Emerson Legacy Emerson Legacy System Modernization System Modernization PhilosophyPhilosophy
Roel C. MulderRoel C. Mulder
Director Migrations & Director Migrations & Modernization EuropeModernization Europe
©©
WHY partner with Emerson early ?WHY partner with Emerson early ?WHY partner with Emerson early ?WHY partner with Emerson early ?– Match requirements to business
objectives
– Holistic approach
• Automation modernization and not just system migration
– Form a partnership
• Create a vision to sustain a competitive edge for the next 20 years
– Articulate the value of automation
• Develop a compelling business case to modernize
• Help to win over skeptical management
zz
Next ICSS (BPCS+SIS) architectureNext ICSS (BPCS+SIS) architectureNext ICSS (BPCS+SIS) architectureNext ICSS (BPCS+SIS) architecture
FullyFully integratedintegrated system, system, butbut separatedseparated accordingaccording to IEC 61511to IEC 61511
Separated Safety networkSeparated Safety networkOne system databaseOne system database
NONO serversserversNONO traffic controllerstraffic controllersIPIP communication between nodescommunication between nodes
Separated Safety networkSeparated Safety networkOne system databaseOne system database
NONO serversserversNONO traffic controllerstraffic controllersIPIP communication between nodescommunication between nodes
©©
Integration AdvantageIntegration AdvantageIntegration AdvantageIntegration Advantage
- Integrated Operation
– Any data from BPCS or SIS on graphics
- Integrated Engineering
- One tool with separate BPCS/SIS User profile
- Integrated Diagnostics
- Integrated Alarms and Events
– One system clock, one Event Chronicle
- Separated Control & Safety
©©
TRADITIONAL all TRADITIONAL all DiscretesDiscretes via SIS IOvia SIS IOTRADITIONAL all TRADITIONAL all DiscretesDiscretes via SIS IOvia SIS IO
5
MODBUS comms
©©
MAXIMIZE BPCS MAXIMIZE BPCS –– SIS IntegrationSIS Integrationcreates Commercial Advantagecreates Commercial AdvantageMAXIMIZE BPCS MAXIMIZE BPCS –– SIS IntegrationSIS Integrationcreates Commercial Advantagecreates Commercial Advantage
SYSTEM comms
2
©©
Electronic Marshalling Solution Electronic Marshalling Solution Electronic Marshalling Solution Electronic Marshalling Solution - 22 channel types for BPCS, high voltage/low
voltage and Intrinsically Safe
- 20 channel types for SIS, high voltage/low voltage and Intrinsically Safe
- Marshalling requirement included
– fuse, knife disconnect, testing points, led status, signal conditioning, high current relay, (IS) isolation
42 types©©
Electronic Marshalling InstallationElectronic Marshalling InstallationElectronic Marshalling InstallationElectronic Marshalling Installation- Ex Zone 2 certified
- -40 to +70 degC
- ISA-S71.04-1985 Class G3
- Marine certification
- Only 20 cm build-in depth, DIN rail
8
©©
Electronic Marshalling 19inch Electronic Marshalling 19inch mounting for Migrations in cabinetsmounting for Migrations in cabinetsElectronic Marshalling 19inch Electronic Marshalling 19inch mounting for Migrations in cabinetsmounting for Migrations in cabinets
9
BPCS Migrations SIS Migrations
©©
MigrationsMigrations in the Heavy in the Heavy ProcessProcess IndustryIndustryMigrationsMigrations in the Heavy in the Heavy ProcessProcess IndustryIndustry
©©
DCS Migration CriteriaDCS Migration CriteriaDCS Migration CriteriaDCS Migration Criteria
- Minimal process shutdown
- Smooth transition for operation personnel
- Save transition
- Spread of investment over multiple years
- Preserve the field cabling, avoid individual loop test
- Finally replacing all the operation consoles, the controllers and IO
©©
WHAT needs to be done?WHAT needs to be done?WHAT needs to be done?WHAT needs to be done?
Field DevicesField Devices
Plant AreasPlant AreasRack RoomRack Room
Control RoomControl RoomMaintenance ShopMaintenance Shop
Control NetworkControl Network
Plant NetworkPlant Network
Add Add // Replace Replace InstrumentsInstruments
Junction Box Junction Box LocationsLocations
Integrity of Integrity of CablesCables, , TraysTrays, , Conduit Conduit etc.etc.
Wiring Wiring PhilosophyPhilosophy
Application Application ComplexityComplexity
Network Network InfrastructureInfrastructure
Operating Operating StandardsStandards
Training Training RequirementsRequirements
Historians Historians & & 3rd 3rd party party
connectivityconnectivity
Production Production Management Management
& & ERP ERP IntegrationIntegration
UnderUnder--utilized utilized Smart InstrumentsSmart Instruments
AvailableAvailable && AccurateAccurateDocumentationDocumentation
“Clean” Areas“Clean” Areas
Leave PLCs in Leave PLCs in Place Place or or Move Move to to
New SystemNew System
Real Real Estate Estate CConstraintsonstraints
100% 100% Accurate Accurate I/O I/O
CountCount
FJBsFJBs
Maintenance Maintenance PracticesPractices
Power Power & & GroundingGrounding
3
©©
Emerson Emerson Modernization ProgramsModernization ProgramsEmerson Emerson Modernization ProgramsModernization Programs
- “Emerson has developed a flexible approach to the migration of their own and competitor legacy systems.”
- “One key advantage that Emerson has, which many of its competitors do not, is its expertise in field instrumentation, control valves, fieldbus implementation, and wireless implementation.”
- “This is especially crucial in hot cutover projects where not only the system, but also the instruments and valves were being changed over.”
www.emersonprocess.com/Modernizationwww.emersonprocess.com/Modernization HOW ??HOW ??
©©
Migration in 2 or 3 phasesMigration in 2 or 3 phasesMigration in 2 or 3 phasesMigration in 2 or 3 phases- System components have different life cycles
- Separate the risk for the application from the physical electrical connection risk over two steps
- Distribute the required process shutdown over several planned stops
- Financial spread over multiple years
©©
Emerson’s Migration ProgramEmerson’s Migration ProgramEmerson’s Migration ProgramEmerson’s Migration Program
- Phased migration
- Preserve investments
- Minimal process shutdown
- Avoiding obsolescence
- Include improvements
- Improved control will improve output
- Involve Emerson services to minimize risk
©©
Legacy DCS Migration MethodsLegacy DCS Migration MethodsLegacy DCS Migration MethodsLegacy DCS Migration Methods
- One step, all-at-once
- Horizontally, layer-by-layer
- Vertically, process unit-by-unit
- L shape, Horizontal + Vertical
©©
Horizontal Legacy DCS Migration method Horizontal Legacy DCS Migration method step 1 HMI replacementstep 1 HMI replacementHorizontal Legacy DCS Migration method Horizontal Legacy DCS Migration method step 1 HMI replacementstep 1 HMI replacement
IO cards
HMIStation
HMIStation
HMIStation
ConfigStation
TerminationPanel
IO cards
TerminationPanel
IO cards
TerminationPanel
DataServer
Controllers Controllers Controllers
4
Horizontal MethodHorizontal MethodHorizontal MethodHorizontal MethodADVANTAGE
- Smooth method for Operators, no mix of two systems.
- Parallel and/or fall back operation
- One discipline per step, separate graphics, control language and electrical risks
- Short switchover times needed
DISADVANTAGE
- Intermediate equipment and services that are replaced in the next steps
- More equipment needed
- Hybrid system service needed for step 1
- Performance Legacy DataServer
- No improvements during step 1
©©
Vertical Legacy DCS Migration method Vertical Legacy DCS Migration method step 1 First process unit replacementstep 1 First process unit replacementVertical Legacy DCS Migration method Vertical Legacy DCS Migration method step 1 First process unit replacementstep 1 First process unit replacement
IO cards
HMIStation
HMIStation
HMIStation
ConfigStation
TerminationPanel
IO cards
TerminationPanel
IO cards
TerminationPanel
ConfigStation
Controllers Controllers Controllers
Vertical MethodVertical MethodVertical MethodVertical MethodADVANTAGE
- Limited risks per process unit only for graphics conversion, control language and electrical risks
- No extra project resources needed
- Direct improvements possible per unit
- Switchover at planned unit stops
DISADVANTAGE
- Two system HMIs in one control room, risk for operator mistakes
- System service needed for both systems
- Intermediate equipment for data exchange
- Only possible for non-interrelated units
- Detailed research needed for data interlocks ©©
WhatWhat is the Best is the Best MigrationMigration MethodMethod ??WhatWhat is the Best is the Best MigrationMigration MethodMethod ??
- Depends on planned shutdown period of the plant
- Depends on foreseen transition period
- Depends on acceptable risk
- Depends on resourses
- Depends on system size
- Depends on space for new cabinets and logistics
- Depends on need for improvements
ItIt all all dependsdepends
©©
DCS DCS MigrationsMigrations ProjectsProjectsDCS DCS MigrationsMigrations ProjectsProjectsEXISTING PROJECTSEXISTING PROJECTS RECENT PROJECTSRECENT PROJECTS
NewshamNewsham
Quad 204Quad 204Clair RidgeClair Ridge
SolanSolan
DagnyDagny
VisundVisund
ETAPETAP
Martin Martin LingeLinge
AndrewAndrew
CleetonCleeton
North North CormorantCormorant
Forties CharlieForties CharlieForties EchoForties Echo
NinianNinian Central/ North/ SouthCentral/ North/ SouthMurchisonMurchisonHeatherHeather
ThistleThistle
GryphonGryphon
BalmoralBalmoral
AlwynAlwynDunbarDunbar
West Sole AlphaWest Sole Alpha
North Sea Automation & Safety SystemNorth Sea Automation & Safety SystemNorth Sea Automation & Safety SystemNorth Sea Automation & Safety System
■■ AndrewAndrew■■ CleetonCleeton■■ NewshamNewsham■■ West Sole AlphaWest Sole Alpha
■■ SolanSolan
■■ Martin Martin LingeLinge
■■ North CormorantNorth Cormorant
■■ Forties CharlieForties Charlie■■ Forties EchoForties Echo
■■ Clair RidgeClair Ridge■■ ETAPETAP■■ QUAD 204QUAD 204
■■ DagnyDagny■■ VisundVisund
■■ NinianNinian Central/N/SCentral/N/S■■ MurchisonMurchison
■■ HeatherHeather■■ ThistleThistle
■■ Gryphon FPSOGryphon FPSO
■■ BalmoralBalmoral
■■ AlwynAlwyn■■ DunbarDunbar
Device Signal Tag (DST) = 140,000Device Signal Tag (DST) = 140,000
TOTAL $167MTOTAL $167M