work programme provider guidance chapter 3c€¦  · web viewdwp performance management teams and...

24
Work and Health Programme Provider Guidance Chapter 16 - Performance Management and Compliance Monitoring Contents Performance Management and Intervention Regime (PMIR) Level 1: Performance Management Regime (PMR) Level 2: Informal action - Performance Manager (PM) Led Level 3: Informal action - Nationally Led Level 4: Formal action - Nationally Led Performance Indicators Cohort Profiles and Management Information Local Engagement Meeting Contract Performance Review Compliance Monitoring Performance Manager Checks Evaluation and Reporting Provider Assurance Team Annexes Performance Management and Intervention Regime (PMIR) Updated:06/04/2017 1 V1.8

Upload: others

Post on 11-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

Chapter 16 - Performance Management and Compliance Monitoring

Contents

Performance Management and Intervention Regime (PMIR)Level 1: Performance Management Regime (PMR)Level 2: Informal action - Performance Manager (PM) LedLevel 3: Informal action - Nationally LedLevel 4: Formal action - Nationally LedPerformance IndicatorsCohort Profiles and Management InformationLocal Engagement MeetingContract Performance ReviewCompliance MonitoringPerformance Manager ChecksEvaluation and ReportingProvider Assurance TeamAnnexes

Performance Management and Intervention Regime (PMIR)

Updated:06/04/2017 1 V1.8

Page 2: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

1. DWP operates a robust performance management regime to hold Providers to account for performance offers within their contract. This Performance Management and Intervention Regime (PMIR) has been developed to support the delivery of Provision, and underpin your contract.

2. The aim is to ensure you meet the performance levels and customer service standards stipulated in your contract and where required take formal action against you, where you do not meet such performance levels and customer service standards.

3. DWP will manage your performance at the headline CPA level, the headline Devolution Deal Area (DDA) level, and at individual customer group level (disability, LTU and early access) in the CPA, and may take performance improvement action should your performance in any of these fall below the levels stipulated in your contract. We will also monitor the performance of the individual participant groups within the DDA in order to inform progress towards an outcome. These will be included in the regime as Performance Indicators (PIs).

4. There are four levels of this regime:

• Level 1: Performance Management Regime (PMR)

• Level 2: Informal action - Performance Manager (PM) Led

• Level 3: Informal action - Nationally Led

• Level 4: Formal action - Nationally Led

Level 1: Performance Management Regime (PMR)

5. DWP Supplier Managers and Performance Managers will hold regular Contract Performance Review (CPR) meetings with you which will focus on achieving contractual performance levels and customer service standards including but not limited to, on an in-month, rolling 3 month, rolling 12 month and cumulative basis, in line with the Contract from Day One.

6. Performance will be managed on both the quantitative and qualitative aspects of your contract. Category Managers and staff representing Jobcentre Plus districts may also attend these meetings. You will be required to provide monthly Management Information prior to the CPR.

Level 2: Informal action - Performance Manager (PM) Led

Updated:06/04/2017 2 V1.8

Page 3: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

7. If Level 1 (PMR) shows that you may not achieve the performance levels and customer service standards set out in your contract, DWP Performance Managers may, but are not obliged to, undertake informal action, by setting up a performance Action Plan.The Action Plan will be used to capture all agreed actions for performance improvement including incremental performance and pipeline data that may lead to outcomes, review dates and the Cohort Management Information to improve the achievement of the performance levels and customer service standards in line with the Contract.

8. The Action Plan is to be populated by you and must fully address all concerns. The actions must be specific about the required improvement, and the improvements must be specific, measurable, achievable, realistic and time bound.

Level 3: Informal action - Nationally Led

9. If the remedial actions captured on the Provider Action Plan are unable to lift your performance in order to meet the performance levels and customer service standards in the Contract, the DWP Performance Managers can escalate this to enable DWP to undertake further informal action from a central point within DWP Performance Management Team, supported by Commercial.

10. You will be invited to a meeting to discuss your performance and receive a Management letter to request that your performance improves. At this stage you will be informed that formal action could be taken in the event that performance doesn’t improve.

Level 4: Formal action - Nationally Led

11. At this stage DWP will take formal action by issuing a Performance Improvement Notice (PIN) in accordance with the Contract, to address failure to meet the performance levels and customer service standards in the Contract.

12. DWP will work with you to support the completion of a Performance Improvement Plan (PIP) and agree the forecasted Management Information you are asked to supply.

13. DWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support improvement to your performance.

Updated:06/04/2017 3 V1.8

Page 4: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

14. In the event that your performance does not improve to meet the performance levels and customer service standards as required by the PIN, DWP may take action to terminate your Contract. For the avoidance of doubt, DWP will still be entitled to take action at Level 4 whether or not it has taken all of the steps outlined at Levels 1, 2 and/or 3, above.

Performance Indicators

15. None of the above precludes any and all remedies available to DWP under the contract. The contract takes precedence.

16. DWP will manage your performance against Performance Indicators (PI). These will include the individual participant groups within the DDA, and also the progress towards an outcome as informed by earnings commencement, and the £1,000 and £2,000 milestones. Where a PI potentially indicates a future failure of a tMPL, DWP may require you to develop an improvement plan to remedy this by issuing a Performance Indicator Course of Action Notice.

17. Subsequent failure of the improvement plan and/or tMPL does not remove or impact the remedies available to the authority.

Cohort Profiles and Management Information

18. DWP will measure your performance using a cohort and a profiled Cohort measure,based on the information you provided as part of your tender and which has been incorporated in to your Contract. You will be measured against the individual Cohort Profile for each Claimant Group (Disability, Early Access and LTU) in the CPA, the headline DDA, and the Cohort Profile for the CPA overall. A Cohort will relate to Starts in a calendar month, i.e. all the Participants where the start date entered on PRaP falls in the relevant calendar month. Further information can be found in Chapter 17 - Management Information.

19. The outcome definition for both employed and self-employed must have been met at or before 639 days from the Start Date. For self-employed outcomes, DWP will allow you until 700 days from the Start Date to submit a claim. After 791 calendar days, for the purposes of performance management, the result of an outcome claim will be deemed final. Any subsequent adjustment, such as the recovery of invalid outcome payments will not adjust the cohort performance.

Updated:06/04/2017 4 V1.8

Page 5: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

20. Performance data against these profiles will be taken from HMRC data, the Provider Referral and Payment system (PRaP) and, in the case of self-employed participants, from outcome claims submitted by you. DWP produces MI Packs on a monthly basis. The MI Pack produced comprises the data from the previous calendar month, i.e. the pack produced in December would contain data for the entire calendar month of November. The MI packs will contain the data input to PRaP regarding your customers, and cohort profiles performance against the performance levels and customer service standards in the Contract , and will allow the Department to monitor your performance across various time periods including cohort, rolling 3 months, rolling 12 months and cumulative from day 1 of the contract.

21. You will be required to provide a monthly performance return (supplier MI) containing key data that drives the performance of the Contract. This will be in a form agreed with DWP following further discussion, and is likely to include, but is not limited to, information such as the following:

the number of supplier and end-to-end supply chain staff working on this contract (including data on absences) and in what roles, including a full-time equivalent (FTE) breakdown;

caseload sizes per adviser; (including the average and maximum caseload size each of your, and your end-to-end supply chain, advisers will be expected to manage);

the number of people participating within the main element of the supplier delivery model;

supplier performance against the customer service standards agreed in your Contract;

participant attendance at face-to-face and group sessions and potentially other agreed channels of engagement; and

the performance and management from each Prime delivery location and of the supply chain, Including information on what commercial action you are taking on your supply partners.

An example of the Action Plan which will be used is included at Annex A.

22. In the main, activity will centre on monthly Local Engagement Meetings (LEMs) and Contract Performance Review meetings (CPRs) to manage your performance. These meetings will be the key vehicles through which DWP drives delivery of services in accordance with the performance levels and customer service standards in the Contract.

Updated:06/04/2017 5 V1.8

Page 6: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

Local Engagement Meeting (LEM)

23. LEMs will be made up of DWP Performance Managers, representatives from current and/or future DDAs as they are created within the CPA, and local area stakeholders including Jobcentre Plus. This will provide a forum in which we can discuss and support performance improvement, service delivery and service integration across the CPA and the DDA. You may be invited to discuss performance at these meetings.

24. The agenda will include a discussion of your performance in the DDA and wider CPA, particularly relating to your integration with local services. The LEM is also an opportunity to discuss future direction and impact any changes affecting delivery of the provision.

25. The LEM will provide an opportunity to ensure that the Programme is helping the appropriate claimants in to work, and to address areas of concern. This may include discussion on referrals to you from Jobcentre Plus as well as the participants being signposted to Jobcentre Plus from external organisations. It will enable a collaborative approach to be taken between all stakeholders to contribute to the successful delivery of the programme.

Contract Performance Review (CPR)

26. The purpose of the Contract Performance Review (CPR) is to formally examine with you, your performance for individual contract(s). All relevant aspects of performance will be assessed against contractual requirements and outcomes.

27. The usual frequency of CPR is monthly, however this can be reviewed as appropriate.

Content of the CPR meeting

28. The CPR will focus on the ongoing achievement of performance levels and customer service standards and depending on priority issues for each meeting, is likely to cover some/all of the following areas:

• action points outstanding from previous meeting;

• performance

• expected future performance based on information available (e.g. earning commencements and current performance levels);

• review of Action Plan – including improvement expectations agreed at the last meeting;

Updated:06/04/2017 6 V1.8

Page 7: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

• Sub-contractor (end to end performance) and Supply Chain performance;

• employer engagement;

• collaborative working (including Operational Process Updates);

• Decision Making and Appeals (DMA);

• participant experience;

• Compliance Monitoring;

• Performance Manager checks;

• exit feedback/CV/references; and

• DWP policy changes – latest DWP memos.

Content in detail (This list is not exhaustive)

29. Action points outstanding: The PM will go through any outstanding action points not cleared before the meeting and updating where possible. Any action points raised during the current meeting will be assigned a named person/persons and a timescale for resolution.

30. Performance: The main focus of the CPR is reviewing performance on a cohort profile basis against your performance levels and your delivery of the customer service standards in the Contract. Depending on the priority of issues identified for the meeting, the CPR is likely to last an hour and a half (more if required). PMs will use the available MI, action logs, supporting documents, results from compliance monitoring checks and the Action Plan to lead performance discussions. Any areas of improvement or weakness will be highlighted during discussion and captured in your Action Plan. The PM will challenge you to meet your targets and be clear about any interventions action which may be taken should the performance levels or the customer service standards in the Contract not be met.

31. Subcontractor and supply-chain performance: You will be asked about the performance of subcontractors delivering end-to-end services on your behalf, as well as the performance of other delivery partners including specialists. You will be asked about the steps you are taking to ensure performance is high, and what actions you are taking to remedy any poor performance.

32. Employer Engagement: The PM will ask about the work you have done to engage with local employers, including identifying new employers,

Updated:06/04/2017 7 V1.8

Page 8: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

sourcing vacancies and collaborating to develop routes in to employment for participants.

33. Collaborative working: Discussion will focus on how you are continuing to improve on good local working relationships and regular liaison with Jobcentre Plus and Provider, particularly around resolving issues and sharing information to inform future planning. Discussion should also capture any local delivery issues.

34. DMA: Discussion will focus on how effective the current processes are, areas for concern, and any identified improvement activities.

35. Participant Experience: Discuss any current complaints and participant experiences to identify trends and the effectiveness of processes. Independent Case Examiner (ICE) data will help inform discussions. You will be expected to provide figures on the number of complaints received (in-month); number of complaints resolved; and the number of complaints still outstanding in line with your complaints process. You will be questioned on the breakdown of complaints across the Supply Chain and if this has identified any areas of weakness.

36. Compliance Monitoring: The PM will feedback outcomes / actions from the latest check.

37. Performance Manager checks: The findings of the checks will be discussed at the CPR.

38. Exit feedback/CV/references: Discussion should focus on the quality of Exit feedback and how the process is performing against the 10 day target against any tCSS target..

39. DWP policy changes / latest DWP memos: This item is to ensure all parties are aware of any policy changes since the last CPR.

Performance Requirements

40. The Performance levels you are required to deliver are set out in schedule 2 of your contract.

41. DWP will actively monitor the service you deliver against these performance levels. This will be done using a combination of IT-based management information and Compliance Monitoring checks. The following tables and paragraphs show the categories under which performance will be measured and managed and the standards which relate to the delivery of customer service.

42. The tender Minimum Performance Levels (tMPLs) are:

Updated:06/04/2017 8 V1.8

Page 9: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

tMPL

1

CPA level tMPL.

This is the headline performance target; a CPA-level % conversion rate taken from your tender offers for each of the separate customer groups. Performance will be measured and managed on a cohort profile basis.

2

CPA level Disability Customer Group tMPL.

This is the performance target for persons who have a disability attending WHP on a voluntary basis, taken from your tender offer. Performance will be measured and managed on a cohort profile basis.

3

CPA level Early Entry Customer Group tMPL.

This is the performance target for the Early Entry disadvantaged groups attending WHP on a voluntary basis, taken from your tender offer. Performance will be measured and managed on a cohort profile basis.

4

CPA level LTU Customer Group tMPL.

This is the performance target for the LTU group attending WHP on a mandatory basis, taken from your tender offer. Performance will be measured and managed on a cohort profile basis.

5

DDA level tMPL

The tMPL for the DDA will be measured both distinctly from and as part of the tMPL for the CPA (tMPL1). Performance will be measured and managed on a cohort profile basis.

This is an aggregate of the performance against performance targets for each of the separate customer groups at DDA level; a DDA-level % conversion rate.

43. Please see the table at Annex B for more detail.

44. The following table shows the Customer Service Standards that will utilise IT based management information:

CSS 1 a. 100% of ‘Referrals’ will result in a ‘Participant Start’ or failure to attend within 10 working days of referral.

b. This activity will be recorded in PRaP within 15 working days of referral.

Updated:06/04/2017 9 V1.8

Page 10: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

2The supplier must acknowledge a ‘Referral’, within two working days of the referral, on PRaP.

3

No more than 4% of referrals will be in backlog.

Backlog is defined as an accumulation of uncompleted work or matters needing to be dealt with. In line with CSS1, this would be a figure greater than 15 working days.

4No single referral will be in backlog for more than 25 working days from date of referral.

45. Payment of the Delivery Fee, as described in your Contract, will be subject to meeting the above four CSS. Accordingly, payment of the Delivery Fee may be deferred should the above CSS fall below minimum required levels. The basic principles for application of deferral of the Delivery Fee are as follows:

Failure to meet two or more of the four CSS (labelled as numbers 1 to 4), which form this suite, in one or more in-month periods (when viewed across a rolling three-month window) may result in 50% of the Delivery Fee being withheld until the failure is remedied.

This deferral of half of the Delivery Fee would continue until such a time that within a three-month rolling period, no more than one individual CSS failure is evident across the four CSS that form the suite.

Once performance has been remedied to a satisfactory level, the Delivery Fee would be placed back into payment and any deferred fees would become due for payment at the earliest opportunity (expected to be next due payment date).

If a supplier is unable to remedy a failure for which the Delivery Fee has been deferred, the supplier shall no longer be entitled to receive, and DWP shall be relieved of any obligation to pay, the withheld Delivery Fee.

46. Deferral of the Delivery Fee may be instigated in advance of, or in conjunction with, a formal PIN as described in paragraphs 12 – 15. Deferral of the Delivery Fee payment remedies operate independently of and runs alongside all other available remedies and can be triggered independent of any performance improvement action being taken.

Updated:06/04/2017 10 V1.8

Page 11: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

47. None of the above precludes any and all remedies available to DWP under the contract. The contract takes precedence.

48. The following CSSs will be measured via a sample-based Compliance Monitoring Regime:

CSS

5The supplier must ensure that for all ‘Participant Starts’, an agreed Action Plan is in place within 20 working days of the referral.

6The supplier must send copy of the ESF form to an agreed DWP address, by electronic means or otherwise, within five working days of date of participant signature.

49. You are required to deliver the performance levels against these Customer Service Standards and those tender Customer Service Standards (tCSS) taken from your tender as are set out in schedule 2 of your contract.

50. Each CSS will be monitored using the most appropriate method, either IT-based and/or Compliance Monitoring, from Day One; any failure to meet the agreed level for a CSS and/or tCSS may result in performance improvement action being instigated.

51. Please see the diagram at Annex C for more information.

None of the above precludes any and all remedies available to DWP under the contract. The contract takes precedence

Compliance Monitoring

Updated:06/04/2017 11 V1.8

Page 12: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

52. DWP Compliance Monitoring Officer’s (CMO) perform regular evidence based checks to identify if Providers are adhering to the delivery models set out in their contracts, and to identify if all ESF and Match funded Providers are adhering to the delivery models set out in their contracts.

53. This includes checking samples of Participant records held by the provider for eligibility, activity, and to ensure that a claimant has reached the relevant earnings threshold and that Outcome Payment have been correctly made. CMOs will check use of participant Action Plans and the quality of their content, as well as identifying whether participant engagement is in line with the programme/model (including for those participants who have moved to another CPA), and will check on sanction activity to ensure there is a consistent approach across the WHP.

54. CMOs will check that the ESF Regulatory Requirements, in terms of Marketing and Publicity; Sustainable Development; Equality and Diversity; Document Retention are being adhered to (electronic versions of all documents are kept; no paper copies will be accepted). Further information regarding ESF requirements can be found in the Generic Provider Guidance Chapter 11b – ESF requirements 2014 – 2020 (England Only) and also further information can be found in Chapter 18 - European Social Fund.

55. Further information regarding ESF requirements can be found in the Generic Provider Guidance Chapter 11b – ESF requirements 2014 – 2020 (England Only) for detail on how to assess and evidence an individual’s eligibility for support through ESF 2014-2020 contracts. This includes the criteria and preferred documents to use; this chapter also includes information and criteria where a self-declaration will be required for assessing and evidencing eligibility. Final (approved) compliance lists of checks to be carried out will be sent to you during Contract Award/Go Live.

56. DWP will specify the location where the checks will take place and we expect them to be centralised in DWP locations. However, we retain the option for CMOs to carry out the checks in providers premises where DWP decides this is appropriate. All records must be available on the Provider system for inspection.

57. The sample of participants to be checked will be sent to Providers 5 days prior to the CMO checks being carried out. It is expected that Providers will undertake their own compliance checks on the sample and will return their completed checks to the CMO before the agreed compliance meeting date. This 5-day requirement is to ensure Providers can have fully informed discussions regarding the sample when the compliance checks are carried out.

Updated:06/04/2017 12 V1.8

Page 13: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

58. You are expected to have the necessary remote IT equipment, which must comply with the relevant DWP policies as defined in the appropriate section of the Work and Health Programme Terms & Conditions, which you can bring to the location to enable DWP to carry out centralised checks of your systems; this includes the provision of any necessary electronic evidence that is required by the CMO to undertake the checks effectively.

59. The sample of records to check will be selected randomly using a method chosen by DWP. The frequency, periodicity and size of the samples may change throughout the contract period. Where a supplier holds more than one WHP contract, a sample may be drawn from across a selection (up to and including all) of the supplier’s WHP contracts (with the error rate being extrapolated across the claims from those contracts); from each contract (with the consequent error rate being extrapolated across the claims from the contract from which the sample was draw); or through a combination of approaches.

60. All issues arising from CMO checks are reported to you and relevant DWP stakeholders. Contract review meetings with DWP Supplier Managers and Performance Managers will include discussions around compliance issues identified by CMOs.

61. DWP reserves the right to carry out physical checks on documentation as part of this process.

Performance Manager Checks

62. Performance Managers may undertake their own checks to complement those already undertaken by the CMOs, by looking more in depth at individual cases.

63. The checks focus on the participant’s journey, seeking assurances that you are addressing the participant’s barriers to employment, and to test that your approach is in line with your Contract.

64. The checks may also include a ‘go-look-see’ approach where the PM will observe a range of activities, including jobsearch and the initial engagement meetings. These will not only be with the prime provider, but also end-to-end delivery partners and sub-contractors (if appropriate). PM’s may also undertake “deep dives” into specific areas to understand where there are specific areas of weakness. PM’s may also ask to attend sub-contractor end-to-end delivery and supply chain meetings, and accompany your Performance Managers on their meetings/visits to your sub-contractor and supply chain partners.

65. The findings from the checks will feed into a provider’s CPR meeting.

Updated:06/04/2017 13 V1.8

Page 14: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

Evaluation and Reporting

66. Independent evaluation will be an important element of your Provision and you will be asked to co-operate in a range of evaluations commissioned by the DWP.

67. Other interested parties and Government Departments as part of wider cross-government agendas may commission further evaluations and your assistance will be expected when required.

68. As part of this evaluation work, researchers may wish to visit and interview you and your sub-contractors and supply chain, Participants and employers involved in your Provision. You may be asked to provide the relevant contact details and, in order to facilitate this process; you should seek advance agreement from Participants to take part in evaluations.

69. Advance notice will be given where your co-operation is required.

70. An end of project evaluation report will also be required, highlighting innovative delivery practices and achievements against the cross cutting themes.

Provider Assurance Team

71. The primary purpose of the Contracted Employment Provision (CEP) Provider Assurance Team (PAT) is to provide the DWP CEP Director with an assurance that provider systems of internal control are such that payments made to providers are in accordance with DWP and Treasury requirements.

72. PAT reviews and tests providers’ systems of internal control to establish how effective they are at managing risk to DWP in relation to CEP expenditure, service delivery and data security, including the arrangements they have.

73. This work is carried out by the PAT by reviewing Providers’ internal control systems to assess their ability to manage risk across four key areas:

74. Governance Arrangements – covering the Provider’s governance arrangements, systems for tracking and reporting performance and their anti-fraud measures

75. Service Delivery – includes the Provider’s systems for starting, ending and moving Participants through Provision and generally looks to ensure that DWP is getting the service it is paying for. This section also covers management of the supply chain

Updated:06/04/2017 14 V1.8

Page 15: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

76. Claim Procedures and Payments – looks to ensure that Providers have in place effective systems to support their claims for payment, including appropriate segregation of duties

77. Data Security – looks to ensure that Providers have in place adequate systems to safeguard DWP data whilst it is being stored and/or transmitted around their organisations.

78. The PAT operates at a national level across all provision, enabling it to present CEP Providers operating across regions with a single view of the effectiveness of their systems; each Provider will have a nominated Senior Provider Assurance Manager and therefore a single point of contact within DWP for management of assurance related issues / concerns.

79. On completion of each review, you are awarded an assurance rating from the following four categories – weak, limited, reasonable and strong. You will also receive a formal report detailing the review findings including key strengths and areas for improvement; where weaknesses have been identified you are asked to complete an action plan setting out appropriate steps for improvement and this is followed up at an agreed point.

80. The timescale for a subsequent review is determined by several risk factors; these include your current assurance rating, the contract value and intelligence from internal stakeholders. Provider reviews are conducted over a period of up to 20 weeks. The resource allocated to each review depends on the complexity of the contract delivery.

Findings from each Provider Review

81. Findings from each review are routinely reported to the relevant category managers/supplier managers and other DWP stakeholders. Remedial actions may be taken in the following circumstances:

If, following a Weak or Limited Assurance level from the Provider Assurance Team, your subsequent assurance level is the same or worse for the same reasons, or you are awarded a consecutive third weak or limited assurance, regardless of the reasons

Following a review, if you fail to submit and/or implement the Action Plan within the agreed timescale

Where there are suspicions that you may be acting inappropriately, the team will refer to Internal Investigations as the experts trained in the legalities and techniques required to carry out formal investigations

Updated:06/04/2017 15 V1.8

Page 16: Work Programme Provider Guidance Chapter 3c€¦  · Web viewDWP Performance Management Teams and DWP Commercials will work with you to undertake activities to monitor and support

Work and Health Programme Provider Guidance

82. DWP will periodically publish Provider assurance levels and names (note - this will not include reports or supporting information). This is to satisfy a commitment DWP made in response to a Freedom of Information request and to support DWP’s commitment to public transparency.

83. The PAT will work with you to ensure that you understand what is expected and are, therefore, adequately equipped to develop robust systems to support your service delivery model throughout the duration of the contract (for further information please see DWP Generic Provider Guidance, Chapter 6, Provider Assurance

Annexes

Annex A: Sample provider action plan

Annex B: tMPL Diagrams

Annex C: tCSS Diagrams

Updated:06/04/2017 16 V1.8