WORK BREAK DOWN STRUCTURE
![Page 3: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/3.jpg)
05/03/2023M.Talha
Outline
Work breakdown structure
Levels of Work breakdown structure
Numbering system of Work breakdown structure
Types of Work breakdown structure
Organization breakdown structure
![Page 4: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/4.jpg)
Work break down structure
![Page 5: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/5.jpg)
05/03/2023M.Talha
Work break down structure
A work break down structure is a technique/process in which the complete project is broken down into small chunks/parts.
Project
Chunks/Parts
![Page 6: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/6.jpg)
05/03/2023M.Talha
Work break down structure
It is the process by which :
Project Manager, all connected functional managers, and all connected staff will work together and analyze all the aspects of the project
project Sub-projects Tasks Sub-tasks Work
packages
![Page 7: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/7.jpg)
Level of work breakdown structure
![Page 8: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/8.jpg)
05/03/2023M.Talha
Level of work breakdown structure
(LEVEL 1) (LEVEL 2) (LEVEL 3)(LEVEL 4) (LEVEL 5)
There is no hard and fast rule and depends on your own choice 1 or 2 levels can lead to difficulty in integration of activities Too many levels can make the analysis complex Then How many levels ??
project Sub-projects Tasks Sub-tasks Work
packages
![Page 9: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/9.jpg)
05/03/2023M.Talha
Level of work breakdown structure
Two approaches to the no of levels Building up the WBS till such time that the work packages
available is capable of giving a good definition of work content, the cost, time, and resources required.
Using 8/80 rule
8
80
![Page 10: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/10.jpg)
Numbering system of work breakdown structure
![Page 11: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/11.jpg)
05/03/2023M.Talha
1
1.1 1.31.2
1.1.1
1.1.2
1.2.1
1.2.2
1.3.1
1.3.2
1.1.1.1
1.1.1.2
1.1.2.1
1.2.2.2
1.2.2.1
1.3.1.1
1.3.1.2
1.2.1.2
1.3.2.1
![Page 12: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/12.jpg)
05/03/2023M.Talha
![Page 13: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/13.jpg)
05/03/2023M.Talha
construction of a houseSr# Assigned to Rate ($) Hours
internal electrical
1 rough in electrical A 5,000 342 install and terminate B 5,000 163 HVAC equipment C 15,000 12 plumbing 1 rough in plumbing D 22,000 122 set plumbing fixtures E 31,000 83 test and clean F 8,000 23 foundation excavate 1 pour concrete G 30,000 342 cure and strip forms H 7,000 14 steel erection 1 steel coloums I 5,000 162 beams J 2,000 223 joist K 2,000 21 external Masonry work 1 install roof drains L 2,000 82 roofing M 10,000 93 install tiles N 15,000 10 Building finishes 1 paint wall O 8,000 132 ceiling tiles P 4,000 123 carpet Q 1,500 84 hardware R 6,000 27
![Page 14: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/14.jpg)
Types of work breakdown structure
![Page 15: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/15.jpg)
05/03/2023M.Talha
Types of WBS
Following are the 2 types of work break down structure
1. Product oriented work break down structure
2. Functionally oriented work break down structure
![Page 16: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/16.jpg)
05/03/2023M.Talha
Product WBS
In product oriented WBS, the project is subdivided into sub-projects on the basis of “product”
The sub-project is again subdivided on the basis of product and so on, till the tiny work package are obtained
![Page 17: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/17.jpg)
05/03/2023M.Talha
Functionally oriented WBS
In this type the project is broken-down on the basis of functional departments (or Functional tasks)
The project is subdivided into sub-projects on the basis of “Function”
The sub-project is again subdivided on the basis of functional department and so on, till the tiny work package are obtained
![Page 18: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/18.jpg)
Organization breakdown structure
![Page 19: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/19.jpg)
05/03/2023M.Talha
Organization breakdown structure
It is a process by which the personnel's involved in the project can be decomposed into groups, sub-groups and individuals
It should be done in such a way that a group or individual can be identified with the work packages arrive as per work breakdown structure.
![Page 20: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/20.jpg)
05/03/2023M.Talha
Organization5
Electrical work5.1
Plumbing5.2
Administration5.3
Design5.1.1
Fitting5.1.2
Design5.2.1
Fitting5.2.2
Accounts5.3.1
Procurement5.3.2
![Page 21: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/21.jpg)
05/03/2023M.Talha
![Page 22: Work breakdown structure by muhammad talha](https://reader033.vdocuments.us/reader033/viewer/2022051404/58ed3f2f1a28ab636c8b469f/html5/thumbnails/22.jpg)
05/03/2023M.Talha
Orga
niza
tion 5
5.3
5.2
5.1
5.3.1
5.3.2
5.2.1
5.2.2
5.1.15.1.2
Internal1.1
Construction of house1
1.1.
1.1 1.1.
1.31.1.
1.2
Electrical1.1.1
Integrating OBS with WBS
Plumbing1.1.2
1.1.
2.1 1.1.
2.2
1.1.
2.3
Fitting
Design
Account
procurement