What is the highly optimized manufacturing process?
Management had agreed on a basic imperative that company would use highly
optimized manufacturing process.
Intent Higher volume, Lower Cost manufacturing
ITT-Teves was the Worlds leading supplier of four wheel passenger car ABS and
TCS.
ITT-Teves - Market Leader ABS & TCS
ITT acquisition Strategy
Bosch introduced and Alfred Teves following in 1985.
Till 1988 Alfred had MK2, in 1990 they launched
ITT-Automotive manufacturing is driven by Market
Opening up plants in Ashville and Morganton.
Shorter Product Life Cycles
MK2 6Years
MK4G -
-
7/27/2019 What is the Highly Optimized Manufacturing Process
2/3
US They go and check the contract
Vol req 50000 to 400000
Japan
Target pricing approach 90% of this project was about getting costs down.
Worry about volumes and passing Bosch
Not enough time to optimize all manufacturing equipment in advance of installation
in the plant
Concept of Simultaneous Engineering
Have they considered voice from US during Simultaneous Engineering?
Was EU manufacturing team in touch with US team during development?
Unfortunately, not all the members took the opportunity to participate
DFM
Self Clinching required a perfect fit High quality inspection needed?
Increased complexity of design
To meet future challenges more improvements are necessary - Does this
mean MK20 higher versions expected?
Modular Design
Very good R&D Team
- FSR & EBD Proprietary technology
Modularity & Standardization -> great deal of Manufacturability and Low cost ->
trade-offs in reduced product variety and customization
Manufacturing Strategy for the MK20
To cut labor costs in response to customer demands for lower cost products
Transfering manufacturing of highly labor-intensive or relatively unsophisticated
products outside Germany
-
7/27/2019 What is the Highly Optimized Manufacturing Process
3/3
Frankfurt plant focus on supplying customer in Europe.
Morganton and Asheville Plant would primarily supply customers in North America
Production Capacity
Frankfurt - 2Mn/Y
Mechelen - 1Mn/Y
Morganton - 1Mn/Y
Asheville - 3Mn/Y
Standardized Process Technology
Use the same assembly process in all the plants
Company to source Globally
- Earlier Frankfurt plant had sourced to Morganton Plant for Chrysler
Global Sourcing could allow ITT to run preproduction series for customers
Didnt have to invest in production capacity in advance
How flexibility is needed?
High degree of flexibility
First time yields - 98%
Second time yields 99.7%
25% of the Capital equip costs for MK 4 were related to QA.