wm go live check list
TRANSCRIPT
-
7/25/2019 WM GO Live Check List
1/2
G.V.Shivakkumar [email protected] [email protected]
Technical set up requirement at Go live locations
Check List of Activities and Roles
Networking All locations are connected the SAP central server/the speed should be proper to carry
the SAP transaction and should be approved by the SAP CTMs. This should be place by19 th April 09.
Local IT support or the locations should be in place Monitor !se o "et#or$ % Mails& SAP& Local 'o#nloads
Hardware
All (ard#are to be ready by 19 th April 0) *PCs /Printers etc+ SAP ,!I is loaded on all re-uired achines ne Local IT support person is in char e
Documentation
2nd !ser 'ocu entation or the respective roup.
Training
All 2nd !sers are Trained in ! Transactions
Chec$ that they are trained on se re atino Con i uration issueso 3unctional issueso Procedural Issueso (ard#are issueso "et#or$in Issues
"o !ser should atte pt to do a 4ob o IT i they need a service e. . Chan e IPaddresses& local syste na es
"A#
To $eep #atch on
!sers accidentally lo in out others !sers deletin others sessions All proble s to be lo ed in throu h 2 ail
mailto:[email protected]:[email protected]:[email protected]:[email protected] -
7/25/2019 WM GO Live Check List
2/2
G.V.Shivakkumar [email protected] [email protected]
(elp 'es$ Creation5 Level 1 support *procedure to be desi ned by SAP CTMs and ClientsIT depart ent+
Activities to $e #erformed $efore Go%Live
All the asters should be ready by 66 66 6666 date
Transaction Trainin to !ser #ill be i parted by CTM on 66 66 6666 date
Plant #ise Stoc$ #ill be do#nloaded ro P7' syste on 66 66 6666 date 8 #ill
circulate to respective Plants
7espective Plants #ill input the data in iven in #ise Stoc$ !pload te plate 8 send the
approved iles to CTM by end o 66 66 6666 date.
Custo i:ation re-uest other than activation o ;M #ill be trans erred to P7' by 66 66
6666 date in Master #ill be uploaded in P7' usin 'C pro ra by 66 66 6666 date.
Material Master ;ill be 2