Renewable Energy WorkshopWednesday, November 12, 2008OARDC/OSU, Wooster, Ohio
Randall Reeder, P.E.Randall Reeder, P.E.Associate Professor andAssociate Professor and
Extension Agricultural EngineerExtension Agricultural Engineero tate n vers tyo tate n vers ty
ColumbusColumbus
Modern wind machines may be small or huge
Up to 5 MW per unit
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 2/11
11/12/20
Wind Power BenefitsWind Power Benefits
Less reliance on coal and foreign oilLess reliance on coal and foreign oil
Potential for more American jobsPotential for more American jobs
Net decrease in undesirable emissionsNet decrease in undesirable emissions
New technology offers hope (taller towers,New technology offers hope (taller towers,
bigger machines, higher efficiencies)bigger machines, higher efficiencies)
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 3/11
11/12/20
Wind Power ConcernsWind Power Concerns
Wind is intermittent and unpredictable
Costlier than other sources of electricity
Requires new transmission linesfrom where the wind is to where the need is
Delays up to 2 years by a lack of parts
Delays by “Not in my back yard” (even if
it’s 5 miles away)Huge first cost
Wind powerWind power
Question: if I offered you a free windQuestion: if I offered you a free windmac ne, ma c e o your nee s omac ne, ma c e o your nee s oelectric power, would you accept it?electric power, would you accept it?
Would you accept the free wind machine if IWould you accept the free wind machine if I
grid?grid?
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 4/11
11/12/20
First U.S. Town Powered SolelyFirst U.S. Town Powered Solely
by Windby WindRock Port, Missouri, has wind turbines thatRock Port, Missouri, has wind turbines thatsupp y a e own s e ec r c y, ma ngsupp y a e own s e ec r c y, ma ngthe first to operatethe first to operate solelysolely on wind power.on wind power.
The power of the wind increases in relation tothe cube of the wind speed.If the wind speed is doubled, the power outputis 8 times greater.
Wind speeds increase at greater heights.Construction that allows hub heights of 1000feet is foreseeable.
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 5/11
11/12/20
Texas becoming top site for wind power growth
T. Boone Pickens is planning to build thebiggest wind farm in the world,
.
Why build it in Texas??
Based on wind speeds at 100 feet
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 6/11
11/12/20
7.0
9.0Example average
wind speeds(mph)
8.0Actual wind speeddetermines power
Output at 9 mphis Double the output
.
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 7/11
11/12/20
Wind Farm, Palm Springs, California4000 units
Rhode Island (off shore): a $1.5 billion wind farm
is planned, more than 100 turbines, each 240 feet tallMassachusetts still says, “NO!”
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 8/11
11/12/20
Wind power potential of Great Lakes:
Michigan: potential for 100,000 wind turbinesWisconsin: exploring 3 projects
o: aya oga oun y, exp or ng a pro ec
Off shore is more expensive to build and operate
Ice requires sturdier construction
Energy Tax Credits
As part of the $700 Billion bailout, Congress renewedthe wind energy tax credits for 1 year, and solar for 8
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 9/11
11/12/20
Can wind power provide20% of our electricity by 2030?
Will take about $1 Trillion over the next 25 years, to installacres of wind turbines across Midwest and Great Plains,plus thousands of miles of transmission lines.
Would require cutting red tape anda “Git ‘er done” attitude.Comparable to building the Interstate Highway systemin 1950s and 60s.
As the percentage of electricity from wind and solar increases,an equal amount of “instant-on” backup generatorsare required
In Wisconsin…One company pays landowners $3,000 to $8,000a year for up to 30 years to place towers on their land.
“If you've got one turbine, that's so much. If you have three or four,it's a retirement plan."
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 10/11
11/12/20
Darrieus Wind Turbine(vertical axis)
Maglev Wind Turbine
8/8/2019 Wind Energy Reeder
http://slidepdf.com/reader/full/wind-energy-reeder 11/11
11/12/20
Kite Gen uses large kites that fly in the upper atmosphere(800-1000m high) tethered to long poles which are attached toand spinning a large cylinder shaped structure.