winter 2009 no.74 magazine of the scottish wild land group · magazine of the scottish wild land...

24
Magazine of the Scosh Wild Land Group Winter 2009 No.74 Registered Charity No: SC004014

Upload: others

Post on 13-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

Magazine of the

Scottish Wild Land Group

Winter 2009 No.74

Registered Charity No: SC004014

Page 2: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

2

WILD LAND NEWS:Magazine of the Scottish Wild Land Group

Winter 2009: Issue 74 Registered Charity No: SC004014

East Lodge, Craibstone Bucksburn, Aberdeen, AB21 9SJ Tel: 01224 716709 or 07754 571364 Web: www.swlg.org.uk E-mail: [email protected]

Printed by Clydeside Press, 37 High St, Glasgow, G1 1LX Tel: 0141 552 5519 WLN73 design, layout and editing by Jayne Glass © Scottish Wild Land Group 2009 Front cover: Loch Hourn and Ladhar Beinn by K Brown

ContentsComment .............................................................................................. 3Three New Major Hydro Schemes proposed ........................................ 4Beauly To Denny Pylons: The Case For ................................................. 6NewsNewsNewsNewsNews ............................................................... 11AGM 2009 .......................................................................................... 15Book Review... .................................................................................... 15Wind farms in rural Wales: Community benefits?.............................. 16Wild Land research Institute launched at the University of Leeds ..... 20Letter to the Editor ............................................................................. 21

Page 3: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

3

Comment

Page 4: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

4

Three New Major Hydro Schemes proposedBy Geoff Moore

On 20 October I went to a presentation

by Scottish and Southern Energy for the

proposed new hydro scheme at Kilder-

morie, at Ardross village hall. Described

to the press as a “small dam” I imagined

it wouldn’t be in a wild area; perhaps it

would be above Loch Morie; but was

shocked to see it is quite a large scheme in

the heart of the major wild area between

Loch Vaich (an existing hydro reservoir

with other hydro infrastructure to the

north and south), Strathcarron, the Struie

road between Alness and Ardgay and Ben

Wyvis. This scheme will industrialize the

heart of this area; in terms of area and

quality of wild land this is in the top 30

in Scotland. The dam is to be near the 45

easting of OS sheet 20 on the Abhainn na

Glasa, and all major streams in the catch-

ment downstream are to have intakes

with new access tracks; particularly Loch

a’Chaorainn to the south. They hope to

start construction in spring, 2011. Many

people will already know that this same

company recently industrialized the heart

of another top 30 wild area: Glen Doe; in-

itially described in the media as “the last

major hydro scheme in Scotland” but this

soon changed to “the first major hydro

scheme in Scotland since the Sixties”.

Posters showed output figures: 7.5 MW

power output, and 31 GWh of energy

produced per year. The maths suggests

it will only be operating for half the year.

One of the 3 company reps came up to me

to chat. I pointed out that the common

figures used for the number of house-

hold equivalents of power produced are

based on a household using around 2KW

(a rough average); but it would be more

relevant to use a peak value of, say, 10KW,

because the generation companies need

to be able to cover peak times for exam-

ple when millions turn the kettle on be-

tween TV programmes; and he actually

agreed, blaming the government for that

figure. And in this way the public are being

led to believe that Glen Doe can power a

city the size of Glasgow. From my walks

in that area pre-hydro it was obvious that

there is not enough flowing water in that

catchment to maintain this indefinitely-

indeed he said that at that rate the reser-

voir would empty after about 6 days.

I also mentioned that we are yet to hear

the authorities announce that any coal

fired station can now close due to all the

“renewables” and that therefore all these

“renewables” are in addition to, not in-

stead of, conventional powerstations.

Again he actually agreed, admitting that

no coal fired station will close due to “re-

Page 5: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

5

newables”, but that they will be on full

load less often.

He also revealed the proposed (up till re-

cently confidential) sites for the 2 Great

Glen hydro schemes: Loch nam Breac

Dearga (OS 26, Balmacaan Estate above L

Ness). A wild unspoilt place as I remember

it from 2007. And Loch a’Choire Ghlais (OS

34, the NE corrie of the NE of the 2 Loch

Lochy Munros). Both will be pumped stor-

age schemes. From what he said, these

are needed to complement windfarms

for when there’s no wind! Another case

of “in addition to” not “instead of” (wind-

farms). He said that if these schemes get

the go ahead, there will be “a conveyor

belt” of other hydro schemes.

As expected, he reiterated the opinion

that these schemes are needed to com-

bat global warming. Companies inherent-

ly exist to make maximum profit, there-

fore in my opinion they are only using this

as propaganda; I would guess they are far

more interested in their remuneration.

And wind turbines appear to be very lu-

crative! The following figures are obvi-

ously not completely accurate, but give a

rough idea. A typical power output figure

given for a turbine is 1MW. I have been

reliably informed that for every £30 worth

of electricity produced by wind (free en-

ergy) turbines, you and me (the taxpay-

ers) subsidize them by an extra £45(!!).

If we use an estimate that the turbines

operate for half the time, and that a unit

of electricity (1KWhr) is approximately

10p, each turbine earns the company

around £1.1 million per year- not a bad

little earner!

As for these structures combating global

warming, even the companies building

them admit that when a windfarm is con-

structed, all the extra CO2 released dur-

ing construction (mining and processing

the iron ore, manufacturing the turbines,

road haulage, destruction of the peat

beds) takes 15 years to be “paid back”

by the clean electricity produced. When

many scientists are predicting that a cata-

strophic acceleration of global warming

could be imminent, with the rapid melt-

ing of huge ice sheets in Antarctica and

Greenland, should we really be adding

more CO2 to the atmosphere?

By Geoff Moore

Page 6: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

6

Beauly To Denny Pylons: The Case Forby Campbell Slimon

Moving from the Borders, my grandfa-ther took the tenancy of Crubenbeg farm in 1928 when the pylon line was being constructed through Drumochter, which was part of the farm. My father took over the neighbouring farm of Breakachy in 1951, when the power line coming over the Corrieyairick and through our arable land, three hundred yards from the farm steading, on its way to Keith was being erected. But it was 1963 before we were connected to the mains, forty five long years after suburbia. Yet, now it is subur-bia who objects to the line being simply upgraded, albeit on a much shorter route coming through our Parish.

In this article I concentrate on C.R.A.P. (Cairngorm Revolt Against Pylons) and illustrate why the acronym is appropri-ate. However,I have to say that their cam-paigning was highly efficient. How else would they get eight and a half thousand signatures for a community of three hun-dred souls? Judging by the car stickers, it was not the indigenous population that were signing.

Incidentally, the original boundary line for the Cairngorm National Park exclud-ed both Laggan and Dalwhinnie. It was a farmer led campaign, through FWAG (Farm Wildlife Advisory Group) that pre-sented a petition to the Scottish Parlia-ment, when I and two fellow Laggan farmers travelled to Edinburgh with it. If ‘sustainable development’ had not been

built into the aims of the National Park, then the crofters and farmers would not have signed the petition and we would not be in it, as generally, the big sport-ing estates were against it. Renewable energy is sustainable development if it is anything. We were included following a decision by the Rural Affairs Committee at its sitting in Kingussie.

The proposed route followed the exist-ing line coming over the Corrieyairick. However, coming through Laggan there were a number of properties virtually un-derneath the present line, but now the minimum distance has to be two hundred metres from the cables. So to achieve this aim the route was to be taken along the valley floor. At the well-attended local meeting, the Laggan residents asked for a more appropriate route. (No one from Ardverikie Estate attended this meeting. One presumes because the proposed line was not going through the estate, they saw no reason to get involved.) It was my wife, Sheena, the local councillor at the time who suggested the alternative, avoiding Laggan altogether by heading straight to Dalwhinnie from Garvamore six miles upstream from Laggan. This route was nine miles as against the up-to-fifteen of that proposed. Everybody ap-peared to be happy.

The first two miles, approximately, was owned by Alcan (now Rio Tinto) then a mile and a half by Ardverikie, a mile and

Page 7: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

7

a half is in Laggan Community Forest and the remaining four miles are on Ben Al-der Estate. Ben Alder wished the line to be realigned to the North through com-mercial woodland rather than following a right of way and past a keeper’s house. This was done. L.C.F. were concerned about archaeological sites, but were co-operating, and Alcan had no objections. Only Ardverikie were strongly opposed, in spite of the fact that they depend on hydro-electricity to maintain the Estate’s viability and their own power-line ran along this alternative proposed route to their Dalwhinnie transformer. Would it not make economic sense for Ardverikie to tap into the line on site?.

The impression given by CRAP and the maps produced were highly misleading. CRAP stated the route was going through the centre of the Cairngorm National Park. It was not. The proposed line runs paral-lel to the south-western boundary at one mile distance and some thirty-five miles from Cairngorm. About a third of the length, three miles, would be in commer-cial woodland and most of rest commer-cialised landscape. In fact, the spokesman for C.R.A.P. admitted that it was the best possible line that had been chosen.

CRAP never mentioned that if the appli-cation were to succeed, two hundred and twenty pylons, along thirty six miles, from Dalwhinnie and Garvamore, going right into the heart of the National Park, at Boat of Garten would be replaced with a low voltage wooden pole line. Nine miles of admittedly much bigger pylons, but set further apart, as against thirty four

miles. CRAP’s motto ‘NO PYLONS in the CAIRNGORM NATIONAL PARK’ would be more appropriate if they had backed the application!!

No film companies would ever come to Laggan again, if the application were to succeed, was their argument. ‘Monarch of the Glen’ was shot right down Strathspey, often the pylons were in the background in rural scenes and sometimes very close but behind the camera. I have travelled along ‘The Desert Road’ in New Zealand where part of the ‘Lord of the Rings’ was filmed and there are three power lines running alongside.

At the C.N.P. planning application meet-ing in Laggan, C.R.A.P. produced a survey stating that a large majority of visitors would not return to the Park if the ap-plication were to succeed. Has anyone observed cars doing U-turns on the A9 at Dalnamein, at the south of the Drumo-chter Pass where the pylons come into view? Again, they ignored the fact that at present, the motorist passes under the line ten times coming through Drumo-chter, whereas with the new line it will only be twice. I don’t know how many people have said to me that it was only when they saw the hideous ‘NO PYLONS’ signs, that they were aware of them run-ning alongside. By coincidence, I heard on the very day of the meeting that a small house site in Laggan, facing North and di-rectly at a pylon two hundred yards dis-tant and with water supply and drainage problems, had sold as a retirement home (for approximately £100,000) to some-body from England.

Page 8: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

8

C.R.A.P. also used the human health ar-gument. There are conflicting opinions. I know it is not conclusive, but a neighbour lived virtually under the line in Etteridge farmhouse for seventy five years and her husband, Johnny, for sixty years. Both had their full health and faculties till they died within a week of each other in their mid-eighties

It is interesting that C.R.A.P.’s publicity concentrated on the already ‘industrial-ised’ Drumochter Pass and not the wilder, remoter Corrieyairick Pass. To my mind it shows their ‘Nimby’, attitude. In fact, the objections for the latter were miniscule in comparison. They used the ‘Park’ as an excuse. If the line were to be moved a mile or so to the West, it would actually be in wilder, more scenic country, cross-ing Loch Laggan, but out of the ‘Park’.

My attitude has been that, if the line is coming, why not seek some planning gain to make life easier in this low income, high cost community. The neighbouring glen receives an income of around £100,000 per annum from their wind-farm. Giv-ing assistance to young struggling fami-lies and the elderly with the supply of a minibus and travelling expenses where there is no public transport. Facilities for the community normally found only in in bigger towns, such as a pavilion, dug-outs and mower as well as drainage for their shinty pitch.

Planning gain could help to do up der-elict buildings like the Kingshouse at Garvamore and, of course, the seriously eroded Wade road over the Corrieyairick

and several Wade bridges. It would ben-efit this glen and the tourist industry. To see what can be achieved one has only to go up past Garvamore, the last oc-cupied house on the upper Spey. Half a dozen shepherds houses which had been standing derelict for nearly a century, have been brought back to their former glory. This in spite of one being across the unbridged Spey and the remotest, Shes-gnan, fourteen miles from Laggan Bridge at the end of a two-mile 4w.d. track. The renovators are what are locally known as ‘The Bothy Boys’ from the Central Belt. The hard graft and personal cost and time could only be achieved because of the deep love they have of this “Wild place” and yet having spoken to some of them, they have no problem with a new bigger line crossing above them. Further planning gain might be achieved by link-ing the Sustrans route from Dalwhinnie to Wolftrax, the mountain-bike centre at Laggan, underneath the line and so over the Corrieyairick.

A previous Laggan doctor used to say that “the rain that falls on our backs is worth millions of pounds to those in the South”. He was referring to the Hydro works of Alcan. Not a penny does Laggan receive. I suggested to Highland Coun-cil that a Way-leave payment per pylon, similar to that paid to landowners, be paid to the Communities that the line passed through. Highland Council agreed to take the suggestion up with the Coun-cils further South, however, they declined to support a Community Way-leave, as needless to say did C.R.A.P. Personally,

Page 9: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

9

I would like to have seen the old drove road over the Corrieyairick modernised to a drive road. When my father was in the Inverness-shire County Council, as Roads Convener, in the 1960s they looked seriously at a road through Glenfeshie to Deeside. What a boon for tourism that would have been; to be able to drive from Royal Deeside to Loch Ness, through the Cairngorm National Park, in a couple of hours, following the trails of the drovers, reivers and illicit whisky traders.

Tom Johnson, the Secretary of State for Scotland, who was responsible for the big hydro-electric schemes of the 1940s, when speaking in the House of Commons said “I wish people would not regard the Highlands as some kind of Garden of Eden. That there are other attributes than simply landscape.”

Whether the Power Line is needed at all, I am not qualified to comment, but with the Glendoe Scheme coming on stream, with enough wattage to power Glasgow, and reports which state that Britain could be the new Saudi Arabia with its poten-tial of wind, tidal and wave power, I say: “Bring it on!”

by Campbell Slimon

Editor’s note on Campbell Slimon’s article.

In the spirit of starting a healthy debate, my ideas for the Coireyairick (perhaps Coire Dhaireach- coire of the rutting?) are rather different.

The original purpose of the road was to suppress the Highlanders militarily, a policy so effective that the native popu-lation can barely muster a platoon these days (and such a force would be in Af-ghanistan anyway, suppressing the locals, militarily...): surely it is now time to rewild the Pass, uproot the roadbed, and let the sheep graze peacefully on this redundant symbol of post-’45 cleansing. Even bet-ter, the road could have a battery of tur-bines along it, with a competition for local schoolchildren to name them, perhaps giving a broken clan name to each one, so the descendants of those people scat-tered to the Colonies can have something tangible to visit on their next Homecom-ing? Jesting apart, there is a more serious technical argument against upgrading the Beauly-Denny line, a case eloquently made by Prof Andrew Bain- contact Grant for a copy and read it in full…

Page 10: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

10

Distributors Sought!Helpful people are required to assist in distributing copies of Wild Land News around outdoor shops and other likely venues.

Your Steering Team has Scotland reasonably well covered, but south of the Central Belt, Fife, the West Highlands and south of the border

are untouched as yet. Please contact the Membership Secretary if you would like to help. You will be sent a supply of magazines, which sell well in shops and at climbing walls (“donation to the rescue team tin” works the best); also, copies can be left in doc-tor/dentists’ waiting rooms, cafes, inns and hotels in walking/climbing areas, B&Bs and other rural businesses where walkers and outdoor enthusiasts tend to congregate.

SWLG is a membership organisation, and we always require new members to increase our collective voice in opposition to the other side- this method of recruitment suits our limited funds and volunteers are hereby asked to form a disorderly queue.

SWLG t-Shirts are now available.SUPPORT YOUR FAVOURITE CHARITY

Choose either the new logo OR the Wild Land News cover you prefer, printed on high quality white cotton!

All sizes available, including women’s fit and children’s.

Help recruit new members to the cause for only £18 (inc. postage). Cheques (payable to Scottish Wild Land Group), and full details of your requirements, specifying which cover image you want - consult your back issues - should be sent to the Membership Secretary, address on inside back cover.

Allow 28 days for delivery. Please don’t send cash. Credit /debit cards can be accepted by post or telephone.

Environmental Thocht for the Day

From Private Fraser, Perdition Platoon, Company B, The Royal Scottish Regiment.

“We’re aa doomed, doomed I say”.

(If only all contributors could be so concise. Next issue: Paris Hilton discusses the im-pacts on deep-peat bogs during wind turbine installation. Ed)

Page 11: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

11

NewsNewsNewsNewsNewsGlenDoe Hydro £160 million, 1 or 2 deaths on site, 28 miles of hill roads carved (allow-ing access for the soon-to-be-announced wind turdines on Meall Caca...a wonderful name for a wonderful project) and 1,500,000 tonnes of rock blasted and shifted for the dam alone.

Everything was going to plan, when an unhelp-ful landslide forced the operators to drain the reservoir and stop the flow of profit. Oh dear.

After the fanfare of the contractors “working in harmony with nature”, and this is how She pays them back! Rumours of a Control Order on Nature, for Her anti-social behaviour to-wards humble investors, will be followed up most diligently.

Neart nan Gleann Or, the power of propagan-da from the glens: if you have ever added up the total electricity produced by these power schemes (according to the press releases), and wondered why we need any more...now we know. When the developers HQC say the “Glen Doe turbine is designed to produce up to 100MW- enough energy to power every home in a city the size of Glasgow”, they are either lying or obfuscating.

An SSE spokesman admitted to one of our cor-respondents that the reservoir would empty itself in 6 days, if the turbine ran at full power. The system is designed to run for some 4 hours per day, at times of peak load (and peak prof-it?), as a back-up to coal and nuclear baseload, so- how green is their valley?

The future’s bright green The hydro schemes of the 1950s were needed to provide back-up for the shiny new nuclear powerstations (they were to produce a special type of electricity which would be so cheap it would be free; don’t mention the warheads) during down-time, apparently. Rumours of the next hydro schemes have just been solidified: read Geoff Moore’s article for details and locations. An SSE mannie admitted that these develop-ments are needed as back-up for the intermit-tent windfactory output. Are we destroying

the environment as we attempt to save it, or is this just business as usual for myopic human-ity?

Power exports A member reports that 1459MW of electric juice gurgled southwards, in December 2008. Further enquiries indicate that the National Grid estimate some 50,000 GigaWatts are produced annually in Scotland, with 30% of them being exported. Who ac-tually takes the profit from the sale of all this wattage?

Meantimes, the West Highland Free Press reports regularly that some two-thirds of the population of the Western Isles suffer from “fuel poverty”. Let them drink cheap booze to keep warm, until the Scottish Government joins up the thinking on that one too.

Nuclear power Another member reports that, on a random day, Scotland derived 65% of her electricity from the two (rather elderly) nuclear power stations. Their average daily input is c.37% During last winter’s prolonged high pressure system, the blades on the tur-bines at Edinbane in Skye produced barely a spasm of power for weeks, at a time when the cold weather meant much higher demand from consumers.

Shrewd investors (I couldn’t possibly name names) have got shares and directorships in both industries, and don’t suffer from “fuel poverty”.

Funicular goes a funny colour- into the red Largely unreported by the respectable ‘papers, but noted in Private Eye no.1240 (10/7/2009), p.29, Europe is looking for some refunds of grant aid, after irregularities were found in 27 out of 40 “big spending projects” audited. Highlands and Islands Enterprise had to nationalise the mountain railway in 2008, to keep the white elephant out of the grave-yard a while yet. Alan Blackshaw has resigned from the local enterprise board and stated publicly that he reckons “the eventual cost

cont p14

Page 12: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

12

Page 13: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

13

Page 14: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

14

to the public purse will be around £50 mil-lion” plus the same amount again to remove it when it, er, runs out of steam. Jobs for the boys at both ends, eh? All aboard the gravy train! Why does the public purse only get the losers, when we could nationalise the “re-newables” dripping roast? The Swedish state owns Vattenfall, and EdF is 85% owned by the French Government.

Gordon Broon’s brother is rather high up in EdF, so why doesn’t our subPrime Minister follow foreign example and stop flogging our assets to the lowest bidder? Having sold our gold at the bottom of the market, one suppos-es there’s not much else of value left in this Septic Isle.

Loch Rannoch Amusement Park for Lonely Billionaires SWLG didn’t object to this one, as it isn’t really wild land anymore. Cornishman, ach I’ve forgot his name again,but he’s a fine fellow, wants to have an exclusive resort where seriously wealthy individuals can relax in the company of only such as themselves, with no “gold-diggers” allowed anywhere near. A 7-storey crannog-style restaurant in the loch, to disrupt the arctic char; plastic surgery clinic; golf course...lots of Caledonian remnants cut down... There have been many objectors (the JMT website shows their good one, in the “campaigning” pages), but this type of devel-opment seems to be most favoured by our elected representatives, so we shall see if the lure of caddying jobs for a handful of grateful locals will swing it in whatsisname’s favour.

Mair golfing balls The ongoing stoosh in Aber-deenshire, anent the proposed “best golf pitch in the world” just gets worse, with anti-devel-opment local councillors being denounced as “scoundrels who have to be stopped” by the astonishing mouthpiece George Sorial. Will 4 households be evicted by compulsory pur-chase, thus proving that “Scotland is open for business” (A. Salmond)? The SWLG didn’t ob-ject to this one either, and I shouldn’t be giv-ing Donald Chump the oxygen of even more publicity, but he seems to be descended from

Somerled, to judge from thon authentic bow-of-the-birlinn windswept hairstyle, so we should really give the guy a (tax)break and see if he can put the best wee country on the map at last. The deposed council leader’s motion to oppose compulsory purchase was defeated by 55 votes to 6, so bullying seems to get re-sults in a democracy.

The bottom line? It was reported in the Her-ald, 23/5/09, that Scottish and Southern En-ergy carries a net debt burden of £4.8billion. Expect ever-higher electricitybills, and endless “green energy” taxpayer-subsidised construc-tion projects, as they attempt to fill this bot-tomless pit. Do the directors get bonuses?

Fluctuating promises SSE pledged to straight-en the notorious “distillery bends” section of road near the Glen Ord whisky factory, as part of their community contribution to offset the disruption caused during their Fairburn windfarm construction project. £700,000 was committed, but had to be dodged due to a legal wrangle over land - now SSE will only do temporary straightening to allow their tur-bine lorries through, then restore the bends to their original condition. Local communities tempted by the blandishments of develop-ers might wish to note this. www.north-star-news.co.uk/news/fullstory.php/aid/4256 Up-date... Our Ross-shire observer got an email from Ross Easton, of SSE, stating “the works will be tarred and permanent”...time will tell.

RED ‘X’If there is a red ‘X’ on the address

label of your envelope, then please

read the beginning of “Comment”

to find out the significance, if any, of

this mark.

Page 15: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

15

AGM 2009All members are hereby invited to attend the Group’s Annual General Meeting, which is to be held at the Royal Hotel in Bridge of Allan (north of Stirling) on Saturday the 12th of December. The Royal is at the west end of the main street, and is conspicuous on the left as one approaches from the A9 roundabout.

There’s easy parking, and regular trains to the station nearby. Wealthy landowners arriving by helicopter should contact our Treasurer about landing fees.

We have the room from 1-4pm, and as there is to be some socialising (and a slideshow contrasting Scotland with Norway) afterwards, we should really get on with the AGM by 1.30, so please arrive promptly! We have negotiated a reduced rate of £45pppn (B&B) for any members who need accomodation- please contact the hotel directly, stating you are a member of SWLG and are attending the AGM.

Non-members are also welcome, but will not be able to vote on any matters which may arise. If you have any questions for the Team, but can’t attend the AGM, please feel free to contact us.

With so much happening to Scotland’s wild land at present, we would appreciate a decent turn-out by members so a debate can be held on the best way to harness the energy of our volunteers in countering the many threats we face!

Book Review...Over the “summer”, a book arrived for reviewing. Fortunately, I was off in Norway with the author and never found the time to read it, but I am reliably informed that it’s quite good (as these things go).

It’s called 101 Best Hill Walks in the Scottish Highlands and Islands, and is not all obses-sive about Munro heroics. Good shot of me on top of the Cobbler and a handy Gaelic translation section at the back. Ideally sized for the top pooch of your rucksack, and cannily priced at £9.99, the guide features concise text, a photo and an “innovative” (it says so on the back cover) 3D mapping of every walk...the author has 40 years’ experience of the hills, and every walk seems to have been thoroughly researched, so the book can be recommended to novices and experienced walkers alike.

But not by me (as I prefer to be lost in the hills) and as the author is my esteemed brither, there can be no nepotism here.

ISBN 978-1-905769-16-2, www.fortpublishing.co.uk. Available from most outdoor shops, and highstreet booksellers.

Page 16: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

16

Wind farms in rural Wales: Community benefits?by Max Mundy

Given that this is the magazine of the Scottish Wild Land Group many read-ers will be surprised to find an article on Wales. Recent issues of Wild Land News have featured concerns about new wind energy projects north of the border. This brief article considers the economic im-pacts of commercial wind in Wales, in terms of genuine local economy effects. In Wales and Scotland wind developers have worked to show the wider economic benefits associated with these develop-ments, with these set beside what are sometimes considered to be negative en-vironmental impacts. In what follows the issues of economic impacts are examined from a Welsh economy standpoint with the hope that some of the conclusions will be of wider and more general inter-est.

Commercial wind energy projects are ex-pected to drive Wales and the wider UK economy towards sustainable develop-ment targets. At the same time there are concerns that derived ‘global’ environ-mental benefits are achieved at the cost of significant ‘local’ environmental costs. For Wales these issues have become acute. At the end of 2006 Wales had an es-timated installed onshore wind energy ca-pacity of around 300MW. However, plan-ning guidance from the Welsh Assembly Government in 2005 actively sought the development of 800MW of new on-shore capacity by 2010, and with the expecta-tion of higher levels of on-shore wind by 2020. Much of the new development was planned to be in 7 Strategic Search Areas (SSAs). These are all upland areas,

much of them in the National Forest Es-tate. Forestry Commission Wales (FCW) has recently managed a procurement programme to find developers that are to go forward to gain necessary planning permissions. At the time of writing the procurement programme is near com-pletion. In the qualification process FCW has sought information from developers on expected local economic impacts, and has expected prospective developers to engage with communities through con-sultations. There is the prospect of a se-ries of community benefit provisions tied to the energy produced from the planned wind farms.

The rationale for community benefit pro-visions linked to wind farm developments

Page 17: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

17

has not been clearly stated by develop-ers or local or national government. Such provisions are not part of the formal plan-ning process, and developers have been keen to avoid describing these provisions as compensation. One possible context for these provisions is the lack of more ‘conventional’ economic benefits accru-ing to affected communities from wind power schemes.

Limited local economic impacts connect-ed to what is, after all, a capital intensive form of power generation, should be no surprise. It is here useful to outline some of the project economics which lead to this conclusion. Compared to conven-tional alternatives such as coal fired gen-eration, much of the cost of wind power projects is up front due to the nature of the key input. Wind energy project per-formance links to load factors (the time during which the generating turbine ca-pacity is actually being used), and with this connected to average wind speeds. In Wales, as in Scotland, relatively high aver-age onshore wind speeds makes schemes potentially more viable. Scale also impacts viability: the lifetime project costs per kil-owatt hour fall significantly with project size. Turbines mounted at greater eleva-tions mean higher wind speeds and with a greater area swept by blades. Larger turbines of course mean that more infra-structure is needed at sites (and possible greater visual impacts). For Wales upland locations provide the higher annual aver-age wind speeds, but to this must be add-ed greater construction costs and related grid connection issues. Scale advantages are not limited to the development phase of wind energy with economies also avail-able in operational (for example mainte-

nance) and managerial economies.

How then might the rural economy ben-efit from large scale wind energy? Eco-nomic benefits might include an increase in construction activity due to site devel-opment, the installation of infrastructure, and use of specialist services and subcon-tractors. There is also the potential for incoming workers to spend money on lo-cally produced goods and services; this is potentially significant for larger sites with contractors present for many months making use of local accommodation serv-ices. However, when one examines the existing and expected locations of new projects on the Welsh Forest Estate then it is difficult to avoid the conclusion that the local supply side is very limited. The ma-jority of wind energy projects developed thus far in Wales have needed significant imports of goods and construction labour from non-rural parts of Wales, and often from the rest of the UK or overseas.

For example, typical project development phases comprise feasibility assessment and planning, wind turbine installation, grid connection, and other infrastruc-ture development (generally new access roads). Estimates vary but constructing a wind farm involves a capital investment ranging from £600,000 to £1 million per MW installed. How far can projects make use of the genuinely local supply base? Welsh evidence would suggest that local (and indeed regional) sourcing is quite limited. Inevitably, the turbine is the key element of spend. These are imported, but with some of the manufacturers hav-ing representative offices in Wales. The turbine installation and grid connection involves specialist teams, and the turbine manufacturer will be closely involved in

Page 18: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

18

the installation for warranty reasons. Re-gional inputs are normally limited to civil engineering i.e. around one fifth of total investment, and not inconsiderable. Oth-er development costs and planning can involve consultants based in Wales, but many business services tend to be pur-chased by the headquarters of whoever the developer is; to date often a foreign or domestic multinational enterprise lo-cated outside of Wales.

What about job prospects during opera-tional life of the wind farm? Welsh evi-dence suggests this is quite limited. For example, even the Cefn Croes wind ener-gy project near Devil’s Bridge (at 59MW, the largest so far developed in the region) needs just 4 on-site technicians (who do live locally), and with the turbine manu-facturer having set up an office with a manager in Aberystwyth. On the basis of current employment trends in wind de-velopments across Wales, the operation and maintenance activity associated with the seven planned new wind develop-ments on the Welsh Forest Estate might only be associated with new jobs in the hundreds. The very reliability of modern turbines will reduce local job prospects because of high levels of automation. Fundamentally, wind energy has not been a way of bringing significant new job opportunities to rural Wales, and devel-opers need to qualify any stated aims in these respects.

Further benefits may come from the pay-ment of rental and other related income to local landowners. These payments have a potential role in sustaining local farming and rural communities. Another impact relates to rates paid by wind pow-er projects. In the BWEA analysis Onshore

Wind: Powering Ahead (April 2006), ben-efits of wind energy (planned on shore developments to 2010) in Wales were es-timated to be around £277.8m of which £24.8m was business rates.

Balanced against a lack of economic im-pacts in more conventional terms is the steady evolution of community benefit provisions. Recent research (see Cow-ell et al., 2008) examining the form and operation of community benefit provi-sions attached to wind energy projects in Wales showed that most on-shore wind projects had some form of community benefit provision. Indeed provisions have become somewhat routine. Most com-mon to date has been the formation of a fund to support activities in adjacent local communities. It is accepted that the issue of the affected ‘community’ surround-ing a wind energy project is contentious. It is estimated that around two thirds of projects currently operational in Wales have made funds available, and with com-mitted funds usually linked directly to the installed capacity of the turbines and var-ying between £500/MW to £5000/MW/annum. The financial scale of community benefit provisions has tended to trend upwards through time.

Community funds differ in administrative structure but with wind project developers closely involved. In the Welsh case mon-ies are used as grants to local activities, such as community facilities, sports and social clubs, churches, play schools, local events, training and environmental/habi-tat enhancement. Education is one key theme with some community funds giv-ing bursaries for local students going into tertiary education. Another is sustainable energy projects, for example subsidising

Page 19: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

19

technologies like low energy light bulbs, or providing them free, as well as running schemes to increase awareness and take-up of energy efficiency measures.

To conclude, genuinely local economic benefits deriving from the placement of large commercial wind energy projects in the rural economy of Wales are fairly limited. This is one context for communi-ty benefit provisions which undoubtedly do provide some welfare enhancements. The evidence from Wales suggests where communities have benefits in terms of provisions it has been mainly a develop-er-initiated process, and then with some debate over how far local communities could benefit more from the wind re-source. Part of the debate has focused on the potential for higher levels of commu-nity ownership of wind projects.

On the face of it community ownership would seem to lead to higher returns when compared to community benefit schemes. For example Community View-finder (2007) suggests that wind energy can generate average net profits upwards of around £60,000 per MW of installed capacity per annum, in comparison to the £500-£5000 per MW typically offered in community benefit provisions in Wales. In Wales, as in Scotland, there has been the suggestion that the returns from community ownership could increase the prospects for wind projects to generate wider long-term economic welfare ben-efits for communities. However, commu-nity ownership can have a downside in terms of financial risks to the local com-munity were the project not to perform as expected, or with changing electric-ity prices. Moreover, the lower numbers of community owned wind projects in

Wales as compared to European states such as Germany and Denmark points to very different industry and institutional conditions that encourage local owner-ship (including attractive feed-in tariffs for electricity generated from renewa-bles, and generous tax incentives). Direct community ownership of wind energy is uncommon in Wales (i.e. just 3 instances in schemes developed up until 2007).

For communities facing large scale wind projects it is important that the potential local economic benefits and scale of any community provisions deriving from this type of power generation infrastructure are understood. Moreover, the develop-ment of community benefit provisions from the wind project developer should be placed in the context of the expected financial performance of schemes over their lifetime, and might be placed on a more transparent footing in terms of un-derlying rationale.

Max Munday

Page 20: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

20

Wild Land research Institute launched at the University of Leeds

by ?

The new Wildland Research Institute (WRi) was launched at the University of Leeds on the 21st October and was at-tended by the SWLG’s co-ordinator Rob Mc Morran, along with 50 or so profes-sionals, including various representatives of key agencies, NGO’s and research bod-ies. The institute is a unique UK-based research group which will specialise in research and policy development relat-ing to wilderness and wildland. The aim is to address the research requirements, strategies and policies for a transition to a greater presence of wild landscapes and natural processes in the UK, Europe and the rest of the world. The institute will have a dedicated core team of around 20 interdisciplinary researchers and upwards of 100 associates working on the different dimensions of wilderness and wildland.

Current work includes a reconnaissance survey of wildland in Scotland, contract-ed by the John Muir Trust and Scottish Natural Heritage, and the Institute has strategic links with national and interna-tional bodies including the UK Wildland Network and Aldo Leopold Wilderness Research Institute in the USA. The insti-tute will also publish a new journal - Wild-er Horizons - which will include a mix of peer-reviewed research papers, feature articles, letters to the editor , announce-ments and book reviews.

Steve Carver, Director of the Institute, ex-plains in the first edition of Wilder Hori-zons that “the idea for both the institute and the journal have been a long time in

gestation, but we believe the time is now right for this development, with interest in all things wild increasing among sci-entists, politicians and conservation pro-fessionals as well as the general public”. Steve has written for Wild Land News about wild land mapping in Scotland (see WLN72) and the SWLG is excited about the prospect of working with the WRi in the future. Steve is a long-term advocate for wild land conservation and re-wilding and a highly experienced and distinguished researcher, who has been working on research projects on wilder-ness and wildland in the UK and further a field for over 20 years.

The establishment of the institute rep-resents a major step forward in terms of the recognition of the importance of wild land areas, not just in the UK, but across Europe and the world. The future work of the institute will no doubt make a major contribution to increasing the knowledge base around wilderness and wild land, supporting more effective policy related decisions at different levels and signifi-cantly raising the profile and standing of the entire wildland and re-wilding agen-da. The importance of this development for the conservation and enhancement of Scotland’s wild areas should not be un-derestimated and many eyes will be ea-gerly following the work and progress of the institute in coming years.

For more information about the work of the institute visit www.wildlandresearch.org

Page 21: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

21

Let me corroborate your editorial description of the modus operandi of windfarm develop-ers, especially their deployment of “Scottish Renewables” (WLN 72) tactics, with my obser-vation of how a potentially major project has slipped under the radar here in Lochaber.

Only the bare minimum and legally mandatory information has been made publicly available. I was not aware of the ‘rigorous local consul-tation’ one day information display in the en-trance foyer of Lochaber College, Fort William, of this proposed windfarm which happened about 2 months ago, until too late. Neverthe-less I asked about any planning application at the Fort William Planning Dept; there was no application and the staff were unaware of any potential application. I knew there was a seri-ous effort to site a windfarm on Druim Fada because I was aware if the environmental im-pact study taking place at that time, plus the occasional presence of surveyors wandering about on the hill, and the siting of a 50m an-emometer mast there. Totally unconnected to the windfarm the Highland Regional Council Planning Dept, Inverness sent me, about 10 Feb., notification of a proposal to redraw the Lochaber Local Plan, changing the designation of a defined area of land surrounding Corpach and Annat from ‘open land’ (Council policy forbidding any development) to ‘mixed use’: a catch-all designation encouraging develop-ment of business, housing, social amenities like shops or schools. No mention was made of any possible windfarm.

I called in again at Fort William Planning Dept.: still no windfarm application. 2 weeks later I received a neighbours’ notification letter from North British Windfarm Ltd., giving me notice of their application to site 4 turbines near my house. No mention was made of the size of these turbines, the only technical detail be-

ing ‘commercial windfarm’. Another trip to Fort William Planning Dept. revealed nothing new. I phoned up North British Windfarm Ltd and they were happy to tell me each turbine would stand 120m high to blade tip and be rated at 2 to 2.5 MW. There appears to be zero communication between North British Wind-farms Ltd and Highland Region/Lochaber Plan-ning Dept.

I considered the possible siting of a windfarm with 120m turbines clearly visible from a huge swathe of Lochaber to be of public interest so I copied my neighbours’ notification letter and delivered it by hand to Stewart Taylor, the Lochaber News local paper resident journal-ist, asking him to use his discretion whether or not to print something in his newspaper. 3 issues later they had not printed anything about this windfarm. No planning applica-tion notice appeared in the regular Planning Applications column in the Oban Times until 12 March, which was worrying as my neigh-bours’ notification stated that details of the application could be viewed at Corpach PO or Fort William Planning Dept. for a period of 14 days following the date on the notifica-tion, which was 23 Feb 09, so readers would not be able to view mandatory details of the application. Lochaber News did not publish the notice. Nowhere have I read of the date by which objections to this application should have been lodged.

Two more anemometer masts have been sited much higher up on Druim Fada for 3 or 4 years now, one at each end, no applications have been lodged to my knowledge to site turbines near these masts - I suspect the 4 turbines proposed at low level are the precursor ‘sof-teners’ for a much bigger future application - what is Scottish Renewables’ tactics regard-ing Trojan horses? My view about Druim Fada

Letter to the Editor

Page 22: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

22

planning committee and were only built as a result of appeal to the Scottish Office. All 5 Ross councilors voted for the windfarm as did 1 local councillor, Eddie Hunter, the remaining 3 local councillors voted against. Had Eddie Hunter also voted against the Scottish Office would have had a difficult job upholding this decision in the face of unanimous local oppo-sition.

Work will begin in 2011 and in a couple of years Druim Fada, at an altitude of about 150m up the south side, close to Annat and Corpach, will be blessed with 4 off 80m tur-bines, with blade tips reaching 120m, each generating 2.5MW when the wind blows. The developer, North British Windpower say they have no plans to extend the scheme, despite siting 2 other anemometers much higher up and further afield on Druim Fada. The real reason for siting just 4 turbines low down and close to Corpach is the availability of a high voltage high power electric cable or feeder which terminates at the now redundant and demolished Arjo Wiggins Pulp and Paper Mill site. Installing a short feeder from here to the windfarm won’t cost much. North British Windpower will still coin in the market ROC (Renewable Obligation Certificate) price for all the electricity this windfarm generates, they will make a killing.

For further details get wild with Andrew Shaw, Managing Director or Graham Irwin, Director, North British Windpower, Lochside House, 3 Lochside Way, Edinburgh Park, Edinburgh, EH11 9DT; tel: 0131 452 2018, email: [email protected].

windfarms is I am not going to object because Druim Fada is not in my view wild land, and I am pro-renewable energy. However I am con-cerned about the way in which this application is being pursued.

Roger Boswell, Annat, Fort William.

Recent developments

Notice of the Druim Fada windfarm planning application appeared in the Oban Times (OT) on 12 March 2009, giving a deadline for com-ments and objections of 9 April 2009. No no-tice was printed in the other local paper, the Lochaber News (LN). In the following weeks nothing concerning the Druim Fada Wind-farm appeared in either local paper. Nobody seemed to have noticed the notice.

Late in the day, this windfarm application came to the attention of the Fort William Com-munity Council, who successfully secured an extension to the deadline for comments of 1 May 2009. At last the press and public started taking an interest, several articles appeared in the OT, LN, and P&J. Highland Council’s relevant Area Planning Committee, viz Ross Skye and Lochaber Planning Committee, held a Public Hearing on 26 August 2009 to decide on what to do with North British Windpower’s planning application. This committee com-prised 4 local councillors from Lochaber and 5 non-local councillors from Ross. The hearing involved a site visit followed by a public meet-ing in the local village hall, Kilmallie Hall which was attended by about 80 members of the public. I wish I’d been there but I was away in Wales looking after my best friend, my 87 year old Mum, so I missed the debate, but I read about it, sounded like a good old Scottish Stra-mash or is that a Boorach? (I’m from Wales) . The decision went 6 votes to 3 in favour of the windfarm. Surprising result as about 3 years ago the anemometer applications relevant to this windfarm were refused by the relevant

Page 23: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WINTER 2009

23

SWLG Steering TeamRob Mc Morran (Co-ordinator): East Lodge, Craibstone, Aberdeen, AB21 9SJ, 01224 716709 or 07754 571364 ([email protected]) Tim Ambrose (Treasurer): 8 Clevedon Road, Kelvinside, Glasgow, G12 0NT ([email protected]) Grant Cornwallis ((WLN74 Editor & Membership Secretary): 36 Mansefield Crescent, Clarkston, Glasgow,G76 7EB, 0141 638 2210 or 07968 500595 ([email protected]) Jayne Glass (Webmaster): Jayne Glass, 30 Churchill Court, Aberfeldy, PH15 2AT ([email protected]) David Jarman: Findon Cottage, Culbokie, Ross-shire, IV7 8JJ ([email protected]) Calum Brown: Flat 3, 38 North Street, Cambuskenneth, Stirling, FK9 5NB ([email protected]) Graeme Cornwallis: 201 River Court, Busby, Glasgow, G76 8DR ([email protected])

NotesThis edition of Wild Land News (WLN) is designed and edited by Jayne Glass. Individual articles do not necessarily reflect the views of the SWLG Steering Committee. We welcome any general enquiries about wild land in Scotland as well as any comments you may have about the content of WLN. We are also keen to hear about any local developments in wild areas which you think might concern the Group. Please contact Rob Mc Morran, the Co-ordinator, in the first instance. We also welcome contributions for WLN (articles, letters, photographs etc). Please send any contributions to [email protected] or contact us if you would like to send hard copies.

If you would like to join SWLG, please complete the membership form below and return to the Member-ship Secretary with the correct payment. It is also possible to join SWLG via our new website (www.swlg.org.uk). If you have any enquiries about bankers’ orders, Gift Aid, generous donations and any other financial matters, please get in touch with Tim Ambrose, our Treasurer.

An individual annual subscription costs £10 and includes a subscription to Wild Land News. The reduced subscription for unwaged, senior citizens, and juniors (under 18) is £5. Corporate membership and family membership (for two adults living at the same address) are priced £20 and £15 respectively. Please make cheques payable to Scottish Wild Land Group (subscriptions run to 31 December each year). We are always trying to increase our membership so that Scotland’s wild land can have a stronger voice. Please spread the word about us and direct potential members to our website (www.swlg.org.uk) where they will find membership information and online payment options.

Membership Form

Please enrol me as a member of the Scottish Wild Land Group. I enclose a sub-scription of £_______________ (see notes above)

Name: .......................................................................................................................

Address: ..................................................................................................................

E-mail: .....................................................................................................................

Return the form and subscription fee (cheques payable to SWLG) to: Membership Secretary, SWLG, 36 Mansefield Crescent, Clarkston, Glasgow, G76 7EB

Page 24: Winter 2009 No.74 Magazine of the Scottish Wild Land Group · Magazine of the Scottish Wild Land Group Winter 2009: Issue 74 Registered Charity No: SC004014 East Lodge, Craibstone

WILD LAND NEWS 74

24

At Tiso we know you’ll need the right gear whether you’re climbing the Inaccessible Pinnacle or going for a stroll in the Cairngorms. That’s why we’re geared up for you. Because we like to test the gear that we sell in the only way we know. Out there. We know what it’s like to bag your first Munro and we’ve fallen in more streams than you could imagine. So when you leave the store you’ll have the best advice and the right gear.

Visit your local Tiso store or shop online at tiso.com

All rucsacs come with full instructions – “fill and seek adventure!”

Tiso-WLN[210x148].indd 1 22.05.2008 14:04:44