with payoff matrix slide

1
The Hub Power Company Limited Turbine Seal Modificatio ns Gas Air Heater Repair / Seal Modificatio RO for Desalinatio n (High RFO Price) New Hydraulic Coupling Design for BFW Pump Extraction point change for Auxiliary steam from HP to IP VSD on Gas Recirculati on Fan RO for Desalinatio n (Low RFO Price) COST / EFFORT BENEFIT / IMPACT Project Ideas on Pay-Off Matrix

Upload: waqashabib

Post on 20-Dec-2015

3 views

Category:

Documents


0 download

DESCRIPTION

An example of prioritizing project ideas

TRANSCRIPT

Page 1: With PayOff Matrix Slide

The Hub Power Company Limited

Turbine Seal Modifications

Gas Air Heater Repair / Seal Modification

RO for Desalination (High RFO Price)

New Hydraulic Coupling Design for BFW Pump

Extraction point change for Auxiliary steam from HP to IP

VSD on Fuel Oil pump motor

VSD on Gas Recirculation Fan

RO for Desalination (Low RFO Price)

COST / EFFORT

BEN

EFIT

/ IM

PACT

Project Ideas on Pay-Off Matrix