wisconsin department of transportationmar 10, 2020  · wisconsin department of transportation...

12
Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4 th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459 March 2, 2020 NOTICE TO ALL CONTRACTORS: Proposal #11: 1360-00-76 West Fond Du Lac Avenue 6 Highway Intersections STH 145 Milwaukee County 2595-03-73, WISC 2020073 N 60 th Street West Capitol Drive to W Hampton Ave Local Street Milwaukee County Letting of March 10, 2020 This is Addendum No. 02, which provides for the following: Special Provisions: Revised Special Provisions Article No. Description 4 Traffic Plan Sheets: Revised Plan Sheets Plan Sheet Plan Sheet Title (brief description of changes to sheet) 242 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 244 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 246 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 248 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 250 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 252 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 254 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 256 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 258 DELETE INCORRECT GRADE 82.17 AT STATION 58+25 ON T/L LINE 258 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 260 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor. Sincerely, Mike Coleman Proposal Development Specialist Proposal Management Section

Upload: others

Post on 30-Mar-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation

Wisconsin Department of Transportation

Version 02-2017 Solving tomorrow’s transportation challenges

Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459

March 2, 2020

NOTICE TO ALL CONTRACTORS: Proposal #11: 1360-00-76

West Fond Du Lac Avenue 6 Highway Intersections STH 145 Milwaukee County

2595-03-73, WISC 2020073 N 60th Street West Capitol Drive to W Hampton Ave Local Street Milwaukee County

Letting of March 10, 2020 This is Addendum No. 02, which provides for the following: Special Provisions:

Revised Special Provisions Article

No. Description

4 Traffic Plan Sheets:

Revised Plan Sheets Plan

Sheet Plan Sheet Title (brief description of changes to sheet)

242 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 244 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 246 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 248 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 250 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 252 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 254 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 256 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 258 DELETE INCORRECT GRADE 82.17 AT STATION 58+25 ON T/L LINE 258 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 260 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T

The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor.

Sincerely,

Mike Coleman Proposal Development Specialist Proposal Management Section

Page 2: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation

ADDENDUM NO. 02

1360-00-76 & 2595-03-73

March 2, 2020

Special Provisions 4. Traffic Replace paragraph two with the following:

The City of Milwaukee will provide all posting of parking restrictions to facilitate construction operations. Contact Mr. Cameron Potter, (414) 286-3276, at least three working days prior to the start of construction operations.

Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: Revised: 242, 244, 246, 248, 250, 252, 254, 256, 258, 260

END OF ADDENDUM

Page 3: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 242 March 2, 2020
Page 4: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 244 March 2, 2020
Page 5: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 246 March 2, 2020
Page 6: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 248 March 2, 2020
Page 7: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 250 March 2, 2020
Page 8: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 252 March 2, 2020
Page 9: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 254 March 2, 2020
Page 10: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 256 March 2, 2020
Page 11: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 258 March 2, 2020
Page 12: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 260 March 2, 2020