wollongong city ses annual report...
TRANSCRIPT
Wollongong City SESAnnual Report
2010
2The worst in nature
the best in us
Wollongong City SES Unit Montague Street, North Wollongong, NSW 2500
Wollongong City Local Controller
Steve Cliffe
Our Vision: To build and support safe and resilient communities by providing the State’s most versatile and utilised volunteer emergency service
Our Motto: Volunteers excelling in emergency management
Our Mission: Lead communities in managing floods and storms and help people in other emergencies
3The worst in nature
the best in us
Introduction
This is my first annual report as Local Controller of the Wollongong City Unit; 2010 has been quite a busy year.
The Unit has continued to develop, grow and excel in training and operations and continued to work closely with all emergency services and community organisations in the area.
Operationally the Unit has had a few significant events:• Tsunami Marine Warning in February: Whilst this only lasted a day it was significant in that it is a new
area that the SES is now responsible for and involved the full resources of the Unit as well as those of SES units along the NSW coast
• Bulli Upper Railway Catchment Dam emergency in May: In addition to responding to storm damage op-erations we undertook the evacuation of 130 properties in the footprint of the dam failure area following the issue of a red alert for the dam. The Unit was involved in monitoring the dam over the next couple of days and conducted a letter drop to 350 residents
• Father’s Day Windstorm in September: The Unit responded to over 700 requests for assistance following the windstorm which impacted much of the East Coast on Father’s Day. We were operational for almost a week and coordinated assistance from Out Of Area (OOA) SES teams, NSW Rural Fire Service (RFS), Fire and Rescue NSW (FRNSW) and worked closely with Council
Achievements
The Wollongong SES Unit had a successful year consisting of a variety of activities and gains.
The following are some of the highlights and achievements in the area:
• The refurbishment of our Operations Centre including raising of the floor to remove it from the 1% AEP flood level
• Installation of wide-screen monitors throughout our headquarters to improve the display of operational information to our members
• The replacement of all our computer equipment with current technology• The replacement of our old rusting backup power generator with a brand new model• The receipt of a new Mini-bus to assist in the transport of members• The receipt of a new Mitsubishi Triton dual-cab 4WD light response vehicle• The receipt of a new Rigid Hull Inflatable Flood Rescue boat• Attended urgent flood rescue response in Goulburn area with Level 2, 3 and Incident Management Team
(IMT) capabilities
4The worst in nature
the best in us
20100
200
400
600
800
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec2010 32 103 19 10 58 26 34 86 790 44 41 452009 8 11 6 25 46 37 24 153 274 86 13 13
Numb
er of
Tasks
RFA By Month
Flood , 7
Storm, 1181
Search, 4
Public Relations, 15
Other, 43 Tsunami, 1 Training, 46Community Education, 3
Flood
Storm
Search
Public Relations
Other
Tsunami
Training
Community Education
Response Types
In 2010 Wollongong Unit experi-enced an increase in operational activity particularly in storm responses. The Wollongong Unit completed 20 more storm RFA’s in 2010 than the entire Illawarra South Coast region combined in 2009.
Volunteer Hours
Operational storm hours (Left) consumed 2010 for the unit with a total of 27,283 hours.
With the busy workload operationally, it is impressive to note that training hours increased from 2919 in 2009 to 3576 in 2010, up 22.5%.
Operational Periods
February saw the operational year (below) commence with a storm (103 RFA’s), then in May the Bulli Dam Evacuation (58 RFA’s) and later in the year the Father’s day Windstorm. (790 RFA’s).
1 10 100 1000 10000 100000
Community Ed / PR
Equipment Maintenance
Unit Administration
Training - All
Support - Police
Rescue - Vertical and Animal
Tsunami
Storm
Flood
2009
2010
5The worst in nature
the best in us
Volunteer AnalysisThe largest age group (21-30) makes up 38% of membership at the Unit. This may be due to Wollongong being a university city or more likely due to Wollongong’s population increasing with more Generation Y’s moving to the area.
6%
38%
21%
13%
9%12% 16-20
21-30
31-40
41-50
51-60
≥61
Age Distribution
44%
56% Male
Female
Gender Ratio
40%
19%
13%
13%
8% 7%
Length Of Service
0-2
2-5
5-8
8-10
10-15
>15
0 50 100 150 200
Volunteers
2007
2008
2009
2010
Wollongong Unit, like most units in ISR, has the majority of members in the 0-2 category. This can be attributed to the ongoing recruitment to in-crease volunteer membership in all units.
Wollongong Unit is very unique in that it is the only unit in ISR that has a greater percentage of females to males. The female to male split in the unit is 56/42, well above the Region average of 37/63 and the State average of 31/69.
Below represents the steady increase in membership of the Unit over the last 4 years, with membership currently at 151.
6The worst in nature
the best in us
Training
The SES is a Registered Training Organisation (RTO) with the Vocational and Educational Training Advisory Board and has issued the following competencies and statements of attainment (SofA) during 2010 to members of the Wollongong City Unit (compared to 2009):
0
10
20
30
40
50
60
70
Firs
t Aid
Safe
Driv
er P
olicy
Indu
ctio
nL1
Sw
ift W
ater
Aw
aren
ess
L2 F
lood
Boa
t Cre
wLe
vel 3
Tec
hnici
ans
Swim
Tes
tCh
ains
aw C
ross
- Cut
Vert
ical R
escu
eSt
orm
Dam
age
Oper
ate
Com
ms E
quip
Land
sear
chGe
nera
l Res
cue
Map
Rea
ding
/ Na
vTr
aine
rsRF
AOL B
asic
RFP
RFAO
L Adv
ance
d RF
XCh
ains
aw F
ellin
gEv
iden
ce G
athe
rer
Wor
k Op
erat
ions
Cen
tre
AIIM
SAs
sess
ors
Air O
bser
ver
Team
Lead
erM
aint
ain
Team
Saf
ety
(P)
Mai
ntai
n Te
am S
afet
y (C
)Dr
ive
4WD
Vehi
cles
2009
2010
Equipment
The SES continues to invest in the Wollongong Local Government Area to ensure that the Unit is appropriately resourced. Some of the key items that were distributed include:Flood rescue kits for all vehicles and floodboats, 4 x Samsung televisions to enhance operational visual displays, upgrade in all computer hardware, mobile phones and GPS Units and additional equipment to kit out new vehicle.An equipment replacement program was carried out during Sep-tember/October where a variety of operational equipment was replaced/upgraded to ensure our Unit’s ongoing capabilities.Capital expenditure enabled the SES to provide Wollongong City Unit with two new vehicles, one additional rescue vehicle and one commuter bus.
7The worst in nature
the best in us
Unit Financial Summary
The financial year for the Wollongong City Unit runs from 1 May to 30 April.
The following table reflects the financial summary for that period. All other information in this report is based on the 2010 calendar year.
Financial Report
Statement of Receipts and PaymentsWollongong City Account Balance as at 1 May 2009 $37,024.30
2009/2010 2008/2009Receipts $ $ SES (incl. grants, gst reimbursements) 22,814.50 6,367.00Donations 9,937.50 31,003.00Fundraising Income 7,565.10 15,075.00Interest Received 466.69Miscellaneous Income 6,011.37 4,948.00Council 17,296.00 7,077.00Grants 5,000.00
Total Receipts $69,091.16 $64,470.00
Payments $ $ Unit Office Expenses, Stationary and Consumables 17,462.03 7,448.00Misc Trailer/Boats/Vehicles 1,021.32Consumable Equipment and Tools 36,514.09 7,106.00Misc Expenses 6,618.83 30,761.00Bank Charges and FeesVolunteer Reimbursements 338.18 267.00Training Expenses 5,644.68 4,640.00GST Input Tax 6,002.66
Total Payments $73,601.79 $50,222.00
Net Receipts (Payments) -$4,510.63 $14,248.00
Funds Available as at 30 April 2010 $32,513.67
FOR EMERGENCY HELP IN
STORMS AND FLOODS CALL
132 500