Why HIPPS ??
• We have 600# (high pressure bearing) pipeline from well pads till production header.
• After that, we have 150# (low pressure bearing) pipeline due to economy & usage purpose.
• Due to some abnormality, if high pressure reaches 150# pipeline, then it may cause explosion to pipeline & hence vessels in trains area.
![Page 3: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/3.jpg)
High pressure Bearing Pipeline Low pressure Bearing Pipeline
FLOW
107 psi
Onsite Normal Operation (Without HIPPS):
![Page 4: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/4.jpg)
High pressure Bearing Pipeline Low pressure Bearing Pipeline
FLOW
136 psi
If Pressure IncreasesHigh Pressure
![Page 5: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/5.jpg)
WHAT IS HIPPS???
HIGH INTEGRITY PRESSURE PROTECTION SYSTEM
![Page 6: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/6.jpg)
HIGH INTEGRITY
Using 3 transmitters in downstream (works on 2oo3 logic).
![Page 7: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/7.jpg)
PRESSURE PROTECTION
Safety Integrity Level – 3High pressure from formationBack pressure from trainsPipe rating ( 600# to 150# )
![Page 8: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/8.jpg)
Functional Safety of Electrical/Electronic/Programmable Electronic Safety-related Systems
IEC 61508 and IEC 61511 standards for design, implementation and management of safety systems. SIL (Safety Integrity Level ) - is a measurement of performance required.
SIL 3 In accordance with IEC61508 and IEC61511
Low demand PFD-Frequency of demand of operation is < 1 per year
0.001-0.0001
STANDARD- International Electro Technical Commission (IEC)
![Page 9: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/9.jpg)
1
LOGIC SOLVER
107 PSI
107 PSI
107 PSI
107 PSI
Onsite Normal Operation (With HIPPS):
![Page 10: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/10.jpg)
LOGIC SOLVER
1136 PSI
136 PSI
136 PSI
136 PSI
If pressure increases:
![Page 11: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/11.jpg)
1
LOGIC SOLVER
136 PSI
136 PSI
136 PSI
136 PSI
![Page 12: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/12.jpg)
LIST OF INSTRUMENTS
![Page 13: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/13.jpg)
LIST OF INSTRUMENTS
![Page 14: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/14.jpg)
TRANSMITTERS
PSIT-2011 & 2021 for UpstreamPSIT-2010 A/B/C & 2020 A/B/C for
DownstreamPSIT-201 & 202 for Lube Oil
(All PSIT’s are of ROSEMOUNT and Model of series 3051S)
![Page 15: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/15.jpg)
PSIT-201 & 202
Set Point – 1800 to 2700 psi
Purpose To start/stop the pump
![Page 16: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/16.jpg)
PSIT
SPEIFICATIONS
Type Diaphragm Seal type
Maximum Temperature 80ºC
Minimum Temperature -40ºC
Diaphragm Material Hasteloy C 276
Fill Fluid Material Silicon
Output Signal Type 4-20mA
Digital Communication std HART
Trip SP 135psi
![Page 17: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/17.jpg)
SpecificationsType Ball Valve (Make- Valve
Technologies)Size 30”
Opening time Upto 30 minutes
Closing time Upto 5 seconds
Design Pressure 91.7 bar
Design Temperature 130ºC
Failure Action Fail to close
Hydraulic Oil used ISOVG46
XSV
![Page 18: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/18.jpg)
TRIPS FOR HIPPS VALVES:
1. Downstream pressure of HIPPS: 2oo3 logic.
2. When the pressure of air purge to HIPPS panel falls below 0.15 mm of water column (gauge available in field).
3. Position feedback of the HIPPS valve (any one) not available when valves are in OPEN condition: After a time delay of 40 min, both the HIPPS valves will close.
![Page 19: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/19.jpg)
START-UP CONDITIONS
1. Pressure difference between upstream & downstream PSIT must not exceed 2.5 bar.
2. Upstream pressure should not exceed 100psi.
![Page 20: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/20.jpg)
LOGIC OF 2oo3
![Page 21: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/21.jpg)
BASIC LADDER LOGIC OF 2oo3
![Page 22: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/22.jpg)
HYDRAULIC DIAGRAM
![Page 23: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/23.jpg)
MOTOR
DETAILS
Make Crompton Greaves
Voltage 415v +/- 6%
Type 3ɸ AC Squirrel Cage Induction Motor
Full Load Current 3.25 A
Full Load Speed 1415 RPM
![Page 24: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/24.jpg)
• 1300 PSI PRESSURE IS SUFFICIENT FOR KEEPING THE VALVE IN OPEN POSITION.
• Pump stops at 2700 PSI.
• If the circuit hydraulic pressure is • < 1800 PSI - ONE AMONG THE TWO PUMPS WILL START.
• < 1400 PSI THEN BOTH THE RUNS WILL START AUTOMATICALLY.
CONTINUE:
![Page 25: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/25.jpg)
PLC
AI DI DO
PSIT-2011/2021 Limit switch of XSV XSY 2010 A1-1/2, XSY 2010 B1-1/2, XSY 2010 A1-1/ 2, XSY 2010- B2- 1/2
PSIT-2010 A/B/C (ZSO/ZSC- 2010A/2010B) XSY 2020 A1-1/2, XSY 2020 B1-1/2, XSY 2020 A1-1/ 2, XSY 2020- B2- 1/2
PSIT-2020 A/B/C (ZSO/ZSC-2020A/2020B) Trip lamp, Fault lamp
PSIT-201/202 Trip RESET, Fault RESET
•We have S7 400 PLC for HIPPS package & S7 200 PLC for hydraulic circuit.
•We are using two PLC’s. One for each stream for production redundancy.
PLC I/O’s
![Page 26: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/26.jpg)
Specifications of S7 400 PLC:
1. Modular PLC.2. Handle large module.3. Used where high processing speed & deterministic response time is required.4. Used for data intensive tasks (data parallelism).5. Have additional line monitoring diagnostic feature- generates alarm when wire breaks or short circuit.
![Page 27: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/27.jpg)
Specifications of S7 200 PLC:
1. Shoebox PLC
2. Less Memory.
3. Handle small module
4. Cost effective.
![Page 28: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/28.jpg)
ARCHITECTURE
![Page 29: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/29.jpg)
PLC PURGING SYSTEMDETAILS
Make Pepperl + Fuchs
Model 3003-LPS-C1-YZ-VM
Supply Instrument Air
Overpressure Protection Breather
Range 5.5-8.3 bar
Temp. Range -29 to 50°C
Purpose To remove & prevent flammable gas or vapor accumulation.
Note: Before opening the HIPPS panel, the purge pressure low trip logic should be BYPASSED by making the trip BYPASS switch “ON”. (switch available near HIPPS panel).
![Page 30: Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline](https://reader035.vdocuments.us/reader035/viewer/2022081515/5697bfdf1a28abf838cb2dc9/html5/thumbnails/30.jpg)
Cause & Effect