Wind Turbine Manufacturer’s Perspective Jörg Philp Vice President Global Sales Offshore Compiled for 5 th Asia Offshore Wind Day - January 24 th 2019 - Tokyo

Upload: others

Post on 10-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

Wind Turbine Manufacturer’s Perspective

Jörg Philp Vice President Global Sales Offshore Compiled for 5th Asia Offshore Wind Day - January 24th 2019 - Tokyo

Page 2: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

2

Agenda

Senvion at a glance

Why entering the global offshore floating wind market?

Advantages & Challenges

It’s all about LCOE

Page 3: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

3

Senvion at a glance

4,000 employees

2-6.3 MW nominal power

range

35 offices and production

sites

23 languages spoken

8,050 installed wind

turbines

24/7 remote monitoring

90 service stations

82-152 m range of rotor

diameters

Page 4: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

4

Beatrice Thornton Bank I

Alpha ventus Ormonde Thornton

Bank II/III Nordsee

Ost Norder- gründe

Nordsee One TWB II Taranto Nearshore Floating

Capacity 2x 5M (10 MW)

6x 5M (30 MW)

6x 5M (30 MW)

30x 5M (150 MW)

48x 6.2M126 (295 MW)

48x 6.2M126 (295 MW)

18x 6.2M126 (111MW)

54x 6.2M126 (332 MW)

32x 6.3M152 (203 MW)

10x 3.0M122 (30 MW)

24 x 4.2M140 (100 MW)

Various Projects (~ 100 MW)

Depth & distance

45m 23km

17-23m 30km

26-29m 56km

17-21m 9km

12-28m 26km

22-25m 57km

3-11m 18km

26-34m 47km

25-35m 45km

20m 2km

10m 2km

>50m >25km

Customer SSE C-Power e.on EWE

Vattenfall Vattenfall C-Power RWE wpd

Northland Power / RWE

Trianel EWE Renexia

Country Asia & Asia

Comments

Winner of the Renewable UK prize for Best Large Project

‘12

Before schedule delivery

Successfully delivered in

2016

Single Preferred

Bidder

Nearshore, 1st offshore wind farm in

Med. Sea

Single Preferred

Bidder

Single Preferred Bidder

Senvion features a 13 years track record in 5/6MW offshore projects

'06-07 '08-09 '09-10 '11 '12-13 '14 '16 '17 '19 "20 "21

Fleet size of 265 WTGs and 1.58 GW installed offshore

Page 5: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

5

Why entering the global offshore floating wind market?

Page 6: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

6

Market Forcast

The UK Energy Technology Institute suggests that on current trajectories floating wind power could be down to less than €100/MWh by 2025.

Project pipeline is what is needed to justify the big upfront costs.

Globally, forecasts are for some 15GW of floating wind to be anchored offshore by 2030.

Estimates point to 80% Of the global offshore Wind resource being Located in water depths Of 60 meters…

Page 7: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

7

Population Density

Coast Line

Water depth & wind

• 80% of world population live in an area of 50km to the coast

• Same distance as from earth to the moon

• In line with greater and more stable wind

General

Correlation of

Page 8: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

8

70% less installation cost & contingencies

15% less weather requirements du to less

weather risk

10% less operating costs: Less site dependent more standardization

Advantages

Page 9: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

9

Floating project - Gruissan

Project development Design and construction

floating substructure Wind turbine

Conditions at site Four 6.2M152 to be installed

Water depth average 55 m

Timeline Mid 2016: site

awarded to the consortium

2017-2019: Engineering and permits

2020-2021: Construction

From 2021: Operation for 25 years design life

Page 10: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

10

Design process, a collaborative approach

WTG Loads Foundation Design Tower Design

Loads and Design Iterations

FINAL DESIGN, PROJECT CERTIFICATE

Offshore Wind Turbine (OWT) consisting of Rotor Nacelle Assembly (RNA), tower, substructure and foundation Coupled iterative analysis Several design loops

CERTIFIED WIND & SITE CONDITIONS TYPE CERTIFIED TURBINE (RNA)

Page 11: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

11

Challenges from the Turbine OEM Perspective

Demo Projects tend to be small hence lack of scale effects

High engineering and project management resources required

WTG Modification

Large Component exchange

Foundation Design Process is crucial for success

Certification Process

Page 12: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

12

Regional Challenges

Project Start Control architecture and operation concept incl. hardware integration Major change in yaw system: Step to Hydraulic yaw

Loads model Nacelle hardware adaptions Controller, loads Validation & certification

Prototype Prototype validation/ opt. Internal development, external costs investments

Type Cert Vref increase to min. 57,5m/s Loads reduction for higher wind class or lager rotor, raise of extreme wind speed

1 2 3 4

Japan encounter 2-3 Typhoons a year with 8 to 10 near misses passes

Floating will not be limited

Page 13: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

13

$0

$50

$100

$150

$200

$250

$300

67% reductionbetween 2017and 2025

32% LCOEreductionbetween 2010and 2016 in theU.K.

It’s all about LCOE

Adj

uste

d St

rike

Pric

e ($

201/

MW

h)

Expected Commercial Operation Date

Page 14: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

14

Floating is anticipated to follow a downward cost

• High wind regime hence high capacity factor • Large turbine Size

• Economic of scale e.g. predictable & reliable political framework

• Enter the second phase of large scale projects • Reduce platform size / CAPEX

• Improvement of installation • Real collaboration between Designer, OEM

Page 15: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

15

Page 16: Wind Turbine Manufacturer’s Perspective3 Senvion at a glance 4,000 employees . 2-6.3 MW . nominal power range . 35 . offices and production sites . 2382. languages spokenrange of

Thank you for your attention © Senvion All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photography, recording, or any information storage and retrieval system, without permission from Senvion.