World Meteorological OrganizationEXECUTIVE COUNCILSixty-Ninth SessionGeneva, 10 to 17 May 2017
EC-69/Doc. 20(2)Submitted by:
Secretary-General13.V.2017DRAFT 1
AGENDA ITEM 20: REVIEW OF PREVIOUS RESOLUTIONS OF THE EXECUTIVE COUNCIL
REVIEW OF PREVIOUS DECISIONS OF THE EXECUTIVE COUNCIL
SUMMARY
DECISIONS/ACTIONS REQUIRED:
Adopt draft Decision 20(2)/1 (EC-69) – Review of previous decisions of the Executive Council.
CONTENT OF DOCUMENT:
The Table of Contents is available only electronically as a Document Map*.
* On a PC, in MS Word 2010 go to “View” and tick the “Navigation Pane” checkbox in the “Show” section. In MS Word 2007 or 2003, go to “View” > “Document Map”. On a Mac, go to “View” > “Navigation Pane” and select “Document Map” in the drop-down list on the left.
EC-69/Doc. 20(2), DRAFT 1, p. 2
DRAFT DECISION
Draft Decision 20(2)/1 (EC-69)
REVIEW OF PREVIOUS DECISIONS OF THE EXECUTIVE COUNCIL
THE EXECUTIVE COUNCIL,
Noting the body of decisions agreed at the sixty-eighth session of the Executive Council,
Having examined its previous decisions still in force:
Decides:
(1) To keep in force the following decisions:
EC-68 1, 2, 3, 4, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 23, 2426, 27, 28, 30, 33, 36, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 82, 83, 84, 85, 86, 93, 94;
(2) Not to keep in force the other decisions adopted before its sixty-ninth session;
Agrees to monitor the implementation of Decisions of the Council with a view to making recommendations for further action, as appropriate, at its seventieth session;
Requests the Secretary-General to publish the in-force decisions, including those with corrigenda in a new issue of Resolutions of Congress and the Executive Council (WMO-No. 508) and to bring this publication to the attention of all concerned parties.
__________
EC-69/Doc. 20(2), DRAFT 1, p. 3
BACKGROUND INFORMATION SUPPORTING DECISIONNOT TO BE INCLUDED IN THE SESSION REPORT
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
1 (EC-68) Organization of the session X X CER This decision is procedural and does not
require follow up action.
2 (EC-68) Consideration of the reports X X DSG This decision is procedural and does not
require follow up action
3 (EC-68) WMO Disaster Risk Reduction governance, user-interface mechanisms and Disaster Risk Reduction Roadmap
X X WDS
1. DRR Roadmap was approved by the WMO President2. The various groups that constitute the WMO DRR governance structure have met to further the work on the DRR Programme with the involvement of Members
4 (EC-68) Systematic characterization and cataloguing of extreme weather, water and climate events and standardization of respective hazard information
X X WDS/CLW
The Inter-Programme Task Team onCataloguing Extreme Weather, Water and Climate Events (IPTT-CWWCE) has met and developed a course of action that will provide a mechanism to support the requirements of Cg-17 Resolution 9
5 (EC-68) Provision of multi-hazard impact-based forecast and risk-based warning services
X X WDSIn-country stakeholder workshops are being organized by Members with the assistance of WMO through the PWS Programme to implement impact-based
EC-69/Doc. 20(2), DRAFT 1, p. 4
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
to the public services by NMHSs. Production of guidance materials is in progress
6 (EC-68) Implementation of the Common Alerting Protocol
X X WDSThe WMO PWS programme is assisting Members implement the CAP standard through the CAP Jump-start initiative
7 (EC-68) Flood Forecasting Initiative X X CLW
8 (EC-68) Flash Flood Guidance System X CLW
The Global FFGS workshop has been cancelled in agreement with the principal donor due to budgetary and security concerns
9 (EC-68) Severe Weather Forecasting Demonstration Project
X X WDS
This Decision is being implemented through a number of SWFDP regional projects, each of which are in different phases. For example, implementation in Southern Africa as it is currently in Phase IV
10 (EC-68) Enhancing the capability of National Meteorological and Hydrological Services in tropical cyclone impact-based forecasting and warning services with multi-hazard approach
X X WDS The decision has been conveyed to the five tropical cyclone regional bodies. And TC RSMCs are well aware of the request for them to lead the development of the tropical cyclone impact-based forecasting and warning products. Discussions regarding the specifications for such products are planned following the 2017 cyclone
EC-69/Doc. 20(2), DRAFT 1, p. 5
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
season.
11 (EC-68) Strengthening the regionally coordinated tropical cyclone forecasting system to cover all Members affected by tropical cyclones
X X WDS
The decision has been conveyed to the five tropical cyclone regional bodies. These bodies (through RSMCs and neighboring Members) understand well the need to provide tropical cyclone forecasting and warning advisory information to those WMO Members that are not normally included in the TCP, e.g., Yemen joined the PTC last year. Efforts will continue to strengthen implementing the decision.
12 (EC-68) Met-ocean forecasting and warnings
X X WDS
13 (EC-68) Assistance to humanitarian agencies X X WDS
14 (EC-68) High-impact Weather Project X X RES
On-going activity with significant progress, e.g., CMA One of the request for Members signed an MoU to host an International Coordination Office during EC-69
15 (EC-68) Implementation of WMO cross-cutting urban focus
X X RES
EC-69/Doc. 20(2), DRAFT 1, p. 6
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
16 (EC-68) Country-focused results-based framework and mechanism for WMO contributions to the Global Framework for Climate Services
X X CLW
17 (EC-68) WMO support to the implementation of activities of the Intergovernmental Panel on Climate Change
X X DSGEC-69/Doc. 4.2 provides follow-up information
18 (EC-68) Support for the World Climate Research Programme Coupled Model Intercomparison Project
X X RES/WCRP
19 (EC-68) The Integrated Global Greenhouse Gas Information System concept paper
X X RES This decision requires development of the IG3IS implementation plan by EC-70. An annotated outline was posted to solicit Member comments at EC-69
20 (EC-68) Enhancement of the relationship between WMO and the United Nations Environment Programme on atmospheric composition matters
X X RES
Discussions were held on potential joint activities related to atmospheric composition at the GAW Symposium. Also, the IG3IS Steering Committee included the active participation of UNEP
21 (EC-68) Addressing priorities and gaps X X CLW/GCOS
EC-69/Doc. 20(2), DRAFT 1, p. 7
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
identified in the Global Climate Observing System Status Report 201522 (EC-68) Review of the Global Climate Observing System Implementation Plan 2016
X X CLW/GCOS
23 (EC-68) Development of a Climate Service Toolkit
X X CLW Latest update in EC-69/Doc. 4.5 Decision 2 - Deployment of CST
24 (EC-68) National Climate Outlook Forums and National Climate Forums
X CLW Concept note in preparation. Latest update in EC-69/Doc.4.5 Decision 3
25 (EC-68) Strengthening WMO climate monitoring and assessment
X X CLW Latest update in EC-69/Doc. 4.5
26 (EC-68) Inclusion of updated text on climatological normals in the Guide to Climatological Practices(WMO-No. 100)
X X CLW Translated in 6 languages and posted on the web.
27 (EC-68) Exchange of data and products for the implementation of the Climate Services
X X CLW
EC-69/Doc. 20(2), DRAFT 1, p. 8
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
Information System28 (EC-68) Operational implementation of a Global Seasonal Climate Update
X X CLW Latest update in EC-69/Doc. 4.1 Decision 4
29 (EC-68) WMO support to the implementation of the Global Programme of Research on Climate Change Vulnerability, Impacts and Adaptation and the Country-level Impacts of Climate Change project
X X CLW Latest update in EC-69/Doc. 4.6
30 (EC-68) Regional WMO Integrated Global Observing System Centres
X X OBS
31 (EC-68) Initial version of the Guide to the WMO Integrated Global Observing System to assist Members in the implementation of the relevant Technical Regulations
X X OBSA new draft Resolution 5.1(2)/2 — Initial Version of the Guide to the WMO Integrated Global Observing System at EC-69
EC-69/Doc. 20(2), DRAFT 1, p. 9
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
32 (EC-68) Best practices for achieving user readiness for new-generation meteorological satellites
X X OBS
33 (EC-68) Four-year plan for WMO activities related to space weather
X X OBS
34 (EC-68) Approval of the new edition of the International Cloud Atlas (WMO-No. 407)
X X OBS
35 (EC-68) Inter-programme Expert Team on Operational Weather Radars
X X OBS
36 (EC-68) Preserving the radio-frequency spectrum for meteorological and related environmental activities at the World Radiocommunication Conference 2019
X X
OBS37 (EC-68) Amendments to the Manual on Codes (WMO-No. 306) and Appendix C of the Manual on the WMO
X X OBS
EC-69/Doc. 20(2), DRAFT 1, p. 10
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
Information System (WMO-No. 1060)38 (EC-68) Development of a strategy for the WMO Information System X X OBS39 (EC-68) Climate Data Management Systems and data rescue resource plan
X[X] [X] CLW To be decided during EC-69.
40 (EC-68) WMO mechanism for the recognition of long-term observing stations
XX OBS
41 (EC-68) Implementation of Resolution 60 (Cg-17) and Resolution 65 (Cg-17)
X
CER/CLW
Res 60 (EC-70= brochure 3rd draft and reviewed by GFCS ET) specific data requirements is ongoing and the global survey on data policy of Members is ongoing
42 (EC-68) Implementation of the WMO Strategy for Service Delivery
X
X WDS
Members are being assisted to implement the WMO Strategy for Service Delivery through holding in-country SSD stakeholder workshops. Through other initiatives including training workshops and pilot projects, the Strategy is being implemented in the critical areas of focus as per this decision
43 (EC-68) Action Plan – Meteorological services for aviation X X WDS44 (EC-68) X X WDS
EC-69/Doc. 20(2), DRAFT 1, p. 11
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
Intercommission Aviation Research Project45 (EC-68) Implementation of the competency framework for Public Weather Services
X X WDS
CBS-16 has submitted a recommendation to EC-69 to consider for approval, the "PWS Provisions", addressing the Competency Framework for PWS, for inclusion in the WMO Technical Regulations (WMO-No. 49)
46 (EC-68) Collaboration between the Commission for Atmospheric Sciences and the Commission for Agricultural Meteorology
X X RES/CLWOngoing activity. GAW: we have joint interest but have not done anything specific yet
47 (EC-68) Development of METAGRI Services Project
X X CLWAgM component has been implemented in several projects including in CREWS/GFCS
48 (EC-68) Collaboration with institutions to implement the activities of the Commission for Agricultural Meteorology
X X CLWConcept note of GRIAM still being developed. Will be discussed during CAgM-17
49 (EC-68) Technical assessment of the Marine Meteorology and Oceanography Programme
X X WDSAssessment completed/in process of evaluation submission through the Executive Management and JCOMM-5 prior consideration of EC-70
EC-69/Doc. 20(2), DRAFT 1, p. 12
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
50 (EC-68) Development of the Global Cryosphere Watch
X X RES/OBS
51 (EC-68) High-mountain activities
X X OBS
52 (EC-68) Polar Regional Climate Centres
X X OBS/CLW
53 (EC-68) Year of Polar Prediction
X X RES/OBS
On-going activity. The Year of Polar Prediction will be launched during EC-69. A specific side event is organized on Monday 15 May
54 (EC-68) International Polar Partnership Initiative
X X RES/OBS55 (EC-68) Implementation of the seamless Data-Processing and Forecasting System X [X] [X] WDS
Draft Resolution 8.1(1) (EC-69) for endorsement of the results and decide on the way forward
56 (EC-68) Operational implementation of forecast verification X X WDS
Standard verification procedures developed and incorporated into the new Manual on the GDPFS (WMO-
EC-69/Doc. 20(2), DRAFT 1, p. 13
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
activitiesNo. 485). It is being implemented as part of the SWFDP regional projects. Further guidance materials still need to be developed
57 (EC-68) Strategy to assist Members in improving their use of high-resolution numerical weather prediction and implementing limited-area Numerical Weather Prediction systems X X WDS
Outline of the Guidelines developed. Task Team established to develop the Guidelines
58 (EC-68) Operational implications and requirements for impact-based forecasting X X WDS
In-country assessments following stakeholders workshops jointly organized by DPFS/PWS. Guidance materials on aspects of the system requirements and compilation of lessons learnt still to be developed
59 (EC-68) Fifteenth session of the Commission for Hydrology X X CLW60 (EC-68) Meteorological and hydrological aspects of siting and operation of nuclear power plants X X WDS61 (EC-68) World Weather Research Programme
X X RES This decision has a period of validity until 2023
EC-69/Doc. 20(2), DRAFT 1, p. 14
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
Implementation Plan for the period 2016–202362 (EC-68) Global Atmosphere Watch Implementation Plan for the period 2016–2023
X X RES This decision has a period of validity until 2023
63 (EC-68) Capacity development priorities for 2016–2019
X X DRA
64 (EC-68) Reconfirmation of the Institute of Biometeorology (Florence, Italy) as a WMO Regional Training Centre
X X DRA
65 (EC-68) Extension of the WMO Information System metadata profile for education and training
X X DRA
66 (EC-68) Considerations for the thirteenth WMO Symposium on Education and Training (2017)
X X DRA
67 (EC-68) Impact evaluation of the WMO Fellowship Programme
X X DRA
68 (EC-68) Advisory Group for the X X DRA
EC-69/Doc. 20(2), DRAFT 1, p. 15
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
Programme for WMO Small Island Developing States and Member Island Territories69 (EC-68) Resource mobilization X X DRA70 (EC-68) WMO contribution to the 2030 Agenda for Sustainable Development
X X CER
71 (EC-68) Review of cooperation agreements X X CER
72 (EC-68) Recognition of partner organizations X X CER73 (EC-68) Cooperation between the public and private sectors for the benefit of society
X X DSG EC-69/Doc. 12.2
74 (EC-68) WMO positioning in Future Earth
X X DSG Being addressed as part of ongoing WCRP Review
75 (EC-68) WMO-Group on Earth Observations key collaboration areas X X OBS
76 (EC-68) WMO Quality Management X X WDS
EC-69/Doc. 20(2), DRAFT 1, p. 16
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
Framework – Organization-wide approach
77 (EC-68) WMO Gender Action Plan X X SPO/DSG
78 (EC-68) Theme for World Meteorological Day 2018
X X CER
79 (EC-68) Consideration of the reports on oversight
X X IOO
80 (EC-68) Joint Inspection Unit recommendations
X X IOO
81 (EC-68) Improved budget structure X X REM See EC-69/Doc. 16.2(4)
82 (EC-68) Preparation of WMO Strategic and Operating Plans 2020–2023
X X SPO/DSGIn progress until the SOP 2020-2023 is approved by Congress. See draft and Decision in EC-69/Docs. 16.2(1) and 16
83 (EC-68) Role and operation of National Meteorological and Hydrological Services
X X SPO/DSGA questionnaire will be circulated to establish the status of the role and operation of NMHSs
EC-69/Doc. 20(2), DRAFT 1, p. 17
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
84 (EC-68) Governance review X X DSG EC-69/Doc. 16.3
85 (EC-68) Preparations for an international conference on the socioeconomic benefits of National Meteorological and Hydrological Services
X X WDSEfforts to raise funds and determine the venue for the Conference are in progress. The Conference is tentatively planned for 2018
86 (EC-68) WMO engagement in the organization of the International Conference on Multi-Hazard Early Warning Systems
X X WDS
87 (EC-68) Interim plan for funding liability for After-Service Health Insurance
X X REM See EC-69/Doc. 17.2
88 (EC-68) Amendments to Staff Rules and Regulations
X X REM
EC-69/Doc. 20(2), DRAFT 1, p. 18
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
89 (EC-68) Revised salaries and pensionable remuneration of ungraded officials
X X REM
90 (EC-68) Approval of appointments, promotions, nominations, transfers and extensions of staff in the professional category and above
X X REM
91 (EC-68) Appointment of the Deputy Secretary-General and Assistant Secretary-General
X X REM
92 (EC-68) Sixty-first International Meteorological Organization Prize and other awards
X X CER Does not require additional follow-up action
93 (EC-68) Roadmap to an enhanced framework for WMO Technical Regulations
X X DSG
94 (EC-68) Designation of acting members of the Executive Council X X CER
Procedural decision. Does not require follow-up action
95 (EC-68) Review of subsidiary bodies and other bodies reporting to the Executive Council X X DSG
Procedural decision. Does not require follow up-action
EC-69/Doc. 20(2), DRAFT 1, p. 19
Number and Title of Decision
Status of ImplementationResponsibl
e department
Comments on status if not completed as planned
Not started
In progress
Requires Amendment Implemented
Keep In
ForceSuppress
96 (EC-68) Publication of scientific lectures X X DSG
Procedural decision. Does not require follow up-action
Totals 96 1 66 1 27*
73*
incl.7 Impld 21
*2 Decisions pending future status at EC-69. Either may be Kept In Force or Suppressed