Why Best Practice isn’t enough

W E B I N A R

PROJECT MANAGEMENT

Andy West

www.ilxgroup.com

Page 2: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Introduction

Andy West

An experienced and professional Project & Change Management Skills Trainer with experience across a range of market sectors.

Involved in a number of projects covering the design and implementation of business systems and training solutions within a number of organisations.

Page 3: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Purpose of this Webinar

• To consider the difficulties in embedding and using PRINCE2® in organisations

• To suggest some reasons for the lack of success and to suggest strategies to improve success.

Page 4: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

What is PRINCE2?

A Management Method with four Integrated Elements of:

• 7 Principles (guiding obligations and good practices)

• 7 Themes (raw materials of project management knowledge)

• 7 Processes (step-wise progression through a project)

• Tailoring to the project environment (flexibility)

Page 5: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

What PRINCE2 doesn’t do

• Specialist aspects of the Project• Detailed techniques in project management• Leadership advice or people skills

Page 6: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

What is PRINCE2 supposed to provide

• Best Practice model • Set of documents• Guidance on

embedding & tailoring

Page 7: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Embedding & Tailoring

Embedding is organisation based and focuses on:• Process responsibilities• Standards (templates, definitions)• Integration with business processes • Process assurance• Scaling rules/guidance• Training and development• Tools

Tailoring is project based and focuses on:• Adapting the themes (through the strategies and controls)• Incorporating specific terms/language• Revising the Product Descriptions for the management

products• Revising the role descriptions for the PRINCE2 project roles• Adjusting the processes to match the above

Page 8: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Embedding Difficulties

• Bureaucratic• Don’t like ‘rules’• Baby and bath water• Change in language

Page 9: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Tailoring Difficulties

• How big is this Project?• How risky is this Project?• What techniques should I use this time?• Where do I find guidance?

Page 10: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Results of poor embedding or tailoring

• Lots of training, little use• Disaffected Staff• Poor Control• Heroic or Robotic Project Management

Page 11: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Embedding Strategies

• Implement as a Project• Look for business

reasons• Retain current language• Keep it simple• Be wary of formal

standards

Page 12: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Tailoring Strategies

• PRINCE2 Guidance• Project Assessment• Knowledge is shared

Page 13: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

PRINCE2 isn’t Project Management

• And Project Management isn’t just PRINCE2• Remember the techniques, leadership, specialist

knowledge• Senior management support

Page 14: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

A final thought…

Every project is unique…

How you deal with each project should be too.

Page 16: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R 16

Enjoyed this presentation?

Find out more visi t ing our website www.i lxgroup.com, giving us a cal l on

+44 (0) 1270 611 600 or send an emai l to

Individuals enquir ies [email protected] enquir ies ben.green@i lxgroup.com

Further your knowledge by finding out the impact change has had on the Middle Manager and the

influence the middle manager has on change