wilshire heights-na hike-bike-trail-presentation-10-25-2016

44
DATA CURRENT OF OCTOBER 1 2016 DALLAS HIKE AND BIKE NETWORK PARK AND RECREATION DEPARTMENT WILSHIRE HEIGHTS NEIGHBORHOOD ASSOCIATION OCTOBER 25, 2016 DATA CURRENT OF OCTOBER 1 2016

Upload: chris-davidson

Post on 13-Apr-2017

43 views

Category:

Government & Nonprofit


1 download

TRANSCRIPT

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

DALLAS HIKE AND BIKE

NETWORK PARK AND RECREATION DEPARTMENT

WILSHIRE HEIGHTS NEIGHBORHOOD ASSOCIATION OCTOBER 25, 2016

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

2

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• History of Dallas Hike and Bike Network

• Existing Trails

• Trails In Design or Under Construction

• Proposed Trails

PURPOSE

3

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

HISTORY: DALLAS MORNING NEWS JANUARY 12, 1969

4

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• Park and Recreation Department’s Long Range Development Plan – A Renaissance Plan adopted in 2002

• Plan survey identified hike and bike trails as high priority of Dallas citizens

• Plan recommended implementation of regional trail network throughout Dallas

RENAISSANCE PLAN OF 2002

5

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• The Dallas Trail Network Master Plan was adopted in 2005, revised in 2008

• Linear trails – 28.8 miles

• Loop trails – 33.9 miles

• Natural trails – 22.8 miles

• 86 Miles

• As of October 1, 2016

• Linear trails – 64.3 miles

• Loop trails – 54.9 miles

• Natural trails – 33.8 miles

• 153 Miles

TRAIL MASTER PLANS

6

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

2003 AND 2006 FUNDING LEVERAGING

• The 2003 and 2006 Bond Program leveraged an additional $29.5M through various grant and partnership programs

7

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• Significant funding and project design support since 1997

• Priority of the Commissioners Court

• Coordinates funding through TxDOT and NCTCOG

• 2003 Open Space Plan

• Funding for new trails throughout Dallas County •Trinity Forest Spine Trail

•Kleberg Trail

•Trinity Skyline Trail

PARTNERS: DALLAS COUNTY

8

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• Funding for trails in portion of City of Dallas within Collin County

• Funding for Preston Ridge Trail (2003)

• Moss Glen Park Loop Trail (2016)

• Priority of Council Member Sandy Greyson

PARTNERS: COLLIN COUNTY

9

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• Approved by City Council on April 13, 2011

• Established agreement to be used on 60.7 miles (22.4%) of built-out system

• Key provisions of Oncor License Agreement

•Perpetual

•No up-front cost considerations

•City of Dallas maintains full width of corridor

PARTNERS: ONCOR

10

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• Approved by DART and City Council on November 23, 2015

• A non-exclusive perpetual easement for trails

• Allows for trail improvements on trail, including benches, trash bins, drainage improvements, and water fountains

• All landscaping and improvements must be reviewed and approved by DART and maintained by the City of Dallas

PARTNERS: DART

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

EXISTING TRAILS

12

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 153 miles of existing trails

EXISTING TRAILS

13

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• White Rock Creek Trail established in 1977

• 9.3 mile trail

• Improvements since 2003:

• Portion of trail renovated and widened (2003 and 2006 Bond Program) from Valley View Park to Forest Lane

• Trail extended from Valley View Park to Hillcrest Park (2006 Bond Program)

WHITE ROCK CREEK TRAIL

14

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• Completed in 1976

• 9.3 mile loop trail

• Improvements since 2000 • East Lawther Trail Improvements (2000 to 2002) from Garland Road to Sunset Bay

•West Lawther Trail Improvements Phase 1 (2003 to 2004) from Pump House to Lily Pad Bay

•Mockingbird Pedestrian Bridge (2005 to 2007)

WHITE ROCK LAKE TRAIL

15

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• Improvements since 2006:

• West Lawther Trail Improvements Phase 2 (2007 to 2009) from Pad Bay to Mockingbird Pedestrian Bridge

• East Lawther Trail Improvements (2014 to 2015) from Mockingbird Bridge to Bath House Cultural Center

WHITE ROCK LAKE TRAIL

16

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 4.1 mile trail on old railroad right of way

• From White Rock Lake Trail to Hill Street

• Funding from Dallas County, City of Dallas, and TxDOT

• Phased opening between 2009 and 2011

• $10.11M project

SANTA FE TRAIL

17

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 1.5 mile trail

• SoPAC terminus at Northwest Highway to Goforth Road (Doran Point)

• Opened in May 2015

• Connects to the White Rock Creek Trail

• Remaining portion of the trail from Goforth Road to Muchert Service Facility is in design

FLAG POLE HILL TRAIL

18

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 1.2 mile trail

• Lake Highlands High School to Ferndale Drive

• Open in October 2014

• Oncor easement

• Eventually connects to White Rock Creek Trail

LAKE HIGHLANDS PHASE I

19

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 1.7 mile trail

• Between Skillman St and Fisher Road opened May 2016

• Portion of Ridgewood Trail between Glencoe Park and Skillman Street remains under construction

• Mockingbird Pedestrian Bridge

• Some great views

RIDGEWOOD TRAIL

20

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 1 mile extension completed in June 2016

• From Hill Street along DART ROW

• Baylor Hospital to Fair Park

• Funding from City of Dallas

• $.7M cost

SANTA FE TRAIL EXTENSION

21

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

SOPAC TRAIL

• .9 miles

• Two portions of the trail are already open

•White Rock Lake Trail to Lakewood Park

•Trammel Road to Northwest Highway

• Managed and funded by City of Dallas

•$1.2M

• Connects to Ridgewood, White Rock Lake, and Flag Pole Hill Trails

• Construction expected to begin in January 2017 and be completed in January 2018

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

TRAILS IN DESIGN OR UNDER

CONSTRUCTION

23

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 50 miles in design or under construction

• 4.6 miles under construction

• Five Mile Creek Trail

• Ridgewood Trail

• Runyon Creek Trail

• 44.9 miles in design

• 25.8 miles expected to begin construction in 2017

TRAILS IN DESIGN OR UNDER CONSTRUCTION

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

TRAILS UNDER CONSTRUCTION

25

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 1.2 mile trail

• Portion of Ridgewood Trail between Fisher Road and Skillman St already open

• Segment includes

•Mockingbird Pedestrian Bridge

•One smaller bridge at Twin Sixties Dr

• $17M cost for segment

• Expected to open in Spring 2017

RIDGEWOOD TRAIL

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

TRAILS IN

DESIGN

27

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

SOPAC TRAIL PHASE III

• 1.8 miles

• From Lakewood Park to Trammel Road

• Managed by Dallas County, funding from City of Dallas and NCTOG

• $3.9M

• Connects to White Rock Lake Trail and Santa Fe Trail

• Construction expected to begin in January 2017 and be completed in January 2018

28

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

SOPAC TRAIL PHASE IVA

• 2.5 miles

• From Northwest Highway to Greenville Avenue

• Managed by Dallas County, funding from City of Dallas and NCTOG

• $8.3M

• Connects to •Ridgwood Trail •Flag Pole Hill Trail

• Construction expected to begin in January 2017 and be completed in January 2018

29

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 1.2 mile trail

• Harry Moss Park to Arbor Park

•Sidewalk/street connection to Lake Highlands Trail Phase I

• Trail in final design

•Public meeting tonight with CM McGough to determine alignment options

• Needs $2.6M for constructing trail

LAKE HIGHLANDS TRAIL PHASE II/WEST

30

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• .6 mile trail

• White Rock Creek Trail to Lake Higlands Trail Phase I •Watercrest Park to Olive Schapiro Park

• Trailhead proposed for new Alamo Drafthouse at Skillman St and Abrams Rd

• Trail in conceptual design •Public meeting tonight with CM McGough to determine alignment options

• Construction is funded •Design to begin in January 2017

LAKE HIGHLANDS TRAIL SOUTH

31

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• .7 mile trail

• Portion of Flag Pole Hill Trail from SoPAC Trail to Goforth Road open

• Through Flag Pole Hill Park to Muchert Service Facility

• Trail design finished

• Project being put out to bid in November 2016

• Construction expected to begin in January 2017

•Completion in October 2017

FLAG POLE HILL TRAIL

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

PROPOSED TRAILS

33

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 102 miles of proposed trails

• Estimated cost of total system buildout $200M

• Reconstruction of 35 miles of loop and linear trails ($36M)

• Building new trails ($164M)

FULL PROPOSED SYSTEM

34

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

CIRCUIT TRAIL CONSERVANCY

35

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

CIRCUIT TRAIL CONSERVANCY

• Private group of trail supporters raising money to match bond funds to develop 13.7 miles of the trail network

• Key high cost segments of trail system that have not yet been built

• The Connection $21M

• Baker Pump Station Connection $2M

• Cedar Creek Bridge $2M

• Trinity Forest Spine Trail $18M

• Total cost of $43M

• Requesting $20M of City funds, $13M in letters of intent

36

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

CIRCUIT TRAIL CONSERVANCY

37

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

CIRCUIT TRAIL CONSERVANCY

38

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

CIRCUIT TRAIL CONSERVANCY

39

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

CIRCUIT TRAIL CONSERVANCY

40

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

CIRCUIT TRAIL CONSERVANCY

41

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

CIRCUIT TRAIL CONSERVANCY

42

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

SOPAC TRAIL PHASE IVB

• 1.2 miles

• From Greenville Avenue to White Rock Creek Trail and Northaven Trail (Phase IB)

• Estimated cost of $4.2M

• Would allow trail users to connect to the White Rock Creek Trail and Northaven Trail

43

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

• 153 miles of existing trails

• 50 miles in design or under construction

• 44.9 miles in design

• 25.8 miles expected to begin construction in 2017

• 4.6 miles under construction

• Five Mile Creek Trail

• Ridgewood Trail

• Runyon Creek Trail

• 102 miles of proposed trails

FULL PROPOSED SYSTEM

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016

DALLAS HIKE AND BIKE

NETWORK PARK AND RECREATION DEPARTMENT

WILSHIRE HEIGHTS NEIGHBORHOOD ASSOCIATION OCTOBER 25, 2016

DA

TA C

UR

REN

T O

F O

CTO

BER

1 2

016