128 Project Order Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities Building Facts Map Legend >140% 130%-139% 120%-129% 110%-119% 100%-109% 90%-99% < 89% Priority Funding Area William B. Wade 132.1% William A. Diggs 100.8% J. P. Ryon 92.5% Eva Turner 139.9% Dr. Samuel Mudd 118.3% Daniel of St. Thomas Jenifer 156.8% C. Paul Barnhart 121.2% Berry 148.5% Arthur Middleton 108.7% 22 Kindergarten Wing Addition k Security Upgrades Needed High Traffic Site Constricted Site Worn Finishes Efficient Circulation Wade Elementary School was originally constructed in 1989, and received a kindergarten wing addition in 2002. Interior finishes are in fair condition, and floors show wear from high-intensity use. VCT floors in the addition may have had installation issues, and show an inordinate amount of wear. The gym is adorned with hard surfaces which are not conducive to athletic activity. Skylights and clerestories provide natural light in corridors, but may be susceptible to leaking issues. Circulation is clear and efficient. Exterior cladding is in fair condition, and shows some staining. Mechanical systems are in fair condition, and the domestic water system requires a back-flow preventer. Electrical systems are in good condition, but security upgrades are required. The site is constricted by a number of relocatables as well as a water tower. The site is located along a heavily trafficked road. William B. Wade Elementary School Hard Surfaces

Upload: others

Post on 19-Aug-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: William B. Wade Elementary School...William B. Wade Elementary School Hard Surfaces 129 Current Building Score Maintenance Priority Prescribed Work Cost Analysis 12 3.75 Minor Renovation,

128

Project Order

Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities

Building Facts

Map Legend

>140%

130%-139%

120%-129%

110%-119%

100%-109%

90%-99%

< 89%

Priority Funding Area

William B. Wade132.1%

William A. Diggs100.8%

J. P. Ryon92.5%

Eva Turner139.9%

Dr. Samuel Mudd118.3%

Daniel of St. Thomas Jenifer156.8%

C. Paul Barnhart121.2%

Berry148.5%

Arthur Middleton108.7%

22

Kindergarten Wing Addition

k

Security Upgrades Needed

High Traffic Site

Constricted Site

Worn FinishesEfficient Circulation

Wade Elementary School was originally constructed in 1989, and received a kindergarten

wing addition in 2002. Interior finishes are in fair condition, and floors show wear from

high-intensity use. VCT floors in the addition may have had installation issues, and

show an inordinate amount of wear. The gym is adorned with hard surfaces which are

not conducive to athletic activity. Skylights and clerestories provide natural light in

corridors, but may be susceptible to leaking issues. Circulation is clear and efficient.

Exterior cladding is in fair condition, and shows some staining. Mechanical systems

are in fair condition, and the domestic water system requires a back-flow preventer.

Electrical systems are in good condition, but security upgrades are required. The site

is constricted by a number of relocatables as well as a water tower. The site is located

along a heavily trafficked road.

William B. WadeElementary School

Hard Surfaces

Page 2: William B. Wade Elementary School...William B. Wade Elementary School Hard Surfaces 129 Current Building Score Maintenance Priority Prescribed Work Cost Analysis 12 3.75 Minor Renovation,

129

Current Building Score

MaintenancePriority

Prescribed Work Cost Analysis

12

3.75

Minor Renovation, Roof Replacement.

It is recommended that Wade Elementary undergo a

minor renovation, including architectural, mechanical,

and security upgrades, as well as a roof replacement.

ARCH

MEP

SITE

SURVEY 3.67

2.71

4.01

3.76

<2 Replace

2-3 Replace / Reno.3-4 Reno. / Maint.>4 Maintenance

SurveyCategories 3.75

This School Project Determination

BuildingScore

Description Qty. Unit County Share State Share Cost/Unit TOTAL

ARCH

Roof Replacement 76,253 sf $197,495 $336,276 $7 $533,771

Flooring Repair 76,253 sf $305,012 $- $4 $305,012

MEP

Data System Upgrades 76,253 ls $126,961 $216,177 $5 $343,139

Cooling Upgrades 76,253 sf $691,233 $1,176,965 $25 $1,868,199

Fire Alarm System Upgrade 76,253 sf $84,641 $144,118 $3 $228,759

CCTV System Upgrade 76,253 sf $38,088 $64,853 $1 $102,942

SITE

Exterior Lighting 20 ea $130,000 $- $6,500 $130,000

Stormwater Management/Water Quality 1 ls $46,250 $78,750 $125,000 $125,000

Drainage 1 ls $200,000 $- $200,000 $200,000

Subtotals $1,819,681 $2,017,139 $3,836,821

Total Including Soft Costs $3,437,620 $2,017,139 $5,454,760

Current

672

672

OptimumSRC 768

Proposed

Recommendations