wisconsin department of transportation · 2020. 9. 15. · wisconsin department of transportation...
TRANSCRIPT
Wisconsin Department of Transportation
Version 02-2017 Solving tomorrow’s transportation challenges
Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459
September 2, 2020
NOTICE TO ALL CONTRACTORS: Proposal #02: 5270-01-60, WISC 2020 411
Sauk City - Arlington Wisc R Overflow Bridge to Riddle Road STH 60 Columbia County
Letting of September 15, 2020 This is Addendum No. 01, which provides for the following: Schedule of Items:
Revised Bid Item Quantities
Bid Item Item Description Unit Old
Quantity Revised Quantity
Proposal Total
465.0105 Asphaltic Surface Ton 501 329 830
Added Bid Item Quantities
Bid Item Item Description Unit Old
Quantity Revised Quantity
Proposal Total
211.0100 Prepare Foundation for Asphaltic Surface (5270-01-60)
LS 0 1 1
649.0105 Temporary Pavement Marking Line Paint 4-Inch
LF 0 70,000 70,000
Plan Sheets:
Revised Plan Sheets Plan
Sheet Plan Sheet Title (brief description of changes to sheet)
2 General Notes (Updated note regarding paving within 24 hours of milling)
3 Typical Existing Sections (Replaced proposed typical sections with missing existing typical sections)
6 Proposed Typical Sections (Added Asphaltic Surface layer for shoulder widening) 25 Miscellaneous Quantities (Updated Asphaltic Surface quantities in Asphalt Items table)
27 Miscellaneous Quantities (Added Temporary Pavement Marking Line Paint 4-Inch in Pavement Marking Items table)
Schedule of Items Attached, dated September 3, 2020, are the revised Schedule of Items Pages 1 – 5. Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: Revised: 2, 3, 6, 25 and 27.
The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor.
Sincerely,
Mike Coleman Proposal Development Specialist Proposal Management Section
END OF ADDENDUM
Wisconsin Department of Transportation 09/03/2020 07:14:56
Proposal ID: 20200915002 Project(s): 5270-01-60Federal ID(s): WISC 2020411
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0002 203.0100Removing Small Pipe Culverts EACH
5.000_________._____ _________._____
0004 204.0120Removing Asphaltic Surface Milling SY
213,150.000_________._____ _________._____
0006 205.0100Excavation Common CY
803.000_________._____ _________._____
0008 211.0400Prepare Foundation for AsphalticShoulders
STA72.000
_________._____ _________._____
0010 213.0100Finishing Roadway (project) 01. 5270-01-60
EACH1.000
_________._____ _________._____
0012 305.0110Base Aggregate Dense 3/4-Inch TON
2,320.000_________._____ _________._____
0014 305.0120Base Aggregate Dense 1 1/4-Inch TON
160.000_________._____ _________._____
0016 312.0110Select Crushed Material TON
170.000_________._____ _________._____
0018 455.0605Tack Coat GAL
15,222.000_________._____ _________._____
0020 460.0105.SHMA Percent Within Limits (PWL) TestStrip Volumetrics
EACH1.000
_________._____ _________._____
0022 460.0110.SHMA Percent Within Limits (PWL) TestStrip Density
EACH1.000
_________._____ _________._____
1.000000024 460.2005
Incentive Density PWL HMA Pavement DOL16,260.000
16,260.00
1.000000026 460.2007
Incentive Density HMA PavementLongitudinal Joints
DOL22,592.000
22,592.00
1.000000028 460.2010
Incentive Air Voids HMA Pavement DOL24,250.000
24,250.00
0030 460.6224HMA Pavement 4 MT 58-28 S TON
24,250.000_________._____ _________._____
Proposal Schedule of Items Page 1 of 5
Wisconsin Department of Transportation 09/03/2020 07:14:56
Proposal ID: 20200915002 Project(s): 5270-01-60Federal ID(s): WISC 2020411
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0032 465.0105Asphaltic Surface TON
830.000_________._____ _________._____
0034 522.0124Culvert Pipe Reinforced Concrete ClassIII 24-Inch
LF82.000
_________._____ _________._____
0036 522.0130Culvert Pipe Reinforced Concrete ClassIII 30-Inch
LF108.000
_________._____ _________._____
0038 522.0136Culvert Pipe Reinforced Concrete ClassIII 36-Inch
LF68.000
_________._____ _________._____
0040 522.1024Apron Endwalls for Culvert PipeReinforced Concrete 24-Inch
EACH2.000
_________._____ _________._____
0042 522.1030Apron Endwalls for Culvert PipeReinforced Concrete 30-Inch
EACH4.000
_________._____ _________._____
0044 522.1036Apron Endwalls for Culvert PipeReinforced Concrete 36-Inch
EACH80.000
_________._____ _________._____
0046 522.2324Culvert Pipe Reinforced ConcreteHorizontal Elliptical Class HE-III 24x38-Inch
LF58.000
_________._____ _________._____
0048 522.2624Apron Endwalls for Culvert PipeReinforced Concrete Horizontal Elliptical24x38-Inch
EACH2.000
_________._____ _________._____
0050 618.0100Maintenance And Repair of Haul Roads(project) 01. 5270-01-60
EACH1.000
_________._____ _________._____
0052 619.1000Mobilization EACH
1.000_________._____ _________._____
0054 624.0100Water MGAL
27.000_________._____ _________._____
0056 625.0500Salvaged Topsoil SY
500.000_________._____ _________._____
0058 628.1905Mobilizations Erosion Control EACH
2.000_________._____ _________._____
Proposal Schedule of Items Page 2 of 5
Wisconsin Department of Transportation 09/03/2020 07:14:56
Proposal ID: 20200915002 Project(s): 5270-01-60Federal ID(s): WISC 2020411
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0060 628.1910Mobilizations Emergency Erosion Control EACH
1.000_________._____ _________._____
0062 628.2004Erosion Mat Class I Type B SY
500.000_________._____ _________._____
0064 628.7504Temporary Ditch Checks LF
50.000_________._____ _________._____
0066 628.7555Culvert Pipe Checks EACH
5.000_________._____ _________._____
0068 629.0210Fertilizer Type B CWT
1.000_________._____ _________._____
0070 630.0120Seeding Mixture No. 20 LB
9.000_________._____ _________._____
0072 630.0500Seed Water MGAL
12.000_________._____ _________._____
0074 633.5200Markers Culvert End EACH
10.000_________._____ _________._____
0076 642.5001Field Office Type B EACH
1.000_________._____ _________._____
0078 643.0300Traffic Control Drums DAY
70.000_________._____ _________._____
0080 643.0900Traffic Control Signs DAY
718.000_________._____ _________._____
0082 643.1050Traffic Control Signs PCMS DAY
14.000_________._____ _________._____
0084 643.5000Traffic Control EACH
1.000_________._____ _________._____
0086 646.1020Marking Line Epoxy 4-Inch LF
106,750.000_________._____ _________._____
0088 646.3020Marking Line Epoxy 8-Inch LF
2,030.000_________._____ _________._____
0090 646.4520Marking Line Same Day Epoxy 4-Inch LF
70,000.000_________._____ _________._____
0092 646.5020Marking Arrow Epoxy EACH
17.000_________._____ _________._____
Proposal Schedule of Items Page 3 of 5
Wisconsin Department of Transportation 09/03/2020 07:14:56
Proposal ID: 20200915002 Project(s): 5270-01-60Federal ID(s): WISC 2020411
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0094 646.5120Marking Word Epoxy EACH
7.000_________._____ _________._____
0096 646.5220Marking Symbol Epoxy EACH
6.000_________._____ _________._____
0098 646.6120Marking Stop Line Epoxy 18-Inch LF
315.000_________._____ _________._____
0100 649.0120Temporary Marking Line Epoxy 4-Inch LF
70,000.000_________._____ _________._____
0102 650.6000Construction Staking Pipe Culverts EACH
5.000_________._____ _________._____
0104 650.8000Construction Staking ResurfacingReference
LF54,437.000
_________._____ _________._____
0106 650.9910Construction Staking SupplementalControl (project) 01. 5270-01-60
LUMP SUM _________._____LS
0108 690.0150Sawing Asphalt LF
826.000_________._____ _________._____
1.000000110 740.0440
Incentive IRI Ride DOL41,240.000
41,240.00
0112 SPV.0060Special 01. Verify Landmark ReferenceMonuments
EACH8.000
_________._____ _________._____
0114 SPV.0090Special 01. Asphaltic Centerline RumbleStrips, Sinusoidal, 2-Lane Rural
LF7,270.000
_________._____ _________._____
0116 SPV.0090Special 02. Asphaltic Shoulder RumbleStrips, Sinusoidal, 2-Lane Rural
LF16,050.000
_________._____ _________._____
0118 SPV.0180Special 01. Removing DistressedPavement Milling
SY2,135.000
_________._____ _________._____
0120 211.0100Prepare Foundation for Asphaltic Paving(project) 01. 5270-01-60
LUMP SUM _________._____LS
0122 649.0105Temporary Marking Line Paint 4-Inch LF
70,000.000_________._____ _________._____
Proposal Schedule of Items Page 4 of 5
Wisconsin Department of Transportation 09/03/2020 07:14:56
Proposal ID: 20200915002 Project(s): 5270-01-60Federal ID(s): WISC 2020411
Section: 0001 _________._____Total:
Total Bid: _________._____
Proposal Schedule of Items Page 5 of 5