Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4 th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459 December 2, 2019 NOTICE TO ALL CONTRACTORS: Proposal 001: 1007-12-78, WISC 2019 732 Illinois State Line – Madison USH 12/18 Intchg/Core NB/Early Work IH 39 Dane County Letting of December 10, 2019 This is Addendum No. 01, which provides for the following: Special Provisions: Revised Special Provisions Article No. Description 3 Prosecution and Progress 8 Other Contracts 34 High Performance Dowel Bars for Concrete Pavement Schedule of Items: Revised Bid Item Quantities Bid Item Item Description Unit Old Quantity Revised Quantity Proposal Total 205.0100 Excavation Common CY 32,580 210 32,790 455.0605 Tack Coat GAL 569 57 626 460.7222 HMA Pavement 2 HT 58-28 S TON 1,843 260 2,103 460.7624 HMA Pavement 4 HT 58-28 V TON 360 150 510 643.0300 Traffic Control Drums Days 87,245 405 87,650 643.0420 Traffic Control Barricades Type III Days 2,540 3 2,543 643.0705 Traffic Control Warning Lights Type A Days 4,193 6 4,199 643.0715 Traffic Control Warning Lights Type C Days 14,032 30 14,062 643.0800 Traffic Control Arrow Boards Days 748 5 753 643.0900 Traffic Control Signs Days 35,710 75 35,785 643.1050 Traffic Control Signs PCMS Days 291 12 303 690.0150 Sawing Asphalt LF 1,223 248 1,471 SPV.0035.001 Roadway Embankment CY 350,360 -40,000 310,360

Upload: others

Post on 06-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

Wisconsin Department of Transportation

Version 02-2017 Solving tomorrow’s transportation challenges

Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459

December 2, 2019

NOTICE TO ALL CONTRACTORS: Proposal 001: 1007-12-78, WISC 2019 732

Illinois State Line – Madison USH 12/18 Intchg/Core NB/Early Work IH 39 Dane County

Letting of December 10, 2019 This is Addendum No. 01, which provides for the following: Special Provisions:

Revised Special Provisions Article

No. Description

3 Prosecution and Progress 8 Other Contracts 34 High Performance Dowel Bars for Concrete Pavement

Schedule of Items:

Revised Bid Item Quantities

Bid Item Item Description Unit Old

Quantity Revised Quantity

Proposal Total

205.0100 Excavation Common CY 32,580 210 32,790 455.0605 Tack Coat GAL 569 57 626 460.7222 HMA Pavement 2 HT 58-28 S TON 1,843 260 2,103 460.7624 HMA Pavement 4 HT 58-28 V TON 360 150 510 643.0300 Traffic Control Drums Days 87,245 405 87,650 643.0420 Traffic Control Barricades Type III Days 2,540 3 2,543 643.0705 Traffic Control Warning Lights Type A Days 4,193 6 4,199 643.0715 Traffic Control Warning Lights Type C Days 14,032 30 14,062 643.0800 Traffic Control Arrow Boards Days 748 5 753 643.0900 Traffic Control Signs Days 35,710 75 35,785 643.1050 Traffic Control Signs PCMS Days 291 12 303 690.0150 Sawing Asphalt LF 1,223 248 1,471

SPV.0035.001 Roadway Embankment CY 350,360 -40,000 310,360

Page 2: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

Plan Sheets:

Revised Plan Sheets Plan

Sheet Plan Sheet Title (brief description of changes to sheet)

9 Typical Sections (revised Typical Finished Section to reflect HMA shoulder replacement)

10 Typical Sections (revised Typical Finished Section to reflect HMA shoulder replacement; revised legend to include symbol AP67 for HMA Pavement 6.75-Inch)

42 Plan Details (updated to show location of HMA shoulder replacement; revised legend to include symbol AP67 for HMA Pavement 6.75-Inch and SW01 for Sawing Asphalt)

43 Plan Details (updated to show location of HMA shoulder replacement; revised legend to include symbol AP67 for HMA Pavement 6.75-Inch and SW01 for Sawing Asphalt)

85 Traffic Control – Construction Staging Typicals (revised to reflect HMA shoulder replacement)

86-91 Traffic Control – IH 39 SB Shoulder Closure (revised note stating to place barrier after HMA shoulder replacement)

184 Miscellaneous Quantities (updated quantities for Excavation Common and Roadway Embankment to reflect changes HMA shoulder replacement and placement of waste material within the project limits by project ID 1007-12-74/75; revised Note 7 to indicate change in CY)

186 Miscellaneous Quantities (revised quantities associated with HMA shoulder replacement) 193 Miscellaneous Quantities (revised quantities associated with HMA shoulder replacement)

195-196 Miscellaneous Quantities (revised quantities associated with HMA shoulder replacement)

Added Plan Sheets Plan

Sheet Plan Sheet Title (brief description of why sheet was added)

85A-E Traffic Control – IH 39 SB Shoulder Pavement Replacement (added traffic control sheets for HMA shoulder replacement)

The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor. Sincerely,

Mike Coleman Proposal Development Specialist Proposal Management Section

Page 3: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

ADDENDUM NO. 01

1007-12-78

December 2, 2019

Special Provisions

3. Prosecution and Progress.

Replace subsection titled Southbound IH 39 and Northbound IH 39 Ramp to Westbound USH 12 under section titled A Sequence of Operations with the following:

Upon completion of temporary shoulder replacement, coordinate with the engineer to have the contractor from project 1007-12-74/75 deliver and install department-owned CBTP along the median shoulder of southbound IH 39 for use with this project as detailed in the plans.

8. Other Contracts

Add the following paragraph to the end of section titled Project 1007-12-74/75:

The contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50 in the Fall of 2019 and Spring of 2020. Embankment material will be limited to an elevation less than 6 feet above the bottom of any proposed culvert or storm sewer pipe for Project ID 1007-12-78. The material will be in place by May 15, 2020. Coordination with the Project 1007-12-74/75 contractor will be needed for any construction activities performed within Work Area 1 prior to May 16, 2020.

34. High Performance Dowel Bars for Concrete Pavement.

Delete paragraph (2) and the list (1-5) of high performance bars and replace with the following:

(2) Furnish dowel bars of the dimensions the plans show and conforming to standard spec 505.2.6 except for transverse joints in concrete pavement, furnish non-corrosive, high performance dowel bars from the department’s APL. Use only one type of high performance bar for work under the contract.

Schedule of Items Attached, dated December 2, 2019, are the revised Schedule of Items Pages 1, 3, and 11-13. Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: Revised: 9, 10, 42, 43, 85-91, 184, 186, 193, and 195-196 Added: 85A-E

END OF ADDENDUM

Page 4: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

TYPI

CAL

FIN

ISH

ED S

ECTI

ON

- IH

39

12'

LAN

E12

'LA

NE

12'

LAN

E12

'SH

LD

VARI

ABLE

MED

IAN

WID

THRL

2'

2%2%

4%

10'

ROU

NDI

NG

SEED

& F

ERTI

LIZE

R

SALV

AGED

TO

PSO

IL &

EM

AT

STA

2560

+65

- STA

256

2+77

VAR.

VAR.

12'

SHLD

SEED

& F

ERTI

LIZE

R

SALV

AGED

TOPS

OIL

& E

MAT

4'

**

*2'

12'

LAN

E12

'LA

NE

10'

SHLD

4%4%

2%2%

VARI

ES10

'-29.

4'SH

LD

30' C

LEAR

ZO

NE

VARI

ES12

'-13.

6'RA

MP

LAN

E

4:1

6:1

1'

4:1

6:1

'XSB

'RL

VAR.

2.5:

1 MAX

GU

ARDR

AIL

LOCA

TIO

NS

STA

1162

+81'

XSB'

- ST

A 11

63+3

0'XS

B'ST

A 11

63+3

0'XS

B' -

STA

1164

+83'

XSB'

(NO

CU

RB &

GU

TTER

)

EXIS

TIN

G G

UAR

DRAI

L

2.5:

1 MAX

GU

ARDR

AIL

LOCA

TIO

NS

STA

1162

+82'

XSB'

- ST

A 11

63+5

0'XS

B'

EXIS

TIN

G G

UAR

DRAI

L

POIN

T RE

FERR

ED T

OO

N C

ROSS

-SEC

TIO

NS

VAR.

SGSP

SGSP

AG16AG

04PV

20

2.5:

1 M

AX

CB98

STA

1162

+82'

XSB'

- ST

A 11

64+8

3'XS

B'

VAR.

VAR. *

*

2.67

'

1'

TYPI

CAL

FIN

ISH

ED S

ECTI

ON

- IH

39

STA

2554

+60

- STA

255

8+79

12'

LAN

E12

'LA

NE

12'

LAN

E12

'SH

LD

36'

CLEA

R ZO

NE

6:1

4:1

RL

1'

2'

10'

ROU

NDI

NG

OVER 15'

15'OR

LESS

SEED

& F

ERTI

LIZE

R

SALV

AGED

TO

PSO

IL &

EM

AT/M

ULC

H

3:1 M

AX

12'

SHLD

VAR.

VAR.

VAR.

VAR. *

**

*

VARI

ABLE

MED

IAN

WID

TH

SEED

& F

ERTI

LIZE

R

SALV

AGED

TOPS

OIL

& E

MAT

POIN

T RE

FERR

ED T

OO

N C

ROSS

-SEC

TIO

NS

2.67

'

2.5:

1

2.5:

1

2'

12'

LAN

E10

'SH

LD

12'

SHLD

30' C

LEAR

ZO

NE

12'

LAN

E

4:1

6:1

1'

'TSB

'RL

VAR.

VAR.

VAR.

VAR.

CB42

SGSP

SGSP

AG16AG

04PV

20

VAR.

VARI

ES12

.9' T

O 1

4.4'

TIE

BARS

(TYP

)

CP12

AG06

PU06

AG16

AG19

AP67

Δ

ΔTI

E BA

R TO

BE

INST

ALLE

D FO

R FU

TURE

PRO

JECT

.IT

EM IN

CIDE

NTA

L TO

BID

ITEM

"CO

NCR

ETE

PAVE

MEN

T 12

-INCH

".

VAR.

1'

*IH 3

9 N

B 12

1/2

-INCH

CO

NCR

ETE

PAVE

MEN

T, C

ON

CRET

E BA

RRIE

R TY

PES4

2, G

UAR

DRAI

L, A

ND

MIN

UM

UM

2" O

F BA

SE A

GG

REG

ATE

DEN

SE 1

1/4-

INCH

TO

BE

CON

STRU

CTED

IN F

UTU

RE P

ROJE

CT

*IH 3

9 N

B 12

1/2

-INCH

CO

NCR

ETE

PAVE

MEN

T, C

ON

CRET

E BA

RRIE

R TY

PES4

2, G

UAR

DRAI

L, A

ND

MIN

UM

UM

2" O

F BA

SE A

GG

REG

ATE

DEN

SE 1

1/4-

INCH

TO

BE

CON

STRU

CTED

IN F

UTU

RE P

ROJE

CT

CRO

WN

LIN

E

CRO

WN

LIN

E

POIN

T RE

FERR

EDTO

ON

PRO

FILE

POIN

T RE

FERR

EDTO

ON

PRO

FILE

STA

2555

+25'

TSB'

- ST

A 25

59+5

6'TS

B'

VAR.

VARI

ES13

.6'-1

8'RA

MP

LAN

E

VARI

ES0'

-19.

1'G

ORE

2'

12'

LAN

E

VARI

ES0'

-10'

SHLD

12'

LAN

E

VAR.

VAR.

VAR.

2.5'

5'

4:1

4%

2.5:

1 MAX

GU

ARDR

AIL

LOCA

TIO

NS

STA

2558

+25'

TSB'

- ST

A 25

59+2

9'TS

B'

EXIS

TIN

GG

UAR

DRAI

L

POIN

T RE

FERR

EDTO

ON

PRO

FILE

POIN

T RE

FERR

ED T

OO

N C

ROSS

-SEC

TIO

NS

STA

2556

+57'

TSB'

- ST

A 25

59+2

9'TS

B'

STA

2555

+00'

TSB'

- ST

A 25

56+5

7'TS

B'

1'2.

67'

1'

VAR. *

14.3

'

6:1

GU

ARDR

AIL

LOCA

TIO

NS

STA

2556

+27

- STA

255

8+79

12'

SHLD

4'

AG04 AG

16PV

20

2.5:

1 M

AX

SGSP

1'* *3.

3'

AP67

AP67

**

**RE

PLAC

E 10

' OF

EXIS

TIN

GH

MA

SHO

ULD

ER

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

03_T

S.DW

GFI

LE N

AME

:11

/26/

2019

4:5

2 PM

PLO

T DA

TE :

PLO

T BY

:KY

LE C

ORN

ELIU

S

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:20

FT

1007

-12-

78IH

39

DAN

ETY

PICA

L SE

CTIO

NS

- FIN

ISH

ED

LAYO

UT

NAM

E - 0

6

AG06

PU06

6" B

ASE

AGG

REG

ATE

DEN

SE 1

1/4

-INCH

AG04

4" B

ASE

AGG

REG

ATE

DEN

SE 1

1/4

-INCH

PV20

SGSP

LEG

END

CON

STRU

CT R

ELIE

F TR

ENCH

ES A

T DI

TCH

SAG

PO

INTS

OR

EVER

Y 25

0'(S

EE C

ON

STRU

CTIO

N D

ETAI

L)

SUBG

RADE

SH

OU

LDER

PO

INT

(SH

OW

N O

N P

LAN

DET

AIL

SHEE

TS)

PIPE

UN

DERD

RAIN

6-IN

CH

CB98

CON

CRET

E BA

RRIE

R TE

MPO

RARY

PRE

CAST

INST

ALLE

D

CP12

CON

CRET

E PA

VEM

ENT

12-IN

CH,

DOW

ELED

AN

D TI

NED

CB42

CON

CRET

E BA

RRIE

R TY

PE S

42

AG19

19" B

ASE

AGG

REG

ATE

DEN

SE 1

1/4

-INCH

AG16

16" S

ELEC

T CR

USH

ED M

ATER

IAL

AP67

HM

A PA

VEM

ENT

6.75

-INCH

2.5"

UPP

ER L

AYER

4 H

T 58

-28

V4.

25" L

OW

ER L

AYER

2 H

T 58

-28

S

9

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 9 December 2, 2019
Page 5: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

STA

2562

+77

- STA

256

3+73

STA

2565

+60

- STA

257

1+64

TYPI

CAL

FIN

ISH

ED S

ECTI

ON

- IH

39

12'

LAN

E12

'LA

NE

12'

SHLD

VARI

ABLE

MED

IAN

WID

THRL

2'

2%4%

2.67

'

12'

SHLD

2%

12'

LAN

E

2.5:

1

2.5:

1

SEED

& F

ERTI

LIZE

R

**

**

*

12'

LAN

E12

'LA

NE

4%2%

2%

VARI

ES10

'-29.

4'SH

LD

VARI

ES0'

-29.

5G

ORE

1'

4:1

6:1

'XSB

'RL

VAR.

VARI

ES13

.6'-1

8'RA

MP

LAN

E

2.5'

5'

4:1

4%VA

R.

STA

2574

+28

- STA

258

1+63

TYPI

CAL

FIN

ISH

ED S

ECTI

ON

- IH

39

12'

LAN

E12

'LA

NE

12'

SHLD

36'

CLEA

R ZO

NE

6:1

VARI

ABLE

MED

IAN

WID

TH

4:1

RL

1'

2'

2%2%

10'

ROU

NDI

NG

OVER 15'

15'OR

LESS

SEED

& F

ERTI

LIZE

R

SALV

AGED

TO

PSO

IL &

EM

AT/M

ULC

H

4%6:

1

3:1 M

AX

1'

6:1

12'

FUTU

RESH

LD

2%

12'

SHLD **

**SH

OU

LDER

AT

2% C

ROSS

SLO

PE F

OR

FUTU

RE T

HIR

D LA

NE

4:1

6:1

36'

CLEA

R ZO

NE

SEED

& F

ERTI

LIZE

R

SALV

AGED

TO

PSO

IL &

MU

LCH

6:1

6:1

GU

ARDR

AIL

LOCA

TIO

NS

STA

2579

+15

- STA

258

1+63

12'

SHLD

4'

GU

ARDR

AIL

LOCA

TIO

NS

STA

2580

+24

- STA

258

1+63

12'

SHLD

4'

2'

12'

LAN

E10

'SH

LD

4%4%

2%

VARI

ES10

'-29.

4'SH

LD

30' C

LEAR

ZO

NE

12'

LAN

E

2%

4:1

6:1

1'

4:1

6:1

1'

'XSB

'RL

**

**

2.5:

1 MAX

GU

ARDR

AIL

LOCA

TIO

NS

STA

1164

+83'

XSB'

- ST

A 11

65+3

8'XS

B' (N

O C

URB

& G

UTT

ER)

STA

1165

+38'

XSB'

- ST

A 11

65+7

8'XS

B'ST

A 11

67+5

7'XS

B' -

STA

1168

+27'

XSB'

EXIS

TIN

G G

UAR

DRAI

LG

UAR

DRAI

L LO

CATI

ON

SST

A 11

67+6

5'XS

B' -

STA

1168

+28'

XSB'

GU

ARDR

AIL

LOCA

TIO

NS

STA

1176

+37'

XSB'

- ST

A 11

79+0

6'XS

B' (N

O C

URB

& G

UTT

ER)

STA

1183

+08'

XSB'

- ST

A 11

83+6

4'XS

B'

2.5:

1 MAX

EXIS

TIN

G G

UAR

DRAI

L

2.5:

1 MAX

GU

ARDR

AIL

LOCA

TIO

NS

STA

1183

+08'

XSB'

- ST

A 11

83+6

5'XS

B'

EXIS

TIN

G G

UAR

DRAI

L

POIN

T RE

FERR

ED T

OO

N C

ROSS

-SEC

TIO

NS

POIN

T RE

FERR

ED T

OO

N C

ROSS

-SEC

TIO

NS

SALV

AGED

TOPS

OIL

& E

MAT

2.5:

1SG

SP

AG16AG

04PV

20

SGSP

SGSP

AG16AG

04PV

20PV

20

AG04 AG

16PV

20

AG04

AG16

PV20

2.5:

1 M

AX

SGSP

2.5:

1 M

AX

SGSP

STA

1164

+83'

XSB'

- ST

A 11

66+1

8'XS

B'ST

A 11

67+5

9'XS

B' -

STA

1173

+84'

XSB'

CB98

2'10'

SHLD

4%

30' C

LEAR

ZO

NE

4:1

6:1

1'

2'

STA

1164

+83'

XSB'

- ST

A 11

70+3

0'XS

B'

STA

1170

+30'

XSB'

- ST

A 11

73+7

4'XS

B'

4%*

1'

*IH 3

9 N

B 12

1/2

-INCH

CO

NCR

ETE

PAVE

MEN

T, C

ON

CRET

E BA

RRIE

R TY

PES4

2, G

UAR

DRAI

L, A

ND

MIN

UM

UM

2" O

F BA

SE A

GG

REG

ATE

DEN

SE 1

1/4-

INCH

TO

BE

CON

STRU

CTED

IN F

UTU

RE P

ROJE

CT

*IH 3

9 N

B 12

1/2

-INCH

CO

NCR

ETE

PAVE

MEN

T, G

UAR

DRAI

L AN

D M

INU

MU

M 2

" OF

BASE

AG

GRE

GAT

E DE

NSE

1 1

/4-IN

CH T

O B

E CO

NST

RUCT

ED IN

FU

TURE

PRO

JECT

CRO

WN

LIN

E

CRO

WN

LIN

E

POIN

T RE

FERR

EDTO

ON

PRO

FILE

POIN

T RE

FERR

EDTO

ON

PRO

FILE

1'1'

**

2%4%

8.7'

10'

ROU

NDI

NG

SEED

& F

ERTI

LIZE

R

SALV

AGED

TO

PSO

IL &

EM

AT

4'

SGSP

PV20

2.5:

1 M

AX1'

*3.3'

AP67

2.5:

1 MAX

EXIS

TIN

G G

UAR

DRAI

L

AP67

**RE

PLAC

E 10

' OF

EXIS

TIN

GH

MA

SHO

ULD

ER

**

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

03_T

S.DW

GFI

LE N

AME

:11

/26/

2019

4:5

2 PM

PLO

T DA

TE :

PLO

T BY

:KY

LE C

ORN

ELIU

S

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:20

FT

1007

-12-

78IH

39

DAN

ETY

PICA

L SE

CTIO

NS

- FIN

ISH

ED

LAYO

UT

NAM

E - 0

7

AG04

4" B

ASE

AGG

REG

ATE

DEN

SE 1

1/4

-INCH

PV20

SGSP

LEG

END

CB98

CON

CRET

E BA

RRIE

R TE

MPO

RARY

PRE

CAST

INST

ALLE

D

CON

STRU

CT R

ELIE

F TR

ENCH

ES A

T DI

TCH

SAG

PO

INTS

OR

EVER

Y 25

0'(S

EE C

ON

STRU

CTIO

N D

ETAI

L)

SUBG

RADE

SH

OU

LDER

PO

INT

(SH

OW

N O

N P

LAN

DET

AIL

SHEE

TS)

AG16

16" S

ELEC

T CR

USH

ED M

ATER

IAL

AP67

HM

A PA

VEM

ENT

6.75

-INCH

2.5"

UPP

ER L

AYER

4 H

T 58

-28

V4.

25" L

OW

ER L

AYER

2 H

T 58

-28

S

10

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 10 December 2, 2019
Page 6: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

INL

W

W

WW

WW

INL

WEAK

FOFO

FO

FOFO

FOFO

FO

FO

FOFO

PRO

POSE

D IH

39

NB

IH 3

9 SB

WB

TO S

B RA

MP

SLO

PE IN

TERC

EPT,

TYP

RL

RL 'X

SB'

USH 12/18 WB

EXIS

TIN

G B

RIDG

E ST

RUCT

URE

B-13

-464

TO

REM

AIN

1163

'XSB

'11

64'X

SB'

1165

'XSB

'11

67'X

SB'

1168

'XSB

'

WIS

DOT

- ITS

EDG

E O

F SE

LECT

CRU

SHED

MAT

ERIA

L, T

YP

SUBG

RADE

SH

OU

LDER

POIN

T, T

YP

BRID

GE

STRU

CTU

RE B

-13-

729

(SEE

STR

UCT

URE

PLA

NS)

EXIS

TIN

G B

RIDG

E ST

RUCT

URE

B-13

-466

TO

REM

AIN

+69.

54 -1

4.33

' LT

AG02

MG

S G

UAR

DRAI

L TO

BE

INST

ALLE

DW

ITH

FU

TURE

PRO

JECT

MG

S G

UAR

DRAI

L TO

BE IN

STAL

LED

WIT

HFU

TURE

PRO

JECT

CB98

CB98

+83.

21'X

SB'

29.

50' R

T

+87.

00'X

SB'

9.0

0' R

T+1

3.50

'XSB

' 9

.00'

RT

+17.

77'X

SB'

29.

50' R

T

+59.

10'X

SB'

29.

50' R

T

RETA

ININ

G W

ALL

R-13

-351

(SEE

STR

UCT

URE

PLA

NS)

STO

RM S

EWER

ITEM

STO

BE

INST

ALLE

D W

ITH

FUTU

RE P

ROJE

CT

STO

RM S

EWER

ITEM

S TO

BE

INST

ALLE

D W

ITH

FU

TURE

PRO

JECT

RETA

ININ

G W

ALL

R-13

-349

(SEE

STR

UCT

URE

PLA

NS)

CON

CRET

E SU

RFAC

E DR

AIN

S DR

OP

INLE

T(S

EE C

ON

STRU

CTIO

N D

ETAI

L)

BORE

AN

D JA

CK C

ULV

ERT

PIPE

SEE

CON

STRU

CTIO

N D

ETAI

L

CON

CRET

E SU

RFAC

E DR

AIN

S DR

OP

INLE

T(S

EE C

ON

STRU

CTIO

N D

ETAI

L)

2561

2562

2563

2564

2565

2566

STRU

CTU

RAL

APPR

OAC

H S

LAB

STRU

CTU

RAL

APPR

OAC

HSL

ABST

RUCT

URA

LAP

PRO

ACH

SLA

B

1166

'XSB

'

BRID

GE

STRU

CTU

RE B

-13-

730

(SEE

STR

UCT

URE

PLA

NS)

RETA

ININ

G W

ALL

R-13

-350

(SEE

STR

UCT

URE

PLA

NS)

REM

OVE

EXI

STIN

G C

MCP

AN

D RE

PLAC

EW

ITH

12"

UN

PERF

ORA

TED

PIPE

UN

DERD

RAIN

FO

R TE

MPO

RARY

DRAI

NAG

E (S

EE C

ON

STRU

CTIO

N D

ETAI

L).

PERM

ANEN

T IN

LET

AND

PIPE

TO

BE

INST

ALLE

D W

ITH

FU

TURE

PRO

JECT

.

AP67

AP67

+28.

55'X

SB'

0.0

0'

+28.

56'X

SB'

10.

00' R

T

+71.

01'X

SB'

10.

00' R

T

+71.

07'X

SB'

0.0

0'+4

8.07

'XSB

' 0

.00'

+48.

04'X

SB'

10.

00' R

T

SW01

SW01

SW01

10'

10'

MATCH LINE 2560+25

MATCH LINE 2566+25

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

12_P

D.DW

GFI

LE N

AME

:11

/26/

2019

4:3

3 PM

PLO

T DA

TE :

PLO

T BY

:KY

LE C

ORN

ELIU

S

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:40

FT

1007

-12-

78IH

39

DAN

EPL

AN D

ETAI

LS -

IH 3

9

LAYO

UT

NAM

E - 0

6

PLAN

DET

AIL

LEG

END

AG02

BASE

AG

GRE

GAT

E DE

NSE

1 1

/4-IN

CH

AP67

6.75

-INCH

HM

A PA

VEM

ENT

NO

TE: S

EE "P

LAN

DET

AILS

- U

SH 1

2/18

"FO

R U

SH 1

2/18

DET

AILS

NO

TE: S

EE "P

LAN

DET

AILS

- U

SH 1

2/18

"FO

R U

SH 1

2/18

DET

AILS

CB98

CON

CRET

E BA

RRIE

R TE

MPO

RARY

PREC

AST

INST

ALLE

D

SW01

SAW

ING

ASP

HAL

T

42

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 42 December 2, 2019
Page 7: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RAP

INL

INL

PRO

POSE

D IH

39

NB

IH 3

9 SB

WB

TO S

B RA

MP

SLO

PE IN

TERC

EPT,

TYP

RL

DELI

NEA

TED

WET

LAN

DS, T

YP

RL 'X

SB'

EXIS

TIN

G B

RIDG

E ST

RUCT

URE

B-13

-461

TO

REM

AIN

1169

'XSB

'11

70'X

SB'

1171

'XSB

'11

72'X

SB'

1173

'XSB

'11

74'X

SB'

WIS

DOT

- ITS

EDG

E O

F SE

LECT

CRU

SHED

MAT

ERIA

L, T

YP

SUBG

RADE

SH

OU

LDER

PO

INT,

TYP

NB TO WB RAMP

AG02

AG02

NB TO WBRA

MG

S G

UAR

DRAI

L TO

BE

INST

ALLE

DW

ITH

FU

TURE

PRO

JECT

TO TH CTCB98

+64.

00'X

SB'

9.0

0' R

T

+77.

50'X

SB'

9.0

0' R

T

+83.

63'X

SB'

29.

50' R

T

3-35

1N

S)

RETA

ININ

G W

ALL

R-13

-352

(SEE

STR

UCT

URE

PLA

NS)

STO

RM S

EWER

ITEM

S TO

BE

INST

ALLE

D W

ITH

FU

TURE

PRO

JECT

E ROJE

CT

2567

2568

2569

2570

2571

2572

STRU

CTU

RAL

APPR

OAC

H S

LAB

BRID

GE

STRU

CTU

RE B

-13-

731

(SEE

STR

UCT

URE

PLA

NS)

REM

OVE

EXI

STIN

G C

MCP

AN

D RE

PLAC

E W

ITH

12" U

NPE

RFO

RATE

D PI

PE U

NDE

RDRA

IN F

OR

TEM

PORA

RY D

RAIN

AGE

(SEE

CO

NST

RUCT

ION

DETA

IL).

PERM

ANEN

T IN

LET

AND

PIPE

TO

BE

INST

ALLE

D W

ITH

FU

TURE

PRO

JECT

.

10'

SW01

MATCH LINE 2566+25

MATCH LINE 2572+25

+02.

62'X

SB'

10.

00' R

T

+06.

28'X

SB'

0.0

0'

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

12_P

D.DW

GFI

LE N

AME

:11

/26/

2019

4:4

0 PM

PLO

T DA

TE :

PLO

T BY

:KY

LE C

ORN

ELIU

S

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:40

FT

1007

-12-

78IH

39

DAN

EPL

AN D

ETAI

LS -

IH 3

9

LAYO

UT

NAM

E - 0

7

PLAN

DET

AIL

LEG

END

CB98

CON

CRET

E BA

RRIE

R TE

MPO

RARY

PREC

AST

INST

ALLE

D

AG02

BASE

AG

GRE

GAT

E DE

NSE

1 1

/4-IN

CH

NO

TE: S

EE "P

LAN

DET

AILS

- NB

TO W

B RA

MP"

FO

RN

B TO

WB

RAM

P DE

TAIL

S

AP67

6.75

-INCH

HM

A PA

VEM

ENT

SW01

SAW

ING

ASP

HAL

T

43

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 43 December 2, 2019
Page 8: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

CON

STRU

CTIO

N S

TAG

ING

TYP

ICAL

S

SB IH

39/

90

SHO

ULD

ER C

LOSU

RE(W

ITH

NIG

HTT

IME

LAN

E CL

OSU

RE)

12'

LAN

E10

'SH

LD10

'SH

LD12

'LA

NE

'XSB

'RL

2'

*CO

NCR

ETE

BARR

IER

TEM

PORA

RY P

RECA

STDE

PART

MEN

T O

WN

ED

WO

RK A

REAS

1-5

12'

LAN

E10

'SH

LD10

'SH

LD12

'LA

NE

'XSB

'RL

2'

*CO

NCR

ETE

BARR

IER

TEM

PORA

RY P

RECA

STDE

PART

MEN

T O

WN

ED

WO

RK A

REAS

1-5

2'2'

TRAF

FIC

CON

TRO

L DR

UM

10'

WO

RKSP

ACE

*CO

NCR

ETE

BARR

IER

TEM

PORA

RY P

RECA

STDE

PART

MEN

T O

WN

ED T

O B

E DE

LIVE

RED

AND

INST

ALLE

D BY

OTH

ERS

UN

DER

1007

-12-

75.

(ST

A 11

41+1

2'XS

B -

STA

1175

+08'

XSB'

)

(LO

OKI

NG

NO

RTH

)

STA

1170

+30'

XSB'

- ST

A 11

84+0

0'XS

B'

12'

LAN

E10

'SH

LD10

'SH

LD12

'LA

NE

'XSB

'RL

TEM

P AS

PHAL

TIC

SHO

ULD

ER -

NIG

HTT

IME

STA

1170

+30'

XSB'

- ST

A 11

84+0

0'XS

B'

12'

LAN

E10

'SH

LDW

ORK

ZO

NE

12'

LAN

E

'XSB

'RL

2'2'

TRAF

FIC

CON

TRO

L DR

UM

100'

SPA

CIN

G

STA

1197

+00'

XSB'

- ST

A 12

54+0

0'XS

B'ST

A 11

97+0

0'XS

B' -

STA

1254

+00'

XSB'

12'

LAN

E12

'LA

NE

10'

SHLD

10'

SHLD

12'

RAM

P LA

NE

'XSB

'RL

STA

1161

+00'

XSB'

- ST

A 11

70+3

0'XS

B'ST

A 11

84+0

0'XS

B' -

STA

1197

+00'

XSB'

12'

LAN

E12

'LA

NE

10'

SHLD

WO

RK Z

ON

E12

'RA

MP

LAN

E

'XSB

'RL

STA

1161

+00'

XSB'

- ST

A 11

70+3

0'XS

B'ST

A 11

84+0

0'XS

B' -

STA

1197

+00'

XSB'

2'2'

12'

LAN

E12

'LA

NE

10'

SHLD

10'

SHLD

12'

RAM

P LA

NE

'XSB

'RL

12'

LAN

E12

'LA

NE

10'

SHLD

WO

RK Z

ON

E12

'RA

MP

LAN

E

'XSB

'RL

2'2'

TRAF

FIC

CON

TRO

L DR

UM

50' S

PACI

NG

NO

T SH

OW

N IN

PLA

N D

ETAI

LS

NO

TE:

6.75

" TEM

PORA

RY H

MA

PAVE

MEN

T TO

BE

PLAC

ED IN

2 L

AYER

S (S

EETY

PICA

L SE

CTIO

NS

FOR

THIC

KNES

SES

4.75

" LO

WER

LAY

ER O

N N

IGH

T 1

2.00

" UPP

ER L

AYER

ON

NIG

HT

2LA

YERS

MU

ST B

E PL

ACED

IN C

ON

SECU

TIVE

NIG

HTS

. TH

E FO

LLO

WIN

GPL

AN D

ETAI

LS S

HEE

TS "T

RAFF

IC C

ON

TRO

L - I

H 3

9 SB

SH

OU

LDER

PAVE

MEN

T RE

PLAC

EMEN

T" S

HO

W N

IGH

TTIM

E DE

VICE

LAY

OU

T.DU

RIN

G T

HE

DAY

BETW

EEN

PLA

CIN

G L

AYER

S, S

EE S

DD "T

RAFF

ICCO

NTR

OL,

SH

OU

LDER

CLO

SURE

ON

DIV

IDED

RO

ADW

AY, S

PEED

SG

REAT

ER T

HAN

40

MPH

" FO

R AD

VAN

CED

SIG

NIN

G F

OR

DAYT

IME

SHO

ULD

ER C

LOSU

RE. P

LACE

DRU

MS

DIRE

CTLY

AG

AIN

ST 2

" DRO

P AT

50' S

PACI

NG

.

TEM

PORA

RY A

SPH

ALTI

CSH

OU

LDER

- SE

E ST

AGIN

GSH

EETS

FO

R DE

TAIL

S

TRAF

FIC

CON

TRO

L DR

UM

100'

SPA

CIN

G

TRAF

FIC

CON

TRO

L DR

UM

100'

SPA

CIN

G

TRAF

FIC

CON

TRO

L DR

UM

50' S

PACI

NG

NO

T SH

OW

N IN

PLA

N D

ETAI

LSTE

MP

ASPH

ALTI

C SH

OU

LDER

- N

IGH

TTIM

E

TEM

P AS

PHAL

TIC

SHO

ULD

ER -

NIG

HTT

IME

TEM

P AS

PHAL

TIC

SHO

ULD

ER -

DAYT

IME

TEM

P AS

PHAL

TIC

SHO

ULD

ER -

DAYT

IME

TEM

P AS

PHAL

TIC

SHO

ULD

ER -

DAYT

IME

TEM

PORA

RY A

SPH

ALTI

CSH

OU

LDER

- SE

E ST

AGIN

GSH

EETS

FO

R DE

TAIL

S

STA

1141

+00'

XSB'

- ST

A 11

74+0

0'XS

B'SH

OU

LDER

CLO

SURE

STA

1141

+00'

XSB'

- ST

A 11

74+0

0'XS

B'

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

51_T

C_TS

.DW

GFI

LE N

AME

:11

/27/

2019

6:4

3 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:20

FT

IH 3

9DA

NE

LAYO

UT

NAM

E - 0

1 SB

1007

-12-

78TR

AFFI

C CO

NTR

OL

- CO

NST

RUCT

ION

STA

GIN

G T

YPIC

ALS,

IH 3

9 SB

85

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 85 December 2, 2019
Page 9: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RIPR

AP

RIPRAP

USH 12/18

INL

INL

INL

W

W

W

W

IH 3

9/90

IH 3

9/90

RIPR

AP

INL

WEAK

WEAK

EAK

WEAK

OH

OH

OH

O

2550

2555

1162

'XSB

'

1164

'XSB

'

SB TO EB RAMP

IH 3

9 SB

EB TO

SB R

AMP

IH 3

9 N

B

100'

(TYP

)Chic

ago

EAST

3990

Cam

brid

ge1812

EXIT

142

B

EXIS

TIN

G B

RIDG

E B-

13-4

66

Chic

ago

EAST

3990

Cam

brid

ge1812

EXIT

142

B

USH 12/18 EB

COO

RDIN

ATE

TRAF

FIC

CON

TRO

L FO

R IN

TERM

ITTE

NT

LAN

E CL

OSU

RES

WIT

H P

ROJE

CT 1

007-

12-7

5 AN

D10

07-1

2-78

SHO

ULD

ER P

AVEM

ENT

REPL

ACEM

ENT,

SEE

PLAN

DET

AILS

MATCHLINE STA 1163+85'XSB'

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

TEM

P.DW

GFI

LE N

AME

:11

/27/

2019

6:4

3 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:100

FT

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER P

AVEM

ENT

REPL

ACEM

ENT

LAYO

UT

NAM

E - 0

2

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

85A

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Added Sheet 85A December 2, 2019
Page 10: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RIPR

AP

RIPRAPRIPRAP

RIPRAP

RIPRAP

INL

USH 12/18

INL

W

WW

INL

WW

WW

W

IH 3

9/90

RIPRAP

INL

INL

INL

WEAKWEAK

GUY

MH

H

OH

POSTPOST

POST

POST

POST

1164

'XSB

'11

66'X

SB'

1168

'XSB

'11

70'X

SB'

1172

'XSB

'11

74'X

SB'

1176

'XSB

'11

78'X

SB'

NL

WB TO

SB RAM

P

IH 3

9 SB

USH 12/18 WB

IH 3

9 N

B

SB TO

WB RAM

P

NB TO WB RAMP

100'

(TYP

)

EXIS

TIN

G B

RIDG

E B-

13-4

61

EXIS

TIN

G B

RIDG

E B-

13-4

64

SHO

ULD

ER P

AVEM

ENT

REPL

ACEM

ENT,

SEE

PLAN

DET

AILS

MATCHLINE STA 1163+85'XSB'

MATCHLINE STA 1178+85'XSB'

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

TEM

P.DW

GFI

LE N

AME

:11

/27/

2019

6:4

4 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:100

FT

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER P

AVEM

ENT

REPL

ACEM

ENT

LAYO

UT

NAM

E - 0

3

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

85B

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Added Sheet 85B December 2, 2019
Page 11: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RIPR

AP

W

A/C

W

W

INL

FEMRITE DRFEMRITE DR

INL

INL

INL

INL

PRIV

ATE

PRIV

ATE

WV

MH M

WV

MH

MHOH OH OH OHOH

OHOH

OH

1180

'XSB

'11

82'X

SB'

1184

'XSB

'11

86'X

SB'

1188

'XSB

'11

90'X

SB'

1192

'XSB

'11

94'X

SB'

SB T

O W

B RA

MP

IH 3

9 SB

IH 3

9 N

B

FEMRITE DRIVE

EXIS

TIN

G B

RIDG

E B-

13-4

62

EXIS

TIN

G B

RIDG

E B-

13-4

63

EB TO

NB

RAM

P

IH 3

9 N

B

Chic

ago

EAST

3990

Cam

brid

ge18

12EX

IT 1

42 B

AHEA

D1/

3

MIL

E

WES

T

Mad

ison

1812

EXIT

142

A

EXIT

ON

LY

EXIS

TIN

G B

RIDG

E B-

13-4

63

Chic

ago

EAST

3990

Cam

brid

ge18

12EX

IT 1

42 B

AHEA

D1/

3

MIL

E

WES

T

Mad

ison

1812

EXIT

142

A

EXIT

ON

LY

48" X

30"

48"X

60'

100'

(TYP

)

MATCHLINE STA 1178+85'XSB'

MATCHLINE STA 1193+85'XSB'

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

TEM

P.DW

GFI

LE N

AME

:11

/27/

2019

6:4

4 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:100

FT

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER P

AVEM

ENT

REPL

ACEM

ENT

LAYO

UT

NAM

E - 0

4

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

85C

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Added Sheet 85C December 2, 2019
Page 12: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

W

W

MH

MH

T

W

W

W T

WW

W WW

IH 3

9/90

IH 3

9/90

INL

INL

INL

INL

INL

OBSCURE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

MH

CP 703B

1194

'XSB

'11

96'X

SB'

1198

'XSB

'12

00'X

SB'

1200

'XSB

'12

02'X

SB'

1204

'XSB

'12

06'X

SB'

IH 3

9 SB

IH 3

9 N

B

PCM

S M

ESSA

GE

FRAM

E B

39/9

0 SB

LEFT

ON

LY

12/1

8 W

BBO

THLA

NES

FRAM

E A PLAC

E DU

RIN

GN

IGH

TTIM

E W

ORK

50'

(TYP

)10

0'(T

YP)

MATCHLINE STA 1193+85'XSB'

MATCHLINE STA 1208+85'XSB'

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

TEM

P.DW

GFI

LE N

AME

:11

/27/

2019

6:4

4 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:100

FT

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER P

AVEM

ENT

REPL

ACEM

ENT

LAYO

UT

NAM

E - 0

5

85D

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Added Sheet 85D December 2, 2019
Page 13: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RIPR

APRI

PRAP

WAT

ERTO

WER

MH

W WIN

LIN

L

IH 3

9/90

IH 3

9/90

INL

INL

INL

INL

INL

INL

OHOH

OH OH

OH

OH

OH

XSB'

1208

'XSB

'12

10'X

SB'

1212

'XSB

'12

14'X

SB'

1216

'XSB

'12

18'X

SB'

1220

'XSB

'1

IH 3

9 SB

IH 3

9 N

B

100'

(TYP

)

PCM

S M

ESSA

GE

FRAM

E B

39/9

0 SB

MID

DLE

LAN

E

12/1

8 W

BRI

GH

TLA

NE

FRAM

E A PLAC

E DU

RIN

GN

IGH

TTIM

E W

ORK

SEE

TRAF

FIC

CON

TRO

L CO

NST

RUCT

ION

DET

AIL

"DET

AIL

FOR

ADVA

NCE

TEM

PORA

RY S

IGN

ING

FOR

LAN

E CL

OSU

RE" F

OR

ADVA

NCE

D SI

GN

ING

LAYO

UT

MATCHLINE STA 1208+85'XSB'

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

TEM

P.DW

GFI

LE N

AME

:11

/27/

2019

6:4

5 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:100

FT

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER P

AVEM

ENT

REPL

ACEM

ENT

LAYO

UT

NAM

E - 0

6

85E

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Added Sheet 85E December 2, 2019
Page 14: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RIPR

AP

HO

HO

HO

H

OH

OH

OH

OH

OH

OH

OH

OH

2534

2536

2538

2540

2542

2544

2546

2548

1136

'XSB

'

1138

'XSB

'

1140

'XSB

'

1142

'XSB

'11

44'X

SB'

1146

'XSB

'

1148

'XSB

'

1150

'XSB

'

IH 3

9 N

B

USH

12/

18 E

B O

FF R

AMP

TO IH

39

SB

WO

RK

AREA

1NO

TE:

UPO

N C

OM

PLET

ION

OF

TEM

POR

ARY

SHO

ULD

ER R

EPLA

CEM

ENT,

PLAC

E TR

AFFI

C C

ON

TRO

L FO

R S

HO

ULD

ER C

LOSU

RE

PRIO

R T

OBE

GIN

NIN

G W

OR

K O

N S

TRU

CTU

RES

OR

FIL

L W

OR

K.

THIS

SH

EET

SHO

WS

THE

IH 3

9 SB

SH

OU

LDER

CLO

SUR

E.SE

E SU

PPLE

MEN

TAL

PLAN

SH

EETS

'TR

AFFI

C C

ON

TRO

L - I

H 3

9 SB

NIG

HTT

IME

LAN

E C

LOSU

RE'

AN

D 'T

RAF

FIC

CO

NTR

OL

- IH

39

SB R

AMP

CLO

SUR

ES' F

OR

LAY

OU

T O

F AD

DIT

ION

AL D

EVIC

ES O

N IH

39

SB.

SHEE

T 1

TIES

INTO

STA

GE

1 O

F PR

OJE

CT

1007

-12-

75.

SHEE

T 1A

TIE

S IN

TO S

TAG

E 2

OF

PRO

JEC

T 10

07-1

2-75

.SH

EETS

2-5

AR

E TH

E SA

ME

FOR

BO

TH C

ON

FIG

UR

ATIO

NS.

ACC

ESS

WO

RK

AREA

1 F

RO

M U

SH 1

2/18

EB.

ACC

ESS

WO

RK

AREA

S 2

& 3

FRO

M U

SH 1

2/18

WB.

ACC

ESS

WO

RK

AREA

S 4

& 5

FRO

M F

EMR

ITE

DR

IVE.

TEM

POR

ARY

PAVE

MEN

T M

ARKI

NG

S AN

D T

RAF

FIC

STA

GIN

GSW

ITC

HES

AR

E SH

OW

N IN

PLA

N 1

007-

12-7

5.

*C

BTP

DEP

ARTM

ENT

OW

NED

TO

BE

DEL

IVER

ED A

ND

INST

ALLE

DBY

OTH

ERS

UN

DER

TH

E 10

07-1

2-75

PR

OJE

CT.

SHEE

T 1

IH 3

9 SB

CBT

P

IH 3

9 SB

CO

OR

DIN

ATE

TRAF

FIC

CO

NTR

OL

WIT

H P

RO

JEC

T 10

07-1

2-75

, CBT

PPL

ACED

UN

DER

PR

OJE

CT

1007

-12-

75

R-1

3-33

4

2

+81.

85, 3

.00'

RT

*CBT

P D

EPAR

TMEN

T O

WN

EDST

A 11

41+1

2'XS

B' -

STA

1175

+08'

XSB'

WIT

H G

AWK

SCR

EEN

(SEE

CO

NST

RU

CTI

ON

DET

AIL)

MATCHLINE STA 2548+80

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

SH

OU

LDER

CLO

SURE

.DW

GFI

LE N

AME

:11

/27/

2019

7:5

5 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:100

FT

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER C

LOSU

RE

LAYO

UT

NAM

E - 0

1

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

86

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 86 December 2, 2019
Page 15: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RIPR

AP

HO

HO

HO

H

OH

OH

OH

OH

OH

OH

OH

OH

2534

2536

2538

2540

2542

2544

2546

2548

1136

'XSB

'

1138

'XSB

'

1140

'XSB

'

1142

'XSB

'11

44'X

SB'

1146

'XSB

'

1148

'XSB

'

1150

'XSB

'

IH 3

9 N

B

CO

OR

DIN

ATE

TRAF

FIC

CO

NTR

OL

WIT

HPR

OJE

CT

1007

-12-

75M

ATC

H C

ON

CR

ETE

BAR

RIE

R T

EMPO

RAR

YPR

ECAS

T PL

ACED

UN

DER

PR

OJE

CT

1007

-12-

75

WO

RK

AREA

1NO

TE:

UPO

N C

OM

PLET

ION

OF

TEM

POR

ARY

SHO

ULD

ER R

EPLA

CEM

ENT,

PLAC

E TR

AFFI

C C

ON

TRO

L FO

R S

HO

ULD

ER C

LOSU

RE

PRIO

R T

OBE

GIN

NIN

G W

OR

K O

N S

TRU

CTU

RES

OR

FIL

L W

OR

K.

THIS

SH

EET

SHO

WS

THE

IH 3

9 SB

SH

OU

LDER

CLO

SUR

E.SE

E SU

PPLE

MEN

TAL

PLAN

SH

EETS

'TR

AFFI

C C

ON

TRO

L - I

H 3

9 SB

NIG

HTT

IME

LAN

E C

LOSU

RE'

AN

D 'T

RAF

FIC

CO

NTR

OL

- IH

39

SB R

AMP

CLO

SUR

ES' F

OR

LAY

OU

T O

F AD

DIT

ION

AL D

EVIC

ES O

N IH

39

SB.

SHEE

T 1

TIES

INTO

STA

GE

1 O

F PR

OJE

CT

1007

-12-

75.

SHEE

T 1A

TIE

S IN

TO S

TAG

E 2

OF

PRO

JEC

T 10

07-1

2-75

.SH

EETS

2-5

AR

E TH

E SA

ME

FOR

BO

TH C

ON

FIG

UR

ATIO

NS.

ACC

ESS

WO

RK

AREA

1 F

RO

M U

SH 1

2/18

EB.

ACC

ESS

WO

RK

AREA

S 2

& 3

FRO

M U

SH 1

2/18

WB.

ACC

ESS

WO

RK

AREA

S 4

& 5

FRO

M F

EMR

ITE

DR

IVE.

TEM

POR

ARY

PAVE

MEN

T M

ARKI

NG

S AN

D T

RAF

FIC

STA

GIN

GSW

ITC

HES

AR

E SH

OW

N IN

PLA

N 1

007-

12-7

5.

*C

BTP

DEP

ARTM

ENT

OW

NED

TO

BE

DEL

IVER

ED A

ND

INST

ALLE

DBY

OTH

ERS

UN

DER

TH

E 10

07-1

2-75

PR

OJE

CT.

SHEE

T 1A

CBT

P

R-1

3-33

4

USH

12/

18 E

B O

FF R

AMP

TO IH

39

SB

IH 3

9 SB

IH 3

9 SB

*CBT

P D

EPAR

TMEN

T O

WN

EDST

A 11

41+1

2'XS

B' -

STA

1175

+08'

XSB'

WIT

H G

AWK

SCR

EEN

(SEE

CO

NST

RU

CTI

ON

DET

AIL)

12"X

36"

2

+81.

85, 3

.00'

RT

MATCHLINE STA 2548+80

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

SH

OU

LDER

CLO

SURE

.DW

GFI

LE N

AME

:11

/27/

2019

7:5

5 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:100

FT

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER C

LOSU

RE

LAYO

UT

NAM

E - 0

1A

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

87

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 87 December 2, 2019
Page 16: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RIPR

AP

RIPR

AP

RIPR

AP

RIPRAP

USH 12/18

INL W

WW

W

W

W

INL

INL

INL

INL

WW

WW

IH 3

9/90

IH 3

9/90

IH 3

9/90

IH 3

9/90

RIPR

AP

INL

INL

BM 754B

2550

2552

2554

2556

2558

2560

2562

2564

1152

'XSB

'

1154

'XSB

'

1156

'XSB

'11

58'X

SB'

1160

'XSB

'11

62'X

SB'

1164

'XSB

'11

66'X

SB'

USH 12

/18 E

B OFF

RAM

P TO IH

39 SB

IH 3

9 N

B

USH 12/18 EB

B-13

-729

I H 39 S B EX I T R

AMP TO

USH

12/

18 E

B

Chic

ago

EAST

3990

Cam

brid

ge1812

EXIT

142

B

R-1

3-34

8R

-13-

349

R-1

R-1

3-33

4

WO

RK

AREA

2W

OR

K AR

EA 1

NO

TE:

UPO

N C

OM

PLET

ION

OF

TEM

POR

ARY

SHO

ULD

ER R

EPLA

CEM

ENT,

PLAC

E TR

AFFI

C C

ON

TRO

L FO

R S

HO

ULD

ER C

LOSU

RE

PRIO

R T

OBE

GIN

NIN

G W

OR

K O

N S

TRU

CTU

RES

OR

FIL

L W

OR

K.

THIS

SH

EET

SHO

WS

THE

IH 3

9 SB

SH

OU

LDER

CLO

SUR

E.SE

E SU

PPLE

MEN

TAL

PLAN

SH

EETS

'TR

AFFI

C C

ON

TRO

L - I

H 3

9 SB

NIG

HTT

IME

LAN

E C

LOSU

RE'

AN

D 'T

RAF

FIC

CO

NTR

OL

- IH

39

SB R

AMP

CLO

SUR

ES' F

OR

LAY

OU

T O

F AD

DIT

ION

AL D

EVIC

ES O

N IH

39

SB.

SHEE

T 1

TIES

INTO

STA

GE

1 O

F PR

OJE

CT

1007

-12-

75.

SHEE

T 1A

TIE

S IN

TO S

TAG

E 2

OF

PRO

JEC

T 10

07-1

2-75

.SH

EETS

2-5

AR

E TH

E SA

ME

FOR

BO

TH C

ON

FIG

UR

ATIO

NS.

ACC

ESS

WO

RK

AREA

1 F

RO

M U

SH 1

2/18

EB.

ACC

ESS

WO

RK

AREA

S 2

& 3

FRO

M U

SH 1

2/18

WB.

ACC

ESS

WO

RK

AREA

S 4

& 5

FRO

M F

EMR

ITE

DR

IVE.

*C

BTP

DEP

ARTM

ENT

OW

NED

TO

BE

DEL

IVER

ED A

ND

INST

ALLE

DBY

OTH

ERS

UN

DER

TH

E 10

07-1

2-75

PR

OJE

CT.

SHEE

T 2

EXIS

TIN

G B

RID

GE

B-13

-466

EXIS

TIN

G B

RID

GE

B-13

-467

WO

RK

AREA

2

IH 3

9 SB

EXIT

RAM

P TO

USH

12/

18 E

B

*CBT

P D

EPAR

TMEN

T O

WN

EDST

A 11

41+1

2'XS

B' -

1175

+08'

XSB'

WIT

H G

AWK

SCR

EEN

(SEE

CO

NST

RU

CTI

ON

DET

AIL)

MATCHLINE STA 2548+80

MATCHLINE STA 2563+50

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

SH

OU

LDER

CLO

SURE

.DW

GFI

LE N

AME

:11

/27/

2019

7:5

5 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:100

FT

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER C

LOSU

RE

LAYO

UT

NAM

E - 0

2

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

88

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 88 December 2, 2019
Page 17: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RIPR

AP

RIPRAPRIPRAP

RIPRAP

RIPRAP

W

INL

USH 12/18

INL

W

WW

WW

INL

WW

WW

W

IH 3

9/90

IH 3

9/90

RIPRAP

INL

INL

INL

INL

MH

POSTPOST

POST

POST

2564

2566

2568

2570

2572

2574

2576

2578

1166

'XSB

'11

68'X

SB'

1170

'XSB

'11

72'X

SB'

1174

'XSB

'11

76'X

SB'

1178

'XSB

'11

80'X

SB'

IH 3

9 SB

USH 12/18 WB

IH 3

9 N

B O

FF R

AMP

TO

USH

12/18 W

B

IH 3

9 S

B ON R

AMP FROM USH 12/18 WB

B-13

-730

I H 3 9

S B E X

I T R

AMP

TO

US H

12 / 1 8

WB

WO

RK

AREA

4

R-1

3-35

1R

-13-

350

R-1

3-35

2

B-13

-731

+75.

83, 3

.00'

RT

IH 3

9 N

B

WO

RK

AREA

3R

EA 2

NO

TE:

UPO

N C

OM

PLET

ION

OF

TEM

POR

ARY

SHO

ULD

ER R

EPLA

CEM

ENT,

PLAC

E TR

AFFI

C C

ON

TRO

L FO

R S

HO

ULD

ER C

LOSU

RE

PRIO

R T

OBE

GIN

NIN

G W

OR

K O

N S

TRU

CTU

RES

OR

FIL

L W

OR

K.

THIS

SH

EET

SHO

WS

THE

IH 3

9 SB

SH

OU

LDER

CLO

SUR

E.SE

E SU

PPLE

MEN

TAL

PLAN

SH

EETS

'TR

AFFI

C C

ON

TRO

L - I

H 3

9 SB

NIG

HTT

IME

LAN

E C

LOSU

RE'

AN

D 'T

RAF

FIC

CO

NTR

OL

- IH

39

SB R

AMP

CLO

SUR

ES' F

OR

LAY

OU

T O

F AD

DIT

ION

AL D

EVIC

ES O

N IH

39

SB.

ALSO

SEE

PLA

N S

HEE

T 'T

RAF

FIC

CO

NTR

OL

- IH

39

SB R

AMP

CLO

SUR

ES' F

OR

LAY

OU

T O

F D

EVIC

ES W

HEN

TH

E SB

CLO

SIN

GR

AMPS

.

ACC

ESS

WO

RK

AREA

1 F

RO

M U

SH 1

2/18

EB.

ACC

ESS

WO

RK

AREA

S 2

& 3

FRO

M U

SH 1

2/18

WB.

ACC

ESS

WO

RK

AREA

S 4

& 5

FRO

M F

EMR

ITE

DR

IVE.

*C

BTP

DEP

ARTM

ENT

OW

NED

TO

BE

DEL

IVER

ED A

ND

INST

ALLE

DBY

OTH

ERS

UN

DER

TH

E 10

07-1

2-75

PR

OJE

CT.

D

SHEE

T 3

EXIS

TIN

G B

RID

GE

B-13

-464

EXIS

TIN

G B

RID

GE

B-13

-461

EXIS

TIN

G B

RID

GE

B-13

-465

CBT

P

CBT

P

WO

RK

AREA

2

100

(TYP

)

*CBT

P D

EPAR

TMEN

T O

WN

EDST

A 11

41+1

2'XS

B' -

1175

+08'

XSB'

WIT

H G

AWK

SCR

EEN

(SEE

CO

NST

RU

CTI

ON

DET

AIL)

12"X

36"

+07.

89, 2

9.31

' RT

MATCHLINE STA 2563+50

MATCHLINE STA 2577+60

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

SH

OU

LDER

CLO

SURE

.DW

GFI

LE N

AME

:11

/27/

2019

7:5

5 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

1 IN

:100

FT

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER C

LOSU

RE

LAYO

UT

NAM

E - 0

3

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

89

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 89 December 2, 2019
Page 18: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

RIPR

AP

W

A/C

A/C

MH

MH

A/C

W

W

FEMRITE DRFEMRITE DR

INL

INL

INL

INL

PRIV

ATE

PRIV

ATE

WV

MH MH

WV

MH

MHOH OH OHOH

OHOH

OHOH

SIGN

2578

2580

1180

'XSB

'11

82'X

SB'

1184

'XSB

'11

86'X

SB'

1188

'XSB

'11

90'X

SB'

1192

'XSB

'11

94'X

SB'

IH 3

9 N

B

IH 3

9 SB

T O U

S H 1

2 / 1 8 W

B

B-13

-732

WO

RK

AREA

5

UPO

N C

OM

PLET

ION

OF

TEM

POR

ARY

SHO

ULD

ER R

EPLA

CEM

ENT,

PLAC

E TR

AFFI

C C

ON

TRO

L FO

R S

HO

ULD

ER C

LOSU

RE

PRIO

R T

OBE

GIN

NIN

G W

OR

K O

N S

TRU

CTU

RES

OR

FIL

L W

OR

K.

THIS

SH

EET

SHO

WS

THE

IH 3

9 SB

SH

OU

LDER

CLO

SUR

E.SE

E SU

PPLE

MEN

TAL

PLAN

SH

EETS

'TR

AFFI

C C

ON

TRO

L - I

H 3

9 SB

NIG

HTT

IME

LAN

E C

LOSU

RE'

AN

D 'T

RAF

FIC

CO

NTR

OL

- IH

39

SB R

AMP

CLO

SUR

ES' F

OR

LAY

OU

T O

F AD

DIT

ION

AL D

EVIC

ES O

N IH

39

SB.

ACC

ESS

WO

RK

AREA

1 F

RO

M U

SH 1

2/18

EB.

ACC

ESS

WO

RK

AREA

S 2

& 3

FRO

M U

SH 1

2/18

WB.

ACC

ESS

WO

RK

AREA

S 4

& 5

FRO

M F

EMR

ITE

DR

IVE.

SHEE

T 4

EXIS

TIN

G B

RID

GE

B-13

-462

EXIS

TIN

G B

RID

GE

B-13

-463

FEMRITE DRIVE

WO

RK

AREA

4

100

(TYP

)50

(TYP

)

48"X

24"

IH 3

9 N

B

IH 3

9 NB

ON

RAM

P FR

OM U

SH 1

2/18

IH 3

9 SB

EXI

T RA

MP

TO U

SH 1

2/18

WB

MATCHLINE STA 2577+60

MATCHLINE STA 2591+75

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

SH

OU

LDER

CLO

SURE

.DW

GFI

LE N

AME

:11

/27/

2019

7:5

6 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

Cust

om

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER C

LOSU

RE

LAYO

UT

NAM

E - 0

4

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

90

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 90 December 2, 2019
Page 19: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

W

W

MH

MH

W

T

W

W

W T

RIPR

AP

WW

W WW

IH 3

9/90

IH 3

9/90

INL

INL

INL

INL

INL

OBSCURE

PRIVATE

PRIV

ATE

PRIV

ATE

PRIVATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATE

PRIV

ATEPR

IVAT

E PRIV

ATE

MWELMWELMWEL

MH

CP 703B

ANT.

1194

'XSB

'11

96'X

SB'

1198

'XSB

'12

00'X

SB'

1200

'XSB

'12

02'X

SB'

1204

'XSB

'12

06'X

IH 3

9 SB

IH 3

9 N

B

50(T

YP)

UPO

N C

OM

PLET

ION

OF

TEM

POR

ARY

SHO

ULD

ER R

EPLA

CEM

ENT,

PLAC

E TR

AFFI

C C

ON

TRO

L FO

R S

HO

ULD

ER C

LOSU

RE

PRIO

R T

OBE

GIN

NIN

G W

OR

K O

N S

TRU

CTU

RES

OR

FIL

L W

OR

K.

THIS

SH

EET

SHO

WS

THE

IH 3

9 SB

SH

OU

LDER

CLO

SUR

E.SE

E SU

PPLE

MEN

TAL

PLAN

SH

EETS

'TR

AFFI

C C

ON

TRO

L - I

H 3

9 SB

NIG

HTT

IME

LAN

E C

LOSU

RE'

AN

D 'T

RAF

FIC

CO

NTR

OL

- IH

39

SB R

AMP

CLO

SUR

ES' F

OR

LAY

OU

T O

F AD

DIT

ION

AL D

EVIC

ES O

N IH

39

SB.

ACC

ESS

WO

RK

AREA

1 F

RO

M U

SH 1

2/18

EB.

ACC

ESS

WO

RK

AREA

S 2

& 3

FRO

M U

SH 1

2/18

WB.

ACC

ESS

WO

RK

AREA

S 4

& 5

FRO

M F

EMR

ITE

DR

IVE.

SHEE

T 5

50(T

YP)

SEE

STAN

DAR

D D

ETAI

L D

RAW

ING

'TR

AFFI

CC

ON

TRO

L, S

HO

ULD

ER C

LOSU

RE

ON

DIV

IDED

RO

ADW

AY, S

PEED

GR

EATE

R T

HAN

40

MPH

'FO

R A

DVA

NC

ED S

IGN

ING

MATCHLINE STA 2591+75

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\02

52_T

C_SB

SH

OU

LDER

CLO

SURE

.DW

GFI

LE N

AME

:11

/27/

2019

7:5

6 AM

PLO

T DA

TE :

PLO

T BY

:CH

AD E

VEN

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

Cust

om

1007

-12-

78IH

39

DAN

ETR

AFFI

C CO

NTR

OL

- IH

39

SB S

HO

ULD

ER C

LOSU

RE

LAYO

UT

NAM

E - 0

5

PCM

S

TRAF

FIC

CO

NTR

OL

DR

UM

WIT

H T

YPE

C

LEG

END

TYPE

III B

ARR

ICAD

E

TYPE

III B

ARR

ICAD

E W

TH A

TTAC

HED

SIG

N

TRAF

FIC

CO

NTR

OL

DR

UM

FLAS

HIN

G A

RR

OW

BO

ARD

SIG

N O

N P

ERM

ANEN

T SU

PPO

RT

SIG

N O

N T

EMPO

RAR

Y SU

PPO

RT

CO

NC

RET

E BA

RR

IER

TEM

POR

ARY

PREC

AST

WO

RK

ZON

E

TEM

POR

ARY

RAI

SED

PAV

EMEN

T M

ARKE

R(O

NE

WAY

REF

LEC

TOR

)

CR

ASH

CU

SHIO

NS

TEM

POR

ARY

DIR

ECTI

ON

OF

RO

ADW

AY T

RAF

FIC

POR

TABL

E C

HAN

GEA

BLE

MES

SAG

E BO

ARD

DIR

ECTI

ON

OF

CO

NST

RU

CTI

ON

TR

AFFI

C

CC

WO

RK

AREA

SHO

ULD

ER W

IDEN

ING

STEA

DY

BUR

N L

IGH

T

(CBT

P)

91

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 91 December 2, 2019
Page 20: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\03

02_M

Q.D

WG

FILE

NAM

E :

11/2

7/20

19 9

:23

AMPL

OT

DATE

:PL

OT

BY :

ZACH

FRE

EMAN

3

PRO

JECT

NO

:PL

OT

NAM

E :

3

SHEE

T 10

07-1

2-78

IH 3

9DA

NE

MIS

CELL

ANEO

US

QU

ANTI

TIES

LAYO

UT

NAM

E - 0

3

184

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 184 December 2, 2019
Page 21: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\03

02_M

Q.D

WG

FILE

NAM

E :

11/2

7/20

19 7

:43

AMPL

OT

DATE

:PL

OT

BY :

KYLE

CO

RNEL

IUS

3

PRO

JECT

NO

:PL

OT

NAM

E :

3

SHEE

T 10

07-1

2-78

IH 3

9DA

NE

MIS

CELL

ANEO

US

QU

ANTI

TIES

LAYO

UT

NAM

E - 0

5

186

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 186 December 2, 2019
Page 22: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\03

02_M

Q.D

WG

FILE

NAM

E :

11/2

6/20

19 7

:57

PMPL

OT

DATE

:PL

OT

BY :

KYLE

CO

RNEL

IUS

3

PRO

JECT

NO

:PL

OT

NAM

E :

3

SHEE

T 10

07-1

2-78

IH 3

9DA

NE

MIS

CELL

ANEO

US

QU

ANTI

TIES

LAYO

UT

NAM

E - 1

2

193

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 193 December 2, 2019
Page 23: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\03

02_M

Q.D

WG

FILE

NAM

E :

11/2

7/20

19 8

:39

AMPL

OT

DATE

:PL

OT

BY :

CHAD

EVE

N

3

PRO

JECT

NO

:PL

OT

NAM

E :

3

SHEE

T 10

07-1

2-78

IH 3

9DA

NE

MIS

CELL

ANEO

US

QU

ANTI

TIES

LAYO

UT

NAM

E - 1

4

195

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 195 December 2, 2019
Page 24: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:P:

\201

9 PR

OJE

CTS\

5019

001

- BIC

\CIV

IL3D

\SH

EETS

PLAN

\100

7127

8\03

02_M

Q.D

WG

FILE

NAM

E :

11/2

7/20

19 8

:41

AMPL

OT

DATE

:PL

OT

BY :

CHAD

EVE

N

3

PRO

JECT

NO

:PL

OT

NAM

E :

3

SHEE

T 10

07-1

2-78

IH 3

9DA

NE

MIS

CELL

ANEO

US

QU

ANTI

TIES

LAYO

UT

NAM

E - 1

5

196

dotmpc
Text Box
Addendum No. 01 ID 1007-12-78 Revised Sheet 196 December 2, 2019
Page 25: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

Wisconsin Department of Transportation 12/02/2019 08:15:25

Proposal ID: 20191210001 Project(s): 1007-12-78

Federal ID(s): WISC 2019732

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0002 201.0120

Clearing ID

27.000

_________._____ _________._____

0004 201.0220

Grubbing ID

27.000

_________._____ _________._____

0006 204.0100

Removing Pavement SY

5,014.000

_________._____ _________._____

0008 204.0110

Removing Asphaltic Surface SY

1,769.000

_________._____ _________._____

0010 204.0150

Removing Curb & Gutter LF

390.000

_________._____ _________._____

0012 204.0157

Removing Concrete Barrier LF

347.000

_________._____ _________._____

0014 204.0165

Removing Guardrail LF

1,985.000

_________._____ _________._____

0016 204.0180

Removing Delineators and Markers EACH

17.000

_________._____ _________._____

0018 204.0220

Removing Inlets EACH

1.000

_________._____ _________._____

0020 204.0245

Removing Storm Sewer (size) 01. 12-Inch

LF

243.000

_________._____ _________._____

0022 204.0270

Abandoning Culvert Pipes EACH

2.000

_________._____ _________._____

0024 204.0291.S

Abandoning Sewer CY

38.000

_________._____ _________._____

0026 204.9060.S

Removing (item description) 01. ApronEndwall

EACH

1.000

_________._____ _________._____

0028 205.0100

Excavation Common CY

32,790.000

_________._____ _________._____

0030 206.1000

Excavation for Structures Bridges(structure) 702. B-13-731

LUMP SUM _________._____LS

0032 206.1000

Excavation for Structures Bridges(structure) 703. B-13-732

LUMP SUM _________._____LS

Proposal Schedule of Items Page 1 of 16

Page 26: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

Wisconsin Department of Transportation 12/02/2019 08:15:25

Proposal ID: 20191210001 Project(s): 1007-12-78

Federal ID(s): WISC 2019732

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0064 415.0100

Concrete Pavement 10-Inch SY

709.000

_________._____ _________._____

0066 415.0120

Concrete Pavement 12-Inch SY

2,284.000

_________._____ _________._____

0068 416.0610

Drilled Tie Bars EACH

306.000

_________._____ _________._____

0070 416.0620

Drilled Dowel Bars EACH

167.000

_________._____ _________._____

0072 416.1110

Concrete Shoulder Rumble Strips LF

1,891.000

_________._____ _________._____

0074 416.1715

Concrete Pavement Repair SHES SY

90.000

_________._____ _________._____

0076 416.1725

Concrete Pavement Replacement SHES SY

35.000

_________._____ _________._____

0078 455.0605

Tack Coat GAL

626.000

_________._____ _________._____

1.00000

0080 460.2000

Incentive Density HMA Pavement DOL

2,160.000

2,160.00

0082 460.7222

HMA Pavement 2 HT 58-28 S TON

2,103.000

_________._____ _________._____

0084 460.7424

HMA Pavement 4 HT 58-28 H TON

1,162.000

_________._____ _________._____

0086 460.7624

HMA Pavement 4 HT 58-28 V TON

510.000

_________._____ _________._____

0088 465.0110

Asphaltic Surface Patching TON

20.000

_________._____ _________._____

0090 465.0125

Asphaltic Surface Temporary TON

55.000

_________._____ _________._____

0092 465.0315

Asphaltic Flumes SY

14.000

_________._____ _________._____

0094 465.0400

Asphaltic Shoulder Rumble Strips LF

7,583.000

_________._____ _________._____

0096 501.1000.S

Ice Hot Weather Concreting LB

29,300.000

_________._____ _________._____

Proposal Schedule of Items Page 3 of 16

Page 27: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

Wisconsin Department of Transportation 12/02/2019 08:15:25

Proposal ID: 20191210001 Project(s): 1007-12-78

Federal ID(s): WISC 2019732

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0308 630.0200

Seeding Temporary LB

2,273.000

_________._____ _________._____

0310 630.0300

Seeding Borrow Pit LB

5,120.000

_________._____ _________._____

0312 630.0500

Seed Water MGAL

1,664.000

_________._____ _________._____

0314 633.0100

Delineator Posts Steel EACH

9.000

_________._____ _________._____

0316 633.0500

Delineator Reflectors EACH

18.000

_________._____ _________._____

0318 633.1000

Delineators Barrier Wall EACH

9.000

_________._____ _________._____

0320 633.5200

Markers Culvert End EACH

31.000

_________._____ _________._____

0322 638.2101

Moving Signs Type I EACH

7.000

_________._____ _________._____

0324 642.5401

Field Office Type D EACH

1.000

_________._____ _________._____

0326 643.0300

Traffic Control Drums DAY

87,650.000

_________._____ _________._____

0328 643.0420

Traffic Control Barricades Type III DAY

2,543.000

_________._____ _________._____

0330 643.0500

Traffic Control Flexible Tubular MarkerPosts

EACH

25.000

_________._____ _________._____

0332 643.0600

Traffic Control Flexible Tubular MarkerBases

EACH

25.000

_________._____ _________._____

0334 643.0705

Traffic Control Warning Lights Type A DAY

4,199.000

_________._____ _________._____

0336 643.0715

Traffic Control Warning Lights Type C DAY

14,062.000

_________._____ _________._____

0338 643.0800

Traffic Control Arrow Boards DAY

753.000

_________._____ _________._____

Proposal Schedule of Items Page 11 of 16

Page 28: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

Wisconsin Department of Transportation 12/02/2019 08:15:25

Proposal ID: 20191210001 Project(s): 1007-12-78

Federal ID(s): WISC 2019732

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0340 643.0900

Traffic Control Signs DAY

35,785.000

_________._____ _________._____

0342 643.0910

Traffic Control Covering Signs Type I EACH

30.000

_________._____ _________._____

0344 643.0920

Traffic Control Covering Signs Type II EACH

40.000

_________._____ _________._____

0346 643.1000

Traffic Control Signs Fixed Message SF

180.500

_________._____ _________._____

0348 643.1050

Traffic Control Signs PCMS DAY

303.000

_________._____ _________._____

0350 643.1055.S

Truck or Trailer Mounted Attenuator DAY

4.000

_________._____ _________._____

0352 643.5000

Traffic Control EACH

1.000

_________._____ _________._____

0354 645.0111

Geotextile Type DF Schedule A SY

898.000

_________._____ _________._____

0356 645.0120

Geotextile Type HR SY

654.000

_________._____ _________._____

0358 645.0220

Geogrid Type SR SY

19,230.000

_________._____ _________._____

0360 646.1020

Marking Line Epoxy 4-Inch LF

31,978.000

_________._____ _________._____

0362 646.3020

Marking Line Epoxy 8-Inch LF

4,112.000

_________._____ _________._____

0364 646.5020

Marking Arrow Epoxy EACH

2.000

_________._____ _________._____

0366 646.9010

Marking Removal Line Water Blasting 4-Inch

LF

9,170.000

_________._____ _________._____

0368 646.9110

Marking Removal Line Water Blasting 8-Inch

LF

275.000

_________._____ _________._____

0370 649.0105

Temporary Marking Line Paint 4-Inch LF

14,935.000

_________._____ _________._____

Proposal Schedule of Items Page 12 of 16

Page 29: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50

Wisconsin Department of Transportation 12/02/2019 08:15:25

Proposal ID: 20191210001 Project(s): 1007-12-78

Federal ID(s): WISC 2019732

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0372 649.0205

Temporary Marking Line Paint 8-Inch LF

210.000

_________._____ _________._____

0374 649.0760

Temporary Marking Raised PavementMarker Type I

EACH

50.000

_________._____ _________._____

0376 652.0125

Conduit Rigid Metallic 2-Inch LF

100.000

_________._____ _________._____

0378 652.0225

Conduit Rigid Nonmetallic Schedule 402-Inch

LF

1,775.000

_________._____ _________._____

0380 653.0222

Junction Boxes 18x12x6-Inch EACH

8.000

_________._____ _________._____

0382 690.0150

Sawing Asphalt LF

1,471.000

_________._____ _________._____

0384 690.0250

Sawing Concrete LF

1,099.000

_________._____ _________._____

1.00000

0386 715.0415

Incentive Strength Concrete Pavement DOL

910.000

910.00

1.00000

0388 715.0502

Incentive Strength Concrete Structures DOL

28,818.000

28,818.00

1.00000

0390 715.0603

Incentive Strength Concrete Barrier DOL

3,660.000

3,660.00

1.00000

0392 715.0710

Optimized Aggregate Gradation Incentive DOL

4,750.000

4,750.00

5.00000

0394 ASP.1T0A

On-the-Job Training Apprentice at$5.00/HR

HRS

3,200.000

16,000.00

5.00000

0396 ASP.1T0G

On-the-Job Training Graduate at$5.00/HR

HRS

6,000.000

30,000.00

0398 SPV.0035

Special 001. Roadway Embankment CY

310,360.000

_________._____ _________._____

0400 SPV.0035

Special 700. High Performance Concrete(HPC) Masonry Structures

CY

2,530.000

_________._____ _________._____

Proposal Schedule of Items Page 13 of 16

Page 30: Wisconsin Department of TransportationThe contractor for Project 1007-12-74/75 will place approximately 80,000 CY of embankment within Work Area 1 between Stations 2546+00 and 2557+50