work portfolio m
TRANSCRIPT
WORK PROFILE PICTURES
Arc. Adegbenro E. Oluwatosin(B.tech, M.tech)
A graduate with a Bachelor of Technology and Master of Technology in Architecture from
the Federal University of Technology, Akure, Ondo State, Nigeria. He is a registered member
of both American and British Project Management Professional and has undergone series of
professional training like Leadership Training Course both within and outside the border of
Nigeria. He has worked with several companies in the execution of various laudable projects
within and outside Nigeria most especially High-rise or MultiStorey Buildings. Among such
is with BuiltVine Construction Limited, where he was actively involved as a Project Manager
for the construction of a building complex for His Excellency, the President of the Federal
Republic of Nigeria, Dr. Ebele Good luck Jonathan in his home town, Otueke in Bayelsa. To
say a few, he has extensively been involved in the design and construction of High-rise
offices, Storey buildings, Luxury block of flats, Shopping complex, Filling Station, Banks
and lots more. His universal travelling experience had fetched him a great insight and
profound knowledge in the Construction Industry.
DWaves Construction Ltd (2014)
• Design and Supervision of Luxury apartments At VI, Lagos
ELEVATIONS
FRONT ELEVATION
RIGHT SIDE ELEVATION
+ 600 mm G RO UN D F LO OR LE VE L
+6 00 mm GR O UND F LO OR LE VEL
+ 231 20 mm ST EE L R OO F L EV EL
+ 19 000 mm P EN TH OU SE FL OO R L EV EL
+ 64 00m m FIR ST FL OO R L EV EL
+ 30 75m m ME ZZA NI NE FL OO R L EV EL
+ 95 50m m SE CO ND FL OO R L EV EL
+ 12 700 mm TH IRD F LO OR LE VEL
+ 15 850 mm FO UR TH FL OO R LEV EL
+ 21 700 mm R OO F L EV EL
+ 24 225 mm P ARA PE T WA LL LE VE L
+ 231 20m m ST EE L R OO F L EV EL
+ 190 00m m P ENT HO US E F LO OR L EVE L
+ 640 0m m F IR ST FLO OR LE VE L
+ 307 5m m M EZ ZA NIN E FLO OR L EVE L
+ 955 0m m S EC ON D FLO OR LE VE L
+ 127 00 mm TH IR D F LO OR LE VE L
+ 158 50m m FO UR TH FL OO R L EV EL
+ 217 00m m RO OF LE VE L
+6 00m m G RO UN D FLO O R L EV EL
LEFT SIDE ELEVATION
+2 312 0m m ST EE L R O OF LE VE L
+ 19 000 m m PE NT HO US E FLO O R LE VE L
+6 400 mm F IR ST FL OO R LE VE L
+3 075 mm M E ZA NIN E FLO O R L EV EL
+9 550 mm S EC O ND FL OO R LE VE L
+1 270 0m m TH IRD F LO OR LE VE L
+1 585 0m m FO UR TH FL OO R LE VE L
+2 170 0m m RO O F L EV EL
+ 24 22 5m m PA RA PE T WA LL LE V EL
BACK ELEVATION
+ 600 m m G R OU ND FL O OR LE VE L
+ 231 20 mm S TE EL RO O F L EV EL
+ 19 000 m m PE NT HO US E FLO O R LE VE L
+ 64 00m m FI RS T F LO OR L EV EL
+ 307 5m m M EZ ZA NIN E FLO O R L EV EL
+ 95 50m m SE C ON D F LO O R L EV EL
+ 127 00 mm T HIR D FL OO R L EV EL
+ 15 850 mm F OU RT H FLO O R L EV EL
+ 21 700 mm R OO F LE VE L
+ 24 225 m m P AR A PE T WA LL LE VE L
ELEVATIONS
( a) su sp en sio n ca ble
( b) 75 mm c on cr et e c op ing
( c) da np alo n co ve rin g o ve r
s us pe nd ed s tee l f ramee nt ran ce c an op y
( d) rec es s gro ov e
( e) 50 mm c on cr et e c op ing
L EGE ND
( f) s ta inl es s s te el na dra ils
( g) alu mini um g rill pa ne l
( b)
( a)
( d)
( e)
( f)
( c)
( e)
(b )
( h) 75 mmØ s te el ha nd rai l( h)
(h )
( i) 7 5mmØ s tee l p ipe s
(i)
(g)
( j) a lu co bo nd pa ne ls bl ue
( k) alu co bo nd p an els
(j )
(k) ( l) g la ze d wa ll ti les
(l)
(l)
( l)
(k )
(k )
(l)(n)
( n)
(n )
( m) cu rta in wall( n) pa int
( m)
(m) (m)(m)
( m)
(n)
( n)
( k)
(m)
(k )(k)
( n)
(n )
(a) su sp en si on ca bl e
(b) 7 5mm co nc re te co pin g
(c) da np a lon c ove ri ng ov er
su sp en de d s te el fra meen tra nc e ca no py
(d) re ce ss gr oo ve
(e) 5 0mm co nc re te co pin g
LEGEND
(f) sta in les s ste el na dr ail s
(g) a lumin ium gri ll p an el
(h) 7 5mmØ ste el h an dra il
(i) 75 mmØ s te el pip es
(j) alu co bo nd p an el s b lue
(k) al uc ob on d pa ne ls
(l) gla ze d wa ll tile s
(m) c ur tai n wal l(n) p ain t
( a) su sp en sio n ca ble
( b) 75 mm co nc ret e c op in g
( c) da np alo n co ve rin g ov ers us pe nd ed s tee l f rame
e nt ran ce c an op y
( d) re ce ss gr oo ve
( e) 50 mm co nc ret e c op in g
L EGEND
( f) s ta inl es s s te el na dra ils
( g) alu mini um g rill pa ne l
( h) 75 mmØ s te el ha nd ra il
( i) 7 5mmØ s tee l p ip es
( j) a lu co bo nd pa n els bl ue
( k) alu co bo nd p an els( l) g la ze d wa ll t iles
( m) cu rta in wall
( n) pa int
(a ) s us pe ns ion c ab le
(b ) 7 5mm co n cre te co pi ng
(c ) d an pa lon c ov eri ng o versu sp en de d ste el fra me
en tra nc e ca no py
(d ) re ce ss g roo ve
(e ) 5 0mm co n cre te co pi ng
LEGEND
(f) st ain le ss st ee l n ad rai ls
(g ) a lumin iu m gr ill p an el
(h ) 7 5mmØ st ee l h an dr ail
(i) 75 mmØ ste el pi pe s
(j) al uc ob on d p an e ls b lu e
(k ) a luc ob on d pa ne ls(l) gl az ed wall tile s
(m) c ur tai n wa ll
(n ) p ain t
(m)
+ 300 m m F IN ISH ED G RO UN D LE VE L
+3 00 mm F INI SH ED GR O UN D F LO O R L EV EL
+ 300 mm F INI SHE D GR OU ND LE VEL
+ 242 25m m PA RA PE T WAL L L EV EL
+3 00 mm FI NIS HE D G RO UN D L EV EL
25 mm rec es s gro ov e
50 mm thi ck co nc re te co pin g
22 5mm e xte rn al wa ll
15 0mm c on cre te flo or sl ab
co nc re te be am
(g )
(g)
(g)
(g )
• Design and Supervision of Processing Centre in Lagos.
View showing Drafted Ground floor plan
• Design and Supervision of Shopping Complex at Yobe.
Other notable projects are shown below;
• Investment House Outside Lagos
ARCHITECTURAL STRUCTURES LIMITED, Lagos, Nigeria
Project works : International Breweries SAB MILLER PLC , Ilesa, Osun State
Completed recreational centre/Ablution Block
Completed renovated Old personnel Office
Built-Vine Construction Company, PortHarcourt, Rivers State
Job Description : Supervision of the banquet hall construction of His
Excellency, Dr. Goodluck Ebele Jonathan, ( president of the Federal Republic
of Nigeria) in Otuake, Bayelsa State
Picture during Construction
Picture taken after Completion
Chanderlier and some recess lights put in place for lighting
Picture showing the decorated beam and dropped pop ceiling
WORKS DEPARTMENT, LOCAL GOVERNMENT COUNCIL,KOTON KARFE,
KOGI STATE
High rise Office complex Construction with Raft foundation
Afro-Stuff Sas Nig. Ltd (2008)
Job Description : Supervision of 400 units Federal Mortgage Loan Housing Projects
A picture showing the project, client and contractor.
Inspection of works by Dr. Mike Okiro ( Ex- Inspector General of Police)
RESEARCH PICTURES, FEDERAL UNIVERSITY OF TECHNOLOGY,
AKURE, ONDO STATE, NIGERIA
B. TECH IN ARCHITECTURE RESEARCH THESIS DEFENCE WORK
JURY with jurors/Lecturers/Professors(2006)
M. TECH IN ARCHITECTURE RESEARCH THESIS DEFENCE WORK
JURY with jurors/Lecturers/Professors(2010)
ARCHITECTURAL DESIGN WORK
COMPUTER AIDED CAD DESIGN WORKS
Drawn with autocad, Studiomax, and photoshop
CAD drawing showing Approach View
CAD drawing showing left side View
CAD drawing showing Perspective view