with london market group the future process model – where are we headed? tim carroll lmg forum -...

14
With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Upload: adrian-holmes

Post on 28-Mar-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

With

London Market Group

The Future Process Model – where are we headed?

Tim CarrollLMG Forum - 20th October 2010

Page 2: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Launching LMP in 1998

Page 3: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

The drivers…

•Efficiency to keep London competitive

•Optimising central services

•Choice for insurers

Page 4: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Progress thus far…

• Workshops held with Heads of Associations and Lloyd’s

• 2009 Future Process Working Group established.

– Agreed a set of principles that should underpin any future model

– Recommended to the LMG that the proposed future process is workable and warrants much more detailed design

• An LMG-sponsored project has been initiated to deliver:

– A robust London Market process model, expressed in sufficient detail that it can be adopted and implemented by the market.

– A recommended transition/implementation plan; likely to identify a two stage approach, with a new model for 100% written business as the first implementation, followed by subscription business

Page 5: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Governance structure

Page 6: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

The starting point

•Finished what we had started

•Endorsements roll out & placing

•Claims transformation project

•The Exchange

Page 7: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Key themes

• Future processes all supported by standard (ACORD) messages

• Information captured at its earliest point and reused throughout downstream processes

– Removal of rekeying of information

• Continued reliance on some central services for subscription business

• Transparency, simplicity, clarity across processes (for practitioners & customers)

Page 8: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Placing

• Data exchanged electronically

– Moving to far richer ACORD messages over time

– Separation of pre and post bind processes so that data capture not onerous during negotiation

• Early data capture to remove rekeying in downstream processes

• Face-to-face broking continues but might be replaced eventually for straight-forward, non-complex placements

Page 9: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Accounting & Settlement

• Accounting and settlement process separate from reporting

• Accounting entries and instruction to settle achieved electronically (ACORD)

• Alignment and consistency across the process

• Fewer queries and greater automation

Page 10: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Claims Working Group

• A central Claims Platform

– Ability to integrate with back-office systems

• Flexible process to cater for future claims protocols/schemes

• Claims agreement parties confirmed during placing risk

Page 11: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Facilities & Binders Group

• Placing of facilities supported electronically

• Standard bordereaux format and information (ACORD)

• Potential for “real-time” data provision from coverholders

• “Outside of authority” placing and claims to follow open-market processes

Page 12: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Coming soon

• Consultation document

• Proposals on non-optional central services

• Pragmatic, deliverable model

• Basis for market debate

Page 13: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

Lond

on

Mark

et

Gro

up

Questions?

Page 14: With London Market Group The Future Process Model – where are we headed? Tim Carroll LMG Forum - 20th October 2010

With

London Market Group

The Future Process Model – where are we headed?

Tim CarrollLMG Forum - 20th October 2010