WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the GDP with HS

Upload: dwain-green

Post on 23-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA

• HSR in a global perspective• Higher performance and reduced cost• Revenues• National finance boost the GDP with HSR

Page 2: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

High speed lines in a global perspective

Page 3: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Europe

Moskva

Kijev

Minsk

Warszawa

St PetersburgHelsingfors

Berlin

MünchenBudapest

BukarestMilano

Rom

AtenAnkara

Istanbul

Paris

London

Amsterdam

Madrid

Lissabon

Hamburg

Bryssel

Sofia

Page 4: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Questions

Why: • do 66 countries in the world build HSR• do they build 1000 km in 5 years• do they afford the investment for HSR• do the HSR system promote international

traffic• are the Scandinavian countries the last to

know what the rest of the world knows today

Page 5: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Scandinavians reads

SPAINFRANCEGERMANYGREECEITALYPORTUGALTHENEDERLANDSBELGIUMPOLANDUKRAINERUMANIASOUTHAFRICACHINAJAPANTAIWANINDIATHEILANDLAOSMALAYSIABRASILARGENTINACHILEVENESUELAUSACANADAMAROCOALGERTUNISEGYPTSAUDIARABIAKUWEITBAHARINQATARRUSSIAKAZAKSTANUZBEKISTANISRAELMEXICOFINLANDGREATBRITANSWITZERLANDAUSTRIAHUNGARYRUMANIABULGARIATURKEYRUSSIAIRANIRAQUNITEDARABEMIRATESOMANSOUTHKOREAMYANMARAUSTRALIALIBYA

Page 6: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

The world reads

SPAINFRANCEGERMANYGREECEITALYPORTUGALTHENEDERLANDSBELGIUMPOLANDUKRAINERUMANIASOUTHAFRICACHINAJAPANTAIWANINDIATHAILANDLAOSMALAYSIABRASILARGENTINACHILEVENESUELAUSACANADAMAROCOALGERTUNISEGYPTSAUDIARABIAKUWEITBAHARINQATARRUSSIAKAZAKSTANUZBEKISTANISRAELMEXICOFINLANDGREATBRITANSWITZERLANDAUSTRIAHUNGARYRUMANIABULGARIATURKEYRUSSIAIRANIRAQUNITEDARABEMIRATESOMANSOUTHKOREAMYANMARAUSTRALIALIBYA

Page 7: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Conclusions

• Reports over value the use of car and air transport and under value rail transport

• Building phase for HSR is 1000 km in 5 years• Scandinavian building phase for CR is 200 km in 10 years• Price level is about 150 000 SEK/meter double track

– 65 000 SEK/meter for HSR for 400 km/h– 75 000 SEK/meter for CR with 200 – 250 km/h

• 66 countries has HSR• Travelling with HSR increases market 4 times!• Scandinavia is the latest part of the world to understand HSR!• Our competitiveness is jeopardised!

Page 8: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Europe

Moskva

Kijev

Minsk

Warszawa

St PetersburgHelsingfors

Berlin

MünchenBudapest

BukarestMilano

Rom

AtenAnkara

Istanbul

Paris

London

Madrid

Lissabon

Hamburg

Bryssel

Sofia

Amsterdam

Page 9: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Europe

Moskva

Kijev

Minsk

Warszawa

St PetersburgHelsingfors

Berlin

MünchenBudapest

BukarestMilano

Rom

AtenAnkara

Istanbul

Paris

London

Amsterdam

Madrid

Lissabon

Bryssel

Sofia

Stockholm

Oslo

Köpenhamn

Hamburg

Page 10: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

ÅLBORG

ODENSE

KÖPENHAMN

HAMBURG

JÖNKÖPING

NORRKÖPING

STOCKHOLM

GÖTEBORG

BERGENOSLO

STAVANGER

TRONDHEIM

KRISTIANSANDFROM OSLO TO:GÖTEBORG 1:15KÖPENHAMN 2:30STOCKHOLM 3:15

FROM GÖTEBORG TO:OSLO 1:15STOCKHOLM 2:00KÖPENHAMN 1:15

1:151:15

2:00

ÅRHUS

Page 11: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

High speed lines in a global perspective

Page 12: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Why does the world invest in HSR?

• It is commersially profitable• It is cheaper to build HSR than CR• Safe long term investment for retirement

funds• Reduce crazy stock market values and trading• Most environmental friendly mean of

transport• Competitive with air transport up to 3 hours

Page 13: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Environment

-100

-200

-300

-400

-500

-600

-700

0

100

200

Billion Euro / Year in EU15

Car Train Air Boat

Total extern cost

Subsideries

Cost

for s

ocie

ty

- 750 bn -100 bn - 125 bn -10 bn

Source: EEA 2007

Page 14: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Environment

400

300

200

100

0

500

600

700

SEK / 1000 pkm

Car

Train

Air

Real

env

ironm

ent o

st

650 SEK

197 SEK

455 SEK

Source: INFRAS 2004

Bus326 SEK

Page 15: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Noice

100

90

80

70

60

50

110

120

130dB(A)

Aerodynamic

Rails

Totalt noice

Källa: EC 2003

Motor

0 50040030020010050 Km/h

Page 16: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Market share

70

60

50

40

30

20

80

90

100%

Source: JR500400300200100 600 Km/h

10

0

700 800 900 1000 0

Bil & Buss

Svenska tåg

CR Train

Car & Bus

Air

Page 17: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Market share

70

60

50

40

30

20

80

90

100%

Source: JR

500400300200100 600 Km/h

10

0

700 800 900 1000 0

Car & Bus

High speed train

Air

Page 18: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Environment profit

70

60

50

40

30

20

80

90

100%

Source: JR

500400300200100 600 Km/h

10

0

700 800 900 1000 0

Bil & Buss

Svenska tåg

CR train

Car& Bus

Air

High Speed Train

Page 19: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Swedish Rail Market

• 105 million trips per year 1999 = 11,8 trips/pp

Page 20: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Swedish Rail Market

• 105 million trips per year 1999 = 11,8 trips/pp• 187 million trips per year 2011 = 19,7 trips/pp

TRACK CAPACITY IS SOON FULLWE HAVE CAPACITY PROBLEMS

+ 82 million trips !!People ride trains more !

Page 21: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Swedish Rail Market

• 105 million trips per year 1999 = 11,8 trips/pp• 187 million trips per year 2011 = 19,7 trips/pp• 275 million trips per year 2023 = 27,0 trips/pp

TRACK IS OVER LOADED WE HAVE A TRAFFIC COLLAPSE

HIGH SPEED LINES GIVESINCREASED CAPACITY AND MORE TRAVLLERS

TRAFFIC COLLAPSE IS VOIDED

+ 88 million trips !!People rides the train more often !

Page 22: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Infrastructure cost per meter?

70 000

60 000

50 000

40 000

30 000

20 000

80 000

90 000

100 000

Botnia line> 250 km/h

SEK

10 000

0

Express Way

Global HSR < 250 km/h

ConventionalRail in Sweden

High Way

Road

BallastRail

Sub-structure

Sub-structure

Asphalt

Page 23: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Infrastructure per meter?

70 000

60 000

50 000

40 000

30 000

20 000

80 000

90 000

100 000

Botnia line< 250 km/h

SEK

10 000

0

Express WayGlobal HSR> 250 km/h

Conventional Rail in Sweden

High Way

Road

Electrification

Signalling

BallastRail

Sub-structure

Sub-structure

Asphalt

Page 24: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Electrification

Conventional rail High speed rail

0 SEK/m

Page 25: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Signalling system

Conventional rail High speed rail

20 000 SEK/m

Page 26: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Superstructure

Conventional rail High speed rail

5000 SEK/m

Page 27: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Substructure

3 m

26 m

13 m

6 m

Conventional rail High speed rail

34 000 SEK/m

45 000 SEK/m

Page 28: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Land use

3 m

26 m

13 m

6 m

Conventional rail High speed rail

4 000 SEK/m 100 SEK/m

Page 29: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Land use CR and HSR

Page 30: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Land prices and agriculture

Page 31: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Less tunnels more bridges10,6 meter 10,6 meter

Hallandsåstunneln cost 12 bn SEK

Page 32: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Less tunnels more bridges10,6 meter

Hallandsåstunneln two pipesCost 12 bn SEK

4.5 m

10,8 meter

High speed rail tunnels one pipe Cost 6 bn SEK

Page 33: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Construction cost

• Gasoline price has been doubled in 12 years• Car use has been unchanged per person in 12 years

• Superstructure cost 2002 was 1775 SEK/m• Superstructure cost 2012 was 2635 SEK/m

• Grödinge line cost 2,7 bn or 43 548 SEK/m 1994• Botnia line cost 15 bn or 78 947 SEK/m 2010

Page 34: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Use of moneySystem Conventional rail High speed rail Comment

Electrification system 4 200 SEK/m 2 500 SEK/m No fundaments

Signalling system 16 000 SEK/m No signalls

Track system 5 000 SEK/m 2 250 SEK/m Sleepers in slab

Ballast 2 500 SEK/m In bridge

Substructure 4 000 SEK/m In bridge

Drainage system 900 SEK/m In bridge

Noice, service road, snow 3 900 SEK/m In bridge

Ground preparation 30 000 SEK/m 4 000 SEK/m

Land use cost 4 000 SEK/m 100 SEK/m

Bridge and slabb track 45 000 SEK/m

Project managment 8 447 SEK/m 8 566 SEK/m

TOTAL 78 947 SEK/m 62 416 SEK/m HSR chepest

Page 35: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

CostSystem Conventional rail High speed rail

Railway system 78 947 SEK/m 62 416 SEK/m

Distance 2 x 600 km 94,7 bn SEK 74,9 bn SEK

Construction time 12 year 4 year

Construction intrest 4 % 45,5 bn 12,0 bn

Cost 140,2 bn 86,9 bn

Speed / Travel time > 250 km/h; 4.00 h 400 km/h; 2.00 h

Market 5 million trips 9 million trips

Market value per year 2,5 bn SEK 4,5 bn SEK

Turn over time 56 year 19 year

Page 36: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Investment profitsSystem SEK / m and year Increast price per year

Superstructure 1775 SEK/m 2002 86 SEK/m/year

Grödinge line 43 548 SEK/m 1994 2 212 SEK/m/year

Botnia line 78 947 SEK/m 2010

Oslo – Köpenhamn HSL 62 416 SEK/m 2012

Stand-by cost 2,7 bn SEK per year to wait for theHigh speed line Oslo – Copenhagen !

7,4 million/day

Page 37: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

HSR is a GDP Driver

• The state guarantees 225 bn SEK for HSR• The state gets repaid in 30 years• This triggers domestic investments of 350 bn

SEK in 5 years • No unemployment• Creates 4000 commuters to Norway• This equals to boost the GDP with 3% in 5 years

Page 38: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Funding

STATENORWAY

60 bn

EU20 bn

TRAFIKVERKET & JERNBANEVERKET

TRAFFIC FEE 500 SEK/PP

STATESWEDEN

60 bn

CONSTRUCTIONTIME

12 YEAR

COST140 bn SEK

Page 39: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Funding

STATENORWAY2 bn/year

RENT

EU0 bn

SCANDINAVIAN HIGH SPEED CONTRACTORS

TRAFFIC FEE 500 SEK/PP

STATESWEDEN2 bn/year

RENT

CONSTRUCTIONTIME

4 YEAR

COST87 bn SEK

Page 40: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

Funding

COINCO ORDER THE CONSTRUCTION

SCANDINAVIAN HIGH SPEED CONTRACTORS

TRAFFIC FEE 500 SEK/PP

CONSTRUCTIONTIME

4 YEAR

COST87 bn SEK

EU20 bn

Page 41: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

WHAT DO YOU WANT TO PAY?

High speed trainTRACK FEE = 10 SEK/mileOPERATION = 2,5 SEK/mileProfit = 2,5 SEK/mileTOTALT = 15 SEK/mileENVIRON. = 0,5 SEK/mile

CR-TRAINTRACK FEE = 5 SEK/mileOPERATION = 3,5 SEK/mileProfit = 3,5 SEK/mileTOTALT = 12 SEL/mileENVIRON. = 1,0 SEK/mile

CARROAD FEE = 0 SEK/mileGASOLINE = 8 SEK/mileOPERATION = 30 SEK/mileTOTALT = 38 SEK/mileENVIRON. = 28 SEK/mile

AIRAIR FEE = 4,00 SEK/mileOPERATION = 12,50 SEK/mileProfit = 0,25 SEK/mileTOTALT = 16,75 SEK/mileENVIRON. = 20,00 SEK/mile

TRANSPORT TOTAL COST SEK/mile

CAR 66,00

AIR 36,75

HIGH SPEED RAIL 15,50

CR - RAIL 13,00

APPROXIMATELY TOTAL COST

1 mile = 10 km

Page 42: WHY HSR IS A PROFITABLE BUSINESS CASE FOR SCANDINAVIA HSR in a global perspective Higher performance and reduced cost Revenues National finance boost the

DECISION

- It is free of charge to say YES to high speed rail - You will give public fast transport- You act in a environmental issue- You save money to public and give them wellfare

- Stand-by cost is 7,4 million/day to say NO for high speed rail - You prevent public to cheap and fast transports- You enjoy environmental degradation- You prevent public to save money and be hapier