For more information, visit vancouver.ca/commercial-complete-street October 2016 At Home We are here to discuss the Commercial Drive Complete Street Project. There are many ways to provide feedback: • Discuss ideas, opportunities, and needs with neighbours and City staff • Share ideas through interactive displays and activities • Provide written feedback In Person • Join a 30-minute walking tour led by City staff • Learn more about opportunities and constraints • Tours depart on Thursday, October 20 at 5:30 PM and Saturday, October 22 at 12PM and 2PM. Additional tours will be added if necessary. • All the information shown today is available online at vancouver.ca/ commercial-complete-street • Sign up for the project email list to be notified of future updates and events • Share your thoughts on the online feedback form T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd Join a Walking Tour What’s Happening Today? Commercial DR

Upload: others

Post on 27-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

At Home

We are here to discuss the Commercial Drive Complete Street Project. There are many ways to provide feedback:

• Discuss ideas, opportunities, and needs with neighbours and City staff

• Share ideas through interactive displays and activities

• Provide written feedback

In Person

• Join a 30-minute walking tour led by City staff

• Learn more about opportunities and constraints

• Tours depart on Thursday, October 20 at 5:30 PM and Saturday, October 22 at 12PM and 2PM. Additional tours will be added if necessary.

• All the information shown today is available online at vancouver.ca/commercial-complete-street

• Sign up for the project email list to be notified of future updates and events

• Share your thoughts on the online feedback form

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Join a Walking Tour

What’s Happening Today?Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Please take a few moments to review the information presented here and give us your feedback.

All of the information shown today is also available online at vancouver.ca/commercial-complete-street

We want to hear from you!

Consultation process:

The Grandview-Woodland Community Plan highlights the importance of Commercial Drive as the heart and soul of the neighbourhood.

This project aims to make Commercial Drive a more Complete Street. We want your help!

» Learn more about the project

» Confirm design principles

» Share your ideas and concerns

Your input will be combined with technical analysis and cost considerations to develop preliminary design options.

Phase 1: Listen & Learn

Fall 2016

We are here

Phase 2: Design Options

Winter/Spring 2017

Phase 3: Recommendation

Spring/Summer 2017

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Commercial Drive near Grandview Park (photo: by Tim Welbourn)

Welcome!1Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

What is “All Ages and Abilities”?

1. Provide direct and convenient access to shops and services for people of all ages and abilities (AAA) using all modes of transportation

2. Improve safety and comfort for people travelling by all modes of transportation, with a focus on walking, cycling, and transit

3. Ensure loading, delivery, and access works well for local businesses

4. Consider impacts to transit, traffic flow, nearby streets, and parking

5. Consider flexible design approaches that facilitate special events

6. Explore opportunities to integrate sustainable rainwater management

“All Ages and Abilities” (AAA) describes walking and cycling facilities that are attractive, comfortable, and low-stress for all users, including children, seniors, and people new to active transportation.

For most people to feel safe and comfortable on busy streets when walking or cycling, they prefer their own space, physically separated from motor vehicles.

On Commercial Drive:

• Increase safety and comfort for people of all ages and abilities using all types of transportation

• Allow people convenient access to shops and services

• Maintain and enhance the vitality of the street

• Ensure local businesses continue to thrive

This project covers the corridor of Commercial Drive between Hastings Street and East 14th Avenue, which is separated into two distinct sections.

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Project Goal

Proposed Design Principles:

Project Goals

Outdoor seating at a cafe on Commercial Drive adds vibrancy and life to the street.

AAA bicycle facility along Union Street.

2Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

This project looks at Commercial Drive between Hastings Street and East 14th Avenue. The project will explore Complete Street design tools to improve the corridor in two distinct sections.

Narrow Section - North of Graveley Street

Current Conditions:

• One travel lane in each direction (two total)

• One curb lane in each direction for parking (two total)

• Rush hour restrictions - during busy periods, parking is removed on one side of the street to add a lane of traffic

Wide Section - South of Graveley Street

Current Conditions:

• Two travel lanes in each direction (four total)

• One curb lane in each direction for parking (two total)

E 13th Ave

N

TRINITY ST

MCGILL ST

ETON ST

CAMBRIDGE ST

OXFORD ST

DUNDAS ST

TRIUMPH ST

PANDORA ST

FRANKLIN ST

E HASTINGS ST

E PENDER ST

TURNER ST

E GEORGIA ST

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

E 10th Ave

E 11th Ave

E 12th Ave

KA

MLO

OP

S S

T

CL

AR

K D

RIV

E

WO

OD

LA

ND

D

RIV

E

CO

MM

ER

CIA

L D

RIV

E

GA

RD

EN

D

RIV

E

NA

NA

IMO

ST

SE

ML

IN D

RIV

E

LA

KE

WO

OD

D

RIV

E

VIC

TO

RIA

D

RIV

E

TE

MP

LE

TO

N D

RIV

E

SA

LS

BU

RY

DR

IVE

CO

TTO

N D

RIV

E

MC

LE

AN

DR

IVE

OD

LU

M D

RIV

E

MC

LE

AN

DR

IVE

WO

OD

LA

ND

DR

IVE

POWELL ST

SE

ML

IN D

RIV

E

RO

SE

ST

MC

LE

AN

DR

IVE

N GRANDVIEW HWY

E 13th Ave

LIL

LY S

T

CO

MM

ER

CIA

L D

RIV

E

E GEORGIA ST

E 15th Ave

VIC

TO

RIA

D

RIV

E

E HASTINGS ST

PANDORAPARK

McGILLPARK

WOODLAND PARK

GRANDVIEW PARK

MOSAIC CREEK PARK

ALICE TOWNLEY

PARK

VICTORIA PARK

McSPADDEN PARK

SHELLEYPARK

GARDENPARK

TEMPLETON PARK

OXFORDPARK

JOHN HENDRY

PARKCLARKPARK

BRITANNIA SECONDARY

SCHOOL

BRITANNIA COMMUNITY

SERVICESCENTRE

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

E 10th Ave

E 11th Ave

E 12th Ave

E 14th Ave

TURNER ST

E PENDER ST

SIDE WALK

3.1m

PARKINGLANE

3.7m

TRAVELLANE3.1m 3.1m

TRAVELLANE SIDE WALK

3.7m 3.4m to 5.5m

Commercial Drive - Narrow SectionPLPL

~20 to 22m

PP

PARKINGLANE

SIDE WALK

3.7m

PARKINGLANE

TRAVELLANE

3.1m 3.1m

TRAVELLANE SIDE WALK

Commercial Drive - Wide SectionPLPL

~24m

3.7m3.1m

P P

TRAVELLANE

2.4m

PARKINGLANE

TRAVELLANE

2.4m3.1m

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Project Scope3

N

NorthSection

SouthSection

Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Transportation 2040 is a long-term strategic vision for the City that helps guide transportation and land use decisions and public investments. The plan sets long-term targets and includes policies and actions to help us reach them.

• Target: Make two-thirds of trips on foot, bike, and transit by 2040

• Target: Achieve zero traffic-related fatalities

Key Transportation 2040 Directions:

• W 1.2: Make streets safer for walking

• C 1.1: Build cycling routes that feel comfortable for people of all ages and abilities

• C 1.2: Expand the cycling network to efficiently connect people to destinations

• T 1.3: Improve transit reliability and speed using transit priority measures

• M 1.2: Consider impacts to transit, commercial vehicles, and general traffic flow prior to reallocating road space

• M 1.3: Manage traffic and improve safety and neighbourhood livability

• G 2.2: Provide for efficient loading and unloading

Other Policies Supported:

• Greenest City 2020 Action Plan: Green Transportation

• Healthy City Strategy: Active Living and Getting Outside, Getting Around

• Renewable City Strategy: Complete Streets

• Economic Action Strategy: Support for Local Business

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Transportation 2040

Transportation 2040 Policies

Background

Wide sidewalks in this area of Commercial Drive accomodate people strolling and shopping, street trees, business signs, and bicycle racks.

Commercial-Broadway Station is a busy area with people walking and taking transit, and often sidewalk vending.

4Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Grandview-Woodland Community Plan: Transportation Directions

The Grandview-Woodland Community Plan includes the following transportation directions:

• Complete Streets: Prioritize sustainable transportation choices and accessibility for people of all ages and abilities

• Safety: Eliminate transportation-related fatalities and serious injuries

• Walking: Make walking safe, comfortable, and delightful for everyone

• Cycling: Make cycling safe, convenient, and comfortable for everyone

• Transit: Support transit improvements to increase capacity and ensure service that is fast, frequent, reliable, fully accessible, and comfortable

• Goods Movement, Services, and Emergency Response: Support the local economy and maintain effective emergency response times

• Road Network and Parking: Support a gradual reduction in car dependence by making it easier, safer, and more efficient to drive less

In July 2016, City Council adopted the Grandview-Woodland Community Plan, following a four year community planning process.

Streets as Places: Enhance streets to function both as public spaces as well as pathways for movement

Public plaza at Britannia Community Services Centre provides gathering and event space.

Grandview-Woodland Community Plan: Public Space and Public Life

Grandview-Woodland Community Plan Complete Street Policy:

Design streets to prioritize sustainable transportation choices and accessibility for people of all ages and abilities, while ensuring that core service and delivery functions can still be accommodated and the needs of multiple users and modes of transportation can be safely met.

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Background

Parklet outdoor seating at E 4th Avenue. A parklet converts an on-street parking space into a public gathering place or mini plaza.

5Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

What is a Complete Street?

A Complete Street considers the needs of people of all ages and abilities, using all modes of travel. Safe and comfortable access for people walking, cycling, and using transit is not an afterthought, but an integral planning feature. Accessible design allows all people to meet their daily needs and participate in public life.

Complete Street Treatment Toolkit Examples:

Shorten crossing distance at intersections with curb bulges

Provide raised crosswalks across local streets and laneways

Include a buffer between the sidewalk and motor vehicles

Complete Streets often require retrofitting roads to provide a full array of transportation choices that are safe and convenient.

Improve accessibility (smooth surface and curb ramps)

Improve pedestrian lighting

Provide more seating Provide protected bike lanes

Enhance transit stops

Reduce sidewalk barriers (relocate signs and furniture)

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Complete Streets

Photo by: Payton Chung

6Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Proposed Design Principles Potential Design Elements

Help us confirm the Complete Street design principles for Commercial Drive. Tell us what is important to you.

1. Provide direct and convenient access to shops and services for people of all ages and abilities (AAA) using all types of transportation

2. Improve safety and comfort for people travelling by all types of transportation, with a focus on walking, cycling, and transit

3. Ensure loading, delivery, and access works well for local businesses

4. Consider impacts to transit, traffic flow, nearby streets, and parking

5. Consider flexible design approaches that facilitate special events

6. Explore opportunities to integrate sustainable rainwater management

» Provide more seating and gathering spaces (i.e. parklets, plazas)

» Provide more public art

» Provide clearer sidewalk paths by reducing clutter (i.e. locked bicycles, free-standing signs, newspaper boxes)

» Shorten intersection crossings (i.e. reduce crossing distance with sidewalk extensions or curb bulges)

» Provide raised crosswalks (i.e. elevate crosswalks to sidewalk level at local streets and laneways)

» Provide more street trees and landscaping

» Improve accessibility features (i.e. smooth surfaces, curb ramps, audible signals)

» Improve pedestrian lighting

» Provide more weather protection

» Provide protected bike lanes

» Improve transit stops (i.e. shelters, more space for people to wait)

» Maintain on-street parking

What’s missing...?

Select Top 5 Design Elements

Select Top 3 Design Principles

Complete Street Design Principles7Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Most of Commerical Drive is a thriving commercial high street, but there are ongoing problems with collisions between motor vehicles and other road users, especially people walking and cycling.

• Almost 90% feel comfortable walking with a young child today

• However, only 14% feel comfortable cycling with a young child today

• The highest collision locations are at Hastings Street, Venables Street, East 1st Avenue, and East Broadway

• Right turn or ‘right hook’ collisions for people walking and cycling

• Midblock collisions, often with people jaywalking

• ‘Dooring’ is a hazard, as people cycling are often squeezed between moving and parked cars

4%

15%

60%

80%

10%

22%

27%

15%

How comfortable do/would you feelcycling along Commercial Drive with a

young child?

How comfortable do/would you feelcycling along Commercial Drive

How comfortable would you feelwalking along Commercial Drive with ayoung child or elderly person who may

need assistance?

How comfortable do you feel walkingalong Commercial Drive?

Completely Comfortable Somewhat Comfortable

How comfortable .....?

• Two-thirds of people surveyed have never cycled on Commercial Drive, but only 16% say it’s because they are not interested

• Over 50% are interested but identified the following barriers:

» Feel unsafe/uncomfortable (41%)

» Don’t own a bike (37%)

41%37%

16%

8%12%

50%

21%24%

12% 11%

Don't feelsafe

Don't havebike

Notinterested

Too Far Other

Reasons people don’t cycle on Commercial Drive

All respondents

People travelling by car

Why don’t you cycle on Commercial Drive?

Source: 2016, Intercept Survey

Source: 2016, Intercept Survey

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Safety Hotspots

Perception of Comfort

Safety is a major barrier

Safety and Comfort8

Collision Hotspots Walking & Cycling

T

Potential bike routes and greenways

Existing bike routes and greenways

TRINITY ST

MCGILL ST

ETON ST

CAMBRIDGE ST

OXFORD ST

DUNDAS ST

TRIUMPH ST

PANDORA ST

FRANKLIN ST

E HASTINGS ST

E PENDER ST

TURNER ST

E GEORGIA ST

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

CLARK DRIV

E

WO

ODLAND D

RIVE

COM

MERCIA

L DRIV

E

NANAIMO

ST

VICTO

RIA D

RIVE

E 10TH AVE

E 11TH AVE

E 12TH AVE

PANDORAPARK

McGILLPARK

WOODLAND PARK

GRANDVIEW-PARKMOSAIC

CREEK PARK

ALICE TOWNLEY

PARK

VICTORIA PARK

McSPADDEN PARK

SHELLEYPARK

GARDENPARK

TEMPLETON PARK

OXFORDPARK

BRITANNIA SECONDARY

SCHOOL

BRITANNIA COMMUNITY

SERVICESCENTRE

10 + crashes involving Pedestrians & Cyclists

1 to 3 crashes involving Pedestrians & Cyclists

4 to 9 crashes involving Pedestrians & Cyclists

LEGEND

Source: ICBC, Quick Statistics 2016 (2009-2013 collision data); Pedestrian Safety Study, 2012; Cycling

Safety Study, 2015.

N

Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Overview

• Thousands of people walk along Commercial Drive every day

• About 70% are visiting shops or services

• About 90% feel comfortable walking with a small child or elderly person who needs assistance

Challenges

• Competing sidewalk uses, including people strolling, outdoor seating, locked bicycles, and free-standing signs

• Sidewalk congestion, especially at busy bus stops

Opportunities

• Create a better pedestrian environment and public realm

• Improve comfort by providing raised crosswalks across local streets and lanes

• Improve pedestrian lighting

• Expand sidewalk space at bus stops

• Optimize street furniture locations and reduce sidewalk clutter

• Create more public plazas and parklets on adjacent local streets

Walking and Public Space

Are we missing any challenges or opportunities?

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Walking and Public Space9

Sidewalks on Commercial Drive are generally very busy. Relocating bike parking, smooth surfaces, and improved crossings may help improve accessibility and comfort.

Commercial Drive at Broadway is a gateway to the Grandview-Woodland neighbourhood and a frequent collision location.

Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Overview

• A bike-friendly community: half of all people in the area cycle regularly in good or fair weather, and 60% would like to cycle more often

• About two-thirds of people visiting have never cycled on Commercial Drive, with safety concerns and not having a bike being the largest barriers cited

• Only 14% of people would feel comfortable cycling with a small child today

Challenges

• Shared roadways feel unsafe and uncomfortable for people cycling

• Lack of cycling facilities means people cycle on the sidewalks and in the ‘door zone’ between moving and parked cars

20% 50%

28%

14%

20%

36% 34%

24%

27%

Source: 2015, Transportation Panel Survey

People who cycle regularly ingood/fair weather

Cycling on The Drive

Opportunities

• Explore reallocating a travel lane south of Graveley Street to create a protected bike lane

• Explore improved intersection designs to reduce conflicts between road users

• Expand Mobi bike share

• Relocate bike racks from the sidewalk by adding bike corrals (using on-street parking spaces)

• Improve connections and wayfinding to existing bike routes

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Cycling10

People are more likely to bike on the sidewalk if riding on the street does not feel safe. AAA facilities will help reduce sidewalk riding by providing a safe option.

Without cycling facilities, people are forced to ride in the ‘door zone’ between parked cars and moving traffic. Some people avoid riding altogether because it does not feel safe.

People cycling or skateboarding ride in the ‘door zone’ between parked cars and moving traffic.

Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Overview

• Commercial-Broadway is the busiest rapid transit station in the region, with 90,000 train trips and 60,000 bus trips each day

• Seven bus routes serve the neighbourhood – including the 9, 14, 16, 20, 22, 135, and 99 B-Line bus routes

• 25% of daily trips in the neighbourhood are made by transit (Source: 2015, Transportation Panel Survey)

Challenges

• Overcrowded routes such as the 99 B-Line and the 20 bus route

• Poor reliability on the 20 bus route, in part due to close bus stop spacing (every 200 -300 metres) and bus bunching

Opportunities

• Improve transit reliability and travel times by reducing the number of transit stops (e.g. every 300-500 metres)

• Optimize bus stop locations and create new transit waiting areas

• Align stops with crosswalks to improve access

• Integrate street improvements with station upgrades

• Look for improvements on each bus route outside the Commercial Drive segment

Are we missing any challenges or opportunities?

The 20 Victoria bus route travels from Downtown Vancouver to SE Marine Drive. Waiting areas at some bus stop along Commercial Drive are busy and congested.

The 99 B Line bus stop on Commercial Drive at the Commerical-Broadway Station is one of the busiest in the region.

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Transit

Transit Routes and Service11

N

14, 16, 135, 160, 190

20

9, 99

22 7

4, 7, 209, 210, 211

N

TRINITY ST

MCGILL ST

ETON ST

CAMBRIDGE ST

OXFORD ST

DUNDAS ST

TRIUMPH ST

PANDORA ST

FRANKLIN ST

E HASTINGS ST

E PENDER ST

TURNER ST

E GEORGIA ST

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

E 10th Ave

E 11th Ave

E 12th Ave

KA

MLO

OP

S S

T

CL

AR

K D

RIV

E

WO

OD

LA

ND

DR

IVE

GA

RD

EN

DR

IVE

NA

NA

IMO

ST

SE

ML

IN D

RIV

E

LA

KE

WO

OD

DR

IVE

VIC

TOR

IA D

RIV

E

TE

MP

LE

TON

DR

IVE

SA

LS

BU

RY

DR

IVE

CO

TTO

N D

RIV

E

MC

LE

AN

DR

IVE

OD

LUM

DR

IVE

MC

LE

AN

DR

IVE

WO

OD

LA

ND

DR

IVE

POWELL ST

SE

ML

IN D

RIV

E

RO

SE

ST

MC

LE

AN

DR

IVE

N GRANDVIEW HWY

E 14th Ave

E 15th Ave

E 13th Ave

LIL

LY S

T

CO

MM

ER

CIA

L D

RIV

E

PANDORAPARK

McGILLPARK

WOODLAND PARK

GRANDVIEW-PARK

MOSAIC CREEK PARK

ALICE TOWNLEY

PARK

VICTORIA PARK

SHELLEYPARK

GARDENPARK

TEMPLETON PARK

OXFORDPARK

JOHN HENDRY

PARK CLARK PARK

McSPADDEN PARK

20 route bus stops

Transit bus routes

LEGEND

BRITANNIA SECONDARY

SCHOOL

BRITANNIA COMMUNITY

SERVICESCENTRE

Transit Routes

Source: City of Vancouver, Grandview-Woodland Community Profile, 2014

Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

With over 300 independent businesses serving both locals and the broader region, Commercial Drive is a key destination in the Grandview-Woodland neighbourhood and the city.

In August 2016, the City commissioned a street intercept survey to gain insights into how people travel to and along The Drive.

How do people get to The Drive?

• Over 80% of people surveyed on Commercial Drive sidewalks arrived on foot, bike, or transit

walk

transit

auto driver or passenger

cycle

44%

27%

17%

11%

How do people travel?

Source: 2016, Intercept Survey

How often do people visit The Drive?

• People walking, cycling, or taking transit visit businesses or services more frequently

• Half of the people driving (48%) visit businesses or services once per week or less

5+ days/week

2-5 days/week

once a weekor less

auto driveror passenger

transit

cycle

walk 59% 28% 12%

26% 44% 30%

31% 38% 32%

48%36%16%

How often do people visit?

Source: 2016, Intercept Survey

Where are people coming from?

• Most people shopping on The Drive are local:

» 44% from within Grandview-Woodland

» 38% from elsewhere in the city

» 18% from other municipalities

W 16th Ave

Fra

ser

St

Main

St

Cla

rk D

r

Nan

aim

o S

t

E 16th Ave

E 33rd Ave

Gra

nvill

e S

t

Kingsway

Terminal Ave

44%

8%

3%

2%

0%

other municipalities: 18%

16%

3%

2%

4%

Where are people coming from?

Source: 2016, Intercept Survey

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Accessing Shops and Services

Supporting Local Business 12Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Where do people park to get to The Drive?

• 42% use metered parking either on The Drive (33%) or nearby (9%)

• 32% use free (unmetered) parking on neighbourhood side streets

• Less than 7% use off-street parkades/lots

• 272 on-street parking spaces between Venables St and Grandview Hwy N

• Estimated 800* off-street parking spaces between Venables St and Grandview Hwy N

• Neighbourhood streets have prioritized on-street permit parking for residents

How easy was it to park when coming to The Drive?

• 86% said it was very easy (53%) or somewhat easy (33%) to find parking

• 11% found it somewhat difficult or very difficult (4%) to find parking

off-street parkade

free parking nearby

metered on The Drive

nearby metered parking

42%

32%

9%

7%

Where do people park?

A popular shopping destination for locals who can walk to Commercial Drive, or regional visitors who may drive or take transit.

With limited laneway access on some blocks, delivery vehicles may park on side streets.

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

CLAR

K D

RIVE

WOO

DLAN

D D

RIVE

GARD

EN D

RIVE

NANA

IMO

ST

VICT

ORIA

DRI

VE

TEM

PLET

ON D

RIVE

LAKE

WOO

D DR

IVE

E 10TH AVE

E 11TH AVE

E 12TH AVE

E 13TH AVE

E 14TH AVE

COM

MER

CIAL

DRI

VE

E 15TH AVE

COTT

ON D

RIVE

MCL

EAN

DRI

VE

SALS

BURY

DRI

VE

N GRANDVIEW HWY

WOODLAND PARK

GRANDVIEW PARKMOSAIC

CREEK PARK

ALICE TOWNLEY

PARK

VICTORIA PARK

McSPADDEN PARK

SHELLEYPARK

GARDENPARK

TEMPLETON PARK

Commercial Dr and Venables St (Easy Park surface lot)

Commercial Dr and E 1st Ave(WestPark parade at Il Mercato)

Commercial Dr and lane south of E 8th Ave(Impark parkade at Grandview Woodland Health Centre)

Commercial Dr and E 10th Ave(Impark parkade)

Commercial Dr and E 11th Ave(Impark surface lot & parkade)

Commercial Dr and E 11th Ave(Diamond Parking surface lot)

Commercial Dr and E 11th Ave(Metro Parking surface lot)

F

DE

C

B

A

G

BRITANNIA COMMUNITY

SERVICESCENTRE

Off-Street Parking Locations

Source: City of Vancouver and Parkopedia

17% of people arrive by vehicle, and there is on-street and off-street parking available in the area for visitors.

*Areas behind businesses were often not demarcated into individual spaces, requiring the number of available parking spaces to be estimated (as opposed to counted). Source: 2014, City of Vancouver

Source: 2016, Intercept Survey

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Parking

Supporting Local Business 13Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Daily traffic

• Commercial Drive carries 13,000 to 22,000 vehicles per day, with heavier volumes south of East 1st Avenue

Hourly traffic

• 700-800 vehicles per hour, in each direction in busiest sections during peak times

• Similar volumes to Victoria Drive

• By comparison, Clark Drive, Hastings Street, Broadway, and East 1st Avenue carry in excess of 1,200 vehicles per hour

Are we missing any challenges or opportunities?

A Goods Movement and Business Survey is underway to better understand the loading, delivery, and access needs of individual businesses on The Drive. If you represent a local business and have not completed a survey, please talk to us!

Commercial Drive is a street that primarily serves local destinations. Parallel streets like Clark Drive or Nanaimo Street carry most of the regional traffic through the neighbourhood.

Challenges

• Design must continue to accomodate loading and delivery needs

• Interventions may reduce available on-street parking

T

Potential bike routes and greenways

Existing bike routes and greenways

NA

NA

IMO

ST

VIC

TO

RIA

D

RIV

E

CO

MM

ER

CIA

L D

RIV

E

CL

AR

K D

RIV

E

8200

4000

019

000

1700

022

000

1800

0

49000 46000

2200

0

35000

59000

6200

1700

013

000

1400

036

000

2500

230

26000

40000

4300

0

1300

0

3900

0

1800

0

2400

0

34000

1300

0

1200

0

48000

16000

44000 47000

LEGEND

Secondary Arterial Streets

Neighbourhood Collector Streets

Arterial Streets

TRINITY ST

MCGILL ST

ETON ST

CAMBRIDGE ST

OXFORD ST

DUNDAS ST

TRIUMPH ST

PANDORA ST

FRANKLIN ST

E HASTINGS ST

E PENDER ST

TURNER ST

E GEORGIA ST

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

CLARK D

RIVE

COM

MERCIA

L DRIV

E

NANAIM

O S

TVICTO

RIA D

RIVE

Traffic Counts and Road Designation

Source: City of Vancouver, Grandview-Woodland Community Profile, 2014

N

E HASTINGS ST

VENABLES ST

E 1ST AVE

E BROADWAY

E 12TH AVE

COM

MER

CIA

L D

RIVE

N

AMPM

Number of Motor Vehicles Travelling During the Weekday Peak Hour (rounded to nearest hundred)

LEGEND

Direction of Motor Vehicle Travel

Data from 2016

500400

400700

400800

600500

700500

300800

300300

300400

Hourly Peak Volumes

Source: City of Vancouver, 2016

Opportunities

• Improve wayfinding and signage to existing off-street parking

• Increase customer access to local shops and services

• Consider relocation of special zones (e.g. commercial loading, passenger loading, taxi, etc.)

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Goods Movement and Road Network

Supporting Local Business 14Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

E 13th Ave

N

TRINITY ST

MCGILL ST

ETON ST

CAMBRIDGE ST

OXFORD ST

DUNDAS ST

TRIUMPH ST

PANDORA ST

FRANKLIN ST

E HASTINGS ST

E PENDER ST

TURNER ST

E GEORGIA ST

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

E 10th Ave

E 11th Ave

E 12th Ave

KA

MLO

OP

S S

T

CL

AR

K D

RIV

E

WO

OD

LA

ND

D

RIV

E

CO

MM

ER

CIA

L D

RIV

E

GA

RD

EN

D

RIV

E

NA

NA

IMO

ST

SE

ML

IN D

RIV

E

LA

KE

WO

OD

D

RIV

E

VIC

TO

RIA

D

RIV

E

TE

MP

LE

TO

N D

RIV

E

SA

LS

BU

RY

DR

IVE

CO

TTO

N D

RIV

E

MC

LE

AN

DR

IVE

OD

LU

M D

RIV

E

MC

LE

AN

DR

IVE

WO

OD

LA

ND

DR

IVE

POWELL ST

SE

ML

IN D

RIV

E

RO

SE

ST

MC

LE

AN

DR

IVE

N GRANDVIEW HWY

E 13th Ave

LIL

LY S

T

CO

MM

ER

CIA

L D

RIV

E

E GEORGIA ST

E 15th Ave

VIC

TO

RIA

D

RIV

E

E HASTINGS ST

PANDORAPARK

McGILLPARK

WOODLAND PARK

GRANDVIEW PARK

MOSAIC CREEK PARK

ALICE TOWNLEY

PARK

VICTORIA PARK

McSPADDEN PARK

SHELLEYPARK

GARDENPARK

TEMPLETON PARK

OXFORDPARK

JOHN HENDRY

PARKCLARKPARK

BRITANNIA SECONDARY

SCHOOL

BRITANNIA COMMUNITY

SERVICESCENTRE

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

E 10th Ave

E 11th Ave

E 12th Ave

E 14th Ave

TURNER ST

E PENDER ST

Narrow Section - North of Graveley Street

Wide Section - South of Graveley Street

Opportunity - Spot Improvements and Minor Changes:

• Sidewalk and public realm enhancements

• Potential Mobi bike share expansion

• Bus stop changes

• Review parking restrictions

Opportunity - Significant Improvements:

• Sidewalk and public realm enhancements

• Protected bike lane

• Potential Mobi bike share expansion

• Bus stop changes and expanded waiting areas

This project covers Commercial Drive between Hastings Street and East 14th Avenue.

While the project will explore walking, cycling, transit, and public space improvements through the corridor, the south section is wider and there may be potential to reallocate a travel lane in each direction.

SIDE WALK

3.1m

PARKINGLANE

3.7m

TRAVELLANE3.1m 3.1m

TRAVELLANE SIDE WALK

3.7m 3.4m to 5.5m

Commercial Drive - Narrow SectionPLPL

~20 to 22m

PP

PARKINGLANE

SIDE WALK

3.7m

PARKINGLANE

TRAVELLANE

3.1m 3.1m

TRAVELLANE SIDE WALK

Commercial Drive - Wide SectionPLPL

~24m

3.7m3.1m

P P

TRAVELLANE

2.4m

PARKINGLANE

TRAVELLANE

2.4m3.1m

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Project Opportunities15

N

NorthSection

SouthSection

Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

2)

3)

6)

5)

4)

7)

10)

9)

8)

11)

14)

13)

12)

15)

1)

17)

18)

21)

20)

19)

22)

25)

24)

23)

26)

29)

28)

27)

30)

16)

E 13th Ave

BRITANNIA SECONDARY

SCHOOL

BRITANNIA COMMUNITY

SERVICESCENTRE

N

TRINITY ST

MCGILL ST

ETON ST

CAMBRIDGE ST

OXFORD ST

DUNDAS ST

TRIUMPH ST

PANDORA ST

FRANKLIN ST

E HASTINGS ST

E PENDER ST

TURNER ST

E GEORGIA ST

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

E 10th Ave

E 11th Ave

E 12th Ave

KA

MLO

OP

S ST

CLA

RK

DR

IVE

WO

OD

LAN

D D

RIV

E

CO

MM

ERC

IAL

DR

IVE

GA

RD

EN

DR

IVE

NA

NA

IMO

ST

SEM

LIN

DR

IVE

LAK

EW

OO

D D

RIV

E

VIC

TOR

IA D

RIV

E

TEM

PLE

TON

DR

IVE

SALS

BU

RY

DR

IVE

CO

TTO

N D

RIV

E

MC

LEA

N D

RIV

E

OD

LUM

DR

IVE

MC

LEA

N D

RIV

E

WO

OD

LAN

D D

RIV

E

POWELL ST

SEM

LIN

DR

IVE

RO

SE S

T

MC

LEA

N D

RIV

E

N GRANDVIEW HWY

E 13th Ave

LILL

Y S

T

CO

MM

ERC

IAL

DR

IVE

E GEORGIA ST

E HASTINGS ST

PANDORAPARK

McGILLPARK

WOODLAND PARK

GRANDVIEW PARK

MOSAIC CREEK PARK

ALICE TOWNLEY

PARK

VICTORIA PARK

McSPADDEN PARK

SHELLEYPARK

GARDENPARK

TEMPLETON PARK

OXFORDPARK

JOHN HENDRY

PARKCLARKPARK

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

E 10th Ave

E 11th Ave

E 12th Ave

E 14th Ave

TURNER ST

E PENDER ST

N

What transportation improvements would you make along Commercial Drive?

Please number your dot, place it onto the map, and tell us what it is!

Commercial DR

Opportunities16

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

17)

18)

21)

20)

19)

22)

25)

24)

23)

26)

29)

28)

27)

30)

16)

2)

3)

6)

5)

4)

7)

10)

9)

8)

11)

14)

13)

12)

15)

1)

E 13th Ave

BRITANNIA SECONDARY

SCHOOL

BRITANNIA COMMUNITY

SERVICESCENTRE

N

TRINITY ST

MCGILL ST

ETON ST

CAMBRIDGE ST

OXFORD ST

DUNDAS ST

TRIUMPH ST

PANDORA ST

FRANKLIN ST

E HASTINGS ST

E PENDER ST

TURNER ST

E GEORGIA ST

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

E 10th Ave

E 11th Ave

E 12th Ave

KA

MLO

OP

S ST

CLA

RK

DR

IVE

WO

OD

LAN

D D

RIV

E

CO

MM

ER

CIA

L D

RIV

E

GA

RD

EN

DR

IVE

NA

NA

IMO

ST

SEM

LIN

DR

IVE

LAK

EW

OO

D D

RIV

E

VIC

TOR

IA D

RIV

E

TE

MP

LETO

N D

RIV

E

SALS

BU

RY

DR

IVE

CO

TTO

N D

RIV

E

MC

LEA

N D

RIV

E

OD

LUM

DR

IVE

MC

LEA

N D

RIV

E

WO

OD

LAN

D D

RIV

E

POWELL ST

SEM

LIN

DR

IVE

RO

SE S

T

MC

LEA

N D

RIV

E

N GRANDVIEW HWY

E 13th Ave

LILL

Y S

T

CO

MM

ER

CIA

L D

RIV

E

E GEORGIA ST

E HASTINGS ST

PANDORAPARK

McGILLPARK

WOODLAND PARK

GRANDVIEW PARK

MOSAIC CREEK PARK

ALICE TOWNLEY

PARK

VICTORIA PARK

McSPADDEN PARK

SHELLEYPARK

GARDENPARK

TEMPLETON PARK

OXFORDPARK

JOHN HENDRY

PARKCLARKPARK

ADANAC ST

VENABLES ST

PARKER ST

NAPIER ST

WILLIAM ST

CHARLES ST

KITCHENER ST

GRANT ST

GRAVELEY ST

E 1ST AVE

E 2ND AVE

E 3RD AVE

E 4TH AVE

E 5TH AVE

E 6TH AVE

E 7TH AVE

E 8TH AVE

E BROADWAY

E 10th Ave

E 11th Ave

E 12th Ave

E 14th Ave

TURNER ST

E PENDER ST

N

What aspects of transportation do you love along Commercial Drive?

Please number your dot, place it onto the map, and tell us what it is!

OpportunitiesCommercial DR

17

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

Tell us what is important to consider as we improve the street for all users. Share your hopes and concerns for Complete Street transportation improvements along Commercial Drive.

What are your hopes? ... concerns? 18Commercial DR

For more information, visit vancouver.ca/commercial-complete-streetOctober 2016

Summer 2016

Phase 1: Listen and Learn

What we’ll do: Launch public consultation process, identify

transportation improvements, and present Complete Street

design principles.

Who we’ll consult with: Residents, local businesses, Grandview-

Woodland Transportation and Neighbourhood Parking

Stakeholder Advisory Group (Grandview-Woodland SAG), and

civic advisory committees.

What we’ll create based on feedback: Confirm Complete Street

principles and draft design concepts informed by community

input, stakeholder input, technical analysis, and City policy

priorities.

Grandview-Woodland Community Plan adopted by City Council

Winter 2016 and Spring 2017

Spring and Summer 2017

We Are Here Fall 2016

Phase 2: Design Options

What we’ll do: Public consultation on design options.

Who we’ll consult with: Residents, local businesses, civic

advisory committees, and the Grandview-Woodland SAG.

What we’ll create based on feedback: Evaluate design options

and recommend a preferred design.

Phase 3: Recommendation

What we’ll do: Finalize the design recommendations for a

Commercial Drive Complete Street.

Who we’ll consult with: The public, local businesses, civic

advisory committees, and the Grandview-Woodland SAG.

What we’ll create: Final design recommendation for a

Complete Street on Commercial Drive with refinements to go to

Council.

Ways to share your feedback:

• Review the information on these boards and complete a comment sheet in person at an open house or online at vancouver.ca/commercial-complete-street

• Email: [email protected]

• Phone: 3-1-1

Your input will help finalize the design principles and contribute to design options for creating a more Complete Street along Commercial Drive.

Our process and anticipated milestones:

T:\13-140~1\COMMER~1\13-COM~1\4-CONS~1\PHASE1~1\ENG-TP~1\ENG - TPL - Commercial Drive - Phase 1 - Presentation Boards_ Oct 18 update #7.indd

TimelineE Project Timeline19Commercial DR

We want to hear from you!