withlacoochee river electric cooperative, inc. …...meters served by county (march 31, 2013)...
TRANSCRIPT
![Page 1: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/1.jpg)
Withlacoochee River Electric Cooperative, Inc.
(WREC)
2013 Hurricane Preparedness
Florida PSC Hurricane Preparedness Workshop
April 3, 2013
![Page 2: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/2.jpg)
![Page 3: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/3.jpg)
System Statistics
• Miles of Transmission Line …………………….64
• Miles of Overhead Distribution Line ……….7,099
• Miles of Underground Distribution Line ……3,634
• Number of Substations ………………………….53
• Number of Services Connected ………….217,210
![Page 4: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/4.jpg)
Meters Served by County
(March 31, 2013)
• Pasco 97,363
• Hernando 78,619
• Citrus 24,688
• Polk 517
• Sumter 932
Total Active Meters 202,109
![Page 5: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/5.jpg)
Standards of Construction
• NESC 2012 Compliance
• Prior 2012 – Compliance to standard at time
• RUS bulletins, drawings and engineering
specifications
• WREC Construction & Operations Manual
• Pole Foreman – calculates pole strength
capabilities & clearances of specified spans
and compare results (extreme wind loading)
![Page 6: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/6.jpg)
Flooding & Storm Surges
• Stainless Steel pad mounted equipment
• Strand-filled Jacketed cable inside duct
![Page 7: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/7.jpg)
Safe & Efficient Access /
Attachments by Others
• 2012 – Relocated approx. 30,000’ of OH
primary lines from rear lot line to street.
(estimate 4 yr. completion time frame)
• Joint use agreements specify compliance
with NESC & RUS requirements. Clearance
and loading evaluated per each attachment
request.
![Page 8: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/8.jpg)
Facility Inspections
• 2012 – approx. 2,800 miles of line inspected or
addressed by line patrol, rear to front relocation,
voltage conversion & S.T.A.R program
• Transmission = 62 miles patrolled annually (aerial
and ground)
• Substations inspected monthly
• Pole inspection on schedule for 8 year cycle
• Monthly/Annually maintenance on equipment
(control panels, relays and etc.)
• Annual Infrared of Critical Infrastructure
![Page 9: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/9.jpg)
Vegetation Management
• Aggressive VMP implemented in 2004 to
increase both horizontal & vertical
clearances and problem tree removal
• Currently on a three (3) year cycle for all
distribution lines
• Transmission lines are trimmed annually as
needed
• ROW service orders are generated and
completed for cycle busters (1,334 in 2012)
![Page 10: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/10.jpg)
Storm Preparedness
Annual Activities:
• ERP Reviewed and Updated
• Roundtable Discussion of ERP
• Participate in Seminole & County EOC drills
• Internal Resources Pre-assigned
• Contractor Storm Restoration Contract
• FECA Mutual Aid Agreement
![Page 11: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/11.jpg)
Communications
• Personnel Assigned to County EOC’s
• Web Based Graphical Outage Map
• Daily updates from Manager of PR
FECA
Local EOC’s
Local Media
Cooperative Website
![Page 12: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/12.jpg)
Vulnerability Concerns
• Coastal Flooding - Raised pad mounted
equipment
• Insufficient Outside Crews - Enter storm
restoration contract
• Heavy Right-of Way – Increased clearances
on distribution lines in rural wooded areas
• Multiple Storms – Conversion allows for
back feed of any substation (80 %
completed - 4 yr. completion)
![Page 13: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/13.jpg)
WREC
Emergency Restoration Plan
![Page 14: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/14.jpg)
ERP
The Primary Objective of this plan is to:
– Evacuate employees and equipment from areas
subject to storm surge.
– Protect the public from exposure to hazardous
conditions caused by the disaster.
– Limit damage to Cooperative property.
– Provide for the orderly restoration and repair of
the Cooperative’s transmission and distribution
system.
![Page 15: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/15.jpg)
Restoration Procedures
Objective:
To establish uniformly
implemented methods
for expediting power
restoration while
maintaining the highest
level of safety.
![Page 16: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/16.jpg)
Damage Assessments
General Assessment (ball park)
Detailed Assessment (bird dogging)
Assessment Teams pre-identified
HQ Engineers assigned to districts
![Page 17: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/17.jpg)
Priority Accounts
– Medical facilities, Shelters, Jails
– Major intersections
– County administration buildings
– Water, Sewer plants
– Restaurants, Grocery Stores, Pharmacies
– Hotel, Motels
![Page 18: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/18.jpg)
Crew Briefings
• Hold each morning at 6:00
A. M. during restoration
period.
• Discuss work hours, safety
hazards, work progression
and feedback from field
personnel.
• Invite General Foremen of
contract crews to attend.
![Page 19: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/19.jpg)
FOREIGN CREWS
Circuit maps will be made available to all
foreign crews due to their unfamiliarity of
WREC’s system.
![Page 20: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/20.jpg)
Line Patrol
All substations,
transmission and
distribution lines shall
be inspected and/or
patrolled prior to
energizing.
![Page 21: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/21.jpg)
Outage Management System
Dispatch assigned for
night duty
(3:00 P.M – 6:00 A.M.)
Primary objective to
update OMS.
Identify outage areas with
high consumer density.
![Page 22: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/22.jpg)
Additional Topics
• Drills – Major storm in March tested system.
Meeting scheduled for April to discuss means of
improvement
• The company removes problem trees at company
expense – no replacement program
• Total of 200,446 poles on system and
installed/replaced 26,000 since starting storm
hardening (approx. 70% of wood poles are CCA)
• Company is on target to meet storm hardening
goals
![Page 23: Withlacoochee River Electric Cooperative, Inc. …...Meters Served by County (March 31, 2013) •Pasco 97,363 •Hernando 78,619 •Citrus 24,688 •Polk 517 •Sumter 932 Total Active](https://reader035.vdocuments.us/reader035/viewer/2022070723/5f020d7b7e708231d4025730/html5/thumbnails/23.jpg)
Additional Topics
• Hurricane Sandy caused extreme flooding to
some of our costal service area. We have
raised pad mounted equipment.
• Roundtable discussion scheduled in April –
outcome will determine any revisions to
plan.
• Critical Infrastructure improvements are
identified in 2 yr. work plans (2012-2014)