load warrants it. Always inspect the breaker after a short-circuit current has been interrupted Breakers Test for proper operation: Test and inspect all circuit breakers for proper operation as follows: a. Operate each breaker while in the TEST position and check all functions. This is particularly important for breakers that normally remain in either the opened or closed positions for long periods of time. WARNING: Primary equipment must be completely de-energized while tests on control circuits, etc. are being conducted. Be sure that all areas of feedback from secondary circuits, as well as outside sources, are disconnected. b. Remove the breakers from their compartments to a clean maintenance area. Close compartment door and cover the breaker cutout to prevent access to live parts. WARNING: De-energize equipment completely before doing maintenance work on any devices, connection, bus work, breaker, or feeder cable compartments. This

Upload: others

Post on 09-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    1

    PART 1 - GENERAL

    A. Provide labor, equipment and material to perform one-time preventive maintenance as described below. All work shall be performed continuously during the month of January/February. Contractor shall submit final report showing “as found” and “as left” conditions. Contractor is responsible for field verifying the location of all equipment before submitting pricing.

    B. Ensure equipment is properly de-energized isolated, properly grounded and properly locked and tagged out prior to performing, testing, and maintenance.

    C. All work shall be done in accordance with manufacturer instructions.

    D. Open all spare 480V cubicles, inspect and clean. See items below for more specific requirements.

    E. Notify owner’s representative immediately if any equipment calibration is unobtainable.

    F. All equipment outages will be coordinated through owner’s representative. Contractor will be introduced at onset of work. A minimum of 24 hours’ notice shall be required prior to any outage in the plant.

    G. A final test report will be submitted that includes verification of each item on this work scope. The report will include “as found” and “as left” condition. Partial payment of invoice may be held until report is received and accepted. Report shall be structured and divided similar to this work scope.

    PART 2 - LOW VOLTAGE DRAWOUT SWITCHGEAR

    A. Breaker and Instrument Compartments.

    Periodic inspection of the circuit breaker is recommended at least once a year. More frequent inspections are recommended where severe load conditions, dust, moisture or other unfavorable conditions exist, or if the vital nature of the load warrants it. Always inspect the breaker after a short-circuit current has been interrupted

    Breakers – Test for proper operation: Test and inspect all circuit breakers for proper operation as follows:

    a. Operate each breaker while in the TEST position and check all functions. This is particularly important for breakers that normally remain in either the opened or closed positions for long periods of time.

    WARNING: Primary equipment must be completely de-energized while tests on control circuits, etc. are being conducted. Be sure that all areas of feedback from secondary circuits, as well as outside sources, are disconnected.

    b. Remove the breakers from their compartments to a clean maintenance area. Close compartment door and cover the breaker cutout to prevent access to live parts.

    WARNING: De-energize equipment completely before doing maintenance work on any devices, connection, bus work, breaker, or feeder cable compartments. This

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    2

    includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.

    B. Checks After Breaker is De-energized.

    At the time of inspection, the following checks should be made after the breaker has been de-energized:

    Manually operate the breaker several times, checking for obstructions or excessive friction. Manual closing of an electronically operated breaker may be performed by the following steps:

    a. To charge the mechanism springs, pull the operating handle down until it stops (about 900) ten times for the EntelliGuard breaker. The charge indicator will show CHARGED on a yellow background.

    b. Depress the CLOSE button on the front of the breaker. The springs should discharge and, if the latch is properly reset, the breaker will close.

    Electrically operate the breaker several times to check performance of the electrical accessories.

    Visually check the breaker for loose hardware on the breaker; also, check the bottom of the compartment for any hardware that has fallen from the breaker.

    Remove and inspect the arc quenchers and contacts for breakage or excessive burning.

    The performance of the solid-state current trip devices may be checked with a suitable

    test set. Check electro-mechanical devices for positive trip in accordance with the instructions in the proper Maintenance Manuel.

    Check insulating parts for evidence of overheating and for cracks that indicate excessive

    thermal aging.

    Lubrication: In general, the circuit breaker requires moderate lubrication. Bearing points and sliding surfaces should be lubricated at the regular inspection periods with a thin film of manufacturer approved lubricant. Before lubricating, remove any hardened grease and dirt from the latch and bearing surfaces with mineral spirits then wipe with a clean rag.

    CAUTION: All excess lubricant should be removed with a clean cloth to avoid accumulation of dirt or dust.

    On draw-out breakers, the contact surface of the disconnect fingers should be cleaned

    and greased with manufacturer approved lubricant.

    C. Instruments, Instrument Transformers, and Relays

    Check and inspect all devices to see that they are functioning properly. Check that all electrical connections are tight. Check mounting of the device.

    Under normal conditions, the protective relays do not operate; therefore, it is important to check the operation of these devices regularly. Refer to Relay Instruction Books for detailed instruction.

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    3

    Breaker Compartment Interiors

    WARNING: De-energize equipment completely before doing maintenance work in compartments. This includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.

    Thoroughly clean the interior of the breaker and instrument compartments. Use a vacuum cleaner and clean rags only. Do not use steel wool or oxide papers. Blowing with compressed air is not recommended.

    Check indicating devices, mechanical and key interlocks.

    Check primary disconnecting device contacts for signs of abnormal wear or overheating. Discoloration of the silvered surfaces is not ordinarily harmful. These contacts should be cleaned only by wiping with a lint-free cloth.

    Clean the racking mechanism and lubricate with manufacturer approved lubricant.

    Before replacing the breaker, wipe off the primary disconnecting device contacts. Apply

    a thin coat of manufacturer approved lubricant to the stationary studs and to the primary disconnects on the breaker.

    D. Bus Area

    WARNING: De-energize equipment completely before doing maintenance work on any devices, connections, bus work, breaker or feeder cable compartments. This includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.

    Inspect the buses and connections carefully for evidence of overheating or weakening of the insulating supports. If bus insulation is present, remove the molded covers over the main bus connection to expose joints for inspection.

    Check all connection bolts in the bus compartment and all bracing bolts for tightness.

    Vacuum and, with a clean rag, wipe the buses and supports.

    Visually inspect the insulation on the bars that run from the breaker studs through the bus structure to the cable area.

    After cleaning, megger and record the resistance to ground and between phases of all

    insulated bars and all buses and connections. Disconnect all control circuits before checking resistance. Do not use over a 1500-volt megger. Since definite limits cannot be given for satisfactory insulation resistance values, a record must be kept of the readings.

    E. Cable and Busway Compartment Inspect and check the cable and busway compartment as follows:

    Inspect all power cable connections for signs of overheating and tighten all connections. If severe discoloration or if damage is apparent, remove the damaged portion of the cable.

    CAUTION: Be sure the condition which caused the over-heating has been corrected before energizing.

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    4

    Check all bolts that hold cable terminals to the connection bars for tightness.

    Check the neutral bus and ground bus connection and mounting bolts for tightness.

    Check that all secondary control wiring connections are tight and that all control cabling is

    intact.

    F. Overall Switchgear

    Make the following checks on the complete switchgear equipment.

    Clean and inspect all painted surfaces and retouch where necessary.

    Check to see that all anchor bolts and other structural bolts are tight.

    Check that all breaker and instrument compartment door latches operate properly.

    If the switchgear is equipped with heaters, check to see that all heaters are energized and operating.

    For exterior vent opening in equipment furnished with air filters, the foam filter elements

    should be removed and washed in warm soapy water, rinsed and reassembled at least annually. Elements should be inspected before re-assembly and replaced if any signs of deterioration are evident.

    G. Circuit Breaker Lifting Mechanism

    Under normal conditions, no special maintenance procedures or lubrication is required for this device. If the cable is abraided under any condition, it should be inspected for broken strands or other damage and replaced if necessary.

    H. Torque all bolted connections to manufacturing specifications.

    SWITCHGEAR LIST:

    USHGA/B – GROUND FLOOR

    PART 3 - SWITCHBOARDS

    A. Bus Compartment

    WARNING: De-energize equipment completely before doing maintenance work in compartments. This includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.

    Inspect and check the bus area as follows:

    Inspect the buses and connections carefully for evidence of overheating or weakening of the insulating supports.

    Check all connection bolts in the bus compartment and all bracing bolts for tightness.

    Vacuum and, with a clean rag, wipe the busses and supports.

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    5

    Visually inspect the insulation on the bars that run from the breaker studs through the bus

    structure to the cable area.

    After cleaning, megger and record the resistance to the ground and between phases of all insulated bars and all buses and connections. Disconnect all control circuits before checking resistance. Do not use over a 1500-volt megger. Since definite limits cannot be given for satisfactory insulation resistance values, a record must be kept in the readings.

    Weakening of the insulation from one maintenance period to the next can be recognized from the recorded readings. The readings should be taken under similar conditions each time, if possible, and the record should include the ambient temperature and humidity.

    B. Cable Compartment

    Inspect and check the cable and busway compartment as follows:

    Inspect all power cable connections for signs of overheating and tighten all connections. If severe discoloration or if damage is apparent, remove the damaged portion of the cable.

    CAUTION: Be sure the condition which caused the overheating has been corrected before energizing.

    Check all bolts that hold cable terminals to the connection bars for tightness.

    Check the neutral bus and ground bus connection and mounting bolts for tightness.

    Check that all secondary control wiring connections are tight and that all control cabling is

    intact.

    C. Breaker and Switch Compartment

    WARNING: De-energize equipment completely before doing maintenance work in compartments. This includes de-energizing any connections to outside primary or secondary sources, such as transformers, tie lines, etc.

    Inspect and check the device compartments as follows:

    Thoroughly clean the interior of the breaker and instrument compartments. Use vacuum

    clean rags only. Do not use steel wool or oxide papers. Blowing with compressed air is not recommended.

    Check indicating devices, mechanical and key interlocks.

    Check primary disconnecting device contacts on drawout devices for signs of abnormal wear or overheating. Discoloration of the silvered surfaces is not ordinarily harmful. These contacts should be cleaned only by wiping with a lint-free cloth.

    Clean the racking mechanism and lubricate with manufacturer approved lubricant.

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    6

    Before replacing the drawout breaker, wipe off the primary disconnect contacts. Apply a thin coat of manufacturer approved lubricant to the equipment stabs and to the primary disconnect fingers on the breaker.

    Operate each drawout breaker while in the TEST position to be sure it functions properly.

    This is particularly important for breakers that normally remain in either the opened or closed positions for long periods of time.

    D. Metering and Control Devices

    1. Check and inspect all devices to see that they are functioning properly. Check that all electrical connections are tight. Check mounting of the device. Under normal conditions, the protective relays do not operate; therefore, it is important to check the operation of these devices regularly.

    E. Overall Equipment

    Make the following checks on the complete switchgear equipment:

    Clean and inspect all painted surfaces and retouch where necessary.

    Check to see that all anchor bolts and other structural bolts are tight.

    Check that all breaker and instrument compartment door latches operate properly.

    If the switchboard is equipped with heaters, check to see that all heaters are energized and operating.

    For exterior vent opening in equipment furnished with air filters, the foam filter elements

    should be removed and washed in warm soapy water, rinsed, and reassembled at least annually. Elements should be inspected before reassembly and replaced if any signs of deterioration are evident.

    F. Breaker Lifting mechanism (Hoist)

    Under normal conditions, no special maintenance procedures or lubrication is required for this device. If the cable is abraided under any condition, it should be inspected for broken strands or other damage and replaced if necessary.

    G. Ambient Temperatures and Circuit Loading

    Switchboards are designed for installation where average ambient temperature will not exceed 40 degrees Celsius (104 degrees Fahrenheit). For higher temperatures, derating may be required. The conductor temperatures within the enclosure may be as high as 105 degrees C (220 Degrees F). Some parts of breakers, switches, and fuses may run hotter. Refer to the NEMA or UL standards for those devices and for switchboards for their maximum allowable or anticipated temperature rises above ambient.

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    7

    H. Short Circuits

    Normally, the overcurrent protective device on the circuit will prevent any electrical damage except at the actual point of short-circuit. A thorough inspection of the entire system after any fault current should be made to ensure that there has been no mechanical damage to the conductors, insulation or equipment.

    In addition, the individual overcurrent protective device or devices which performed the short-circuit interruption MUST be inspected for possible arcing damage to contacts, arc chutes and/or insulation. Do not open sealed devices such as breaker trip units. If there is any possibility that sealed units may have been damaged, they should be replaced.

    I. Arcing damage kk

    Some organic insulating materials carbonize when subjected to the heat of an electrical arc and lose their insulating qualities. Any insulation found to be carbon tracked must be replaced before applying power.

    J. Bolt torque for electrical joints

    Torque all bolted connections per manufacturer’s specification.

    SWITCHBOARDS LIST:

    SWBD ESB1-A, SWBD ESB1-B, SWBD ESB2-A, SWBD ESB2-B, SWBD USHBA, SWBD USHBB

    PART 4 - PANELBOARDS

    A. Accumulation of Dust and Dirt:

    If there is an accumulation of dust and dirt, clean out the panelboard by using a brush, vacuum cleaner, or clean lint-free rags. Avoid blowing dust into circuit breakers or other components. Do not use a blower or compressed air.

    1. Carefully inspect all visible electrical joints and terminals in the bus and wiring system.

    2. Visually check all conductors and connections to be certain that they are clean and

    secure. Loose and/or contaminated connections increase electrical resistance which can cause overheating. Such overheating is indicated by discoloration or flaking of insulated and/or metal parts. Pitting or melting of connecting surfaces is a sign of arcing due to a loose or otherwise poor connection. Parts which show evidence of overheating or looseness should be cleaned and re-torqued or replaced if damaged. Tighten bolts and nuts at bus joints to manufacturer’s torque specification.

    B. Proper Ampere, Voltage , And Interrupting Ratings

    1. Check circuit breakers, switches and fuses to ensure they have the proper ampere, voltage and interrupting ratings. Ensure that non-current-limiting devices are not used as replacements for current-limiting devices. Never attempt to defeat rejection mechanisms which are provided to prevent the installation of the incorrect class of fuse.

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    8

    C. Mechanisms Free and In Proper Working Order

    1. Operate each switch or circuit breaker several times to ensure that all mechanisms are free and in proper working order. Replace as required. See NEMA-AB-4 for maintenance of molded case circuit breakers.

    D. Operation of All Mechanical Components

    1. Exercise switch operating mechanisms and external operators for circuit breakers to determine that they operate freely to their full on and off positions.

    2. Check the integrity of all electrical and mechanical interlocks and padlocking mechanisms. For key interlocked systems, ensure that only the required numbers of keys are accessible to the operator.

    3. Whenever practical, check all devices for missing or broken parts, proper spring tension, free movement, corrosion, dirt, and excessive wear.

    4. Adjust, clean and lubricate or replace parts according to the manufacturer’s instructions.

    5. Use clean nonmetallic light grease or oil as instructed.

    6. Do not oil or grease parts of molded case circuit breakers.

    7. If no instructions are given on the devices, sliding copper contacts, operating mechanisms, and interlocks may be lubricated with clean, light grease.

    8. Wipe off excess lubrication to avoid contamination.

    CAUTION: Hydrocarbon spray propellants and hydrocarbon based sprays or compounds will cause degradation of certain plastics. Contact the panelboard manufacturer before using these products to clean, dry, or lubricate panelboard components during installation or maintenance.

    9. Clean and dress readily accessible copper electrical contacts, blades and jaws according to the manufacturer’s instructions when inspection indicates the need.

    E. Damaged Insulating Material and Assemblies

    Look for and replace damaged insulating material and assemblies where sealing compounds have deteriorated.

    F. Moisture or signs of previous wetness or dripping

    Look for any moisture or signs of previous wetness or dripping inside the cabinet.

    NOTE: Condensation in conduits or dripping from outside sources is one known cause of panelboard malfunction.

    1. Seal off any conduits which have dripped condensate and provide means for further condensate to drain away from the panelboard.

    2. Seal off any cracks or openings which have allowed moisture to enter the enclosure. Eliminate the source of any dripping on the enclosure and any other source of moisture.

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    9

    3. Replace or thoroughly dry and clean any insulating material, which is damp or wet or shows an accumulation of deposited material from previous wettings.

    4. Inspect all component devices. Replace any component device which shows evidence of moisture damage or has been subjected to water damage or flooding. Additional information may be found in the NEMA document “Guidelines For Handling Water Damaged Electrical Products”

    G. Before Cleanup and Corrective Action Is Attempted

    In the event of water damage, e.g., flooding or sprinkler discharge, the manufacturer should be consulted before cleanup and corrective action is attempted.

    H. Severe Electrical Short Circuit

    If a severe electrical short circuit has occurred, the excessive currents may have resulted in structural component and/or bus and conductor damage due to mechanical distortion, thermal damage, metal deposits, or smoke. Examine all devices and bus supports for cracks or breakage. The manufacturer should be consulted before cleanup and correction is attempted.

    I. Ground Fault Protection System

    Test the ground fault protection system (if furnished) in accordance with the manufacturer’s instructions. See Section 230.95 of the National Electrical Code and NEMA PB 2.2 Application Guide for Ground Fault Protective Devices for Equipment.

    PANELBOARDS LIST:

    See one-line diagrams.

    PART 5 - AUTOMATIC TRANSFER SWITCHES

    A. Interior Wiring and Components:

    Visual inspection of all wiring and connections for signs of tracking, overheating and insulation deterioration.

    Check and tighten, where necessary, all control circuit wiring terminals.

    Check manual switches and relays for contact continuity.

    Check all common and ground wires. Measure and record resistance to ground readings. Ohms

    Check lug connections and mounting hardware.

    B. Mechanical Checks:

    The following inspection can only be done when the ATS has all power removed from the switch (complete shutdown):

    Tighten all bus connections (Normal, Emergency & Load). Inspect Main contacts (clean & burnish where necessary). Inspect Arcing contacts (clean & burnish where necessary). Inspect Relay Finger contacts (clean & burnish where necessary).

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    10

    Inspect Auxiliary contacts (clean & burnish where necessary). Check length of linkage. Check motor mounting hardware. Check heim joints. Check interlock rod. Check handle bracket for free movement. Lubricate all necessary mechanical parts.

    C. Timer Setup:

    Check and record all time delay settings: TD1 TD2 TD3 AUT TDBT TDMI TETD TNTD Others

    D. Check and record Normal and Emergency Source Voltages

    Normal Voltage:

    A-B B-C C-A Rotation

    A-N B-N C-N

    Emergency Voltage:

    A-B B-C C-A Rotation Hz

    A-N B-N C-N

    Engine Battery VDC

    E. Check Normal and emergency Sensing Voltages

    Check normal voltage sensing Corrected pick-up and dropout Pick-up and drop-out Settings. Settings.

    B1 – P.U. D.O. B1 – P.U. D.O.

    B2 – P.U. D.O. B2 – P.U. D.O.

    B3 – P.U. D.O. B3 – P.U. D.O.

    Emergency source voltage sensing pick-up:

    Relays and other devices:

    F. Verify the following functions

    Engine Start Signal

    Transfer to Emergency

    Transfer to Normal

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    11

    Load Test

    Miscellaneous Functions (review accessory sheet and list/test additional functions below):

    G. Infrared Test

    With an ambient rise infrared heat scanner or tracker, check for ambient rise on energized main contacts, bus work and cable lugs (preferably at full load conditions).

    Pass Fail

    H. Enclosure

    Wipe down and touch up minor exterior scratches.

    Clean interior of enclosure and remove accumulated dust and/or dirt.

    Check door closure, locking bars and mechanism for proper

    I. Miscellaneous (ATS Section)

    Note any corrective actions taken.

    Report unsafe conditions.

    Report recommendations for replacement of major components.

    RTB CHECKOUT (Bypass and Isolation type ATS only) (Write N/A on the check-off line if not an "RTB")

    J. Interior Wiring and Components:

    Visual inspection of all wiring and connections for signs of tracking, overheating, and insulation deterioration.

    Check and tighten, where necessary, all control circuit wiring terminals.

    Check manual switches and relays for contact continuity.

    Check all common and ground wires. Measure and record resistance to ground readings. Ohms

    Check lug connections and mounting hardware.

    K. Mechanical Checks:

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    12

    The following inspection can only be done when the ATS has all power removed from the switch (complete shutdown):

    Check all mounting hardware. Tighten all bus connections (normal, emergency & load). Inspect Auxiliary contacts (clean & burnish where necessary). Inspect Main contacts (clean & burnish where necessary). Check operation of bypass handle. Check operation of isolation handle. Check all finger clusters on the ATS rollout for tightness and overheating (clean & burnish

    where necessary). Check heim joints. Lubricate all necessary mechanical parts.

    L. Verify the following Functions/Lights:

    Verify amber light (LT1) is operational (normal power available). Verify Bypass to Normal operation. Verify blue light (LT3) is constant when load is bypassed to normal. Verify isolation of the "ATS" when load is bypassed to normal. Verify blue light (LT3) is flashing when load is bypassed to Normal and the switch is isolated. Verify amber light (LT2) is operational (emergency. power available). Verify bypass to emergency operation. Verify blue light (LT4) is constant when load is bypassed to emergency. Verify Isolation of the "ATS" when load is bypassed to emergency. Verify blue light (LT4) is flashing when load is bypassed to emergency and the switch is

    isolated.

    M. Miscellaneous (RTB Section)

    Note any corrective actions taken.

    Report unsafe conditions.

    Report recommendations for replacement of major components.

    ATS LIST: SECOND FLOOR - ATS ETSP PENTHOUSE - ATS A, ATS B,

    PART 6 - 600V FEEDER CABLES

    A. Megger cables at 1000 VDC.

    B. Visual and Mechanical Inspection

    C. Inspect exposed sections of cables for physical damage.

    D. Inspect bolted electrical connections for high resistance.

    E. Inspect compression-applied connections for correct cable match and identification.

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    13

    F. Inspect shielding and grounding, cable supports, and terminations.

    G. Perform a shield-continuity test on each power cable.

    H. Verify tightness of accessible bolted electrical connections by calibrated torque wrench they shall be in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.12 in ANSI/NETA std. publication.

    PART 7 - DRY-TYPE TRANSFORMERS

    A. Clean and inspect insulators, bushings and windings. Inspect anchorage, alignment, and grounding. Inspect bolted electrical connections for high resistance.

    B. Perform a Double insulation test.

    C. Verify tightness of accessible bolted electrical connections by calibrated torque wrench they shall be in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.12 in ANSI/NETA std. publication.

    TRANSFORMER LIST:

    XF2-00894 (XFMR LOAD BANK SWGR), XFMR BLXA, XFMR BLXA1, XFMR BLXAA, XFMR ET2A, XFMR ET2C, XFMR ET2D, XFMR ET2E, XFMR ET2F, XFMR ET3B, XFMR GLXA, XFMR GLXB, XFMR GLXD, XFMR PL, XFMR FP, XFMR USHBA, XFMR USHBB

    PART 8 - LIQUID FILLED TRANSFORMERS

    A. Oil Temperature Gauge

    Verify gauge calibration.

    2. Verify and clean the oil temperature gauge.

    B. Tank and Radiators

    1. Clean the heat dissipation surface.

    2. Apply painting where necessary.

    3. Tighten all vibrating parts per manufacturer recommendations.

    4. Check radiator valve operation.

    C. Oil Level Gauge

    Clean the mask.

    Fill with oil if level is under the normal level

    D. Insulating Liquid

    Perform Dissolved gas analysis (ANSI C57-104)

  • WORK REQUIREMENTS UTRP ELECTRICAL PREVENTATIVE MAINTENANCE – MSB

    14

    Perform Dielectric Strength (ASTM D-1816)

    Check water content (ASTM D-1533 and ANSI C57-106).

    TRANSFORMER LIST:

    XFMR USHGA, XFMR USHGB, XFMR USHXA

    PART 9 - POWER/MOLDED CASE BREAKERS

    A. Clean and inspect each breaker and cubicle.

    B. Perform a primary current injection test to verify trip points (This is required for electronic trip breakers rated from 400 amps to 3200 amps) for long-time and short-time ranges.

    C. Perform a contact resistance test.

    D. Other standard tests. Follow all ANSI/NETA standardized test methods.

    Verify tightness of accessible bolted electrical connections by calibrated torque wrench they shall be in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.12 in ANSI/NETA std. publication. Tightness shall be verified for line and load connections

    PART 10 - VFD’S

    A. Inspect and clean. No testing.

    B. Verify tightness of accessible bolted electrical connections by calibrated torque wrench. This shall be in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.12 in ANSI/NETA std. publication.

    VFD LIST:

    Basement – CHWP-1, Condensate return pump, MRAP-1, MRAB-2, MACB-3, MACB-4, MACB-5, MACB-6,

    Ground Floor – MACF-2, MACG-1, MACG-2, MACF-1, MRAGF-1, MRAGF-2

    First Floor – MACF-3

    Penthouse – AHU-1A, AHU-1B, AHU-2A, AHU-2B

    PART 11 - INFRARED SURVEY

    A. Perform infrared survey during January/February of 2020 for all connections for all of the equipment noted above. Survey shall be for all terminations and Busing while equipment is energized with normal building loads.

  • 52

    5,000 KVA34.5 KV-4.16Y/2.4 KV

    CNP34.5 KV CKT.

    52

    N.O.

    SERVICE NO. 2

    4.16Y/2.4 KV34.5 KV-5,000 KVA

    34.5 KV CKT.CNP

    52

    250MVA1200A

    1200A250MVA

    FP-A

    1200A BUS

    MSB

    250MVA1200A

    SERVICE NO. 1

    MSA

    MSWGRA

    2-4"C EA/W3-500KCMIL, 8KVSHIELDED1#3/0 600V GND1-4"C SPARE

    2-4"C EA/W3-500KCMIL, 8KVSHIELDED1#3/0 600V GND1-4"C SPARE

    K1

    MSWGRB

    CNP

    UTHSC

    1200A250MVA

    1200A250MVA

    1200A250MVA

    52

    1200A250MVA

    1200A250MVA

    1200A250MVA

    1200A250MVA

    1200A250MVA

    1200A250MVA

    EQUIPPEDSPACE

    VAULT BLDGAT GRADE

    PENTHOUSE

    5KV, 1200A, 3PH, 3W, 250MVA -LOCATED IN PENTHOUSE - SEE E201 FOR LOCATION. SWITCHGEAR IS EATON G.O. MHU03549.PSWGRA/B

    SEE DETAILEDONE LINE DIAGRAMON E011

    TOFIREPUMPXFMRSEE E035

    TIEN.O.

    K

    USLB - A/B, 208Y/120V - PENTHOUSE

    USHC - A/B, 480Y/277V - PENTHOUSE

    USHBA, 480Y/277V

    USHGA-SW2,480Y/277V

    SEE DETAILEDONE-LINE DIAGRAMON E013

    SEE DETAILEDONE-LINE DIAGRAMON E014

    3#1/0MV-105 SHLD133%1#2 600V GND4"C

    USHGB

    N.C.SW2

    N.O.SW2

    N.C.SW1

    N.O.SW2

    N.O.SW2

    N.C.SW1

    3#1/0MV-105 SHLD133%1#2 600V GND4"C

    3#1/0MV-105 SHLD133%1#2 600V GND4"C

    USHBB, 480Y/277V

    SPARE

    TO 5KVPARALLELINGSWGR PSESEE E012

    3-500KCMIL,SHLD133%1#1/0 600V GND4"C

    1200A250MVASPARE

    3#4/0MV-105 SHLD133%1#2 600V GND4"C

    SPARESPARE

    3-250KCMILMV-105 SHLD133%1#2 600V GND4"C

    SPARE

    3#4/0MV-105 SHLD133%1#2 600V GND4"C

    3-250KCMILMV-105 SHLD133%1#2 600V GND4"C

    3#1/0MV-105 SHLD133%1#2 600V GND4"C

    3#4/0MV-105 SHLD133%1#2 600V GND4"C

    1A 1B 2A 2B 3A 3B

    SPARE EQUIPPEDSPACE

    EQUIPPEDSPACE

    4A 4B

    1200A250MVA

    5A 5B

    1200A250MVA

    1200A250MVASPARE

    9A 9B

    1200A250MVA

    EQUIPPEDSPACE

    10B10A 11B11A 12B12A 13B13A

    MSA2

    250MVA1200A

    K

    PSWGRA PSWGRB

    1200A250MVA

    MSB2

    K

    TO SWGR PSESEE E012

    USHXAGROUND FLOOR

    3#4/0MV-1054"C

    1200A250MVA

    JBOX

    1200A250MVA

    6B 8B

    SEE DETAILEDONE-LINE DIAGRAMON E030

    SEE DETAILEDONE LINE DIAGRAMON E035

    SEE DETAILEDONE-LINE DIAGRAMON E037

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    6:1

    8 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E010

    5KV OVERALL ONE LINEDIAGRAM

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE15KV OVERALL ONE LINE DIAGRAM

    No. Description Date

  • 3

    3

    3

    3

    3

    3

    1200A250MVA

    1200A BUS

    3333

    100/5 100/5 100/5

    1200A

    100/5

    250MVA1200A

    250MVA

    1200A250MVA

    100/5

    600/5

    600/5

    3

    1200A250MVA

    100/5

    3600/5

    600/5

    100/5

    600/5

    600/5

    100/5

    100/5

    1200A

    600/5

    600/5

    3

    250MVA1200A

    3

    250MVA

    100/5 100/5

    3600/5

    3600/5

    1200A250MVA

    100/5

    600/53

    250MVA1200A

    600/53

    3

    3

    600/5

    600/5

    100/5 100/5

    200/5

    1200A

    3

    250MVA

    1200A250MVA

    100/5 100/5

    1200A BUS

    250MVA1200A

    1200A250MVA

    3600/5

    3600/5

    3

    3

    600/5

    600/5

    100/5 100/5

    PSWGRB

    12A11A10A9A 13A

    2A 3A 4A 5A

    R

    5150

    R

    G

    CS86

    5150

    R

    R

    G

    CS86

    G

    R

    5051

    86CS

    R

    G86

    CS

    R

    5051

    R

    5150

    R

    RG86

    CS

    R

    86R

    CS

    G

    5150

    R

    5051

    G86

    R

    CS

    R

    86G

    CS

    5051

    R

    CS

    R

    5051

    G86

    R

    5150

    R

    RG86

    CS

    R

    R

    CS

    G

    5150

    86

    86RG

    50

    R51

    CS

    R

    86

    51

    G

    50

    CS

    R

    RG

    5051

    R

    CS86

    R

    51

    CS

    RG86

    50

    G R

    50

    R51

    CS86

    R

    51

    CS

    86G R

    50

    RG

    5051

    R

    86CS

    R

    51

    G86

    50

    CS

    R

    48VDC CONTROL BUS

    GROUND BUS

    FROM 48VDCBATTERYPANEL DCBN-1

    VT-24200-120V

    -

    TYP

    TO MSWGRA(SEE E010)

    4.16KV METAL-CLAD SWITCHGEAR250MVA, 10,717A SYM AVAILABLE

    PDS

    9B 10B 11B 12B

    2B 3B 4B 5B

    R

    SPACEEQUIPEQUIP

    SPACE

    EQUIPSPACE

    48VDC CONTROL BUS 48VDC CONTROL BUS

    FROM 48VDCBATTERYPANEL DCBS-1

    FROM 48VDC BATTERY PANEL DCBS-2

    FROM 48VDCBATTERYPANEL DCBS-3

    48VDC CONTROL BUS

    FROM 48VDCBATTERYPANEL DCBN-2

    48VDC CONTROL BUS

    MSB2SW1USHBBN-SP3

    S-SP3 S-SP4 USHBA SW2USHGA-

    USHGA-

    DM

    1200/5

    TIEN.O.

    1200A250MVA

    FROM 48VDCBATTERYPANEL DCBN-3

    3

    100/5

    100/5

    1200A

    3600/5

    600/5

    250MVA

    5150

    86

    R

    5150

    86

    R

    G R

    CS

    R

    CS

    G

    GROUND BUS

    48VDC CONTROL BUS

    1200A BUS

    SPACEEQUIPN-SP4

    48VDC CONTROL BUS

    GROUND BUS

    VT-14200-120V

    -

    1200A250MVA

    13B

    48VDC CONTROL BUS

    200/5

    1200A

    3

    1200/5

    250MVA

    5150

    86

    R

    K1

    GROUND BUS

    MSA2

    DM1

    1A

    1B

    RG

    CS

    CPT-15KVA4200-120V/240V

    PANELLS2

    K1

    TO MSWGRBMSB-SEE E010

    GROUND BUS GROUND BUSGROUND BUS

    48VDC CONTROL BUS

    R

    LS2-1

    1200A BUS

    PSWGRA4.16KV METAL-CLAD SWITCHGEAR250MVA, 10,717A SYM AVAILABLEEATON G.O. MHU03549

    LS2-2

    K1

    120V BUS

    LS2-3 LS2-5 LS2-7 LS2-9 LS2-11

    LS2-4 LS2-6 LS2-8 LS2-10 LS2-12 LS2-14

    ATS

    SE

    E B

    ELO

    W F

    OR

    CO

    NT

    INU

    AT

    ION

    SE

    E A

    BO

    VE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N

    CPT-25KVA4200-120V/240V

    R

    CS

    G

    3 2

    3 2

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    DM

    TOSUBSTATIONUSHC-ASEE E013

    1200A250MVA

    5150

    G

    5150

    G5150

    G5150

    G5150

    G5150

    G

    5150

    G5150

    G5150

    G5150

    G5150

    G

    5150

    G 5150

    G 5150

    G5150

    G5150

    G

    5150

    G 5150

    G5150

    G5150

    G 5150

    G

    5150

    G

    TOUSHGA-SW1SEE E030

    TOUSHBBSEE E037

    TOUSHBASEE E037

    TOUSHGA-SW2SEE E030

    TO SUBSTATIONUSHC-BSEE E013

    1200A250MVA

    TO PSESEE E012

    SPARE SPARE SPARE

    TO USLB-ASEE E014

    TO USLB-BSEE E014

    SPARE SPARE SPARE SPARE

    5150

    TO CT'S AT USHCSECONDARY

    5150

    TO CT'S AT USLBSECONDARY

    5150

    TO CT'S AT USHCSECONDARY

    5150

    TO CT'SAT USLBSECONDARY

    USHBA USHGA-SW1

    SPACE

    USHGA-SW2USHBB

    36" (TYP)

    1A 2A 3A 4A 5A 6A 13A12A11A10A9A

    1B 2B 3B 4B 5B 6B 9B 10B 11B 13B112B

    SPACE

    MAIN BRKMSA

    MAIN BRKMSB

    TIEBREAKER

    VT-1,2 VT-3,4

    8A

    8B

    S-SP3EQUIPPEDSPACE

    S-SP4EQUIPPEDSPACE

    N-SP3EQUIPPEDSPACE

    CPT-2PNL LS2

    7A

    7B

    36" (TYP)

    39'-0"

    3 1/2"PAD

    FINISHEDFLOOR

    PSWGRA PSWGRB

    SPARE

    USHC-A

    SPARE PSE PFCC-A (400kVAR) USLB-A USLB-B

    USHC-B

    SPARE SPARE SPARE

    N-SP4EQUIPPEDSPACE

    PFCC-B (400kVAR)

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    6:2

    4 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E011

    5KV SWGR PSWGRA ANDPSWGRB

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE1

    MAIN 5KV SWGR PSWGRA ANDPSWGRB - ONE LINE DIAGRAM

    NOT TO SCALE2

    MAIN 5KV SWGR PSWGRA ANDPSWGRB - FRONT ELEVATION

    No. Description Date

  • MAIN BUS

    DM

    GEN 3

    PARALLELING SWITCHGEAR PSE5KV, 1200A, 3PHASE, 3WIRE W/GND,250MVALOCATED IN PENTHOUSE -SEE E201

    GEN 11#4/0

    DM

    GEN 2

    DM

    800KW0.8PF4160Y/2400VNATURAL GAS GENSETCUMMINS

    800KW0.8PF4160Y/2400VNATURAL GAS GENSETCUMMINS

    750KW0.8PF4160Y/2400VNATURAL GAS GENSETCUMMINS

    2 2

    4200-120V

    2

    4200-120V

    DM

    2

    4200-120V

    NORMAL MAIN POWER FEED FROM MAIN SWITCHGEAR - PSWGRSEE E011

    750KVA4.16KV-480Y/277V

    LOAD BANK750KW,480V NEMA 3RON ROOFSEE E201

    3#2/0,MV-105 5KV133% SHLD,1#2 600V GND3"C

    4-3"C EA/W3-350KCMIL#3/0 GND

    #4/01"C

    3-3KVMOV2.55KVMCOV

    TO GND BARIN PSE SWGRRM

    3#2/0MV-105 5KV133% SHLD,1#2 600V GND3"C

    3#2/0MV-105 5KV133% SHLD,1#2 600V GND3"C

    3#2/0MV-105 5KV133% SHLD,1#2 600V GND3"C

    1#4/0 1#4/0

    EQUIPPEDSPACE

    3#4/0MV-105 5KV133% SHLD,1#1 600V GND3 1/2"C

    1600AS1600AF

    1200ATLSIG

    N.O1200A52

    N.C1200A52

    N.C1200A52

    N.C1200A52

    N.C52N.O

    1200A52N.O1200A52

    N.O1200A52

    GROUND BUS

    3-500KCMILMV-105 5KV133% SHLD,1#1/0 600V GND4"C

    3#4/0MV-105 5KV133% SHLD,1#1 600V GND3 1/2"C

    3#2/0MV-105 5KV133% SHLD,1#2 600V GND3"C

    FROM USHGBSEE E010

    1000/1150KVA4.16KV-480Y/277V

    1600AS1600AF

    1600ATLIG

    800AS800AF

    400ATLIG

    SWGR USHXA1600A,480Y/277V3PH,4W, 65KAICGROUND FLOOR

    N.O.N.C.

    3#4/05KV1#2 GND4"C

    4200-120V

    1200A

    N.O.TIE52 BUS

    VT4200-120V

    GEN 1 GEN 2 GEN 3MAINNORMAL1200A

    MAINMAINMAIN

    1500KVA4.16KV-480Y/277V

    TO GND BARIN PSE SWGRRM

    #4/01"C

    1500KVA4.16KV-480Y/277V

    EQUIPPEDSPACE

    CUBICLE 1 CUBICLE 2 CUBICLE 3 CUBICLE 4 TRANSITION CUBICLE 5 CUBICLE 6

    SWGR USHXB-A/B3200A,480Y/277V3PH,4W, 65KAICSEE E015

    CUBICLE 7 CUBICLE 8

    TO RELAY IN PSESEE E012

    3

    1600:5

    PULLBOX IN7TH FLOOR CHASESEE E206

    3#4/0MV-105 5KV133% SHLD,1#2 600V GND IN 4"C

    3-3KVMOV2.55KVMCOV

    3-3KVMOV2.55KVMCOV

    SWGR LB3200A,480Y/277V3PH,4W, 65KAICSEE E0

    SEE DETAILEDONE LINE DIAGRAMON E035

    SEE DETAILEDONE LINE DIAGRAMON E015

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    6:3

    1 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E012

    NEW 5KV PARALLELINGSWITCHGEAR PSE

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NO SCALE1NEW 5KV PARALLELING SWITCHGEAR PSE

    SEQUENCE OF OPERATION FOR PSE

    A. NORMAL/ EMERGENCY

    1. UNDER NORMAL CONDITIONS, THE NORMAL POWER FEEDER PROVIDES POWER TO THE LOADS VIA NORMALLY CLOSED MAIN BREAKER INSWITCHGEAR PSE.

    2. ON A LOSS OF NORMAL POWER, GEN 1, 2, & 3 WILL START AND THE MAIN NORMAL POWER BREAKER WILL OPEN AND BUS TIE BREAKER WILL CLOSE. THE FIRST GENERATOR TO REACH RATED VOLTAGE AND FREQUENCY WILL RESULT IN THE MAIN GENERATOR BREAKER IN PSE CLOSING INTO THE BUS AND SERVING ALL LOADS SHOWN WHICH ARE PRIORITY 1 LOADS. THE PRIORITY 2 LOAD IS THE DATA CENTER WHICH IS SERVED FROM A 480V BREAKER IN SWITCHGEAR USHXB. ON A LOSS OF POWER THIS BREAKER SHALL BE OPENED AND CLOSED AFTER THE SECOND GENERATOR COMES ONLINE. SEE KEYED NOTE 6 ON E027. THE SECOND AND THIRD GENERATOR WILL CLOSE INTO THE PSE BUS AS THEY ARE SYNCHRONIZED WITH THE FIRST GENERATOR.

    3. WHEN NORMAL POWER RETURNS, AFTER A 5 MINUTE DELAY, THE TIEBREAKER WILL OPEN AND THE MAIN NORMAL BREAKER WILL CLOSE.THE LOAD WILL NOW BE SERVED FROM THE NORMAL SOURCE. AFTERA COOLDOWN PERIOD THE GENERATORS WILL SHUTDOWN.

    B. LOAD BANK OPERATION

    1. THE LOAD BANK ALLOWS TESTING OF ONE GENERATOR AT A TIME.UNDER NORMAL CONDITIONS, THE TIE BREAKER IS OPEN, ISOLATINGTHE NORMAL POWER SOURCE FROM THE EMERGENCY SOURCE.THIS ALLOWS FOR GENERATOR TESTING VIA THE LOAD BANK.

    2. SHOULD NORMAL POWER FAIL WHEN THE LOAD BANK IS IN OPERATION,THE MASTER CONTROLLER SHALL IMMEDIATELY SHUTDOWN THE LOADBANK AND BEGIN THE SEQUENCE NOTED ABOVE.

    No. Description Date

  • SWITCHGEAR USHC-A/B3000A,480Y/277V, 3PH, 4W, 65KAIC

    TIEN.O.3200AF/3200ATLSIG

    2000/2660KVA4.16KV480Y/277VAA/FA

    NEUTRAL BUS

    GROUND BUS

    K

    USHC - A

    600AT800AF

    LSIG600AT800AF

    LSIG600AT800AF

    LSIG600AT800AF

    LSIG600AT800AF

    LSIG1000AT1600AF

    LSIG

    2-3"C EA/W4-350KCMIL1#1 GND 3-2 1/2"C

    EA/W3-350KCMIL1#2/0 GND

    2-3"CEA/W4-350KCMIL1#1 GND

    K

    3200AFMAIN

    3200ATLSIG

    TOEPDPA(FED FROMUSHXB-A)SEE E015

    NEUTRAL BUS

    GROUND BUS

    ATS B

    600AT800AF

    LSIG600AT800AF

    LSIG600AT800AF

    LSIG600AT800AF

    LSIG600AT800AF

    LSIG

    K

    3200AFMAIN

    3200ATLSIG

    2-3"CEA/W3-350KCMIL1#1 GND

    TOEPDPA(FED FROMUSHXB-A)SEE E015

    600AT800AF

    LSIG1000AT1600AF

    LSIG600AT800AF

    LSIG600AT800AF

    LSIG800AT800AF

    LSIG

    3-2 1/2"CEA/W3-350KCMIL1#2/0 GND

    2-3 1/2"CEA/W4-500KCMIL1#1/0 GND

    1000AT1600AF

    LSIG600AT800AF

    LSIG600AT800AF

    LSIG

    3-2 1/2"CEA/W3-350KCMIL1#4/0 GND

    TOPSWGRASEE E011

    3-3KVMOV2.55KVMCOV

    2000KVA4.16KV480Y/277VAA/FA

    USHC - B 3-3KVMOV2.55KVMCOV

    TOPSWGRBSEE E011

    PEAK DEMAND - 1161A

    DOWN CHASETO 2ND FLOORSEE E026

    PEAK DEMAND - 1230A

    2-800AFEQUIPPEDSPACES

    2-800AFEQUIPPEDSPACES

    2-3"C EA/W4-350KCMIL1#1 GND

    2-3"C EA/W4-350KCMIL1#1 GND

    2-3"C EA/W4-350KCMIL1#1 GND

    2-3"C EA/W4-350KCMIL1#1 GND

    2-3"C EA/W4-350KCMIL1#1 GND

    2-3"C EA/W4-350KCMIL1#1 GND

    2-3"C EA/W4-350KCMIL1#1 GND

    2-3"C EA/W4-350KCMIL1#1 GND

    18"

    5KVTERMCABINET

    96"TYP TYP

    1A

    METERING

    MAIN

    ATS-A

    1BC

    1D

    2A

    PNL8DHA

    2B

    2D

    22"TYP

    3A

    PNL8PA

    3D

    4A

    PNL8PD

    800AEQUIPPED

    SPACE

    4B

    4D

    5A

    5D

    800AEQUIPPED

    SPACE

    BUSRISER

    HE

    PNL8DHB

    2C

    3C

    4C

    3BC 5BC

    TIE

    800AEQUIPPED

    SPACE

    BUSRISER

    HN

    BUSRISER

    HM

    BUSRISER

    HKXFMR

    BUSRISER

    HS

    BUSRISER

    HR

    PNL8PC

    ATS-B

    BUSRISER

    HC

    BUSRISER

    HF

    BUSRISER

    HD

    PNL8PB

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    MAIN

    800AEQUIPPED

    SPACE

    METERING

    XFMR5KVTERMCABINET

    BUSRISER

    HB

    BUSRISER

    HA

    #4/01"C

    TO GND BARIN RM. P.113

    2-3"C EA/W4-350KCMIL1#1 GND

    2-3"C EA/W4-350KCMIL1#1 GND

    PNL PBSEE E023

    ATS A

    PNL PASEE E023

    1B/C 1D 2A 2B 2C 2D 3A 3B 3C 3D 4A 4B 4C/D

    6A 6B 6C 6D

    6A

    6D

    6B

    6C

    7A 7B 7C 7D

    600AT800AF

    LSIG

    2-3"C EA/W4-350KCMIL1#1 GND

    BUSRISER

    HP

    8A 8C/D

    3-800AFEQUIPPEDSPACES

    9D 9B/C

    7A

    7D

    7B

    7C

    8A

    8D

    8B

    8C

    9A

    9D

    9BC

    800AEQUIPPED

    SPACE

    3-800AFEQUIPPEDSPACES

    5A/D

    M

    3

    3000:5

    TO RELAYIN 5KV SWGRPSWGRASEE E011

    2#143/4"C

    3

    3000:5

    BACNET TODDC PANEL

    #18/2TWT SHLD3/4"C

    TO RELAYIN 5KV SWGRPSWGRBSEE E011

    2#143/4"C

    BACNET TODDC PANEL

    #18/2TWT SHLD3/4"C

    M

    3

    3000:5

    3000:5

    3

    18"TYP

    96"TYP

    TR

    AN

    SIT

    ION

    SE

    CT

    ION

    TR

    AN

    SIT

    ION

    SE

    CT

    ION

    22"TYP

    8B

    2-3"CEA/W4-350KCMIL1#1 GND

    DIST PNL8PBSEE E017

    DIST PNL8PCSEE E022

    DIST PNL8PDSEE E018

    DIST PNL8DHBSEE E016

    DIST PNL8PASEE E017

    DIST PNL8DHASEE E016

    2-3"CEA/W4-350KCMIL1#1 GND

    DOWN CHASETO 2ND FLOORSEE E024

    600A HORIZONTALSPECTRABUSWAY HBG.E. ARMORCLADALUMINUM,3PH, 4W

    DOWN CHASETO 2ND FLOORSEE E024

    DOWN CHASETO 2ND FLOORSEE E027

    DOWN CHASETO 2ND FLOORSEE E028

    DOWN CHASETO 2ND FLOORSEE E027

    600A HORIZONTALSPECTRABUSWAY HPG.E. ARMORCLADALUMINUM,3PH, 4W

    600A HORIZONTALSPECTRABUSWAY HRG.E. ARMORCLADALUMINUM,3PH, 4W

    DOWN CHASETO 2ND FLOORSEE E029

    600A HORIZONTALSPECTRABUSWAY HSG.E. ARMORCLADALUMINUM,3PH, 4W

    DOWN CHASETO 2ND FLOORSEE E026

    600A HORIZONTALSPECTRABUSWAY HFG.E. ARMORCLADALUMINUM,3PH, 4W

    DOWN CHASETO 2ND FLOORSEE E025

    600A HORIZONTALSPECTRABUSWAY HCG.E. ARMORCLADALUMINUM,3PH, 4W

    DOWN CHASETO 2ND FLOORSEE E025

    600A HORIZONTALSPECTRABUSWAY HDG.E. ARMORCLADALUMINUM,3PH, 4W

    TERMINALBLOCK

    48 #16 - 2"C48 #16 - 2"C

    48 #16 - 2"C48 #16 - 2"C

    480-120VCPT

    480-120VCPT

    TERMINALBLOCK

    800APNL

    PDPH

    600AT800AF

    LSIG

    2-2 1/2"CEA/W4-350KCMIL1#4/0 GND

    DIST PNLPDPHSEE E022

    600A HORIZONTALSPECTRABUSWAY HEG.E. ARMORCLADALUMINUM,3PH, 4W

    600A HORIZONTALSPECTRABUSWAY HAG.E. ARMORCLADALUMINUM,3PH, 4W

    600A HORIZONTALSPECTRABUSWAY HMG.E. ARMORCLADALUMINUM,3PH, 4W

    600A HORIZONTALSPECTRABUSWAY HNG.E. ARMORCLADALUMINUM,3PH, 4W

    600A HORIZONTALSPECTRABUSWAY HKG.E. ARMORCLADALUMINUM,3PH, 4W

    DOWN CHASETO 2ND FLOORSEE E029

    DOWN CHASETO 2ND FLOORSEE E028

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    6:3

    6 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E013

    ONE LINE DIAGRAM -USHC-A, USHC-B

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE1ONE LINE DIAGRAM - USHC-A, USHC-B

    No. Description Date

  • SWITCHGEAR USLB-A/B4000A, 208Y/120V, 3PH, 4W, 100KAIC

    PNL 8LA

    1000AT1600AF

    LSIG225AT800AF

    LSIG1000AT1600AF

    LSIG1000AT1600AF

    LSIG

    TIEN.O.4000AF/4000ATLSIG

    K

    4#4/01#4 GND2"C

    PNL 8LC

    225AT800AF

    LSIG

    4#4/01#4 GND2"C

    PNL 8LB

    1000AT1600AF

    LSIG225AT800AF

    LSIG

    4#4/01#4 GND2"C

    1000/1333KVA4.16KV208Y/120VAA/FA

    NEUTRAL BUS

    GROUND BUS

    USLB - A

    K

    4000AFMAIN

    4000ATLSIG

    TOPSWGRASEE E011

    3-3KVMOV2.55KVMCOV

    NEUTRAL BUS

    GROUND BUS

    K

    4000AFMAIN

    4000ATLSIG

    1000/1333KVA4.16KV208Y/120VAA/FA

    USLB - B 3-3KVMOV2.55KVMCOV

    TOPSWGRBSEE E011

    #4/01"C

    TO GND BARIN RM. P.113

    PEAK DEMAND - 556A

    PEAK DEMAND -1238A

    3-3"C EA/W4-350KCMIL1#2/0 GND

    1000AT1600AF

    LSIG1000AT1600AF

    LSIG1000AT1600AF

    LSIG

    800AFEQUIPPEDSPACES

    1000AT1600AF

    LSIG1000AT1600AF

    LSIG1000AT1600AF

    LSIG1000AT1600AF

    LSIG1000AT1600AF

    LSIG

    18"

    5KVTERMCABINET

    96"TYP TYP

    MAIN

    22"TYP

    800AEQUIPPED

    SPACE

    TIE

    800AEQUIPPED

    SPACE

    BUSRISER

    LS

    1000KVA4160:208/120

    BUSRISER

    LR

    BUSRISER

    LK

    BUSRISER

    LE

    BUSRISER

    LF

    BUSRISER

    LC

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    BUSRISER

    LB

    BUSRISER

    LA

    4-800AFEQUIPPEDSPACES

    BUSRISER

    LD

    BUSRISER

    LP

    BUSRISER

    LM

    PNL8LA

    PNL8LC

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    BUSRISER

    LN

    PNL8LB

    800AEQUIPPED

    SPACE

    MAIN 1000KVA4160:208/120

    5KVTERMCABINET

    34"TYP

    2A

    2B

    2D

    2C

    1A 3A

    3B

    3D

    3C

    2A 2B 2C 2D1A 3A 3B 3C 3D 4A/B/C/D

    4A

    4B

    4D

    4C

    5A 6A

    6B

    6D

    6C

    7A

    7B

    7D

    7C

    6A 6B 6C 6D 7A 7B 7C 9A

    4-800AFEQUIPPEDSPACES

    7D 8A/B/C/D

    8A

    8B

    8D

    8C

    9A

    TO RELAYIN 5KV SWGRPSWGRBSEE E011

    2#143/4"C

    BACNET TODDC PANEL

    #18/2TWT SHLD3/4"C

    M

    3

    4000:5

    4000:5

    3

    M

    3

    4000:5

    TO RELAYIN 5KV SWGRPSWGRASEE E011

    2#143/4"C

    3

    4000:5

    BACKNET TODDC PANEL

    #18/2TWT SHLD3/4"C

    22"TYP

    TR

    AN

    SIT

    ION

    SE

    CT

    ION

    TR

    AN

    SIT

    ION

    SE

    CT

    ION

    3-3"C EA/W4-350KCMIL1#2/0 GND

    3-3"C EA/W4-350KCMIL1#2/0 GND

    3-3"C EA/W4-350KCMIL1#2/0 GND

    3-3"C EA/W4-350KCMIL1#2/0 GND

    3-3"C EA/W4-350KCMIL1#2/0 GND

    3-3"C EA/W4-350KCMIL1#2/0 GND

    NEW3-3"C EA/W4-350KCMIL1#2/0 GND

    3-3"C EA/W4-350KCMIL1#2/0 GND

    3-3"C EA/W4-350KCMIL1#2/0 GND

    3-3"C EA/W4-350KCMIL1#2/0 GND

    3-3"C EA/W4-350KCMIL1#2/0 GND

    DOWN CHASETO 2ND FLOORSEE E025

    DOWN CHASETO 2ND FLOORSEE E024

    DOWN CHASETO 2ND FLOORSEE E024

    DOWN CHASETO 2ND FLOORSEE E027

    DOWN CHASETO 2ND FLOORSEE E027

    DOWN CHASETO 2ND FLOORSEE E028

    1000A HORIZONTALSPECTRA BUSWAY LNG.E. ARMORCLADALUMINUM,3PH, 4W

    DOWN CHASETO 2ND FLOORSEE E028

    DOWN CHASETO 2ND FLOORSEE E029

    DOWN CHASETO 2ND FLOORSEE E029

    DOWN CHASETO 2ND FLOORSEE E026

    DOWN CHASETO 2ND FLOORSEE E026

    DOWN CHASETO 2ND FLOORSEE E025

    1000A HORIZONTALSPECTRA BUSWAY LCG.E. ARMORCLADALUMINUM,3PH, 4W

    TERMINALBLOCK

    48 #16 - 2"C48 #16 - 2"C

    48 #16 - 2"C48 #16 - 2"C

    480-120VCPT

    480-120VCPT

    TERMINALBLOCK

    1000A HORIZONTALSPECTRA BUSWAY LMG.E. ARMORCLADALUMINUM,3PH, 4W

    1000A HORIZONTALSPECTRA BUSWAY LKG.E. ARMORCLADALUMINUM,3PH, 4W

    1000A HORIZONTALSPECTRA BUSWAY LAG.E. ARMORCLADALUMINUM,3PH, 4W

    1000A HORIZONTALSPECTRA BUSWAY LBG.E. ARMORCLADALUMINUM,3PH, 4W

    1000A HORIZONTALSPECTRA BUSWAY LDG.E. ARMORCLADALUMINUM,3PH, 4W

    1000A HORIZONTALSPECTRA BUSWAY LEG.E. ARMORCLADALUMINUM,3PH, 4W

    1000A HORIZONTALSPECTRA BUSWAY LFG.E. ARMORCLADALUMINUM,3PH, 4W

    1000A HORIZONTALSPECTRA BUSWAY LSG.E. ARMORCLADALUMINUM,3PH, 4W

    1000A HORIZONTALSPECTRA BUSWAY LRG.E. ARMORCLADALUMINUM,3PH, 4W

    1000A HORIZONTALSPECTRA BUSWAY LPG.E. ARMORCLADALUMINUM,3PH, 4W

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    6:4

    3 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E014

    ONE LINE DIAGRAM -USLB-A, USLB-B

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE1ONE LINE DIAGRAM - USLB-A, USLB-B

    No. Description Date

  • SWITCHGEAR USHXB - A/B3200A,480Y/277V, 3PH, 4W, 65KAIC

    PNL 8DLXA

    250AT800AF

    LSIG250AT800AF

    LSIG

    PNL 8DLXB

    200AT800AF

    LSIG600AT800AF

    LSIG

    2-2 1/2"CEA/W4-350KCMIL1#1/0 GND

    3#3/01#6 GND2"C

    PNL 8DHXB

    800AT800AF

    LSIG

    2-3 1/2"CEA/W4-500KCMIL1#1/0 GND

    400AT800AF

    LSIG

    3-500KCMIL1#3 GND3"C

    PNL 8DHXD PNL 8DLXD

    800AT800AF

    LSIG250AT800AF

    LSIG

    PNL 8DHXC PNL 8DLXC

    XFMR8DLXC112.5KVA480-208Y/120VK-7

    800AT800AF

    LSIG250AT800AF

    LSIG

    1500/2000KVAAA/FA4.16KV480Y/277V

    NEUTRAL BUS

    GROUND BUS

    USHXB - A

    K

    3200AFMAIN

    3000ATLSIG

    3-3KVMOV2.55KVMCOV

    TOSWGR PSESEE E012

    NEUTRAL BUS

    GROUND BUS

    K

    3200AFMAIN

    3000ATLSIG

    1500/2000KVAAA/FA4.16KV480Y/277V

    USHXB - B3-3KVMOV2.55KVMCOV

    TOSWGR PSESEE E012

    1200AT1600AF

    LSIG

    TOUSHGB

    EXISTINGPANEL EPA2ND FLOORCHASE

    ATS ETSP1200A480Y/277V2ND FLOORCHASE

    18"

    5KVTERMCABINET

    96"TYP TYP

    MAIN

    22"TYP

    800AEQUIPPED

    SPACE

    TIE

    800AEQUIPPED

    SPACE

    1500KVA4160:480/277

    ATSETSP

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    PNL8DHXD

    MAIN 1500KVA4160:480/277

    5KVTERMCABINET

    PNL8DLXB

    PNL8DLXA

    PNL8MXB

    PNLEPDPA

    PNL8DHXB

    PNL8DHXA

    PNL8DHXC

    PNL8DLXC

    PNL8MXA

    PNL8DLXD

    3-2 1/2"CEA/W4-500KCMIL1#3/0 GND

    PNL 8DHXA

    800AT800AF

    LSIG

    2-3 1/2"CEA/W4-500KCMIL1#1/0 GND

    3-350KCMIL1#3 GND2 1/2"C

    2-3 1/2"CEA/W4-500KCMIL1#1/0 GND

    2-3 1/2"CEA/W4-500KCMIL1#1/0 GND

    XFMR8DLXD112.5KVA480-208Y/120VK-7

    XFMR8DLXA112.5KVA480-208Y/120VK-7

    XFMR8DLXB112.5KVA480-208Y/120VK-7

    2-2 1/2"C EA/W3#4/02#4/0 NEUT1#1/0 GND

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    PNL EPDPA

    M

    3

    3000:5

    TO RELAYIN 5KV SWGRPSESEE E012

    2#143/4"C

    3

    3000:5

    BACNET TODDC PANEL

    #18/2TWT SHLD3/4"C

    2#143/4"C

    BACKNET TODDC PANEL

    #18/2TWT SHLD3/4"C

    M

    3

    3000:5

    3000:5

    3

    TO RELAYIN 5KV SWGRPSESEE E012

    800A, 3P EQUIPPED

    SPACE

    800A, 3P EQUIPPED

    SPACE

    TIEN.O.3200AF/3200ATLSIG

    K

    800A, 3P EQUIPPED

    SPACE

    800A, 3P EQUIPPED

    SPACE

    800A, 3P EQUIPPED

    SPACE

    800A, 3P EQUIPPED

    SPACE

    800A, 3P EQUIPPED

    SPACE

    800A, 3P EQUIPPED

    SPACE

    800A, 3P EQUIPPED

    SPACE

    800A, 3P EQUIPPED

    SPACE

    800A, 3P EQUIPPED

    SPACE

    TR

    AN

    SIT

    ION

    SE

    CT

    ION

    TR

    AN

    SIT

    ION

    SE

    CT

    ION

    22"TYP

    800A, 3P EQUIPPED

    SPACE

    800AEQUIPPED

    SPACE

    SEE E021 SEE E021 SEE E019 SEE E019

    SEE E019 SEE E011 SEE E020 SEE E020 PNL 8MXA

    PNL 8MXB

    #4/01"C

    TO GND BARIN RM. P.113

    3-350KCMIL1#3 GND2 1/2"C

    3-350KCMIL1#3 GND2 1/2"C

    3-350KCMIL1#3 GND2 1/2"C

    1#2 GND3/4"C

    1#2 GND3/4"C

    1#2 GND3/4"C

    1#2 GND3/4"C

    480-120VCPT

    480-120VCPT

    TERMINALBLOCK

    48 #16 - 2"C48 #16 - 2"C

    48 #16 - 2"C48 #16 - 2"C

    TERMINALBLOCK

    2-2 1/2"C EA/W3#4/02#4/0 NEUT1#1/0 GND

    2-2 1/2"C EA/W3#4/02#4/0 NEUT1#1/0 GND

    2-2 1/2"C EA/W3#4/02#4/0 NEUT1#1/0 GND

    400AT800AF

    LSIG

    PNL 8MXC

    3-500KCMIL1#3 GND3"C

    400AT800AF

    LSIG

    PNL 8MXD

    3-500KCMIL1#3 GND3"C

    CONTROLPOWER

    UPS

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    6:4

    9 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E015

    ONE LINE DIAGRAM -USHXB - A/B

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE1ONE LINE DIAGRAM - USHXB - A/B

    No. Description Date

  • 600A, 480Y/277V, 3P, 4W, GND, 65KAIC

    8DHA

    3P20A

    NEUTRAL

    GROUND

    TO USHC (SEE E013)

    3P300

    3-300KCMIL1#4 GND2 1/2"C

    3P100A

    4#31#8 GND1 1/4"C

    3P70A

    3#61#10 GND3/4"C

    3P15A

    3P30A

    3#101#10 GND3/4"C

    3P15A

    3#121#12 GND3/4"C

    3#121#12 GND3/4"C

    3#121#12 GND3/4"C

    TO PNL BHA TO CLINIC AIR COMP

    TO PUMP HWP1,2

    TO PUMP ROC1

    TO PUMP LOG-2

    TO PUMP ROC2

    8

    4-100A/3P EQUIPPED SPACES

    800A, 480Y/277V, 3P, 4W, GND, 65KAIC

    8DHB

    3P225A

    NEUTRAL

    GROUND

    TO USHC (SEE E013)

    3#4/01#4 GND2"C

    3P100A

    3P100A

    4#31#8 GND1 1/4"C

    3P100A

    3#31#8 GND1"C

    3P15A

    3#121#12 GND3/4"C

    TO PNL 8HB

    TO PANEL 8HC

    TO SOUTH PHAIR

    COMPRESSORS

    TO PUMP ROC 3D 3A

    TO PUMP ROC-3

    4#31#8 GND1 1/4"C

    4-100A/3P EQUIPPED SPACES

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    6:5

    4 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E016

    ONE LINE DIAGRAMPANELS 8DHA & 8DHB

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE1ONE LINE DIAGRAM - DISTRIBUTION PANEL 8DHA

    NOT TO SCALE2ONE LINE DIAGRAM - DISTRIBUTION PANEL 8DHB

    No. Description Date

  • 1000A, 480Y/277V, 3P, 4W, GND, 65KAIC

    DIST PNL 8PA

    3P20A

    NEUTRAL

    GROUND

    TO USHC-A (SEE E013)

    3#121#12G3/4"C

    3P15A

    3#121#12G3/4"C

    3P30A

    3#10G1#10G3/4"C

    3P20A

    3#121#12G3/4"C

    3P150A

    3#1/01#6G1 1/2"C

    3P40A

    3P50A

    3#81#10G3/4"C

    3P15A

    3#121#12G3/4"C

    OAUNIT

    AO/0-1

    FANRA/0-1/1

    UNITAC/0-1VFD

    UNIT #1

    3P200A

    3#3/01#6G2"C

    3P70A

    3#41#8G1"C

    3P30A

    3#101#10G3/4"C

    3P30A

    3P300A

    FANRA/0-1/2

    FANRA/0-3/2

    OAUNIT

    OA/0-3

    FANRA/0-3/1

    UNITAC/0-3VFD

    UNIT #3

    FANEF/LC-1

    FANEF/LC-2

    UNITAC/L-1

    FANEF/LC-3

    SWGRROOFFCU

    3P300A

    UNITAC/L-3

    VFDVFD VFDVFDVFD VFD

    3-350KCMIL1#4G3"C

    3#81#10G3/4"C

    3#101#10G3/4"C

    3-350KCMIL1#4G3"C

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER60A, 3P40AF

    R G

    SIZE 2

    COMBINATIONSTARTER30A, 3P30AF

    R G

    SIZE 1

    COMBINATIONSTARTER100A, 3P70AF

    R G

    SIZE 2

    COMBINATIONSTARTER30A, 3P30AF

    R G

    SIZE 1

    TO JOHNSONCONTROLPNL

    3#12#12G3/4"C

    TO JOHNSONCONTROLPNL

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#8#10G3/4"C

    3#10#10G3/4"C

    3#4#8G3/4"C

    3#10#10G3/4"C

    TO JOHNSONCONTROLPNL

    TO JOHNSONCONTROLPNL

    TO JOHNSONCONTROLPNL

    TO JOHNSONCONTROLPNL

    TO JOHNSONCONTROLPNL

    2#183/4"C

    2#183/4"C

    2#183/4"C

    2#183/4"C

    2#183/4"C

    2#183/4"C

    4-100A/3P EQUIPPED SPACES

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    3#12#12G3/4"C

    2#183/4"C

    2#183/4"C

    TO JOHNSONCONTROLPNL

    3P100A

    3#31#8G1"C

    PNL 4HAD

    3#31#8G1"C

    3P20A

    NEUTRAL

    GROUND

    TO USHC-A (SEE E013)

    3P20A

    3P20A

    3#121#12G3/4"C

    3P50A

    3#81#10G3/4"C

    3PSIZE 4

    150A

    3#1/01#6G1 1/2"C

    3P20A

    OA UINITOA/0-2

    VFDUNINT #2

    FANRA/0-2/2

    3P150A

    3P300A

    3P100A

    3P300A

    3P15A

    2#121#12G3/4"C

    600A, 480Y/277V, 3P, 4W, GND, 65KAIC

    DIST PNL 8PB

    UNITAC/0-2

    HW CIRCULATION

    HWC 8/1

    FANRA/0-2/1

    OA UINITOA/0-4

    VFDUNINT #4

    3P20A

    FANRA/0-4/1

    FANRA/0-4/2

    UNITAC/0-4

    UNITAC/L-2

    UNITAC/L-4

    PNL

    3#1/01#6G1 1/2"C

    VFD VFDVFDVFD VFD

    3#121#12G3/4"C

    3#121#12G3/4"C

    3#121#12G3/4"C

    3#121#12G3/4"C

    4#31#8G1"C

    3-350KCMIL1#4G3"C

    3-350KCMIL1#4G3"C

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    TO EXISTINGJOHNSONCONTROLPNL

    3#12#12G3/4"C

    TOJOHNSONCONTROLPNL

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#12#12G3/4"C

    VFD 2#183/4"C

    2#183/4"C

    2#183/4"C

    2#183/4"C

    2#183/4"C

    4-100A/3P EQUIPPED SPACES

    TOJOHNSONCONTROLPNL

    TOJOHNSONCONTROLPNL

    TOJOHNSONCONTROLPNL

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    7:0

    0 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E017

    ONE LINE DIAGRAMPANELS 8PA & 8PB

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE1ONE LINE DIAGRAM - DISTRIBUTION PNL 8PA

    No. Description Date

    NOT TO SCALE2ONE LINE DIAGRAM - DISTRIBUTION PNL 8PB

  • 3P30A

    NEUTRAL

    GROUND

    TO USHC-A (SEE E013)

    3P225A

    3P225A

    3P30A

    3P30A

    3P150A

    3P100A

    3P50A

    4-100A/3PEQUIPPEDSPACES

    AC/L-6 AC/L-8

    3P40A

    3P40A

    3P20A

    3P15A

    3P15A

    OA/0-6

    FANRA/0-6/2

    PNL4HAN

    RA/0-8/2

    AC/P-2

    3P20A

    600A, 480Y/277V, 3P, 4W, GND, 65KAIC

    DIST PNL 8PD

    FANRA/0-6/1

    UNITAC/0-8VFD

    UNIT #8

    OA/0-8

    RA/P-2/1

    OA/P-2 EF/LC-5 EF/LC-6

    3P20A

    EF/M-4

    3P15A

    3P15A

    3P15A

    3P15A

    PUMPHWC-8/4

    PUMPCCW-4

    PUMPCCW-3

    PUMPHWC-8/3

    3P20A

    RA/0-8/1

    3#4/01#4 GND2"C

    3#4/01#4 GND2"C

    3#81#10GND3/4"C

    VFD VFD VFD VFDVFD

    3#101#10GND3/4"C

    3#101#10GND3/4"C

    3#1/01#6GND1 1/2"C

    3#101#10GND3/4"C

    4#31#8GND1 1/4"C

    3#121#12GND3/4"C

    3#81#10GND3/4"C

    3#121#12GND3/4"C

    3#121#12GND3/4"C

    3#121#12GND3/4"C

    3#121#12GND3/4"C

    3#81#10GND3/4"C

    3#121#12GND3/4"C

    3#121#12GND3/4"C

    3#121#12GND3/4"C

    3#121#12GND3/4"C

    3#121#12GND3/4"C

    DISCSW

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER60A, 3P40AF

    R G

    SIZE 2

    COMBINATIONSTARTER60A, 3P50AF

    R G

    SIZE 2

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    CONTINUED BELOW

    TO JOHNSONCONTROLPNL

    3#12#12G3/4"C

    2#183/4"C

    TO JOHNSONCONTROLPNL

    2#183/4"C

    TO JOHNSONCONTROLPNL

    2#183/4"C

    TO JOHNSONCONTROLPNL

    2#183/4"C

    TO JOHNSONCONTROLPNL

    2#183/4"C

    TO JOHNSONCONTROLPNL

    2#183/4"C

    TO JOHNSONCONTROLPNL

    2#183/4"C

    TO JOHNSONCONTROLPNL

    2#183/4"C

    TO JOHNSONCONTROLPNL

    2#183/4"C

    TO JOHNSONCONTROLPNL

    3#8#10G3/4"C

    2#183/4"C

    TO JOHNSONCONTROLPNL

    3#8#10G3/4"C

    2#183/4"C

    COMBINATIONSTARTER30A, 3P30AF

    R G

    SIZE 1

    TO JOHNSONCONTROLPNL

    3#101#10GND3/4"C

    2#183/4"C

    COMBINATIONSTARTER30A, 3P30AF

    R G

    SIZE 1

    TO JOHNSONCONTROLPNL

    3#101#10GND3/4"C

    2#183/4"C

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    TO JOHNSONCONTROLPNL

    2#183/4"C

    3P200A

    AC-0-6

    3#3/01#6GND2"C

    VFD

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#12#12G3/4"C

    3#12#12G3/4"C

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    7:0

    6 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E018

    ONE LINE DIAGRAMPANEL 8PD

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE2ONE LINE DIAGRAM - DISTRIBUTION PNL 8PD

    No. Description Date

  • 800A, 480Y/277V, 3P, 4W, GND, 65KAIC

    8DHXB

    3PSPARE

    100A

    NEUTRAL

    GROUND

    TO USHXB-A (SEE E015)

    3P225A

    3P100A

    3P225A

    3PSPARE

    150A3PSPARE

    150A3P200A

    8HXB ELEV9&10

    1HXE-7HXE

    ELEV3&4

    2PSPARE

    50A

    3#4/01#4 GND2 1/2"C

    4#31#8 GND1 1/4"C

    4#3/01#6 GND2"C

    4#4/01#4 GND2 1/2"C

    800A, 480Y/277V, 3P, 4W, GND, 65KAIC

    8DHXA

    NEUTRAL

    GROUND

    TO USHXB - A (SEE E015)

    3P225A

    3P100A

    3P225A

    3P400A

    3P60A

    3P225A

    8HXA 1HXC-7HXC

    EXISTLOAD

    1HXA-7HXA

    ELEV1&2

    OTHERLOAD

    4-100A/3P EQUIPPED SPACES

    4#4/01#4 GND2 1/2"C

    4#31#8 GND1 1/4"C

    4#61#10 GND1"C

    4#4/01#4 GND2 1/2"C

    4#4/01#4 GND2 1/2"C

    4-500KCMIL1#3 GND3 1/2"C

    800A, 480Y/277V, 3P, 4W, GND, 65KAIC

    8DHXC

    3P225A

    NEUTRAL

    GROUND

    TO USHXB-B (SEE E015)

    3P200A

    3P100A

    3P60A

    3P225A

    3P100A

    TO PNL 8HXC

    TO ELEVATOR7 & 8

    TO PANEL2HXN/7HXN

    TO PANEL2HXR/7HXR

    TO AIR COMPPRESSOR

    EXHAUST

    EX AIR COMP.

    4-100A/3P EQUIPPED SPACES

    4#31#8 GND1 1/4"C

    3#61#10 GND3/4"C

    4#4/01#4 GND2 1/2"C

    3#31#8 GND1"C

    4#4/01#4 GND2 1/2"C

    3#3/01#6 GND2"C

    600A, 480Y/277V, 3P, 4W, GND, 42KAIC

    EPDPA

    3P300A

    NEUTRAL

    GROUND

    FROMUSHXB-ASEE E015

    3P300A

    ATS ASEE E013

    ATS BSEE E013

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    7:1

    3 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E019

    ONE LINE DIAGRAMPANELS 8DHXA, 8DHXB,

    8DHXC & EPDPA

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE2ONE LINE DIAGRAM - 8DHXB

    NOT TO SCALE1ONE LINE DIAGRAM - 8DHXA

    NOT TO SCALE3ONE LINE DIAGRAM - 8DHXC

    No. Description Date

    NOT TO SCALE4ONE LINE DIAGRAM - PANEL EPDPA

  • 800A, 480Y/277V, 3P, 4W, GND, 65KAIC

    8DHXD

    3P175A

    NEUTRAL

    GROUND

    TO USHXB-B (SEE E015)

    3P200A

    3P100A

    TO PNL 8HXD

    TO ELEVATOR5 & 6

    TO PNL 2HXK/7HXK

    4-225A/3PEQUIPPEDSPACES

    3P15A

    3P20A

    FANEF/LC-4

    (REFED FROM PNL 8PXA)

    FANEF/T-1

    (REFED FROM PNL 8PXA)

    3#121#12 GND3/4"C

    3#121#12 GND3/4"C

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P15AF

    R G

    SIZE 1

    TO JOHNSONCONTROLPNL

    3#12#12G3/4"C

    2#183/4"C

    TO JOHNSONCONTROLPNL

    3#12#12G3/4"C

    2#183/4"C

    4#2/01#6G2"C

    3#3/01#6G2"C

    4#31#8G1 1/4"C

    2P50A

    3#81#10G3/4"C

    TO GENERATOR

    PNL #1

    600A, 208Y/120V, 3P, 4W, GND, 65KAIC

    8DLXD

    3P200A

    200% NEUTRAL

    GROUND

    TO USHXB-B(SEE E015)

    3P200A

    3P200A

    3P200A

    3P100A

    3P200A

    3P200A

    3P100A

    4-100A/3PEQUIPPEDSPACES

    7LXM,6LXM,5LXM

    7LXK,6LXK,5LXK

    7LXP,6LXP,5LXP

    8LXD 4LXM,3LXM

    4LXK,3LXK,2LXK

    4LXP,3LXP,2LXP

    LOAD

    4#3/01#6G2"C

    4#3/01#6G2"C

    4#3/01#6G2"C

    4#31#8G1 1/4"C

    4#3/01#6G2"C

    4#3/01#6G2"C

    4#3/01#6G2"C

    4#3/01#6G2"C

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    7:1

    9 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E020

    ONE LINE DIAGRAMPANELS 8DHXD & 8DLXD

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE1ONE LINE DIAGRAM - 8DHXD

    NOT TO SCALE2ONE LINE DIAGRAM - 8DLXD

    No. Description Date

  • 600A, 208Y/120V, 3P, 4W, GND, 65KAIC

    8DLXC

    3P200A

    200%NEUTRAL

    GROUND

    TO USHXB -A (SEE E015)

    3P200A

    3P200A

    3P200A

    3P100A

    3P200A

    3P200A

    8LXC

    4-100A/3P EQUIPPED SPACES

    7LXN,6LXN, 5LXN

    7LXS,6LXS, 5LXS

    7LXR,6LXR, 5LXR

    4LXN,3LXN,2LXN,1LXN

    4LXS,3LXS,2LXS

    4LXR,3LXR,2LXR,1LXR

    4#31#8 GND1 1/4"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    600A, 208Y/120V, 3P, 4W, GND, 65KAIC

    8DLXA

    3P200A

    200% NEUTRAL

    GROUND

    TO USHXB-A (SEE E015)

    3P200A

    3P200A

    3P200A

    3P100A

    3P200A

    3P200A

    3P100A

    7LXA,6LXA,5LXA,4LXA

    7LXB,6LXB,5LXB,4LXB

    7LXC,6LXC,5LXC,4LXC

    8LXA 3LXA,2LXA,1LXA

    3LXB,2.221XA,

    1LXB

    3LXC,2LXC,1LXC,

    OTHERLOAD

    4-100A/3P EQUIPPED SPACES

    4#3/01#6 GND2"C

    4#31#8 GND1 1/4"C

    4#31#8 GND1 1/4"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    600A, 208Y/120V, 3P, 4W, GND, 65KAIC

    8DLXB

    3P200A

    200%NEUTRAL

    GROUND

    TO USHXB - A (SEE E015)

    3P200A

    3P200A

    3P200A

    3P100A

    3P200A

    3P200A

    7LXD,6LXD,5LXD,4LXD

    7LXE,6LXE,5LXE,4LXE

    7LXF,6LXF,5LXF,4LXF

    8LXB 3LXD,2.221XB,

    1LXD

    3LXE,2LXE,1LXE

    3LXF,2LXF,

    1LXF,1LXF-1

    4-100A/3P EQUIPPED SPACES

    4#31#8 GND1 1/4"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    4#3/01#6 GND2"C

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    019 1

    0:4

    7:2

    5 A

    MC

    :\U

    sers

    \dnguye

    n\ D

    ocum

    ents

    \ 109

    5-0

    57-0

    1_E

    lec_R

    19_

    dngu

    yen.r

    vt

    E021

    ONE LINE DIAGRAMPANELS 8DLXA, 8DLXB &

    8DLXC

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE3ONE LINE DIAGRAM - 8DLXC

    NOT TO SCALE1ONE LINE DIAGRAM - 8DLXA

    NOT TO SCALE2ONE LINE DIAGRAM - 8DLXB

    No. Description Date

  • 225A, 480Y/277V, 3P, 4W, GND, 65KAIC, RM P.117 - SEE E202

    PDPH

    NEUTRAL

    GROUND

    TOPNL USHC-BSEE 1/E013

    3P100A

    3#31#8G1"C

    POWER UNIT

    FOR LIFT

    3P100A

    3#31#8G1"C

    POWER UNIT

    FOR LIFT

    4-100A/3PEQUIPPEDSPACES

    M

    CP

    M

    CPPNL PROVIDEDWITH LIFT, TYP.

    3P15A

    3#121#12G3/4"C

    FCU-P-9

    3/4

    3P15A

    FCU-P-11

    2

    3#121#12G3/4"C

    3P15A

    FCU-P-12

    2

    3#121#12G3/4"C

    3P15A

    FCU-P-13

    2

    3#121#12G3/4"C

    30A3P5AF

    1

    R G

    30A3P5AF

    1

    R G

    30A3P5AF

    1

    R G

    30A3P2-1/4AF

    1

    R G

    100A, 480Y/277V, 3P, 4W, GND, 65KAIC

    8HC

    NEUTRAL

    GROUND

    TO PNL 8DHBSEE 4/E016

    3P15A

    3#121#12G3/4"C

    FCU-P-10

    3/4

    30A3P2-1/4AF

    1

    R G

    1000A, 480Y/277V, 3P, 4W, GND, 65KAIC

    DIST PNL 8PC

    3P250A

    NEUTRAL

    GROUND

    TO USHC-A/BSEE E013

    3-250KCMIL1#4GND2 1/2"C

    3P200A

    3P225A

    3P30A

    3P50A

    3P100A

    3P30A

    AC/L-5 OA-0-5VFD

    UNIT #5

    3P100A

    3P20A

    3P40A

    3P20A

    FANRA/0-5-1

    PNL4HAP

    UNITAC-0-7

    FANRA/0-7-1

    AC/0-5 AC/L-7 FANRA/0-5-2

    UNITOA/0-7

    FANRA/0-7-2

    VFD VFD VFD VFD VFD

    3#101#10GND3/4"C

    3#101#10GND3/4"C

    3#31#8GND1"C

    3#121#12GND3/4"C

    3#121#12GND3/4"C

    3#3/01#6GND2"C

    3#4/01#4GND2"C

    3#81#10GND3/4"C

    4#31#8GND1 1/4"C

    3#81#10GND3/4"C

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P20AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P30AF

    R G

    SIZE 1

    COMBINATIONSTARTER30A, 3P30AF

    R G

    SIZE 1

    3#12#12G3/4"C

    2#183/4"C

    3#12#12G3/4"C

    2#183/4"C

    3#10#10G3/4"C

    32#183/4"C

    TO JOHNSONCONTROLPNL

    3#10#10G3/4"C

    32#183/4"C

    4-100A/3P EQUIPPED SPACES

    VFD

    TO JOHNSONCONTROLPNL

    TO JOHNSONCONTROLPNL

    TO JOHNSONCONTROLPNL

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    7:3

    2 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E022

    ONE LINE DIAGRAM -PANELS 8HC, 8PC &

    PDPH

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    NOT TO SCALE2ONE LINE DIAGRAM - PANEL PDPH

    NOT TO SCALE1ONE LINE DIAGRAM - PANEL 8HC

    No. Description Date

    NOT TO SCALE3ONE LINE DIAGRAM - DIST PNL 8PC

  • 600A, 480Y/277V, 3PH, 4W, GND

    PANEL PA

    150A3P

    NUUTRAL

    GROUND

    TO ATS ASEE E013

    200A3P

    ACA

    250AMLO

    225A, 480Y/277V, 3PH, 4W, GND

    DISTRIBUTION PANEL "DPUPS"

    50A3P

    NUUTRAL

    GROUND

    125A3P

    LUI125AMLO

    400A, 208/120V, 3PH, 4W, GND

    PANEL SFB

    100A3P

    NEUTRAL

    GROUND

    BB

    125AMLO

    250A3P

    100A3P

    DD

    125AMLO

    100A3P

    FF

    125AMLO

    100A3P

    HH

    125AMLO

    125A3P

    400A, 208/120V, 3PH, 4W, GND

    PANEL SFA

    100A3P

    NEUTRAL

    GROUND

    AA

    125AMLO

    250A3P

    100A3P

    CC

    125AMLO

    100A3P

    EE

    125AMLO

    100A3P

    GG

    125AMLO

    INPUT4#1/0, #1/0 GND2"C

    3#6#10 GND1"C

    5#1/0#8 GND2"C

    3#1/0#1/0 GND1 1/2"C

    5#300KCMIL#2 GND3"C

    3#1/0#1/0 GND1 1/2"C

    5#300KCMIL#2 GND3"C

    45KVA480-120/208VHARMONICCANCELLATIONXFMR

    75KVA480-120/208VHARMONICCANCELLATIONXFMR

    75KVA480-120/208VHARMONICCANCELLATIONXFMR

    ZZ ZZ ZZ

    Y

    S

    S

    S

    BATTERYCABINET

    UPS80KVA480Y/277VG.E.OFCI

    S

    N.C.

    MBPNL

    UPSMAINTENANCEBYPASSPANEL 150A,480Y/277V35KAIC3PH, 4WOFCI

    N.O.

    3PMBB

    150A

    K1K1 3P

    150A

    MIB3P150A

    UIB

    3#1/0#1/0 GND2"C

    N.C.

    NEUTRAL BUS

    GROUND BUS

    UPS INPUT3#3/0#1/0 GND2"C

    UPS OUTPUT3#3/0#1/0 GND2"C

    JB1

    JB2

    NEW3#1/0#1/0 GND2"C

    JB3 JB42#143/4"C

    K1

    SKRU

    PUSHBUTTON

    CONTROLTRANSFORMER

    600A, 480Y/277V, 3PH, 4W, GND

    PANEL PB

    200A3P

    NUUTRAL

    GROUND

    TO ATS BSEE E013

    ACB250AMLO

    225A, 480Y/277V, 3P, 4W, GND, 65KAIC

    MSPECA

    3P60

    3P15A

    3P50A

    NEUTRAL

    GROUND

    TO CONTROL PANEL FOR AHU IN VAULT BLDG

    TO STARTER FOR FCU-SC-1 IN VAULT

    TO VFD FOR CHILLED WATER PUMP IN CYCLOTRON MECH RM

    3#121#12G3/4"C

    3#81#10G3/4"C

    3#81#10G3/4"C

    Texas Registered Engineering Firm F-2113

    Scale

    Date

    Designed By

    Checked By

    SSA Project Number

    Drawing No.

    2825 Wilcrest, Suite #350 Houston, Texas 77042

    Ph. 713.780.7563 Fax.713.780.9209

    Keyplan

    NOT TO SCALE

    8/2

    2/2

    01

    9 1

    0:4

    7:3

    8 A

    MC

    :\U

    sers

    \dnguye

    n\D

    ocum

    ents

    \109

    5-0

    57

    -01_E

    lec_R

    19_dn

    guyen

    .rvt

    E023

    ONE-LINE DIAGRAMPANELS PA & PB

    The University of TexasHealth Science Center at

    Houston

    MEDICALSCHOOL

    BUILDING (MSB)

    DBB

    RBM/DDN

    08/23/2019

    1095-057-01

    1095-057-01

    No. Description Date

    NOT TO SCALE1ONE LINE DIAGRAM - PANEL PA

    NOT TO SCALE2ONE LINE DIAGRAM - PANEL PB

    NOT TO SCALE3ONE LINE DIAGRAM - MSPECA

  • BUS5LA

    100 70 70

    PANEL5HA

    225

    5.24

    1

    5.24

    3

    5.24

    5

    100 225

    PANEL5LA

    5.60

    2

    5.60

    8

    5.61

    2

    5.61

    6B

    70 100 70 70

    BUS4LA

    100 70 70

    4.23

    7

    4.24

    1

    4.24

    3

    PANEL4HA

    100 225

    4LAPANEL

    150 100 705022570

    4.23

    5

    4.61

    0

    4.60

    6

    4.61

    2

    4.60

    0

    3.23

    3A

    3.23

    8B

    3.23

    4

    100 100 70

    PANEL3HA

    100 225

    3LAPANEL

    3.60

    0B

    3.60

    0A

    3.60

    4

    3.60

    6B

    100 70

    BUS3LA

    225

    3.60

    6A

    70 10070

    2.23

    4 PANEL2HA

    100 225

    2LAPANEL

    225150 150 150 70

    2.22

    1C

    2.23

    6

    2.23

    8

    BUS2LA

    1.23

    9

    1.24

    1

    1.24

    3

    1HAPANEL

    1LAPANEL

    1.60

    0A

    1.60

    0B

    707022510070 100

    1.23

    7

    70

    100 225

    225

    225

    5.62

    2

    5.62

    6

    5.63

    0

    70 70 70225

    5LBPANEL

    100

    PANEL5HB

    5.26

    1

    5.25

    9

    5.25

    7

    70 70 70

    BUS5LB

    100 100

    4.62

    8

    4.62

    4

    4.63

    2

    4HBPANEL

    4.25

    3

    4.25

    5

    4.25

    7PANEL4LB

    225 70100 7070 70 100

    BUS4LB

    70

    4.62

    0

    70

    4.25

    9

    BUS3LB

    100 50 70

    3.25

    0

    3.25

    2B

    3.25

    2A 3HBPANEL

    100 225

    PANEL3LB

    3.62

    0

    3.62

    2B

    3.62

    2A

    7070 100225

    2HBPANEL

    2.24

    4

    225

    BUS2LB

    225

    100100

    PANEL2LB

    2.22

    1A

    70

    3.62

    8B

    70

    3.62

    8A

    50

    1.24

    7

    1.24

    9

    1HBPANEL

    10070

    BUS1LB

    225 70100 7070

    1.62

    4

    1.62

    0

    1.61

    6

    1.61

    2

    1LBPANEL

    100 100

    706.

    241

    BUS6LA

    6.60

    8

    6.60

    4

    6.60

    0A

    6.60

    0B

    6.24

    5

    6.24

    3

    100225

    PANEL

    225

    6HAPANEL

    70 70 50

    6LA

    70 70 7070

    6.29

    3B

    6.23

    3A

    50

    6.61

    4

    6.61

    2

    70 70

    BUS7LA

    100 100

    PANELPANEL7HA 7LA

    BUS7LB

    100 100

    PANEL7HB

    PANEL7LB

    70

    7.25

    3

    7.25

    5

    7.25

    7

    70 70

    BUS6LB

    225 225

    225

    PANELPANEL6HB

    7.26

    1

    7.25

    9

    70 70 100

    6LB

    7.61

    8

    7.62

    0

    100

    7.62

    6A

    7.62

    6B

    7.63

    2

    70 7070

    70

    5.23

    7

    5.23

    9

    70

    5.61

    6A

    50

    3.61

    2

    70

    1.60

    4B

    1.60

    4A

    7070

    70

    3.29

    2

    5.25

    5B

    5.25

    5A

    50 70

    4.61

    6

    70

    1.24

    5

    70

    3.24

    6

    3.24

    8

    70 70

    4.26

    1

    70

    5.63

    8

    100

    ROOF

    7THFLOOR

    6THFLOOR

    5THFLOOR

    4THFLOOR

    3RDFLOOR

    2NDFLOOR

    1STFLOOR

    CENTER TAP BOX (TYP.)225A PLUG-IN BUS