winter operations

37
Winter Operations MSP International Airport

Upload: otylia

Post on 24-Feb-2016

48 views

Category:

Documents


0 download

DESCRIPTION

Winter Operations. MSP International Airport. 3400 acres 1200 aircraft operations/day 135 non-stop destinations 50” average annual snowfall. MSP International Airport. Small department of 15 employees Technology used as leverage for Collaborative Decision Making (CDM) process - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Winter Operations

Winter OperationsMSP International Airport

Page 2: Winter Operations

MSP International Airport

• 3400 acres

• 1200 aircraft operations/day

• 135 non-stop destinations

• 50” average annual snowfall

Page 3: Winter Operations

MAC Airside Operations

• Small department of 15 employees

• Technology used as leverage for Collaborative Decision Making (CDM) process

• Interpersonal relationships as/more important

Page 4: Winter Operations

Winter OperationsMSP International Airport

• Pre-Storm• Storm• Post-Storm

Page 5: Winter Operations

Pre-Storm

Page 6: Winter Operations

Pre-StormWeather Forecasts

• NWS Watch/Warnings

• Airport Weather Warning

• NWSChat

Page 7: Winter Operations

Pre-StormWeather Forecasts

• NOAA Graphical Forecasts

Page 8: Winter Operations

Pre-StormWeather Forecasts

• NOAA Tactical Decision Aid

Page 9: Winter Operations

Pre-StormWeather Forecasts

• Private Weather Contractors• Telvent DTN• Weather

Watch

Page 10: Winter Operations

Pre-StormWeather Forecasts

• Private Weather Contractors• Telvent DTN• Weather

Watch• Delta Air

Lines Meteorology

Page 11: Winter Operations

Pre-StormTelecons

• Delta Air Lines

• FAA Air Traffic• Tower• TRACON• ZMP• Command

Center

Page 12: Winter Operations

Pre-StormMAC Internal Planning

• Staffing LevelsClick icon to add picture

Page 13: Winter Operations

Pre-StormMAC Internal Planning

• Staffing Levels

• Staffing Start Time

Click icon to add picture

Page 14: Winter Operations

Pre-StormSurface Temperatures

• Vaisala Navigator

Page 15: Winter Operations

Storm

Page 16: Winter Operations

StormRadar

• Vasaila Avicast

Page 17: Winter Operations

StormASOS

• Stanwyck Avionics

Page 18: Winter Operations

StormFlight Tracking

• FlightExplorer

Page 19: Winter Operations

StormFlight Tracking

• Sensis Aerobahn

Page 20: Winter Operations

StormFlight Tracking

• Sensis Aerobahn

Page 21: Winter Operations

StormVehicle Tracking

• AmeriTrak

Page 22: Winter Operations

StormVehicle Tracking

• AmeriTrak

Page 23: Winter Operations

StormRunway Closures

• Surface Friction Testing• “Pre-Run”

Page 24: Winter Operations

StormRunway Closures

• Surface Friction Testing

Page 25: Winter Operations

StormRunway Closures

• Surface Friction Testing

Page 26: Winter Operations

StormTelecons

• Delta Air Lines

• FAA Air Traffic• Tower• TRACON• ZMP• Command

Center

Page 27: Winter Operations

StormAirport Status/Future Plans

• PASSUR Opsnet

Page 28: Winter Operations

StormRunway Closures

• Plows• Brooms• Blowers• Sanders• Deicers

Page 29: Winter Operations

StormRunway Closures

• Surface Friction Testing• “Post Run”

Page 30: Winter Operations

Post-Storm

Page 31: Winter Operations

Post-StormClean-up

• Lighting and signage inspection

• Snowbank profiles

Page 32: Winter Operations

Post-StormClean-up

• Lighting and signage inspection

• Snowbank profiles

Page 33: Winter Operations

Post-StormClean-up

• Snow-melters

Page 34: Winter Operations

Post-StormClean-up

• Other marketing efforts

Page 35: Winter Operations

Post-Storm”Snow Critique”

• What went right?

• What can “we” do better next time?

Page 36: Winter Operations

Going forward?

• Eliminate “Information Overload”

• “Just-in-Time” information

Page 37: Winter Operations

Josh PaurusDuty Manager – Airside OperationsMSP International [email protected]

• Dude, where’s my car?