woodlawn high school – false infra-red image

14
Woodlawn High School – False Infra-Red Image

Upload: sade-brewer

Post on 04-Jan-2016

25 views

Category:

Documents


0 download

DESCRIPTION

Woodlawn High School – False Infra-Red Image. Woodlawn High School – False Infra-Red Image Riparian Forest Patch. Woodlawn High School – False Infra-Red Image School Grounds and Riparian Forest Patches. Woodlawn High School – False Infra-Red Image - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Woodlawn High School – False Infra-Red Image

Woodlawn High School – False Infra-Red Image

Page 2: Woodlawn High School – False Infra-Red Image

Woodlawn High School – False Infra-Red ImageRiparian Forest Patch

Page 3: Woodlawn High School – False Infra-Red Image

Woodlawn High School – False Infra-Red ImageSchool Grounds and Riparian Forest Patches

Page 4: Woodlawn High School – False Infra-Red Image

Woodlawn High School – False Infra-Red ImageSchool Grounds, Riparian Forest and Stream Patches

Page 5: Woodlawn High School – False Infra-Red Image

SCHOOL GROUNDS RIPARIAN FOREST STREAM

WATER BUDGET

Page 6: Woodlawn High School – False Infra-Red Image

IN F

LOW

PC

P

RUNOFF

PERC.

ET

IRR

OU

T F

LOW

RUNOFF

PERC.

PC

P

ET

STORESTORE

SCHOOL GROUNDS RIPARIAN FOREST STREAM

WATER BUDGET

PC

P ET

STORE

Page 7: Woodlawn High School – False Infra-Red Image

Parameter Units

Patch

School Grounds Riparian Forest Playing Field

         

Length m 280 200 200

Width m 200 100 100

Area of patch m2 56,000 20,000 20,000

Area of patch ha 5.6 2 2

WATER BUDGETPatch Size Calculations

Page 8: Woodlawn High School – False Infra-Red Image

    school grounds    patch area (m2)      56,000

Line Parameter factorVolume of Water (m3)

         Water inputs    

1 Precip 1.05 58,8002 Irrigation   03 Percolation input    4 Run-on    5 Total   58,800

         Water Outputs    

6 Runoff 0.25 14,700

7 Percolation/Discharge 0.55 32,340

8 Evapotranspiration 0.2 11,7609 Change in storage 0 0

10 Total   58,800

WATER BUDGETCalculations for School Grounds Patch

Page 9: Woodlawn High School – False Infra-Red Image

    school grounds   riparian forest   playing field    patch area (m2)   patch area (m2)   patch area (m2)      56,000     20,000     20,000

Line Parameter factor

Volume of Water (m3)   factor

Volume of Water (m3)   factor

Volume of Water (m3)

                     Water inputs                

1 Precip 1.05 58,800    21,000    21,0002 Irrigation   0    0  5 1,2703 Percolation input       0.2 6,468  0.2 6,4684 Run-on       0.5 7,350  0.5 7,3505 Total   58,800    34,818    36,088

                     Water Outputs                

6 Runoff 0.25 14,700  0.05 1,741  0.1 3,609

7 Percolation/Discharge 0.55 32,340  0.55 19,150  0.6 21,653

8 Evapotranspiration 0.2 11,760  0.4 13,927  0.3 10,8269 Change in storage 0 0  0 0    0

10 Total   58,800    34,818    36,088

WATER BUDGETCalculations for Three Patches

Page 10: Woodlawn High School – False Infra-Red Image

      stream with forest   stream with field

      patch area (m2)   patch area (m2)

      1,000   1,000

Line Parameter   Volume of Water (m3)   Volume of Water (m3)

           

  Water inputs        

1 Precip   1,050  1,050

2 Inflow   3,885,235  3,885,235

3 Percolation input   19,150  21,653

4 Run-on   1,741  3,609

5 Total   3,907,176  3,911,547

           

  Water Outputs        

6 Outflow   3,907,176  3,911,547

7 Percolation/Discharge        

8 Evapotranspiration        

9 Change in storage        

10 Total        

WATER BUDGETStream with riparian forest vs. playing field

Page 11: Woodlawn High School – False Infra-Red Image

IN F

LOW

DE

P

RUNOFF

PERC.

DE

-NIT

FE

RT

OU

T F

LOW

RUNOFF

PERC.

DE

P

DE

-NIT

MO

W

STORESTORE

SCHOOL GROUNDS RIPARIAN FOREST STREAM

NITROGEN BUDGET

DE

P

DE

-NIT

STORE

Page 12: Woodlawn High School – False Infra-Red Image

    school grounds    patch area (m2)      56,000

Line Parameter factorAmount of

Nitrogen (kg)         Nitrogen Inputs    

1 Deposition 11.2 62.72 Fertilizer   0.03 Percolation input    4 Run-on    5 Total   62.7         Nitrogen Outputs    6 Runoff 0.25 15.7

7 Percolation/Discharge 0.55 34.5

8 De-nitrification 0.2 12.5

9 Mowing 0 0

10 Change in storage 0 0.011 Total   62.7

NITROGEN BUDGETCalculations for School Grounds Patch

Page 13: Woodlawn High School – False Infra-Red Image

    school grounds   riparian forest   playing field    patch area (m2)   patch area (m2)   patch area (m2)      56,000     20,000     20,000

Line Parameter factor

Amount of Nitrogen

(kg)   factor

Amount of Nitrogen

(kg)   factor

Amount of Nitrogen

(kg)                     Nitrogen Inputs                

1 Deposition 11.2 62.7   11.2 22.4   11.2 22.42 Fertilizer   0.0     0.0   100 100.03 Percolation input       0.2 6.9   0.2 6.94 Run-on       0.5 7.8   0.5 7.85 Total   62.7     37.1     137.1                     Nitrogen Outputs                6 Runoff 0.25 15.7   0.02 0.7   0.1 13.7

7 Percolation/Discharge 0.55 34.5   0.18 6.7   0.6 82.38 De-nitrification 0.2 12.5   0.8 29.7   0.2 27.49 Mowing 0 0.0   0 0.0   0.1 13.7

10 Change in storage 0 0.0   0 0.0     0.011 Total   62.7     37.1     137.112 N to stream         7.4     109.7

NITROGEN BUDGETCalculations for Three Patches

Page 14: Woodlawn High School – False Infra-Red Image

     stream with

forest   stream with field      patch area (m2)   patch area (m2)      1,000   1,000

Line Parameter  Amount of

Nitrogen (kg/ha)  Amount of

Nitrogen (kg/ha)             Nitrogen Inputs        

1 Deposition   1   12 Inflow   3,865   3,8653 Percolation input   7   1104 Run-on   1   145 Total   3,874   3,990

NITROGEN BUDGETStream with riparian forest vs. playing field